PUD FINAL PLAN
COLORADO
APPLICANT: Greeley-Weld County Airport Authority CASE#: 5-563
ADDRESS: Post Office Box 727, Greeley, CO 80631 PLANNER: R. Anderson
REQUEST: Final Plat, Greeley-Weld County Airport Planned Unit Development ACRES: 1,190.00+i
LEGAL: A tract of land located in Sections 1,2 & 3, T5N, R65W and well as Sections 26 & 35,
T6N, R65W, 6TH PM, Weld County, Colorado.
LOCATION: North and adjacent to State Highway 263; East and adjacent to Weld County Road 43
THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS APPROVAL OF THIS
APPLICATION FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 7..3 of :he
Weld County PUD Ordinance 197.
2. It is the opinion of the Department of Planning Services' Staff that the application has shown
compliance with Section 7.4.3 of the Weld County Planned Unit Development Ordinance, as
follows:
A. Section 7.4.3.1 That the uses are consistent with the Weld County Comprehensive Plan,
Zoning and Subdivision Ordinances, Mixed Use Development Ordinance, if applicable and
any IGA in effect influencing the PUD.
B. Section 7.4.3.2 That the uses which would be allowed on the subject property will conform
to the Performance Standards outlined in Section 2 of this Ordinance. The approved
Conditions of Approval will ensure that the performance standards which are outlined in this
section are met.
C. Section 7.4.3.3 That the uses which would be permitted will be compatible with the existing
or future development of the surrounding area as permitted by the existing zoning, and with
the future development as projected by the COMPREHENSIVE PLAN or MASTER PLANS
of affected municipalities. The Greeley Weld Airport PUD falls within the City of Greeley's
Urban Growth Boundary.
D. Section 7.4.3.4 The PUD Zone District shall be serviced by an adequate water supply and
sewage disposal system in compliance with Section 2 of this Ordinance. Water service for
this site will be provided by the City of Greeley and North Weld County Water District. The
City of Greeley and existing individual septic systems will provide adequate means of sewage
disposal. Future expansion shall use municipal sewer service provided by the City of
Greeley.
E. Section 7.4.3.5 That street or highway facilities providing access to the property are
adequate in functional classification, width, and structural capacity to meet the traffic
requirements of the uses of the proposed zone district The Weld County Department of
Public Works and Colorado Department of Transportation (CDOT) have reviewed the final
-1-
2000-28 76
plat and have concluded that the roads are sufficient in functional classification and capacity,
as well as have made provisions for appropriate means of ingress and egress to the PUD and
lots contained within the PUD.
F Section 7.4.3.7 That there has been compliance with the applicable requirements cor faired
in the Zoning Ordinance regarding overlay districts, commercial mineral deposits, and soil
conditions on the subject site. A portion of the Greeley Weld Airport PUD lies within ':he
Flood Plain. Any structures which lie in this area shall conform to the Weld County Flood
Hazard Overlay District regulations, as described in the Weld County Zoning Ordinance,
Section 53. The PUD does not contain any areas known to contain a commercial mineral
deposit in a manner which would interfere with the present or future extraction of such
deposit by an extraction to any greater extent than under the present use of the property.Soil
conditions on the site are not such that they present moderate or severe limitations to he
construction of structures or facilities proposed for the site. The site lies completely in :he
boundary of the Airport Overlay District. Any future construction that will occur in the Planned
Unit Development will be permitted through the consent of the Weld County Airport Authority.
The Airport Overlay District
G. Section 7.4.3.8 If compatibility exists between the proposed uses and criteria listee in the
Development Guide, and the Final Plan exactly conforms to the Development Guide. The
Department of Planning Services has determined that the Final Plan does accurately reflect
the intent of the Development Guide, as submitted by the applicant.
The Department of Planning Services'approval is conditional upon the following:
1. Prior to Recording the PUD Final Plat:
• A. The applicant shall provide evidence to the Departments of Public Works and Planr ing
Services that all circulation requirements, have been met,including all access requirements,
and issues identified in the Department of Public Works referral received October 17,2000.
B. The applicant shall provide the Department of Planning Services with evidence that water
service from the City of Greeley and North Weld County Water District shall be provided.
Evidence of such approval in the form of a signed agreement shall be provided to the
Department of Planning Services.
C. The applicant shall provide documentation to the Department of Planning Services off nal
approval from the City of Greeley Sanitation Department. Evidence of approval in the form
of a signed agreement shall be provided to the Department of Planning Services.
D. The applicant shall provide written evidence of final approval from Union Colony Fire and
Rescue Authority to the Department of Planning Services.
E. The applicant shall submit final construction drawings for roads to the Department of Public
Works for review and acceptance, per Section 7.2.9.2 of the Weld County Subdivision
Ordinance.
F. The Final Plat shall meet all requirements of Section 9.2 of the Weld County PUD Ordinance
#197,and shall delineate all appropriate easement locations,sizes,and titles, in accordance
with Section 10.6 of the Weld County Subdivision Ordinance.
G. The Plat shall include the current version of the Right to Farm Covenant as included in the
Weld County Comprehensive Plan dated October 31, 2000.
-2-
H. Changes in addressing,(including the submission included with the Final Plat,which consists
of Buss Avenue's re-designation into Ed Beegles Lane. Skyhawk Drive and Airport Rood)
shall be reviewed, approved in writing by the appropriate Fire Protection District, Law
Enforcement entity, United States Post Office and the Department of Planning Services. A
copy of each such approval shall be forwarded to the Weld County Department of Planning
Services. Addressing schemes shall follow adopted standard Planning and Addressing
methodologies and will be coordinated with the Weld County Department of Planning
Services at the issuance of Building Permits.
The applicant shall attempt to address the requirements/concerns of the Federal Aviation
Administration's, as stated in the referral response received November 06, 2000.
2. The Final Plat shall be submitted to the Department of Planning Services for recording with in 30 days
of approval by the Board of County Commissioners.
3. The Final Plat is conditional upon the following and that each be placed on the Final Plat as notes
prior to recording:
A. The Greeley Weld Airport PUD shall consist of 1, 190+/-acres. All lands within the PUD are
and shall be owned by the Greeley Weld Airport Authority, shall be governed by the terms ,
conditions, boundaries and adopted maps of the Greeley-Weld County Airport Overlay
District and are subject to Federal Aviation Authority Grant Assurances.The PUD allows for
uses which shall comply with the requirements as set forth in Section 35 of the Weld County
Zoning Ordinance. The common open space shall be owned and maintained in accordance
with Section 6.3.5 of the Planned Unit Development Ordinance.
B. Water service shall be provided by the City of Greeley and North Weld County Water District
and Sewage Disposal shall be provided by the City of Greeley Sanitation Department.
C. Installation of Utilities shall comply with Section 12 of the Weld County Subdivision
Ordinance.
D. Any signs, including entrance signs, entrance walls and identification walls, located on the
property shall adhere to the standards established in Component Five (5) of the
Development Guide adopted in conjunction with the Planned Unit Development Change of
Zone adopted September 1, 1999.
E. Outdoor storage shall be screened from public rights-of-way, and adjacent properties.
F. All local roadways within the PUD shall meet the required standards of the Department of
Pubic Works.
G. In accordance with the Regulations of the Colorado Air Quality Control Commission, any
development that disturbs more than five(5)acres of land must incorporate all available and
practical methods that are technologically feasible and economically reasonable in order to
minimize dust emissions.
H. During development of the site, all land disturbance shall be conducted so that nuisance
conditions are not created. If dust emissions create nuisance conditions, at the request of
the Weld County Department of Public Health & Environment, a fugitive dust control plan
must be submitted.
-3-
. I. In the event that five(5)or more acres are disturbed during the construction and development
of this site,the applicant shall obtain a storm water discharge permit from the Water Quality
Control Division of the Colorado Department of Public Health and Environment.
J. In accordance with the Regulations of the Colorado Air Quality Control Commission any
development that disturbs more than a twenty-five (25) acre contiguous disturbance, or
exceeds six(6)months in duration,the responsible party shall prepare a fugitive dus:control
plan, submit an air pollution emissions notice, and apply for a permit from the Colorado
Department of Public Health and Environment.
K. The applicant shall obtain a storm water discharge permit from the Water Quality control
Division of the Colorado Department of Public Health and Environment. if required. Silt
fences shall be maintained on the down gradient portion of the site during all parts of the
construction phase of the project.
L. The site shall maintain compliance with the Union Colony Fire and Rescue Authxity
requirements at all times.
M. The surface agreement for mineral rights on the site limits the drilling of or and gas wells to
specific locations and the applicant has agreed that no waivers will be signed that allows
drilling of wells in any other location.
N The applicant shall provide"NO PARKING" signs where any road width is 20 feet or less.
O The site shall maintain compliance at all times with the requirements of the Weld County
Public Works Department, Weld County Department of Public Health & Environment, and
the Weld County Department of Planning Services.
P. Screening, Landscaping and maintenance of such improvements shall adhere to the
guidelines and standards established in Component Three (3) of the Developmert Guide
adopted in conjunction with the Planned Unit Development Change of Zone adopted
September 1, 1999.
Q. A Site Plan Review is not required in accordance with Section 35.4 of the Weld County
Zoning Ordinance. The Greeley Weld County Airport Authority, prior to granting a lease
agreement,will review each intended use of its properties,including all buildings,structL res,
and open storage areas in order to determine compatibility of operations and/or structures
within the Planned Unit Development District. The Airport Authority may at that time and at
its discretion, specify which screening,buffering landscaping,structure colors, and/or ether
perimeter treatments may be required to insure a compatible and complimentary
environment within the Planned Unit Development Plan. Minimum improved building (yeas
within the PUD shall be defined as any space upon which there exists a permanent building,
structure, or improvement, plus an additional ten (10) feet around the perimeter of such
improvement.
R. The applicant shall comply with Sections 8.8,8.9,and 8 10 of the Weld County Planned Unit
Development Ordinance, as follows:
8.8 Failure to Record a Planned Unit Development Final Plan - If a Final Plan Dlat has
not been recorded within one (1)year of the date of the approval of the PUD Final
Plan, or within a date specified by the Board of County Commissioners, the Board
may require the landowner to appear before it and present evidence substantiating
that the PUD Final Plan has not been abandoned and that the applicant xr ssesses
the willingness and ability to record the PUD Final Plan plat. The Board may ex-end
-4-
the date for recording the plat. If the Board determines that conditions supporting
the original approval of the PUD Final Plan cannot be met, the Board may, after a
public hearing, revoke the PUD Final Plan;
8.9 Failure to Commence a Planned Unit Development Final Plan - If no const-uction
has begun or no USE established in the PUD within one (1)year of the data of the
approval of the PUD Final Plan,the Board of County Commissioners may require the
landowner to appear before the it and present evidence substantiating that the PJD
Final Plan has not been abandoned and that the applicant possesses the willingness
and ability to continue the PUD. The Board may extend the date for initiation of the
PUD construction and shall annually require the applicant to demonstrate that the
PUD has not been abandoned. If the Board determines that conditions supporting
the original approval of the PUD Final Plan have changed or that the landowner
cannot implement the PUD Final Plan,the Board may,after a public hearing, -evoke
the PUD Final Plan and order the recorded PUD Plan vacated.
8.10 Failure to Comply with the PUD Final Plan -The Board of County Commissioners
may serve written notice upon such organization or upon the owners or residents of
the PUD setting forth that the organization has failed to comply with the PUD F nal
Plan. Said notice shall include a demand that such deficiencies of maintenance be
cured within thirty (30) days thereof. A hearing shall be held by the Board wilhm
fifteen(15)days of the issuance of such notice,setting forth the item,date and place
of the hearing. The Board may modify the terms of the original notice as to
deficiencies and may give an extension of time within which they shall be rectified.
8.10.1 Any PUD Zone District approved in a Final Plan shall be considered as being in
compliance with the official Subdivision Ordinance and 30-28-101 et seq C.R S.
-5-
DEPARTMENT OF PLANNING SERVIC S
PHONE (970) 353-6100 EXT.:3 10
FAX 1976) 304-E:98
1555 N. !7T-I AVENJF
GREELEY, COLORADO 80,-31
•
•
;;.
COLORADO
October 3, 2000
Greeley/Weld County Airport
Attn: Mike Reisman
PO Box 727
Greeley, CO 80631
Subject: S-563- Request for approval of a Final Planned Unit Development Plan (Administrative
Review) on a parcel of land described as Section 1, 2, and 3, Township 5 North, and Ssctijns
26 and 35, Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado
Dear Mr. Reisman:
Your application and related materials for the request described above are complete and in order at the
present time. I have scheduled a meeting with the Weld County Utilities Advisory Committee for
Thursday, November 9, 2000, at 10:00 a.m. This meeting will take place in the Weld County Planning
Department, Room 210, 1555 N. 17th Avenue, Greeley, Colorado.
It is the policy of Weld County to refer an application of this nature to any town or municipality wing wih,n
three miles of the property in question or if the property under consideration is located witnin the
comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the
submitted materia s to the Greeley Planning Commission for their review and comments. Please 3all the
City of Greeley at 970-350-9780, for information regarding the date, time and place of the meeting and the
review process. It is recommended that you and/or a representative be in attendance at each of the
meetings described above in order to answer any questions that might arise with respect to your
application.
If you have any questions concerning this matter, please feel free to cal! me.
Sincerely,
Roped Anderson
Planner
ItW'';
ni_ . irzi, _ _ ________ __
I.,
1_WilBe APPLICATION FLOW SHEET A
APPLICANT: GREELEY/WELD AIRPORT CASE#:S-563
REQUEST: FINAL PLANNED UNIT DEVELOPMENT PLAN
LEGAL: SEC I IONS 1,2&3,T5N,R65W&SECTIONS 26&35,T6N, R651/v,6TH PM,WELD COUNTY: CO
LOCATION: N/ADJACENT WCR 43,BISECTED BY WCR 62
PARCEL ID#: ACRES: 1,190.00+1-
Date By
Application Received SEPT 12,2000 ? J
Application Completed SEPT';5, 2000 RA _
Referrals listed SEPT 25,2000 RA
Design Review Meeting(PUD)
_ �".
File assembled 10)ff�CO 7&'c
Letter to applicant mailed /' /! /&O 1 Referrals mailed it) /57t0 __/ _
Chaindexed /b/b_/CD 's
Vicinity map prepared
DPS Staff Field Check
Administrative Review Decision:
Conditio'is of Approval .,�-.. �,.r...
PC Hearing Date(if applicable),,r Action: —..._..._ —•- + r /0-0
_J
L141 1t f �, . cl 1)O,4--. R. I f/ 5 / -
Surrounding property owners notified
Air photo and maps prepared /r, 1 A ,
BCC Hearing Date(if applicable),Aclion: _ ..-_.._ .
Resolution received
Recorded on maps and filed
Misc '
Overlay Districts Road Impact Fee Area: Yes_ _ No .X ..
Zoning PUD SW Weld_. #1___#2__#3 __
Airport Yes_X..^.. No __ Windsor_ _
•-•• Geo Hazard Yes— _ No_X
Flood Hazard Yes X__ No._ . Panel#0637C