Loading...
HomeMy WebLinkAbout20001083.tiff RESOLUTION RE: APPROVE APPLICATION FOR FEDERAL ASSISTANCE FOR MIGRANT HEAD START PROGRAM IMPROVEMENT IN GRAND JUNCTION, COLORADO, AND AUTHORIZE CHAIR TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Application for Federal Assistance for the Migrant Head Start Program Improvement in Grand Junction, Colorado, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Human Services, Family Educational Network of Weld County, to the Department of Health and Human Services, Migrant Head Start Bureau, commencing July 1, 2000, and ending June 30, 2001, with further terms and conditions being as stated in said application, and WHEREAS, after review, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Application for Federal Assistance for Migrant Head Start Program Improvement in Grand Junction, Colorado, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Human Services, Family Educational Network of Weld County, to the Department of Health and Human Services, Migrant Head Start Bureau, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said application. 2000-1083 HR0071 APPLICATION FOR FEDERAL ASSISTANCE FOR MIGRANT HEAD START PROGRAM IMPROVEMENT IN GRAND JUNCTION, COLORADO PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of May, A.D., 2000. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO r ATTEST: �N !' /� 3/4,t4A ✓ /A v7 t ,,�' ���� `�, Barbara J. irkmeye , Chair l/ Weld County Clerk to th ' �i, iov�i� ; i( -• i C� ` �� �� mile, Pro-Tem BY: to cii,, • / Deputy Clerk to the Bo:�t� JIM --I__- I eorge . Baxter APPROD AS TO RM: �� Dale K. Hall -1C6Cint Aicirney Z__„___-______ Ai Glenn Vaa 2000-1083 HR0071 et Z.Nos MEMORANDUM TO: Weld County Board of County Commissioners WilkFROM: Walter J. Speckman, Executive Director, DHSI✓��� 0 r DATE: May 10, 2000 COLORADO SUBJECT: Request to the Migrant Head Start Bureau for Funding to Assist with the Facility Move in Grand Junction Presented for approval before the Weld County Board of County Commissioners is a request to the Migrant Head Start Bureau for funds to assist with the move of the Migrant Head Start facility in Grand Junction. If you need further information please contact Tere Keller-Amaya, at extension 3342. 2000-1083 APPLICATION FOR OMB Approval No.0348-0043 FEDERAL ASSISTANCE 2.DATE SUBMITTED Applicant Identifier 90CM0136 1.TYPE OF SUBMISSION: 3.DATE RECEIVED BY STATE State Application Identifier plication Preapplication 09 CM0136 A U Construction ❑Construction 4.DATE RECEIVED BY FEDERAL AGENCY Federal Identifier ❑ Non-Construction ❑ Non-Construction 09CM0136 5.APPLICANT INFORMATION Legal Name: Organizational Unit: Weld County Division of Human Servioes (FENWC) Address(give city,county,State,and zip code): Name and telephone number of person to be contacted on matters involvin 1551 N 17 Avenue this application(give area code) P.O. Box 1805 Greeley CO 80632 Walter J. Speckman 6.EMPLOYER IDENTIFICATION NUMBER(EIN): 7.TYPE OF APPLICANT:(enter appropriate letter in box) 8 4 - [5_1_010i0I8I1 3 A.State H.Independent School Dist. 8.TYPE OF APPLICATION: B.County I.State Controlled Institution of Higher Learning ❑ New 0 Continuation ® Revision C.Municipal J. Private University D.Township K.Indian Tribe If Revision,enter appropriate letter(s)in box(es) E.Interstate L.Individual F. Intermunicipal M. Profit Organization A. Increase Award B.Decrease Award C. Increase Duration G.Special District N.Other(Specify) D.Decrease Duration Other(specify): 9.NAME OF FEDERAL AGENCY: Program Improvement 10.CATALOG OF FEDERAL DOMESTIC ASSISTANCE NUMBER: 11.DESCRIPTIVE TITLE OF APPLICANT'S PROJECT: Migrant Head Start TITLE: Migrant Head Start Program Improvement 12.AREAS AFFECTED BY PROJECT(Cities, Counties, States, etc.): Northern Colorado/Western Slope 13.PROPOSED PROJECT 14.CONGRESSIONAL DISTRICTS OF: Start Date Ending Date a.Applicant b.Project 7/1/00 6/30/01 15. ESTIMATED FUNDING: 16.IS APPLICATION SUBJECT TO REVIEW BY STATE EXECUTIVE ORDER 12372 PROCESS? a.Federal $ 00 194,094 a.YES. THIS PREAPPLICATION/APPLICATION WAS MADE b.Applicant $ AVAILABLE TO THE STATE EXECUTIVE ORDER 12372 48,524 PROCESS FOR REVIEW ON: c.State $ 00 DATE d.Local $ 00 b.No. f PROGRAM IS NOT COVERED BY E.O. 12372 e.Other $ 00 0 OR PROGRAM HAS NOT BEEN SELECTED BY STATE FOR REVIEW f.Program Income $ 00 17.IS THE APPLICANT DELINQUENT ON ANY FEDERAL DEBT? g.TOTAL $ 242,618 .00 ❑Yes If"Yes,"attach an explanation. El No 18.TO THE BEST OF MY KNOWLEDGE AND BELIEF,ALL DATA IN THIS APPLICATION/PREAPPLICATION ARE TRUE AND CORRECT,THE DOCUMENT HAS BEEN DULY AUTHORIZED BY THE GOVERNING BODY OF THE APPLICANT AND THE APPLICANT WILL COMPLY WITH THE ATTACHED ASSURANCES IF THE ASSISTANCE IS AWARDED. a.Type Name of Authorized Representative b.Title c.Telephone Number --.3arbara J. Kirkmeyer, Chair, Weld County Board of Commissioner (970) 356-4000 d.Signaty�of Authorized Rep{esenta e e.Date Signed f) t Lf+ll'L / -i tied eje 4-_ O5 /D--QOD0 ?reviops Edition Usable (/ Standard Form 424(Rev.7.97) Authorized for Local Reproduction Prescribed by OMB Circular A-102 —/4425 BUDGET INFORMATION - Non-Construction Programs OMB Approval No.0348-0044 SECTION A-BUDGET SUMMARY Grant Program Catalog of Federal Estimated Unobligated Funds New or Revised Budget Function Domestic Assistance or Activity Number Federal Non-Federal Federal Non-Federal Total (a) (b) (c) (d) (e) (f) (g) $ $ $ $ $ 1. PA 23 93.6000 194,094 48,524 242,618 2. 3. 4. 5. Totals $ $ $ $ $ 194,094 48,524 242,618 SECTION B-BUDGET CATEGORIES GRANT PROGRAM,FUNCTION OR ACTIVITY Total 6. Object Class Categories 1 PA 23 ( ) (2) (3) (4) (5) $ a. Personnel $ $ $ $ b. Fringe Benefits c. Travel d. Equipment e. Supplies f. Contractual 194,094 g. Construction h. Other 194,094 i. Total Direct Charges (sum of 6a-6h) j. Indirect Charges k. TOTALS (sum of 6i and 6j) $ 1$ $ $ $ 194 094 194,094- 7. Program Income $ $ $ $ 1$ Authorized for Local Reproduction Standard Form 424A(Rev.7-97) Previous Edition Usable Prescribed by OMB Circular A-102 SECTION C-NON-FEDERAL RESOURCES (a) Grant Program (b) Applicant (c) State (d) Other Sources (e)TOTALS 8• PA 23 $ 194,094 $ $ $ 194,094 9. 10. 11. 12. TOTAL (sum of lines 8-11) $ 194,094 $ $ $194,094 SECTION D-FORECASTED CASH NEEDS Total for 1st Year 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 13. Federal 194,094 $ 194,094 $ $ $ 14. Non-Federal 15.TOTAL (sum of lines 13 and 14) $ 194,094 $ 194,094 $ $ $ SECTION E- BUDGET ESTIMATES OF-FEDERAL FUNDS NEEDED FOR BALANCE OF"THE"PROJECT (a)Grant Program FUTURE FUNDING PERIODS (Years) (b) First (c)Second (d)Third (e) Fourth 16. $ $ $ $ 17. 18. 19. 20. TOTAL (sum of lines 16-19) $ $ $ $ SECTION F-OTHER BUDGET INFORMATION 21. Direct Charges: 22. Indirect Charges: 23. Remarks: Authorized for Local Reproduction Standard Form 424A(Rev.7-97)Page 2 BUDGET NARRATIVE PROGRAM IMPROVEMENT REQUEST FY2001 Site Development $104,474.00 (see attached) Electrical Hook-up and Lines $11 ,300.00 - pays for disconnecting the current facilities electrical lines, re-connection costs, trenches for wire, costs of wire, parking lights, etc. Foundation $30,000.00 - pays for cement foundation to meet City Standards and Codes. Plumbing $3,000.00 - pays for the costs associated with necessary plumbing re- attachment from the move, as well as hook-ups for water and sewer. Landscape $20,000.00 - pays for landscaping which meets City Standards and Codes, also pays for a sprinkler system. Paint$4,000.00 -pays for the cost of restorative interior and exterior paint, after the move. Contractor Fee$21,320.00- pays for a general contractor and project manager to attend to all details of the move and site development, including City Planning meetings, and project coordination. Total request: $194,094.00 In-kind Contributions: $48,524.00-will be received from donated materials,services,and actual labor performed on the project. 1 FAMILY EDUCATIONAL NETWORK OF WELD COUNTY MIGRANT HEAD START PROGRAM REQUEST FOR FACILITIES FUNDING PROGRAM IMPROVEMENT Following is a request for $194,094.00 for the movement of our current portable facility located on land owned by Mesa County District 51, at the Clifton Elementary School, 3276 F Road to We submitted to your office a request for$115,000.00, in December of 1998. We received approval for the funds May 6, 1999, to be obligated or spent by June 30, 1999, and were unable to spend the funds by such time. Due to the short time frame allowed us to obligate or expend the funds we requested approval for a carry-over-balance, so that we could continue our search to find a permanent home for our Migrant Head Start Program. We made numerous offers on developed pieces of property between June 1999, and February 2000. After going through the negotiation and zoning processes our offers were denied. The zoning issues generally were the barriers for the denials for our purchase of the aforementioned pieces of property. The City of Grand Junction would only approve "child care" facilities in industrial or commercial areas which were inappropriate for our facility. Finally, we were able to acquire an undeveloped piece of property in March 2000, that meets with our satisfaction and the City's zoning requirements. The pieces of property we considered purchasing were all ready developed with drainage, parking, landscaping, electricity etc., therefore; allowing our original $115,000.00, to adequately cover the costs associated with the move. Due to the fact the property we purchased is undeveloped, we are requesting the additional $194,094.00, to cover the costs of site development and meet all Grand Junction codes and regulations. The site development plan (enclosed), and allows for future expansion. We appreciate your expedient consideration of granting our request for Program Improvement Funds. History of Grand Junction Facility and Justification to Move The School District Preschool Programs and FENWC, Migrant Head Start programs have shared use of the facility for the past four years. Due to the increased need of Migrant and Seasonal Head Start services in the area, and an increased need for the School District to occupy the facility for a longer period of time, negotiations were initiated to resolve the issue. 2 It was determined at a final meeting, October 28, 1998, that continuing the shared use of the building is not feasible, if we and the district are to fully meet the needs of the families that we serve. As a result of this conversation, the district asked that we move the facility from the elementary school property. The School Board has set policy that no new portable facilities be placed on school district property, and that where portable facilities exist, they be removed. As a result of this policy we are faced with no other option but to move the facility. It is also important to note that our relationship with the district has not been compromised due to this situation. The sole reason for discontinuing the shared space agreement is that both FENWC and the District have a solid commitment to meeting the needs of the families that they serve. The District has assured us that they will continue to support the FENWC Migrant Head Start Program. 3 ASSURANCES The Weld County Board of Commissioners agree to the following conditions/assurances upon submission of this proposal. 1. The facility will be constructed to comply with local licensing and code requirements, ADA, Section 504, and flood Disaster Protection Act. 2. The Weld County Division of Human Services' Family Educational Network of Weld County, Migrant Head Start Program will operate the Migrant Head Start Program from said facility for the useful life of the facility. 3. The Weld County Division of Human Services' Family Educational Network of Weld County, Migrant Head Start Program will comply with requirements of Uniform Relocation Assistance and Real Property Acquisition Policies Act. 4. The Weld County Division of Human Services' Family Educational Network of Weld County, Migrant Head Start Program will comply with all conditions placed on grant regarding protecting Federal interest, inspection reports, use of the facility default on mortgage, insurance, maintenance of facilities, copies of official documents, retention of records, audits, prior approval for use of grant funds, program income, and procurement procedures. 5. The Weld County Division of Human Services' Family Educational Network of Weld County, Migrant Head Start Program will comply with all requirements of the Davis- Bacon Fair Labor Standards Act (40 USC 276a-276a-5). 4 • Apr It 00 02r36p Skyline Contrasting, Inc (270) 424-08E1 p. 2 : ;y ..•r .r` .CAF .) m. + Ai C aAC INC. 3184 • rand l n,CO BiSos Tel:lamai 4 . 'a s(91*)454-SSSt . PROPOSAL Apt 11,2000 . Prole(k Weld County Mediator!Mr. Merritt st Construction Address: 3093 E%Road 1420lM t0 Street Plans ay: HydroTerta,Inc. 1420 Motor Street Dated: 3127100 Grind70) 41.8184ion, ' 81505 Addenda none • (g70)241�ti184 FM 241-8893 improvements xr Sic/Ine Coraradng,Inc Is pleased to provide you with and tioonn for r described a 1 i mprov the abaci project,as Shove on the attached spree sh io bring the alts to design 1 ate rage S This c Included d s pre workesti on en which needs to take*coat eufq(adaekwaEon. IrdudediaPrdtea11n9fheKnadraed +helewLafir mist 10 days plat to barn auttur vi g operations. 0. Building es: Insca170 Lf.of 2 CI.200 , waterloo from the meter SODS to 5 f twittery outside ut,e sewer • bulling. Connection at Skiing Is by plumbs service on the property,complete with Imported bedding,native baclal and one desnout. bul TN amine deanout Is to be loaded in the parking lot, outside an playground(1) fromea. Connection at building is by plumber. Install 228 U. of off-Site sewer service the soomeast property comer to the adding 8'Sewer main In the 170B frontage road. The dFslte work includes imported bedding, aowable ad Deft 784 spat of asphalt replacement. 804 sgAL of'concrete pavement replacement,traffic control and a$500 allowance for landscape replacement on the Cameron property, juts Ili, Dry Ud1 ies Furnish and Install 2g0 U.d 3'Soh.40 IrrigatIon sleeves at 24"bury. Exc and barkdn only for 220 LI. of s1e ighnng trench, and auger 3 each 24"dia,x 80'dew fight pole bases(lighting conduit to be furnished and installedelectrician).rty corner �bj l and librrr braidlii only for 190 Lf.of joint trench from the southwest 8'cod'. to pas a beat 98'and f m Phase I building to Phase II budding. Becht M piping to be installed by others. (V. Panting Lot Construction: Induces installing sac ) inc es of ap fhof. 8 striping,, appiying lyin a$ p e- blacks, herbicide,Installing a three(3)Inch asps . ri bumper and bistaaing two(7a aceassible paring signs. aEecoutsa; 139 I.C. V. Miscellaneous 8neworIc Install the Mowing sae concrete with underlying ber 22 I.f. Of 2' of S It.Wakened etu p,1 11 rwalk,' ll3 aq.an 30handicapI �a4431.f of 2'acurb a girder,and 11 i!. at drain an it w 3l valley pen, el over'vieed of drain channel with we. Furnish and Install 3170 sgJl: of 6 thick pea 9� Wrier fabric. Furnish and Instal 389 sqL of 8"thick screened rock over weed bender Apr 11 00 02r3°"p Skyline Contracting, Inc (970) 434-0851 P• 3 40111,2000 • Faye 7 Merril Const.—Wet Co.Heackaart Facility hdbec Furnish and ISMI ft of screened diet in landscaped planter areas(eai amendment, Wound cover anti plantings by others) Vl. Construction Surveying: Furnish .survey control, gild torIP to subgrade, back of walklcurb stakes,redtops,biuetops,building comers,and as-bunts. GENERAL NOTES: 1, Compliance testing,peaks,tees,wiener protection,and sure stabltl'aacion are not included. 2, Construction of retaining wall,foundations.ramps and landings for buildings Is not kiduded. 3. A plan and profile 01 the proposed sewer service fine will be required by the Central Grand Valley Sanitation District plot'to conatrurtwn. 4. The pea gravel playground surface will not be accepted°if the Headatart facity is subject to ADA Perna are Skyline complar lnt�the Severi that trnate he facility mist meet ADA requiremecing on tyro different limber lch nts.surface Respectfully fed, Kevin R.Carobs Project Manager KRC:kr • Cc'1W Mer:MNaedeten Apr II 00 02o39p Skyline Contracting, Inc ie70i 434-0851 p. 4 • Skyline Contracting,Inc. Cost Estimate Project Weld County Head Start-3093 if 1/4 Road Owner: Wed Co.Heed Start-Merritt Construction, Inc. Deslpnart HydroTerta,Inc. Plans Dated: 27-Mar-00 aid oats: Apr-00 Addenda: none Section Item No. Description Quantity Unit LLB. Total Sid I Site Grading(Phase 16 2) 1 Clear and Grub, Pretreat Weeds 1 LS. 2050.00 2050.00 2 Camped Base:of Fills 4260 SY 0.40 1700,00 3 Site FIR to Subgrade(Imported) 2506 CY 12.50 31326.00 — Subtotel Sir Orodmg; $ 36,075.00 II Building UM9ittes • 1 2°PVC DornesBc Water Service 70 LF 6.95 466.50 • 2 6"PVC Sewer Service-on site 170 LF 13.80 2346.00. 3 6"PVC Sewer service-Off site 226 LP 71.60 Subtotal Building Utilities; $ i9,014,16 III Dry Utilities 1 3"brig. Sleeves-24"bury 290 LF 4.80 1392,00 • 2 Site Lighting/Light Bases-224'bury 220 LF 4.90 1076.00 3 (3,T,E Trending-48" bury on pwr. 190 LF 7.20 $ 31380. 00 Subtotal Dry Utilities: IV Parking Lot Construction 1 Paved Parking(3"HBP/6"ABC) 13717 SF 1.85 $ 22033.05 22,833.05 Subtotal Perking Lots V Seto. Sltework 1 Site Concrete 1 LS 18033,00 18033.00 2 Pea Gravel Playground(6") 3170 SF 0.54 1711.60 3 Gravel Landscape Area(6") 369 SF 1.12 413.26 4 Topsoil Planter Areas(6") 2209,SF 0,63 1435.05 • Subtotal Miso, Sitew ark: 3 21 593,93 VI Conahuotion sunvying Subtotal Construction Surveying: 1 LS 2320.00 $ 2,320.00 320.00 Total Estimated Cost • ' Vll Play(yound Alternates A Fiber Timber Mulch System-8" 3170 SF 3.10 0627,00 a So'-Fal limber Mulch System-12" 3170 SF 2.08 8496.50 me: MionleiadOWR Hello