Loading...
HomeMy WebLinkAbout20002246.tiff cerkriMEMORANDUM Wine. TO: Board of County Commissioners DATE: September 11, 2000 COLORADO FROM: Kim Ogle, Planner WWI SUBJECT: Norfolk Iron and Steel, dba Winograd's Steel & Supply Site Plan Review (SPR 310) Norfolk Iron and Steel, dba Winograd's Steel & Supply requested at the March 8, 2000 Acceptance of Irrevocable Letter of Credit hearing that if the concrete paving was not completed within six months of the recording of the Site Plan Review Plat, then Winograd's would then submit a Letter of Credit for the paving of that portion of the project until it was completed. Their argument was that this project is for private consideration and the concrete paving is an integral part of the development. The date for completion of the concrete paving was August 10, 2000. Given that on-site concrete paving was completed prior to this date, the applicant is not required to provide collateral in the amount of $ 151,880.00 dollars to secure the cost of the paving as was stipulated during the previous hearing. The Departments of Public Works and Planning Services, and the County Attorney's office has no conflict with the Transportation portion of the Site Plan Review and recommends approval of this portion of the improvements. SERVICE,TEAMWORK INTEGRITY.GENUS V (a p�) a 2000-2246 /// / Weld County Planning Dept, AUG 24 2000 MEMORANDUM RECEIVED TO: Kim Ogle, Planner II DATE: August 23,2000 FROM: Donald Carroll, Engineering Administrator S1. /"COLORADO SUBJECT: SPR-310; Norfolk Iron and Metal (Winograds Steel and Supply) At the request of the Planning Department, I performed a site investigation for the transportation portion of Exhibit "A" of the Improvement Agreement According Policies Regarding Collateral for Improvements (private road maintenance). The concrete approach, parking lots,curb,gutter,and sidewalk have all been completed to my satisfaction. There is one 40-foot radius adjacent to WCR 39.5 that needs to be poured. This is the location where temporary traffic had been routed. I spoke with the superintendent, and he informed me that the radius is scheduled to be poured this week. The Weld County Public Works Department has no conflict with the Transportation portion of the site plan review, and recommends approval of this portion of the improvements. The landscaping items shall be verified by Planning Services. pc: Kim Schuett, CTB SPR-310 plan9-spr.wpd • EXHIBIT"A" Name of Subdivision_ s r g. - 1`' V\1°z c.c.�►c t--"r M.`•t X.t_... Filing: Location; Intending to be legally bound, the undersigned Applicant hereby agrees to provide throughout this subdivision and as shown on the subdivision final plat County dated 19 recorded on _ , 19 , in Book , Page No. , Reception No. ,the following improvements. r (Leave spaces blank where they do not apply) - Estimated improvements .I.Jr.. _Cc., ist Construction Cost Street grading r . Street base . Street paving NA . L5_1 ..$..30.00 -7--- Curbs,gutters. & culverts Sidewalk _ Storm sewer facilities Retention ponds Ditch improvements Subsurface drainage Sanitary sewers ' Sanitary sgtiyers Trunk&forced lanes • Mains ,L,ajerals (house connected) Ott-site sewage facilities _ On-site water supply &storage • • Water mains-,includes Bore Fire hydrants - Survey&street monuments&boxes Street lighting • Street wawa signs Fencin re u' ents Landscaping NA 4,100.00 ' Park improvements -1`- Road Culvert Gras Lined Swale Telephone _ Electric Water Transfer • SUE DOTAL $ 175.980. 00 9 Rcviscd 12/95 J,rJJ3.030 : Engineering and Supervision Costs included (testing,inspection,as-built plans and work in addition to preliminary and final plat;supervision of actual construction by contractors) TOTAL ESTIMATED COST OF IMPROVEMENTS AND SUPERVISION 5 175,980.00 The above improvements shall be constructed in accordance with all County requirements and specifications, and conformance with this provision shall be determined solely by Weld County,or its duly authorized agent. Said im vements shall be completed accordin , e construction schedule� set out in Exhibit"B". ir (In corporation,to be signed by President and attes to ecretary,together with corporate seal.) Date: ?- // Ig 1,9e y • 10 Revised 12/95 Hello