HomeMy WebLinkAbout992218 A C� .
3UL
,) Weld County Referral
wage stEcto ��July 7,1999
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant RiverDance PUD/Mike Case Number Z-528
Siegrist
Please Reply By July 27, 1999 Planner Ben Patton
Project PUD Change of Zone in the MUD area for 600-800 residentiaUcommercial lots
located in the A(Agricultural) zone district.
Legal Located in Section 35 and the W2 of Section 36, T3N, R68W of the 6th P.M., Weld
County, Colorado.
Location East of and adjacent to 1-25; south of and adjacent to Weld County Road 28.
•
Parcel Number Various -see legal
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) August 17, 1999
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
❑ We have reviewed the request and find no conflicts with our interests.
See attached letter. ,,,,,r 2J /e t .- ko
Comments: r pp /
h2 0:.51-'it t ri 1( (.7hn1'1�nM I st P t-O 'k vv \ a c Ana 7 Q-
4.
rL wad
(,CAS((K " V" I CAA cilY/.l /_\ - I k•5 W r ,Gt Lt1 `,f)e �i Vn'•ZL�
be loft oygatoIQ ,z�
Signature Date 7/2�/5
Agency
It
II
51. il/;, - Jc.4//twnn .c>r hfel (� J y.
�vn l
+Weld County Planning Dept. •>1555 N. 17th Ave.Greeley,CO.80631 •:•(970)353-6100 ext.3540 4(970)304-64• 2' EXHIBIT
992218 1 0
St Vrain Valley School District RE-1J
395 South Pratt Parkway • Longmont • CO • 80501-6499
303-776-6200/449-4978 • FAX 303-682-7343
MEMORANDUM
unpin(= Dept.
DATE: June 2, 1999 JUL ? c
1999
TO: Molly Orklid-Larson RECEIVED
Tuttle-Applegate, Inc.
FROM: Scott Toillion, Planning Specialist
RE: Cash-in-lieu agreement - Riverside
Thank you for providing the information on the Riverside proposal to the St. Vrain
Valley School District and your willingness to help the District mitigate the impacts of
development on the schools. After reviewing the site and the demographics the
District would opt for the cash-in-lieu payment rather than a land dedication in this
location. Enclosed is the standard agreement for Weld County development
proposals which identifies the cash-in-lieu requirements. This development would be
required to pay $427 per single-family unit and $196 per townhouse/condo unit prior
to the issuance of a building permit. The note to be placed on the plat is as follows:
"No building permit shall be issued by the County or any other local government for
construction of any new residential dwelling within this plat until the applicant shall first
supply the local government building department with a verified document signed by a
representative of the St. Vrain Valley School District RE-1J which states that the
obligation to pay a cash in-lieu of land dedication fee has been accomplished".
This agreement will be revised and updated when you can provide the final
development numbers, the legal description of the property and the appropriate
signature block information. Once this agreement and its requirements are
implemented the District concerns would be satisfied. Please let me know any
questions you may have.
cc: Ken Kirkland, Assistant Superintendent for Auxiliary services
Scott Ballstadt, Weld County Department of Planning Services
"Excellence - Our Only Option"
� I
Exhibit B School 'arming N. _,side
Standards And
Calculation of
In Lieu Fees
Single Family
h I PI nnin nd r s
Number Projected Student Site Size Acres of Developed
Of Student Facility Standard Land Land Cash-in-lieu
Units Yield Standard Acres Contribution Value Contribution
Elementary _ 474 0.35 + 525 10 3.16 $25,100
165.9
Middle Level 474 0.14 750 25 2.21 $25,100
66.36
High School 474 0.17 1200 40 2.69 $25,100
80.58
Total _. 312.84 8.06 $25,100 $202,256
Single Family Student Yield is .66 $427
Per Unit
r -
6/8/99
Exhibit B School Planning
Standards And
Calculation of
In Lieu Fees
Condo/Townhouse ,
School Planning Standards
Number Projected Student Site Size Acres of Developed
Of Student Facility Standard Land _ Land Cash-in-lieu
Units Yield Standard Acres Contribution Value Contribution
Elementary 110 0.13 525 10 0.27 $25,100
14.3
Middle Level 110 0.11 750 25 0.40 $25,100
12.1
High School 110 0.05 1200 40 0.18 $25,100
5.5
Total 31 .9 0.86 $25,100 $21 ,562
$196
Condo/Townhouse Student Yield is .29 Per Unit
TOTAL ES N6 HS
Total Student Yield: 344.7 180.2 78.5 86.1
Total acreage required: 8.92 _ $223,817.90
Total Dwelling Units 584
6/8/99
5703502181 CDUT BUSINESS OFFICE 096 P92/02 RUG 93 '99 07:57
y , .. rrE,,.1 ti, ) .rI/) 7 i I /pi .i/Q„ ).nis iI11r.sr 'i / ;vy
/74.429/7/ -Y,(Jr/c P ;, a4Q,ItyJo &GLp' rPJ 47 ''41.• Litini
_ jilt t('4r\
f
* W l County Referral
V
�P
c July7, 1999
III lill O
COLORADO ‘_... t,tip
Zse vz a-66'
The Weld County Department of Planning Services has received the following item for review: —0
Applicant RiverDance PUD /Mike Case Number Z-528 °
Siegrist 3
Please Reply By July 27, 1999 Planner Ben Patton
Project PUD Change of Zone in the MUD area for 600-800 residential/commercial lots
located in the A(Agricultural) zone district,
Legal Located in Section 35 and the W2 of Section 36, T3N, R68W of the 6th P.M., Weld y
County, Colorado.
Location East of and adjacent to 1-25; south of and adjacent to Weld County Road 28.
- Parcel Number Various-see legal
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be CFI
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) August 17, 1999
0 We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
0 We have reviewed the request and find no conflicts with our interests.
❑ See attached letter. OS
Comments:
—Fr'4G'G el-t.,c iv)sc{-1Rcitni-. Applic ti-dd no-fc 3
SD chem 2,.3.5 0E -t-he, lccce�s Code- . T 2.5 L./.-)1.at n Wig w i 11
refire_ or . Coo c>AckI-h'dnnal k ,4- -Qro rn ex te+inc 2-o(A) \t 6 '
Signature Ain Alin - (dt_, Date 1/27 /99
Agency 7&QQr
+Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO.80631 +(970)353.8100 ext.3540 +(970)304-8498 fax
1r
1 EXHIBIT
Aug-02-99 11 : 21A Colo Gee Survey 3038662461 P _ 01
STATE OF COLORADO
COLORADO GEOLOGICAL.SURVEY
pivi5inn of Minerals and GeologyPlerNIPI
Department3 of Natural Resources
13 I 3 Sherman Street, Room 77 i
Denver,Colorado 80203 Vet
Phone:13113)866-2611
FAX:(303)856-2461 August 2, 19)9 DEPARTMENT OF
NATURAL
RESOURCES
Mr. Ben Patton WE-00-0006
Weld County Planning Department oni°„'°^'
uuve,vev
1555 N. 17th Ave w,d<ncr
Greeley,CO 8063 I Executive Director
Viarl II I ong
Re: Riverdance PUp "'°^I^^ In,
CGS Review No. WE-00-0006 Vicki C„w.,^
State CeoloSi;t
and Director
Dear Mr. Patton:
In response to your response and in accordance with Senate Bill 35 (1972)1 visited this property
to review the plat. The referral was for a change in zone from agricultural to PUD.
CCiS has no objection to the change in zone,but the following issues should be considered for the
preliminary plat
1) Flood plain. A CT.OMR will be required from FEMA for any improvements within the 100-yr
flood plain. This is discussed in the application report.
2) Oil and gas operations. If the oil wells and tanks are to remain on site after development, it
should be made clear on the preliminary plat that service trucks will be using the development
roads for access.
3) Bank stabilization. I saw no signs that the banks to the lakes were in the process of being
undercut by wave action. However, the very coarse soil,composed of sand, gravel, and pebbles,
is actively eroding and creating rills along the northwest bank of the eastern lake, The banks will
be regraded in preparation for construction of the lakefront houses. A minimum 50-ft setback
from the lakes should he observed for construction. The banks should be stabilized with native
vegetation to prevent continued erosion that would lead to lot deterioration. It may be necesssary
to use erosion control blankets locally,in addition to topsoil, to establish vegetation.
4) Soil. The subsurface material varies across the site from terrace gravels to bedrock of the
Pierre Formation to windblown silts and clays. Soils derived from alluvial material should
provide good subgrade for foundations. However, groundwater will be higher in areas underlain
by gravels,and basement construction is not recommended without a detailed subsurface
investigation and subsurface drainage system. The bedrock, depending on the degree of
cementation, may he more difficult to excavate than surrounding materials. Also, the Pierre
bedrock should be sampled during a preliminary subsurface investigation to determine the
potential for swell. Swelling soils or bedrock will require special foundation and flour
considerations. Likewise, the windblown silts and clays may have the potential for either swell or
collapse behavior, and the subsurface investigation should characterize these soils as well.
Post-it-Fax Note 7671 / "of
oat a
a � Pegee�
To Fro
♦ t
COIF)1�.yt. � r/��1 1. Co. ,... III T
Net -7t/- - ((?.(e)0 Phone„;, pp d S /JPJ� L� 'J ___.
Fax.ly� -✓ j/, .. IL/ z- FAY
Aug-02-99 11 : 21A Colo Geo Survey 3038662461 p - 02
•
•
Riverdancc PUD,p.2
5)Drainage. As stated,groundwater is likely to he shallow beneath the flood plain sediments and
is possibly also high in the farmed area. Currently, flood irrigation will obscure the natural
groundwater conditions,but the proximity to drainages increases the likelihood of shallow
groundwater, at least locally. The boring logs for the subsurface investigation should indicate the
depth to groundwater both during drilling and also a specified time after drilling when the system
has equilibrated_ A groundwater contour map should be prepared for use in planning and design.
All homes should he designed with a perimeter drain to prevent the accumulation of subsurface
water. Because the lot density is high, it may be necessary for the perimeter drains to discharge
to an underdrain beneath the site.
6)Wetlands. The wetlands should be delineated by a qualified consultant. Any disturbance of
these areas will require an approval of the Army Corps of Engineers, as stated in the application
report. Tt is important.to remember that if wetland areas are filled, they still provide a preferred
path for groundwater migration. Lots platted in these areas will likely be subject to wetness, at
least seasonally, unless there is redirection or containment of subsurface flows by drains.
In summary, the next stage of planning must include a preliminary subsurface investigation and
should address the issues listed above. Please call me if there are any questions.
Yours truly 7
• -be
Celia Gree an
Geologist
O0UNI4/,y MOUNTAIN VIEW FIRE PROTECTION DISTRICT
P Administrative Office:
s 9119 County Line Road• Longmont, CO 80501
•
(303) 772-0710• FAX (303) 651-7702
VIEW
July 22, 1999
Mr. Ben Patton
Weld County Planning Department
1555 North 17th Avenue
Greeley,CO 80631
Dear Mr.Patton:
I have reviewed the submitted material pertaining to the change in zoning for the RiverDance PUD/Mike
Siegrist, located east of and adjacent to 1-25; south of and adjacent to Weld County Road 28. (Case
Number Z-528). The Fire District does not object to the request for rezoning provided the development
meets the requirements of the Fire District. All applicable codes as they pertain to water supply, fire
hydrant locations, fire department access,and street widths and designs must be met.
Construction plans for the utilities showing the location of fire hydrants, the size of water mains and
available fire flows must be submitted to the Fire District for review and approval prior to beginning
construction. The submittal must include a water supply analysis indicating the available fire flow at the
most demanding point in the water system.
We appreciate being involved in the planning process. Should you have any questions, please contact me
at 772-0710.
Sincerely,
r \QQ\
LuAnn Penfold
Fire Marshal
LMP/lp
cc: Molly Orkild-Larson,Tuttle Applegate,Inc., 11990 Grant Street,#304,Denver, 80233
Mike Siegrist, Siegrist Companies, 875 West 64th Avenue,Denver,CO 80221
project file
file
107.17.99
4
s EXHIBIT
Station 1 Station 2 Station 3 Station 4 Station 5 Station 6 13
9119 Cnry Line Rd. 10971 WCR 13 P.O.Box 575 P.O.Box 11 10911 Dobbin Run P.O.Box 686 .l
Longmont,CO Longmont,CO 299 Palmer Ave. 8500 Niwot Road Lafayette,CO 600 Briggs
80501 80504 Mead CO 80542 Niwot,CO 80544 80026 Erie,CO 80516
N? of DEPARTMENT OF THE ARMY
�6` CORPS OF ENGINEERS, OMAHA DISTRICT
Q F TRI-LAKES PROJECT OFFICE, 9307 STATE HWY 121
Wi 14 E" m LITTLETON, COLORADO 90129-6901
o ilI � t Srin. _IC "n`,
p� REPLY
July 12, 1999 �'� Planning Dept,
ATTENTION
OF: JUL O 1999
RECEIVED
Mr. Ben Patton
Weld County Planning Department
1555 North 17th Avenue
Greeley, Colorado 80631
RE: RiverDance PUD / Mike Siegrist
Case Number Z-528
Corps File No. 199980435
Dear Mr. Patton:
Reference is made to the above mentioned project located in Section 35 and the West 1h of
Section 36, Township 3 North, Range 68 West, Weld County, Colorado.
If any work associated with this project requires the placement of dredged or fill material, and
any excavation associated with a dredged or fill project, either temporary or permanent, in waters of
the United States which may include streams, open water lakes, ponds or wetlands at this location, this
office should be contacted by a proponent of the project for proper Department of the Army permits or
changes in permit requirements pursuant to Section 404 of the Clean Water Act.
If there are any questions concerning this matter, contact Mr. Terry McKee of this office at
303-979-4120 and reference Corps file No. 199980435.
Sincerely,
°° Flo
V"' Timothy T. Carey
Operations Manager
jb
ir
ll EXHIBIT
Weld County Referral
IJuly 7, 1999
C.
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant RiverDance PUD/Mike Case Number Z-528
Siegrist
Please Reply By July 27, 1999 Planner Ben Patton
Project PUD Change of Zone in the MUD area for 600-800 residential/commercial lots
located in the A(Agricultural) zone district.
Legal Located in Section 35 and the W2 of Section 36, T3N, R68W of the 6th P.M., Weld
County, Colorado.
Location East of and adjacent to I-25; south of and adjacent to Weld County Road 28.
Parcel Number Various- see legal
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) August 17, 1999
❑ A/e have reviewed the request and find that it does/does not comply with our Comprehensive Plan
FoRt We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments: }� &Oftt ?fS on eack La r Qi e YeaUInCL TD hauz E/14�i1��' 1
foQgIQI/O41 QM on nfnho%e. I/PS/ecr7onenauwcrecrlayQ6 ole�ti tie cii C•797i*tp.-
r rb4//id,:i�S,fRc/ud,�y t—OVM4rataileyj 6o Audi-/A Jha Laid erksWry fur/a7/1 boa
Nally ktt (" /ri Ssho[I C16519de ,1VaporctfTdV.Z.44'-eCticeniedK t$rare OF Lo oradc, enoen9� s.4 `04/44¢ 145 @n !ns -ecnon eon KI l�Signature by u re rechtuo //?/,noel Glen y�ed IseAgency 7/S/_O q
:Weld County Planning Dept. +1555 N. 17th Ave.Greeley,CO.80631 +(970)353-6100 ext.3540 4(970)304 . 4 taxi
I
Longmont Soil Conservation District
9595 Nelson Road, Box D - Longmont, CO 80501 - Phone (303)776-4034 w"Fax'(g03)014,49B9anninp DepL.
AUG 0 1999
July 20, 1999 RECEIVED
RE: RiverDance PUD/Mike Siegrist - Case # Z-528
PUD Change of a zone in the MUD area for 600-800 residential/commercial lots located in
the Ag. Zone district.
This request site is located east of and adjacent to I-25, south of and adjacent to WCR 28. The
proposed site consists of 486.75 acres. This PUD proposal is for residential and commercial
development. The residential development includes Lakefront &Equestrian Estates, large
suburban& suburban lots, patio &town homes. Commercial development is proposed along the
I-25 frontage road consisting of a gasoline station, video store, bakery, dry cleaners and
professional offices. This proposed development is located within the flood hazard overlay
district, however, no structures are proposed within the floodway. Mining has occurred in the
floodplain,which has increased the ability of the over bank to handle more floodwater. A new
floodplain boundary will be established with a Conditional Letter of Map revision submitted to
FEMA and approval received prior to on-site construction. All wetlands should be preserved as
much as possible. There is a weed management plan. The maximum building coverage will be
determined at the time of the final plat. Approximately 47% of the proposed site will be open
space. Water taps will be provided by the Little Thompson Water District. The St.Vrain
Sanitation District (Saint San)will provide sanitary sewer service to the proposed development
subject to conditions and rules ®ulations of the St. Vain Sanitation District.
Soils Found On Site:
Achilles&Accents
Deep poorly drained soils subject to flooding
Kim Loam 3- S%
Permeability is moderate, available water capacity is high, surface runoff is medium, and the
erosion hazard is moderate. This soil has a good potential for urban&recreational development.
This soil has a limited capacity for supporting a load. Septic tank absorption fields function
properly, but community sewage systems should be provided if the population density increases
Nelson Fine sandy loam 3- 9%
Permeability is moderate to rapid, available water capacity is moderate, surface runoff is medium
to rapid and the erosion hazard is moderate. Neither septic tank absorption fields nor sewage
lagoons operate properly. Plantings of trees and shrubs may be difficult to establish. Site
preparation for dwellings is more costly. This soil is suited to limited cropping. Potential native
vegetation on this site is dominated by sand blue stem, sand reedgrass, and blue grama.
Switchgrass, sideoats grama and western wheatgrass are also prominent. Pubescent wheatgrass &
crested wheatgrass are also suitable for seeding. This soil does have good potential for
recreational development such as camp, picnic areas and playgrounds.
CONSERVATION-DEVELOPMENT-SELF-GOVERNMENT
Tassel Fine Sandy Loam 5-20%
Permeability is moderate to rapid, available water capacity low, surface runoff medium and
erosion is moderate. Windbreak & environmental plantings are generally not suited to this soil.
Production of vegetation on this treeless soil is low. Poor potential for urban development.
Wiley-Colby Complex 1-3%
Permeability is moderately slow, available water capacity is high, surface runoff is medium and the
erosion hazard is moderate. Windbreaks and environmental plantings are generally well suited.
The best suited trees; Rocky Mtn. Juniper, Eastern Red Cedar, Ponderosa Pine, Siberian Elm,
Hackberry. Best suited shrubs; Skunkbush Sumac, Lilac, Siberian Peashrub and American Plum.
Soils have fair to good potential for urban development.
The weed management plan, if followed, will do a good job of controlling the noxious weeds. The
Home Owners Association will need to be made aware of their responsibility to continue to
control noxious weeds once the HOA takes control.
I would suggest a Specific Site Review before any construction is started because of the diversity
in the soil types. I would also suggest the lowest density of lots possible.
Thank you for the opportunity to comment on this request.
Sincerely,
Longmont Soil Conservation District
STATE OF COLORADO
OFFICE OF THE STATE ENGINEER oeco�o
Division of Water Resources e��
Department of Natural Resources
1313 Sherman Street, Room 818 �r »�
Denver,Colorado 80203 .1276.
Phone:(303)866-3581 r Planning DePt.
FAX:(303)866-3589 N�'�? — —' �+t Bill Owens
July 26, 1999 & Governor
http://water.state.co.us/default.htm
1999 Greg E.Walchcr
AUG 07, Executive Director
Mr. Ben Patton Hal D.Simpson,P.G.
Weld County Planning Dept. RECEIVED State Engineer
1400 N. 17th Ave.
Greeley, CO 80631
RE: RiverDance P.U.D., Z-528
Sections 35 & 36, T3N, R68W, 6th P.M.
Water Division 1, Water District 4
Dear Mr. Patton:
We have reviewed the above referenced proposal to subdivide 486.75 acres into 600 to 800
residential and commercial lots. The proposed water source is Little Thompson Water District (District)
and a letter of commitment for service has been submitted for 125 lots in phase one and 512 lots in
phase two.
The District will supply treated water to the development. As a condition of activation of the taps,
the applicant must transfer 1 unit of Colorado-Big Thompson (CBT) raw water (1 acre-foot per unit) for
each lot, administered by the Northern Colorado Water Conservancy District, to Little Thompson Water
District. No information is provided for the water use on commercial lots. Also, the District has not
provided evidence that the applicant has transferred or will transfer the necessary shares of CBT water
to the District.
Based upon the above and pursuant to Section 30-28-136(1)(h)(II), it is our opinion that
the District has not submitted sufficient evidence documenting that the proposed water supply
can be provided without causing injury to existing water rights. Should you have any questions,
please contact Heidi Frey of this office.
Should you have any questions, please contact Heidi Frey of this office.
Sincerely,
Kenneth W. Knox
Assistant State Engineer
CC: Richard Stenzel, Division Engineer
Water Supply Branch
Little Thompson Water District
KWK\HCF:word\riverdance d EXHIBIT
MEMORANDUM
TO: Ben Patton, W.C. Planning DATE: August 9, 1999
' C FROM: Trevor Jiricek, W.C. Department of Public Health anm Environment
COLORADO SUBJECT: Z-528, RiverDance PUD/Mike Siegrist
The Weld County Department of Public Health and Environment has reviewed this proposal. Our
staff have also observed the proposed site.
The application has satisfactorily addressed water and sewer service. Water will be provided by the
Little Thompson Water District and sewer will be provided by the St. Vrain Sanitation District.
The application materials also adequately address the potential environmental impacts as described
in Section 6.3.1.2.1 of the PUD Ordinance. However, the fate of waste water from the Equestrian
Center was not adequately addressed in this application. The Preliminary Drainage Report and
Water Quality Management Plan states that"Runoff from the Equestrian Center could be conveyed
to the unnamed swale in the eastern portion of the project." The Plan also goes on to state that the
swale currently contains wetland vegetation and eventually discharges into St. Vrain Creek. The
Colorado Water Quality Control Act prohibits discharges to waters of the State. Both surface water
and groundwater are considered waters of the State. As a result,we are requesting that the applicant
submit an updated waste water management plan, for the Equestrian Center, to be submitted with
the Final Plan. I have enclosed a copy of the Confined Animal Feeding Operation Control
Regulations for guidance in drafting the Plan. I would encourage the applicant to review Section
81.6 of these Regulations prior to formulating the plan.
Additionally,due to the proposed density of the subdivision in close relation to the Equestrian Center
we are requesting that the applicant also submit Plans concerning the minimization and management
of flies, dust, and odors created from the Center. Our Department is concerned that the agricultural
type uses may conflict with the nearby residents resulting in complaints, etc. We recommend that
all of these Plans (waste water, fly, dust, and odor)be incoporated into the covenant or other legal
document.
The following are our preliminary recommended conditions for this application:
1) The applicant shall obtain water and sewer service from the Little Thompson Water District and
the St. Vrain Sanitation District.
2) In the event that 5 or more acres are disturbed during the construction and development of this
site, the applicant shall obtain a storm water discharge permit from the Water Quality Control
Division of the Colorado Department of Public Health and the Environment. Silt fences shall
IS
EXHIBIT
RiverDance PUD/Mike Siegrist
August 9, 1999
Page 2
be maintained on the down gradient portion of the site during all parts of the construction phase
of the project.
3) During development of the site, all land disturbance shall be conducted so that nuisance
conditions are not created. If dust emissions create nuisance conditions, at the request of the
Weld County Health Department, a fugitive dust control plan must be submitted.
4) In accordance with the Regulations of the Colorado Air Quality Control Commission any
development that disturbs more than 5 acres of land must incorporate all available and practical
methods which are technologically feasible and economically reasonable in order to minimize
dust emissions.
a) If land development creates more than a 25 acre contiguous disturbance, or exceeds 6 months
induration, the responsible party shall prepare a fugitive dust control plan, submit an air
pollution emissions notice, and apply for a permit from the Colorado Department of Public
Health and Environment.
5) The "Right to Farm" covenant shall be placed on the plat.
In the event inadequate waste water, fly, dust, or odor plans are submitted for the final plan, we will
recommend conditions to address these issues.
If you have any questions, please call me at extension 2209.
tj/z528
MEMORANDUM
TO: Ben Patton,'Planner DATE: July 30, 1999
lFROM: Donald Carroll, Engineering Administrator 121'WI DO SUBJECT: Z-528; River Dance PUD/Mike Siegrist
COLORADO
The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the
purview of the Weld County Mixed Use Development Area (MUD) Planned Unit Development Standards. Our
comments and requirements are as follows:
COMMENTS:
The two major transportation items to be addressed in the change of zone are a traffic impact analysis and storm
water drainage. A new traffic impact analysis for the River Dance Subdivision was included and has now been
forwarded to our traffic analysis consultant, Felsburg, Holt, and Ullevig for their comments and review. A
Preliminary Drainage Report and Water Quality Management Plan has been prepared by Tuttle Applegate. This
has been reviewed and I have no conflict with this report. All drainage plans shall be stamped and signed by a
professional engineer.
REQUIREMENTS:
WCR 28 is identified on the Mixed Use Development Structural Transportation Network Map 2.2 as a collector
status/two-lane road with painted median. Current right-of-way is 60 feet. The developer is required to dedicate
an additional 10 feet of right-of-way which will represent one half of the ultimate width requirement. A Road
Improvements Agreement to construct one half of WCR 28 adjacent to the PUD shall be completed. A chemical
dust suppressant shall be applied to the remaining gravel portion of WCR 28 west to the Frontage Road.
An additional 10 feet of dedicated right-of-way adjacent to WCR 28 shall be placed on the plat.
A typical cross section should reflect a collector/two-lane road with painted median.
cc: Z-528
Planning Dept.
planl5
MJG 02. 1999
RECEIVED
EXHIBIT
_
4
"alrifiNi4 Its a-"" "rata T1
-
„ •
Hello