Loading...
HomeMy WebLinkAbout20003248.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF WELD COUNTY ROAD 17 BETWEEN WELD COUNTY ROADS 22 AND 24 FOR THIRTY WORKING DAYS, TO REPLACE A BRIDGE WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 17 between Weld County Roads 22 and 24 be temporarily closed, with said closure being effective December 21, 2000, for approximately thirty working days to replace a bridge, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 90,, plc eg SD (5/92000-3248 EG0024 ROAD CLOSURE - WCR 17 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of December, A.D., 2000, nunc pro tunc December 21, 2000. BOARD OF COUNTY COMMISSIONERS W D COUNTY, COLO DO ATyS > : ll AA I/ La V Barbara J. ' kmeyer, hair Id • t"r , the :oard `� � M. J. G ile, Pro Tem/- BY: O t k e Board • orge . Baxter AP O D FORM: 1 Dale iCHall _I�nty Attorney ,�447 ^ Glenn �aad' 2000-3248 EG0024 iii-st 6i7-... I MI MEMORANDUM CTO -Clerk to the Board DATE: Dec. 1 , 000 REL ) FROM: Frank B. Hempen, Jr. COLORADO Director of Public Works/County Enginee SUBJECT: Road Closures WCR 17 between WCR 22 and WCR 24 was closed on December 21, 2000, to replace Bridge 17/22B. It is expected to be closed approximately 30 working days. The appropriate documentation is enclosed. Attachments pc: WCR 17 2000-3248 s 1 ,c9 1 v�� .�._.....a WC R a L ,it--4:L. -('- 3 .4 .I 1® . i . ! .. Leileod 1 . f . ( 5'€ e a ft ac t\ , :E i Ira?) .. ' 1 i i ; . /..) /(4.-& I. , (3- 0cAct...:-.74. _r_cp (f7/aa 1' ) POr- 730 i- i . i t4/ O? d-` . . ,TITLE mQC/ .Cos-bice, UJCR 1.7 0.'i Wc,4 ,,, --(1-4;,e-.--2-- ' Q v1d O, Z24 SURVEY BY DATE F '_1 DRAWN BY yV -v,„. DATE a DATE CHECKED BY w COUNTY ROAD NO. --- . M:/LOTFtLE$/MARC.W<4 APPROVED BY COUNTY ENGINEER etv : t 1 7 .r' c rat s� 44 ;.to �. layee. ilr Li.ave cade., 7-11#€ Lta c:..itcj-e--- (44kit'y tcY-4.1fleer--- ciivAifre-- tee)tx,ct e60 ti 4O1 Aoseci, 4 '44-foul- Altou-3 F � ���ti+w• .sue-w... Q Thu va - G) acitMif M ti ce, 4O s.� .1,2e4 " Hello