Loading...
HomeMy WebLinkAbout20000074 RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF "C" STREET BETWEEN 23RD AND 25TH AVENUES FOR EIGHT WORKING DAYS, TO REPLACE A BRIDGE WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that "C" Street between 23rd and 25th Avenues be temporarily closed, with said closure being effective January 5, 2000, for approximately eight working days to replace a bridge, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. �; e'er. Cam, SC? EG0024 ROAD CLOSURE - C STREET PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of January, A.D., 2000, nunc pro tunc January 5, 2000. BOARD OF COUNTY COMMISSIONERS WEI�TY, COLORADO ATTEST: I h.- D WE J /OralBarbara J. meyer, hair Weld County Clerk to th>`: .- :6 I 4Ufrj , 4-OJ J . J. ,-euem BY: ►�Deputy Clerk to the ?:( IA) ' � EXCUSED DATE OF SIGNING (AYE) George E. Baxter APPROVED AS TO FORM: Dale . Ha 7 � // es only Attorney / r did Glenn Vaad 2000-0074 EG0024 I ! 7. I,sz, �i I\ s [ik Z/! c s+ N1'- �,�;. ". Le eVa (` j _ a Ir Ik `, I t , i C I - . . rte^-� { Of 5 6; l E E i I 1 L i i . Oct /TS-1 i P r. y �^- YC x 'i- H., 5' jai: k .i.". .. . r} �< j'-'7;( k • f AUc TITLE �0 CI �'���'i VP' (I' tt )r r a`�" >'"°� . SURVEY BY DATE DRAWN BY t is`,.,y7; DATE CHECKED BY DATE COUNTY ROAD NO. Oe ov; " , M:ILOTFILESIMARC.%A.K4 APPROVED BY COUNTY ENGINEER Let c- 1 • -f- ly fie -- � � C/oce c e Gd, /o C r P De-foot,- A r . c X16 re,(.. �`' `� cI Q ( . Sed cr 75o 1.1)-4 1-J ' 4� d.. 4 LAC 2 - .tsAaf MEMORANDUM 7 WIiD € TO: Clerk to the Board ' - DATE: January5 2000 COLORADO FROM: Dave Becker, Operations Director SUBJECT: Road Closures The following roads was closed: NW"C" Street between 23rd Avenue and 25th Avenue was closed on 1/5/2000 for a bridge replacement. It is expected to be closed for eight working days. The appropriate documentation is enclosed. DB/fc:\eom.ctb Attachments pc: WCR NW"C" Street 2000-0074 Hello