PROJECT: Weld County Centennial&Marlborough (,RANGE ORDER NUMBER: 34
(name. address) 915 10th Street
Greeley, CO 80631 DATE: May 17, 2000
TO CONTRACTOR: ARCHITECT'S PROTECT NC):
name, address) K/S Construction CONTRACT DATE: October 28, 1999
4690 Ironton Street CONTRACT FOR: General Construction
Denver, CO 80239
The Contract is changed as follows:
New steel columns(not to exceed this number) $16,575.00
Attach channel to exg. I beam(dtl. A-4) $2,150.00
Added masonry work: $3,000.00
Concrete foundation cap $5,400.00
Extend floor joists&added plywood: $3,850.00
General Conditions: $3,098.00
Overhead& Profit: $3,407.00
Total: $37,480.00
Reference: Proposal Request#19& Letter dated 5/3/2000
Not valid until signed by the Owner, Architect and Contractor.
The original U. Sum)1' ' A _ )was S 1245,717.00
Net cl Iange by previously authorized Change Orders 4 170,528(X)
The(Contract um)(C. ' ,...)Ma,iii,u,,.,ii..)prior to this Change Order was $ 1-415.773.00
The(Contract Sum)(( )u,r-,ntrr,I na-.w:•-.er nom,. ) will be (increased)QA-,,---11
4uta‘lewitred+hv this Change Order in the amount of $ 37,480(X)
The new(Contract Sum)(I' w'b4,.2...,,,,,lh«)including this Change Order will he 5 1.453,253(X)
The( ontract Time will he+'•'e-w H{6, e' y(unchanged)by l ldcs
The date of Substantial Completion as of the date of this Change Order therefore is 7/12/2000
NI)TE I his sununare ales nor tell(ei r kluges in the(initraet Sum.Cunn2c1 Time or Gum mined Maximum Price Ache in has_:h,c ii.anon/ I I•,
i onsirur ti in ('.h.nµr I iireeticr_
Bley Associates Architects K/S Construction Weld County, Colorado
ARCIiIT1Cr ( 1 NTR crOR ()WN}:R
2020 Clubhouse Drive 4690 Ironton Street 915 10th Street
Address Acid n s Address
Greeley, CO 80 34 Denver, CO 80239 Greeley, CO 80631
m 7 . 9 in i In.74(pd L., • ,
UA• i ---.L///7,19` __ _- __ DA . _.i_l12 ItA'I'14 _O4-7/O._&/ •
AIA CAUTION: You should sign an original AIA document which has this caution pr Inted in red
An original assures that changes will not be obscured as may occur when documents are reproduced
• AlA^
AIA DOCUMENT GE • (II ANIC A I-,i • PAC AVI I • • 4NtHI • 11006_
.AMFIlleAN 'NH I t l iT- Or AI((1111 0 CIS, 0-5, ,NI-\1. YORK _. N.A(.. U ASI TIN( ION I)C. 21111111, '"' 11 I nO'f
WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution.
2000-1279
CHANGE (A N[R
ORDER Ak(:iIllE( r
(A)(\'I'RACT()R 1
FIELD
A/A DOC;LAIEVT G70/ OTHER
WWWEdCounty Centennial&Marlborough ---
PROJEC T: 915 10th Street CHANGE ORDER NUMBER: 37
(name, address) Greeley, CO 80631 >AI E,: May 18, 2000
TO CONTRACTOR: ARCHITECT'S PR()JECT NO:
(name, address) K/S Construction October 28, 1999
CONTRACT DATE:
4690 Ironton Street General Construction
Denver,CO 80239 CON I RAC.I FOR:
The Contract is changed as follows:
Q-bond the back side of the Marlborough building: $12,045.00
Add sutcco Omega finish: $3,350.00
Tuck pointing required by the distributor: $1,500.00
Credit for the origional tuck pointing: $-3,000.00
MasonryInfill: $1,800.00
General Conditions: $1,870.00
Overhead&Profit: $1,755.00
Total: $19,320.00
Not valid until signed by the Owner, Architect and Contractor.
The original(Contract Sum)(c c t..."'I f 1(inuuln l5. )w:u $ 1,245,717.00
Net change by previously authorized Change Orders $ 219,090.00
'I'he(Contract Sum)(C...-"..•"'^,tminAi,im)"wee)prior to this Change Order was $ 1,464,335.00
The (Contact Sum) (r..^....",t,..t nn"winsoh IA:x) will be (increased){ 1—........d)
(,in.t,^^ly I)by this Change Order in the amount of $ 19,320.00
The new(Contract Sum) )including this Change Order will he $ 1,483,655.00
The Contract Time will bc{1ue>-,. 1)(,L .ee_ytI (unc hanged)by _Lr
The date of substantial CompletiOti as of the elate of this t.hange Order therefore is 7/12/2000
NO"IlL 'i rr,,umm:ln rue, Ern tech i i hinges in the Cannel ,sum, contract Time ur Gu:u:Inleec M.tsimum Price 1 .Ivr •JCL uahon, :i n.
I onstntctilt (.Ictngc hoer live.
Bley Associates Architects K/S Construction Weld County,Colorado
ryou
` kJ blubhouse Drive (do o(`tronton Street r)4i i Oth Street
ireO 80634 teh"ver, CO 80239 Aii`eeley, CO 80631
;*&i - - t)AIY. - _. _ -- ±%frL
AIA CAUTION: You should sign an original AIA document which has tills caution printed it red,
An original assures that changes will not be obscured as may occur when documents are :reproduced,
AIA DOCUMENT O701 • CHANCE ORDER • I>) ' 1 ITION • AIA" d- A I • THE.
AMERICAN IN,IJII m Or ARCH Ecrs, H tS NIA: YORK A\E. N.\X wASt11NGON l ... aut,oa G701-1987
WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.
Hello