Case#: S-563 Hearing Date: November 15, 2000
Applicant: Greeley-Weld Airport Authority Planner: Robert Anderson
Address: Post Office Box 727 Greeley, CO 80631
Request: Final Plat, Greeley-Weld County Airport Planned Unit Development
Legal: A tract of land located in Sections 1,2 & 3, T5N, R65W as well as Sections 26 &
35, T6N, R65W, 6TH PM, Weld County, Colorado.
Location: North and adjacent to State Highway 263; East of Weld County Road 43
Parcel Size : 1,190.00 +/- Acres
Dear Commissioners:
On November 14, 2000 at or about 4:20 pm the Department of Planning Services received the
attached referral from the Weld County Department of Public Health and Environment.
The Weld County Department of Planning Services recommends that the following Conditions
of Approval be incorporated into the Resolution as Paragraph 1. J through 1.U.
1.
J. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed
for final disposal in a manner that protects against surface and groundwater
contamination.
K. No permanent disposal of wastes shall be permitted at this site.
L. Waste materials shall be handled, stored, and disposed in a manner that
controls fugitive dust, blowing debris, and other potential nuisance conditions.
M. Fugitive dust shall be controlled on this site.
N. This facility shall adhere to the maximum permissible noise levels as described
in 25-10-101 through 25-10-108 C.R.S., as amended.
O. Adequate toilet facilities shall be provided for the public. CcV- 1885
4 EXHIBIT
P. All pesticides, fertilizer, and other potentially hazardous chemicals must be
stored and handled in a safe manner. Reference 25-8-205.5 Colorado Water
Quality Control Act and Rules and Regulations thereof.
Q. The facility shall utilize the existing public water supply (North Weld County
Water District) and/or the City of Greeley water supply when it becomes
available.
R. The facility shall maintain compliance with its Stormwater Discharge Permit.
S. The application materials indicate that some existing structure will be
removed. The facility must obtain the required demolition permits from the
Weld County Building Inspection Department and conduct any asbestos
related inspections as required by Regulation #8 of the Colorado Air Quality
Control Commission Regulations.
T. All future structures that require sewer service shall be served by the City of
Greeley sewer system.
U. In the event any existing septic system should no longer function in
accordance with the Weld County Individual Sewage Disposal System
Regulations, the system shall be abandoned and the structure it was serving
shall be connected to the City of Greeley sewer system. Any abandoned
septic system shall be abandoned according to Weld County Individual
Sewage Disposal System Regulations.
Respectfully Submitted,
Robert Anderson,
Planner
(it Memorandum
TO: Robert Anderson, W.C. Planning
I e DATE: November 14, 2000
FROM: Pam Smith, W.C. Department of Public
COLORADO Health and Environment L/
CASE NO.: S-563 NAME: Greeley-Weld Airport
The Weld County Health Department has reviewed this proposal.
The application has satisfactorily addressed PUD Ordinance Number 197 in regard to water
service. Water is presently provided by North Weld County Water District. The Development
Guide submitted in the change of zone materials, City of Greeley water will be available to
developments within the PUD in the future "...subject to special agreements with the City not
currently in place". Water from either the North Weld County Water District or the City of
Greeley fulfills the requirements of the PUD Ordinance.
The change of zone application materials appears to have satisfied the PUD requirements in
regard to sewer services. The Development Guide states future developments within the PUD
will be able to utilize the City of Greeley sewer services. Any existing septic system(s) in use
within the PUD are considered to be 'grandfathered'. However, in the event that any of these
systems fail, the system must be abandoned and service provided by the City of Greeley sewer.
The Department has addressed this item with a proposed condition.
The application materials also adequately address the potential environmental impacts as
described in Section 6.3.1.2.1 of the PUD Ordinance. Additionally, the Airport Authority has
had an Environmental Assessment conducted on the PUD property in conjunction with Federal
Regulations. A Finding of No Significant Impact (FONSI) was issued at that time.
The Department recommends approval with the following conditions:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities
Act, 30-20-100, C.R.S., as amended) shall be stored and removed for final disposal in a
manner that protects against surface and groundwater contamination.
2. No permanent disposal of wastes shall be permitted at this site.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, blowing debris, and other potential nuisance conditions.
4. Fugitive dust shall be controlled on this site.
5. The uses of the development shall comply with the appropriate permissible noise level
as described in 25-10-101 through 25-10-108 C.R.S., as amended.
6. Adequate toilet facilities shall be provided for the public.
_. EXHIBIT
cl
1 5315;3
7. All pesticides, fertilizer, and other potentially hazardous chemicals must be stored and
handled in a safe manner. Reference 25-8-205.5 Colorado Water Quality Control Act
and Rules and Regulations thereof.
8. The facility shall utilize the existing public water supply (North Weld County Water
District) and/or the City of Greeley water supply when it becomes available.
9. The facility shall maintain compliance with its Stormwater Discharge Permit.
10. The application materials indicate some existing structures will be removed. The facility
must obtain any required demolition permits from the Weld County Building Inspection
Department and conduct any asbestos related inspections as required by Regulation #8
of the Colorado Air Quality Control Commission Regulations.
11. All future structures that require sewer service shall be served by the City of Greeley
sewer system.
12. In the event any existing septic system should no longer function in accordance with the
Weld County Individual Sewage Disposal System Regulations, the system shall be
abandoned and the structure that it was serving shall be connected to the City of
Greeley sewer system. Any abandoned septic system shall be abandoned according to
Weld County Individual Sewage Disposal System Regulations.
In addition, the Department will review each additional use as it is presented in the Site Plan
Review process.
M:\PAM\Planning\FinalPlan\s-563.wpd
STATE OF COLORADO
OFFICE OF THE STATE ENGINEER oeco<
Division of Water Resources yield County Planning Dept. �s= °',
Department of Natural Resources y`'� N°
1313 Sherman Street, Room 818
Denver,Colorado 80203 OCT 11 2000
Phone:(303)866-3581
FAX:(303)866-3589
RECEIVED Governor
ol Owons
Governor
http://waterstate.co.us/default.htm
Greg E.Watcher
Executive Director
October 10, 2000 Hal D.Simpson,P.E.
Mr. Robert Anderson State Engineer
Weld County Planning Dept.
1 555 N. 17th Ave.
Greeley, CO 80631
Re: Case Number S-563, Greeley/Weld Airport
Sections 1,2, &3, T5N, R65W, 6th PM
Sections 26 & 35, T6N, R65W, 6th PM
Water Division 1, Water District 1
Dear Mr. Anderson:
Pursuant to the State Engineer's August 7, 1995 memorandum to county planning
directors this office is no longer providing comments on land use actions that do not involve
a subdivision as defined in Section 30-28-101 (10)(a), C.R.S. This referral does not appear
to qualify as a "subdivision." Returned herewith are the materials submitted to this office in
the above referenced matter.
If you have any questions in this matter, please contact this office at 303/866-3581 .
Sincerely, ( /
4(O
William C. McIntyre
Water Resource Engineer
Enclosures
cc: Richard Stenzel, Division Engineer
WCM:GreeleyWeldAirportrtn.doc EXHIBIT
Ev
3
OCMIIID‘H
County Referral Weld Co y
COctober 3, 2000
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Greeley/Weld Airport Case Number S-563
Please Reply By October 25, 2000 Planner Robert Anderson
Project Final Planned Unit Development Plan (Administrative Review)
Legal Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North
of the 6th P.M., Weld County,.Colorado.
Location North of and adjacent to WCR 43, bisected by WCR 62
Parcel Number
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable)
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
•
CO
Signature • Lac/y Date 10\ 15Agency O i Y I SIG. c tAaVrK
+Weld County Planning Dept. •:•1555 N. 17th Ave. Greeley,CO.80631 •:•(970)353-6100 ext.3540 +(970)304-6498 fax
it EXHIBIT
G
S#56_3
- ii
LH")
i 4111.1 Weld County Referral
I ::::; Cou;3iypi::n1 iili �t'6l _..11
C j "rvu� October 3, 2000
COLORADO 71 F (;- d c, F t
The Weld County Department of Planning Services has received the following item for review:
Applicant Greeley/Weld Airport Case Number S-563
Please Reply By October 25, 2000 Planner Robert Anderson
Project Final Planned Unit Development Plan (Administrative Review)
Legal Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North
of the 6th P.M., Weld County, Colorado.
Location North of and adjacent to WCR 43, bisected by WCR 62
Parcel Number ,
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated, Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable)
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
❑ We have reviewed the request and find no conflicts with our interests. 4
❑ See attached letter. Wax
Comments: 0 e(-Fed 20 Y1Q.QC1 1,s / \nor-'(I coiu:-
d `-la ! ccx�-E - (1a_ . C DoT nco dS -ta be, oc,l ud ec�
rAc, pIpys p�nrosy . `iha Shp--e, !--wy Acccs5 Ccce us, 1k
p I a ,..I en I e 11n kk o * Shp--e,,ccesse_s al lowed to +ijis
IDUD d po_55,y3 e ,cvtpro v e,w)e.Y1ts -E-O S I 2Ao3 as
+rra-6i c volum c.c.s increase .Signature 4 cu._I ca._ Date 10/25//0U
Agency l �J )r) l
+Weld County Planning Dept. 41555 N. 17th Ave. Greeley, CO. 80631 +(970)353-6100 ext.3540 •N970)304-6498 fax
i • EXHIBIT
1R
S #5103
--ti
4_ 6
i Weld County Referral
iiiipC• October 3, 2000
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Greeley/Weld Airport Case Number S-563 •
Please Reply By October 25, 2000 Planner Robert Anderson
Project Final Planned Unit Development Plan (Administrative Review)
Legal Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North
of the 6th P.M., Weld County, Colorado.
•
Location North of and adjacent to WCR 43, bisected by WCR 62
Parcel Number
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable)
❑ e have reviewed the request and find that it does/does not comply with our Comprehensive Plan
a We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments: 5 etc cFr-brie t- F.-/L 2-ra-la 0"79 S (71-1-99,'
o S- yb/t tM r-11- 9,1'
Signature Date /0/0
,
Agency A .rail
•:•Weld County Planning Dept. •:•1555 N. 17th Ave. Greeley, CO.80631 •:•(970)353-6100 ext.3540 :-(970)304-6498 fax
4 EXHIBIT
S #563
4' 'd County Planning Dept.
:)t: ( C<�) 2000 EfriWeld Countye e
C. October 3, 2000
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Greeley/Weld Airport Case Number S-563
Please Reply By October 25, 2000 Planner Robert Anderson
Project Final Planned Unit Development Plan (Administrative Review)
Legal Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North
of the 6th P.M., Weld County, Colorado.
Location North of and adjacent to WCR 43, bisected by WCR 62
Parcel Number
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable)
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
IA We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
Signature /6:51Date 2/6 „,--2,7_40-0-0
Agency
+Weld County Planning Dept. •:.1555 N. 17th ve. Gree ,CO.80631 fi(970)353-6100 ext.3540 •:•(970)304-6498 fax
+.� = EXHIBIT
(".1 5 *56,i
gNT op- DEPARTMENT OF THE ARMY
-trk '" � CORPS OF ENGINEERS, OMAHA DISTRICT
yet DENVER REGULATORY OFFICE, 9307 S. PLATTE CANYON ROAD
Q., I III LITTLETON, COLORADO 80128-6901
64, y�s REPLY TO October 23, 2000
ATTENTION OF'.
Vicki County Planning Dept.
Mr. Robert Anderson OCT 24 2000
Weld County Planning Department
1555 N. 17`h Avenue f) t r r � E D
Greeley, Colorado 80631 r y c
RE: Greeley-Weld County Airport,Final Planned Unit Development Plan, Case Number S-563
Corps File No. 199880354
Dear Mr. Anderson:
Reference is made to the above-mentioned project located in Sections 1-3, Township 5 North,
Range 65 West, and Sections 26and 35, Township 6 North, Range 65 West, Weld County, Colorado.
If any work associated with this project requires the placement of dredge or fill material, and any
excavation associated with a dredged or fill project, either temporary or permanent, in waters of the
United States which may include ephemeral, intermittent and perennial streams, lakes,ponds or wetlands
at this site, this office should be notified by a proponent of the project for proper Department of the Army
permits or changes in permit requirements pursuant to Section 404 of the Clean Water Act.
If there are any questions concerning this matter please call Mr. Terry McKee of this office at
303-979-4120 and reference Corps File No. 199880354.
Sincerely,
Ti •thy Ca.ey
Chie , : er Reg . ory Office
ks
EXHIBIT
S 4563
•
6 ', le!d Cou dy Planning Depa.
a t 0CT 26 2000
'' i 7 :II A � l ,rk.i Weld County Referral
C. October 3, 2000
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Greeley/Weld Airport Case Number S-563
Please Reply By October 25, 2000 Planner Robert Anderson
Project Final Planned Unit Development Plan (Administrative Review)
Legal Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North
of the 6th P.M., Weld County, Colorado.
Location North of and adjacent to WCR 43, bisected by WCR 62
Parcel Number
The application is submitted to you for review and recommendation. Any comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable)
U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
0 We have reviewed the request and find no conflicts with our interests.
U See attached letter.
Comments: W Ps C
Signature \ Date \0 a0 PO
Agency \nI G S G.O
•
%Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO.80631 •;(970)353-6100 ext.3540 Cx(970)304- 1"`--
- " 3. EXHIBIT
J
MINUTES OF THE WELD COUNTY UTILITIES ADVISORY COMMITTEE
A regular meeting of the Weld County Utilities Coordinating Advisory Committee was held on Thursday,
November 9, 2000, at 10:00 a.m., in the Conference Room of the Weld County Planning Department at
1555 N. 17th Avenue, Greeley, Colorado.
Members Present
Don Carroll Public Works
Don Magnuson Cache la Poudre Irrigating Co.
Mark Peterson St. Vrain Sanitation
Also Present: Robert Anderson, Kim Ogle, Department of Planning Services; Michael Reisman, Michael
Strawbridge, Greeley-Weld County Airport; Trisha Swanson, Secretary.
APPLICANT Floyd Oliver, Elms at Meadow Vale 3r° Filing
CASE NUMBER S-579
PLANNER Kim Ogle
REQUEST Planned Unit Development Final Plat for 108 Lots
LEGAL NW4 of Section 4, T2N, R68W of the 6th P.M., Weld County, Colorado.
LOCATION East of and adjacent to WCR 5.5; south of and adjacent to WCR 26
Kim Ogle, Planner, presented Case S-579. Kim noted that the previous filings for the Elms at Meadow Vale
did not have interior lot easements required, but that they did have front and back easements except
secondary street lots.
Don Carroll noted that there were only 3 members present, so an additional member of the Utility Board
would have to come in, listen to the minutes, and vote as well.
Mark Peterson noted that there is adequate slope and distance and that the site was well laid out. Don
Magnuson asked if the open space would be dedicated to easements as well. Don Carroll noted that this
may be a trade off for not having interior lot line easements.
Mark Peterson moved to approve the plat with the addition of a note on the plat to state as follows:"All sites
designated as "Open Space" shall also serve as drainage and utility easements. An note shall be placed
on the plat to this effect." Don Magnuson seconded the motion. Motion carried unanimously. Doug Dalton
of Public Service listened to the tapes and reviewed the material at 2:00 p.m. on November 9, 2000 and
gave his approval to the plat as well.
APPLICANT Greeley/Weld Airport
CASE NUMBER S-563
PLANNER Robert Anderson
REQUEST Final Planned Unit Development Plan (Administrative Review)
LEGAL Section 1, 2, and 3, Township 5 North, and Sections 26 and 35, Township 6 North of the
6th P.M., Weld County, Colorado.
LOCATION North of and adjacent to WCR 43, bisected by WCR 62
Robert Anderson, Planner, presented Case S-563 and noted that the Department of Planning Services is
recommending approval of the plat.
Mike Reisman of the Greeley-Weld County Airport noted that the internal roadways will remain private for
safety and control, but that they are going to be built out as the need arises, following the plan outlined in
the final plat. Mr. Reisman also noted that the roads on the south side of the plat are existing, but will be
renamed with official signs soon.
EXHIBIT
tt S*5(03
SUMMARY OF THE WELD COUNTY UTILITY BOARD
Thursday, November 9, 2000
Page 2
Don Carroll asked about the water to the site. Mr. Reisman noted that the terminal and some of the closer
buildings will be served by City of Greeley water, but that most of the existing buildings are only for dry
airplane storage. Mike Reisman also noted that the site is planned for annexation into the City of Greeley,
that some of the outbuildings will be served by North Weld water, but the sewer and water will be brought
in to the terminal from the City of Greeley.
Don Carroll asked if the utilities will be available on either side of the streets as noted on the plat. Mr.
Reisman noted that they will be and that there are statements of availability in the file.
Discussion followed concerning the possibility of expansion of the utilities in the future build-out of the site,
with Mr. Reisman noting that future expansion has been planned for, including future lines for water and
sewer.
Don Carroll asked if all the sheets of the plat will be recorded. Mr. Reisman noted that all the sheets will be
recorded.
Mark Peterson moved to accept the plat. Don Magnuson seconded the motion. Motion carried
unanimously. Doug Dalton of Public Service listened to the tapes and reviewed the material at 2:00 p.m.
on November 9, 2000 and gave his approval to the plat as well.