HomeMy WebLinkAbout20002246.tiff cerkriMEMORANDUM
Wine. TO: Board of County Commissioners DATE: September 11, 2000
COLORADO FROM: Kim Ogle, Planner WWI
SUBJECT: Norfolk Iron and Steel,
dba Winograd's Steel & Supply
Site Plan Review (SPR 310)
Norfolk Iron and Steel, dba Winograd's Steel & Supply requested at the March 8, 2000
Acceptance of Irrevocable Letter of Credit hearing that if the concrete paving was not
completed within six months of the recording of the Site Plan Review Plat, then Winograd's
would then submit a Letter of Credit for the paving of that portion of the project until it was
completed. Their argument was that this project is for private consideration and the concrete
paving is an integral part of the development. The date for completion of the concrete paving
was August 10, 2000.
Given that on-site concrete paving was completed prior to this date, the applicant is not
required to provide collateral in the amount of $ 151,880.00 dollars to secure the cost of the
paving as was stipulated during the previous hearing.
The Departments of Public Works and Planning Services, and the County Attorney's office has
no conflict with the Transportation portion of the Site Plan Review and recommends approval of
this portion of the improvements.
SERVICE,TEAMWORK INTEGRITY.GENUS V
(a p�) a 2000-2246
/// /
Weld County Planning Dept,
AUG 24 2000
MEMORANDUM
RECEIVED
TO: Kim Ogle, Planner II DATE: August 23,2000 FROM: Donald Carroll, Engineering Administrator S1. /"COLORADO SUBJECT: SPR-310; Norfolk Iron and Metal
(Winograds Steel and Supply)
At the request of the Planning Department, I performed a site investigation for the transportation portion of Exhibit
"A" of the Improvement Agreement According Policies Regarding Collateral for Improvements (private road
maintenance).
The concrete approach, parking lots,curb,gutter,and sidewalk have all been completed to my satisfaction. There
is one 40-foot radius adjacent to WCR 39.5 that needs to be poured. This is the location where temporary traffic
had been routed. I spoke with the superintendent, and he informed me that the radius is scheduled to be poured
this week.
The Weld County Public Works Department has no conflict with the Transportation portion of the site plan review,
and recommends approval of this portion of the improvements.
The landscaping items shall be verified by Planning Services.
pc: Kim Schuett, CTB
SPR-310
plan9-spr.wpd
•
EXHIBIT"A"
Name of Subdivision_ s r g. - 1`' V\1°z c.c.�►c t--"r M.`•t X.t_...
Filing:
Location;
Intending to be legally bound, the undersigned Applicant hereby agrees to provide throughout this
subdivision and as shown on the subdivision final plat County dated 19
recorded on _ , 19 , in Book , Page No. , Reception No.
,the following improvements.
r
(Leave spaces blank where they do not apply) -
Estimated
improvements .I.Jr.. _Cc., ist Construction Cost
Street grading
r .
Street base .
Street paving NA . L5_1 ..$..30.00 -7---
Curbs,gutters. & culverts
Sidewalk _
Storm sewer facilities
Retention ponds
Ditch improvements
Subsurface drainage
Sanitary sewers '
Sanitary sgtiyers
Trunk&forced lanes •
Mains
,L,ajerals (house connected)
Ott-site sewage facilities _
On-site water supply &storage • •
Water mains-,includes Bore
Fire hydrants -
Survey&street monuments&boxes
Street lighting •
Street wawa signs
Fencin re u' ents
Landscaping NA 4,100.00 '
Park improvements -1`-
Road Culvert
Gras Lined Swale
Telephone _
Electric
Water Transfer
•
SUE DOTAL $ 175.980. 00
9 Rcviscd 12/95
J,rJJ3.030 :
Engineering and Supervision Costs included
(testing,inspection,as-built plans and work in addition to preliminary and final plat;supervision of actual
construction by contractors)
TOTAL ESTIMATED COST OF IMPROVEMENTS AND SUPERVISION 5 175,980.00
The above improvements shall be constructed in accordance with all County requirements and specifications,
and conformance with this provision shall be determined solely by Weld County,or its duly authorized agent.
Said im vements shall be completed accordin , e construction schedule� set out in Exhibit"B".
ir
(In corporation,to be signed by President and attes to ecretary,together with corporate seal.)
Date: ?- // Ig 1,9e
y
•
10 Revised 12/95