Loading...
HomeMy WebLinkAbout20002911.tiff 11 BOARD OF COUNTY COMMISSIONERS PHONE (970) 356-4000, EXT.4200 tso c(41: alpiH4C FAX: (970) 352-0242 P.O.OOX. BOX 758 GREELEY, COLORADO 80632 WI C. COLORADO November 15, 2000 MR CARL EIBERGER 754 WCR 23 3/4 BRIGHTON, CO 80601 Dear Mr. Eiberger: I have discussed the concerns noted in your letter with the Department of Public Works. Weld County Road 23.5 was graded twice weekly during the period of time that Weld County Road 6 immediately west of US Highway 85 was closed for a bridge replacement. It was our judgement that additional traffic was using the road as a detour during the closure. The dust suppressant was also applied along the roadway for the same reason. As you know, the roadway was re-graded and additional gravel was placed last week. Along with the work accomplished last week, we will continue to maintain this roadway on a weekly basis. We believe the additional aggregate and routine maintenance will alleviate your concerns with roadway roughness. Regarding your comments on littering, I have instructed the Department to schedule a weekend pickup along this roadway within the next few weeks. As I have indicated previously, the County has scheduled Weld County Road 23.5 for an improvement project. Design, right of way, and utility relocations are planned for 2000. Construction will start in 2001 starting from Weld County Road 2 and proceeding northward. The County continues to be committed to this project. If you have further questions on this issue, please call Frank B. Hempen, Jr., Director of Public Works, at 970-356-4000, Extension 3750. Sincerely, BOAR[j OF COUNTY COMMIS BONERS ebara J. Kirkmeyer, Chair pc: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer Jeff Jerome, Operations Division Manager �VIn`(Q 2000-2911 A'I /.-r /Fn CORRESPONDENCE RESPONSE RECEIVED DEPARTMENT OF 1 OCT 3 1 2000 WE_U COUNTY * * * PLEASE RESPOND WITHIN THREE DAYS* * * PUBLIC WORKS DEr T IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL OF EXPECTED DATE FOR RESPONSE. RECOMMENDED ACTION: Narrative: GB DH GV BK MG BOARD ACTION: (Initial by Approval) Agree with Recommendation 4 L" t/ '/ / Worksession METHODS OF RESPONSE: _— Board Action ork Session / Letter (Attached) e+µAI/CAA Fr"e1/46444/7 Telephone Call 11 No Response (explain) Depa ent Head • ire M'.\CAROL\O PMAN\R DCOM P2 Carl Eiberger _' 754 W.C.R. 23% Brighton, CO 80601 October 22, 2000 Barbara Kirkmeyer Weld County Commissioner 915 10th Street Greeley, CO 80632 Commissioner Kirkmeyer: (Re): Paving the Southern 8/10 of a mile of road 23 V2. Thank you for your letter regarding the above matter. As you may be aware, road 23 'h is not graded twice a week as we previously discussed, but some times it is three weeks between grading. Due to the chemical placed on the road to reduce the amount of dust, the washboard /rippling of the road cannot be removed by grading it. As you are aware, we have been unable to drive over 5 mph on the road without violently shaking the automobiles and motorcycles. Now it seems that due to the slow driving, people are throwing their trash and bottles out of their vehicles. While we have stopped several individuals after seeing this, it still continues. We have also picked up several bags worth of trash. The added concern is the broken glass along the road,which is dangerous to people, pets, horses and wildlife as you can imagine. Once again,we implore you to drive the road. As mentioned before, if a picture were worth a thousand words, than 1 drive down the road would be worth 1,000,000. Please drive the aforementioned road and call me as soon as you can. I can be reached at(303) 880-4001. Thank you, Carl Eiberger OFFICE OF BOARD OF COMMISSIONERS 915 10TH STREET P.O. BOX 758 GREELEY, COLORADO 80632 igiip WEBSITE: www.co.weld.co.us CI PHONE: 970-356-4000, 4200 FAX: 97 970-35-35 2-0242 COLORADO May 11, 2001 Mr. Carl Eiberger 754 WCR 23 3/4 Brighton, CO 80601 Re: Paving of Weld County Road 23 'h Dear Mr. Eiberger: This letter will serve as a reply to your previous requests for an update on paving WCR 23 'h. The issue was reviewed by the Board of Weld County Commissioners and Frank Hempen, Jr.,Director of Public Works/County Engineer. As you may be aware,the composition of the Board of County Commissioners changed in January of this year. The new Board determined it was appropriate to review all roadway improvement plans currently scheduled by the Public Works Department. The Board made several changes to the Improvement Plan. One of the changes was a determination not to pave WCR 23 '/2 at this time. In lieu of paving the roadway, a decision was made to cover it with a stabilized rock base. This process incorporates a chloride based compound with good quality road base. The resulting product is a hardened surface that greatly diminishes fugitive dust. It will be refinished once a year to maintain the roadway surface, thus controlling the effects of a raveling and potholes. The timing of this work will be discussed within the next two weeks when a revised Improvements Plan is considered by the Board. I am directing Mr. Hempen to advise you of the timing of this project as soon as a decision is made. A signal is planned for the intersection of WCR 6 and U.S. Highway 85. It is the No. 3 priority project in the Upper Front Range Regional Plan Project List. The Colorado Department of Transportation (CDOT) staff has projected construction as early as 2002. It is the consensus of the Mr. Carl Eiberger May 11, 2001 Page 2 Board that installation of this signal will encourage motorists to use this intersection for access to the south instead of WCR 23 1. The Public Works Department will monitor traffic counts to determine whether this assumption is correct. Sincerely, BOARD F COUNTY COMMISSIONERS M. t Geile, Chair pc: Frank B. Hempen, Jr., P.E.,Director of Public Works/County Engineer WCR 23 '1 file Hello