HomeMy WebLinkAbout20002209.tiff p GEOTECHNICAL INVESTIGATION REPORT OF BEEBE DRAW FARMS AND EQUESTRIAN CENTER, FILING 2. LOCATED IN SECTIONS 4,5,8,9,10 AND 17, TOWNSHIP 3 NORTH, RANGE 65 WEST OF THE 6TH PRINCIPAL MERIDIAN, WELD COUNTY COLORADO U FOR BEEBE DRAW FARMS METROPOLITIAN DISTRICT 11409 WEST 17TH PLACE LAKEWOOD COLORADO 80215 MAY 12, 2000 N I AN_ T. . HORIZON CONSTRUCTION • _ _? 'i SERVICES, L.L.C. ■ -- 3310 State Street FAX:s o-s �s Evans, Colorado 80620 fnx: �»o� s39-szF 2000-2209 a HORIZON CONSTRUCTION 'rip- SERVICES, L.L.C. ■ • ■ • _ _• ' II ENVIRONMENTAL - GEOTECHNICAL - MATERIALS TESTING ■ May 12., 2000 Mr. Jim Fell Beebe Draw Farms and Equestrian Center, Filing 2 11406 West 17Th Place Lakewood Colorado 80215 • Re: GEOTECHNICAL INVESTIGATION FOR THE BEEBE DRAW FARMS AND EQUESTRIAN CENTER, FILING 2 PROPOSED CONSTRUCTION SITE LOCATED IN SECTIONS 4,5,8,9,10, AND 17, TOWNSHIP 3 NORTH, RANGE 65 WEST OF THE 6TH PRINCIPAL MERIDIAN, WELD COUNTY, COLRADO. Dear Mr. Fell: We are pleased to submit this Geotechnical Investigation Report for the proposed construction at the above referenced site, as you requested. Based upon our investigation of this site and the subsurface conditions encountered, it is our opinion the site is suitable for the proposed construction, providing the design criteria and recommendations set forth in this report are followed. The enclosed report presents our findings of the subsurface conditions and our recommendations based upon these findings. Sincerely, HORIZON CONSTRUCTION SERVICES, LLC Reviewed by Darrick Turner Thomas Cope, P.E. 2499 °: Geologist / S�Voc �G `7i - 7 Terry Toler President CF: 200029 File Milestone Engineering 3310 STATE STREET, EVANS, COLORADO $0020 (970) 330-3771 (970) 330.521E - FAX HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO. 200039 Beebe Draw Farms May 12, 2000 GEOTECHNICAL INVESTIGATION REPORT SCOPE This report presents the results of a geotechnical investigation for the proposed Beebe Draw Farms and Equestrian Center residential subdivision. located in Weld County, Colorado. The Milton Reservoir borders the property on the east, Weld County Road (WCR) 39 borders on the west, WCR 32 borders on the south and WCR 38 borders the property on the north The investigation included 100 test borings to obtain soils, percolation rate and groundwater data. The objectives of this study were to: 1 . Evaluate the subsurface conditions at the site relative to the proposec construction, 2. Make recommendations regarding the design of the substructures, 3. Recommend certain precautions that should be taken because of adverse soil and/or groundwater conditions, 4. Evaluate Percolation Rates, and 5. Recommend pavement design options. The conclusions and recommendations presented in this report are based upon analysis of field and laboratory data and experience with similar subsurface conditions in the general vicinity. SITE LOCATION AND DESCRIPTION The proposed subdivision is located in part of Sections 4, 5, 8,9,10 and 17 , T3N, R65W, of the 6th PM, Weld County, Colorado. Based on the informatiol provided, the proposed residential structures will normally be built with wood "stick" frames with basements. The footings will be placed on bearing materials approximately 4 to 8 feet below existing grade. The existing site's topography is generally sand hills covered with grasses, sage and cactus. Elevation changes of approximately 160 feet exist throughout the site with positive drainage to the south, southeast. There are numerous oil and gas wells throughout the proposed development. Natural low areas exist throughout the proposed residential areas, which are generally designated for green belts. The previously investigated and developed residential area located in the center of the area has previously been developed and this geotechnical investigation does not include information concerning this previously studied area. Page 1 of 9 HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO 200039 Beebe Draw Farms May 12, 2000 SITE INVESTIGATION The field investigation was conducted from April 13 to May 5, 2000, and consisted of 83 geotechnical borings and 17 percolation bore holes which are located approximately as shown on the Site Plan (Appendix A). The 83 geotechnical borings were drilled to obtain soil samples for laboratory examination, determine field parameters and determine groundwater levels. Boring field logs include field visual classifications and Standard Penetration Tests (SPT) of the materials encountered during sampling. The 17 percolation borings were drilled to determine field visual classifications and determine preliminary percolation rates for the site. Borings were advanced using 4.0-inch diameter continuous flight augers powered by a truck mounted Mobile drilling rig. Soils were obtained to determine an index of the soils relative density and consistency with the Standard Penetration Test (SPT) split spoon sampler. The "N" values listed on the Summary of Test Results is the number of blows required to drive the 2-inch diameter split-spoon sampler and California Sampler, 12-inches into undisturbed soil by a 140-pound hammer dropped 30 inches. The "N" values are listed on the boring logs. Boring logs are provided in Appendix A and include visual or laooratory derived classifications of each soil, location of subsurface changes, and "N" values. A qualified soils technician and geologist from Horizon Construction Services, LLC, was present during all drilling activities and continuously observed the fieldwork. Final boring logs in this report represent the field findings and additional information determined by laboratory observations and tests. LABORATORY TESTS AND EXAMINATIONS Samples obtained from test borings were subjected to testing and inspection in the laboratory to provide a sound basis for determining the physical properties of site subsurface soils. Moisture contents, dry unit weights, consolidation determination, swelling potentials, Atterberg Limits and Unified Soil Classification Standard System were determined. A summary of the test results and laboratory analyses can be found in Appendix B. Preliminary percolation rate values were evaluated over the entire site of which all failed to meet minimum percolation rates. Our evaluation found that all sites would most likely require an engineered leach field. Percolation rates and locations can be found in Appendix D. A brief Beebe Draw USCS Soil Survey can be found in Appendix E. A pavement design based on the poorly graded sands was performed to determine road base and asphaltic concrete thickness. Subgrade soil Page 2 of 9 p HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO. 200039 Beebe Draw Farms May 12, 2000 characteristics and pavement design data can be found in Appendix F. Borehole Elevations and Coordinates with WGS84 elevations can be found in Appendix G. SUBSOIL AND GROUNDWATER CONDITIONS The soil at the site consisted mostly of very loose to medium dense dry to slightly damp poorly graded sands. Sands located down to four feet are typically very loose with a bearing capacity of one thousand pounds (1000) pounds per square foot (psf). Sands located from four feet to eight feet are typically loose with a bearing capacity of 2000 psf. Sands located below eight feet range from loose to medium dense, however the soils were mostly loose with a bearing capacity of 2000 psf. The soils located on the south end along WCR 32 of the proposed site are typically loose poorly graded sands with maximum bearing capacities of 1500 psf to a depth of three to four feet. A clayey sand stratum was found below I the sand stratum, in the southern portion of the site, with stiff to very stiff soils with a maximum bearing capacity of 4000 psf. These materials also exhibited moderate to high swell potentials with swell potentials ranging from 500 to 1500 psf. tr. Ground water was not encountered throughout the proposed subdivision to a depth of 15 feet below grade. RECOMMENDATIONS AND DISCUSSION Our recommendations are based on the assumption that the subsurface conditions are similar to those disclosed by the borings. If variations are noted during construction or if changes are made in the site plan, foundation type or floor levels, we should be notified so we can supplement our recommendations, as applicable. It is our understanding the proposed residences will normally consist of a frame structure founded on spread footings. We do not anticipate foundation loading to be unusual for this type of construction. We recommend that all footer and floor slab subgrades are Ill moistened and compacted to 95% Standard Proctor with a vibratory compactor to reduce settlement. We recommend excavation inspections be performed on all of these lots prior to the placement of footers. FOUNDATION In view of the loads transmitted by the proposed structure and the soil conditions encountered at the site, a conventional spread footing foundation is recommended. The following design criteria should also be observed: 1) All exterior footings should be placed a minimum of thirty inches below finished grade for frost protection. Page 3 of 9 S HORIZON CONSTRUCTION SERVICES, LLC PROJECT N0 200039 Beebe Draw Farms May 12, 2000 2) We recommend that all footer and floor slab subgrades that are founded in the poorly graded sands are moistened and compacted to 95% Standard Proctor with a vibratory compactor prior to the placement of forms and concrete. 3) Footings founded on poorly graded sands and silty sands, from one to five (5') below grade may be designed for a maximum allowable bearing capacity (dead load plus maximum live load) of one thousand pounds per square foot (1000 PSF). 4) Footings founded on poorly graded sands and silty sands below five feet (5') below grade may be designed for a maximum allowable bearing capacity (dead load plus maximum live load) of fifteen hundred pounds per square foot (1500 PSF). 5) The predicted settlement or heave under the above loading should be less than one-inch (1"), generally considered to be within acceptable tolerances. These loads were based on the in-situ material remaining partially saturated and the engineer's recommendations provided as discussed in this report. 6) Minimal swell potential is anticipated in the poorly graded sands, therefore the minimum deadload is zero pounds per square foot (0 psf) for these soils. The clayey sands and sandy clays exhibited moderate to high swell potentials and will require minimum dead loads_ of fifteen hundred pounds per square foot (1500 psf). If clayey sands or sandy clays are encountered within four feet of the footer subgrade then the potentially expansive soils will require over excavation and replacement with moistened and compacted granular material. The granular material, such as pitrun, should be compacted and tested to 95% Standard Proctor. 7) Footings should be proportioned as much as practicable to minimize differential movement. Spread footings should be a minimum of 18 inches in width. Pad footings should be a minimum width of 24 inches. Continuous concrete foundation walls should be well-reinforced top and bottom. 8) The base for structural fill should include all areas within a 2:1 horizontal to vertical slope from the edge of the footings. 9) The geotechnical engineer should complete any required inspections and testing of all subbase and imported material prior to the placement of footer forms or other permanent structures. Required subgrade repair actions could result in the removal of placed forms, footers or foundations walls. Page 4 of 9 HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO. 200339 Beebe Draw Farms May 12, 2000 10) A geotechnical engineer should inspect all subbase and mported material prior to placement of any foundation concrete. We suggest that a geotechnical investigation be conducted if a builder should wish to reduce recommended minimum dead load and soil replacement requirements for structures founded above expansive clayey sands or sandy clays. LATERAL EARTH PRESSURES Lateral pressures on walls depend on such factors as the type of wall, hydrostatic pressure behind the wall, type and slope of backfill material, degree of backfill compaction, allowable wall movements, and surcharge loading conditions. Where anticipated wall movements are greater than approximately 0.5 percent of the wall height or wall movement is constrained lateral earth pressures should be estimated for an "at rest" condition Where anticipated wall movements are greater than 0.5 percent of the wall height, lateral earth pressures should be estimated for "active" condition. Walls backfilled with on-site silty sands material should be designed for an equivalent fluid lateral earth pressure of 55 pounds per cubic foot for the "active" condition and 45 pounds per cubic foot for the "at rest" condition We recommend a coefficient of sliding resistance between the concrete and bearing soils of 0.4 be assumed in the analysis. These values do not consider sloping backfill, surcharge loading, hydrostatic pressures, or horizontal swelling pressures. If any of these conditions are anticipated, lateral earth pressures will need to be adjusted. Disturbed subbase material and fill against footings, stem walls and retaining walls should be compacted to a density of 95% of maximum density and within 3% of optimum moisture, in accordance with ASTM D698. Medium to high plasticity clay soils should not be used as subbase or structural backfill material. FLOOR SLABS The following recommendations are to be provided during construction: 1 . Slabs should be designed for the imposed loading, any expansive or settling soils in the subgrade, and be structurally independent of bearing members and utilities. Any additional recommendations for reducing expansiveness or settling called out under the FOUNDATION section should also be followed in this section. 2. To minimize and control shrinkage cracks that may develop in slabs, control joints are recommended every '15 feet and at areas of potential cracking. The total area contained within these joints should be no greater than 225 square feet. Page 5 of 9 HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO 200039 Beebe Draw Farms May '2, 2000 3. Slabs should be continuously reinforced with wire mesh or equivalent. 4. A minimum of 4 inches of clean granular material such as squeege should be vibrated in place beneath all concrete slabs 5. Granular structural fill, as needed, beneath footings or slabs should be placed in maximum 8-inch lifts compacted to ninety-five percent (95%) and three percent (3%) of optimum moisture in accordance with ASTIM D698. 6. Proposed material to be used for structural fill should be evaluated by a geotechnical engineer prior to installation. A geotechnical engineer should closely observe and or test structural fill installation. 7. The geotechnical engineer should complete any required inspections and testing of all subbase and imported material prior to the placement of footer forms or other permanent structures. Required subgrade repair actions could result in the removal of placed concrete. 8. Exterior slabs exposed to de-icing chemicals or extreme weathering should be constructed using Type II cement with higher air contents and higher compressive strengths. SUBSURFACE DRAINAGE Groundwater was not encountered at the site at the time of the subsurface investigation. For structures founded on the silty sands and poorly graded sands, we do not recommend subsurface drainage for these soil types For structures with subsurface living spaces founded on the sandy clays and clayey sands, the following is recommended: 1) The installation of a drain system during construction is recommended due to possible changes in groundwater levels or future drainage problems caused by broken pipes or the irrigation system. The perimeter drain should be installed around the top of the footer sloping to a sump area at a slope of one-eighth inch per foot (1/8"/1'). The drain should be constructed with four inch (4"), or greater, perforated pipe and should be surrounded in a gravel bed with a minimum of eight inches (8") of one and one-half inch (1-1/2") or three quarter inch (3/4") clean washed gravel. Building paper should be placed above the gravel prior to backfilling. 2) Dampproofing measures should be included during construction. and may include waterproofing sprayed onto the foundation wails and/or an IPimpervious membrane installed adjacent to the exterior of the foundation wall. A clean granular backfill placed adjacent to the barrier should be IN Page 6 of 9 S HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO. 2)0039 Beeoe Draw Farms May 12 2000 installed to allow surface water to enter the perimeter drain described above. GENERAL RECOMMENDATIONS The following recommendations should be followed during construction and maintained by the owner at all times after the structure has been completed. These recommendations are provided to minimize cracking, heaving or settlement of structures due to exposure to moisture caused by irrigation, pooling or runoff of water or breaks in water lines. 1 . Finished grade should be sloped away from all concrete structures on all sides to give positive drainage. A minimum slope of 6 inches for the first 10 feet is suggested. The installation of any object or structure that may imede add t onal the precalutions.ve drainage the other require builder, homeowner landscaper should ensure that the drainage slope from one structure does not cause runoff waters to flow around or onto any other structure that may be harmed by the pooling or flow of water. 2. Gutters and down spouts should be designed, installed, and maintained to carry roof runoff water at least five feet beyond the limits of the foundation backfill area as well as all concrete structures to include: sidewalks porches, steps, driveways and foundations. The pooling of water or the flow of water around or under any structure may cause erosion, settlement, or swelling of soils. The owner must ensure that that all landscaping and structure drainage systems are designed and installed to remove water from around all structures without creating ponding or water flow that will erode the soils and gravels below or around the structures. 3. Underground water supply lines and sprinkling systems should be designed such that piping is installed a minimum of 5 feet outside the backfill of the foundation wall and 2 feet away from all other structures Heads should be designed so that irrigation water is not sprayed withir three feet of foundation walls and two feet of driveways, sidewalks, porches or other structures. These recommendations should be taken into accoun for planned landscaping. Any excavation into subgrade materials below o around any that the effected structure concrete structure does not not fail due to subgrade failure. sc ion system must be repaired terior 4 'Backfill mfoistened and coxmpacted to foundation walls non-structural least ninety percent (90%) of Standard Proctor in accordance with ASTM D698. Backfill below porches , sidewalks, garages and driveways should be compacted to ninety-five percent (95%) of Standard Proctor in accordance with ASTM D698. Page 7 of 9 HORIZON CONSTRUCTION SERVICES, LLC PROJECT NO 200039 Beebe Draw Farms May 12, 2000 5. Lawn edging used around the exterior of the structure should be perforated to prevent surface water ponding in the vicinity of backfill soils. Sod or other vegetation that requires regular watering should not be placed within three feet of the foundation wall area or two feet of other structures to include porches, steps, sidewalks, and driveways. 6. The exterior backfill should not be covered with polyethylene moisture barrier. A weed suppressant geotextile fabric, to allow for natural evaporation of the backfill soils, should be used instead. Sheeting placed below soils or gravel should be installed so that water is not directed toward any structure to include porches, steps, sidewalks, foundation walls or driveways. 7. Footings should be proportioned as much as practicable to minimize differential movement. 8. Compaction requirements should be completed as described in Appendix C, " Suggested Specifications for Placement of Structural Fill". 9. A Registered Professional Structural Engineer should design the sub- structures, and they should take into account the findings and recommendations of this report. 10.Backfill material should be free of frozen soil, dried clods and organic matter. Backfilling should only be accomplished when concrete strength and adequate support to foundation walls are applied and acceptable to the Structural Engineer. 11 .The site soils are susceptible to moderate erosion when ground cover is removed, therefore erosion control measures will be necessary during and after construction at each building site. GENERAL COMMENTS This report has been prepared to aid in the evaluation of the property and to assist the architect and engineer in project design. In the event any changes in the design of the structures or their locations are contemplated, the conclusions and recommendations contained in this report will not be valid unless said changes are reviewed and conclusions of this report modified or approved in writing by Horizon Construction Services, LLC. The professional judgments expressed in this report meet the standard of care of our profession. Every effort was made to provide comprehensive site coverage through careful locations of the test borings, while keeping the site investigation economically viable. Variations in soil and groundwater conditions between test borings may be encountered during construction. In Page 8 of 9 HORIZON CONSTRUCTION SERVICES, LLC PROJECT INC!. 200039 Beebe Draw Farms May 12, 2000 order to permit correlation between the reported subsurface conditions and the actual conditions encountered during construction and to aid in carrying out the plans and specifications as originally contemplated, we recommend that a geotechnical engineer be retained to perform continuous excavation and foundation construction review. Horizon Construction Services, LL.C assumes no responsibility for compliance with the recommendations included in this report unless we are retained to perform adequate on-site review during construction. Analyses were performed and this report was prepared for the exclusive purpose of providing geotechnical engineering and/or testing information and recommendations. Environmental and flood plain assessments were not conducted and are not within the scope of this study. ASTM methods, if any, used in this report apply only to the specified test and any cross references listed in that specific ASTM are not implied or to be inferred. We were not provided with information or have knowledge of any hidden structures or other historical events which may effect this property. At least five separate oil companies maintain oil batteries and accompanying lateral underground lines throughout the property. These companies should be notified prior to any future excavations or subsurface investigations. Other utility companies should also be notified prior to any subsurface work. Page 9 of 9 Hello