Loading...
HomeMy WebLinkAbout992216 PLANNED UNIT DEVELOPMENT CHANGE OF ZONE APPLICATION PLANNING DEPARTMENT USE ONLY: Case Number Application Fee: Zoning District Receipt Number Date Application Checked By: Planner Assigned to Case: TO BE COMPLETED BY THE APPLICANT: (Print or type only except for required signatures). 1 (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed PUD rezoning of the following described unincorporated area of Weld County. LEGAL DESCRIPTION: See Exhibit A (If additional space is required, attach an additional sheet of this same size or a copy of the deed) 120735000038 120735000051 PARCEL NUMBER:12.02i35.1)(111.( 9 120736000025 (12 digit number-found on TAX I.D. or obtained at the Assessor's Office) 1.20735000049 120736000031 NAME OF PROPOSED PUD SUBDIVISION River Dance P.U.D. EXISTING ZONING Ag PROPOSED ZONING P.U.D. TOTAL ACREAGE 486.75 OVERLAY DISTRICTS Flood hazard PROPOSED DEVELOPMENT GUIDE SUBMITTAL (Specific or Conceptual) conceptual PROPERTY OWNERS OF AREA PROPOSED FOR PUD REZONING: NAME Siegrist Companies, c/n Mike Siegrist PHONE (303) 427-8472 ADDRESS 875 W. 64th Avenue, Denver. CO 80221 NAME PHONE ADDRESS APPLICANT OR AUTHORIZED AGENT(if different than above *1 NAME Tuttle Applegate, Inc. , Molly 0rkild-Larson ADDRESS 11990 Grant St. , Ste. 304 Denver, CO 80233-1136 HOME TELEPHONE BUSINESS TELEPHONE 03 4 2-6611 If agent is different from the property owner, please submit written documentation frog th property owner authorizing said agent to represent the owner. (17_ r i � Signature. Owner or Authorized Agent 8 EXHIBIT 992216 mttleApplegate,Inc. Consultants for Land, Mineral and Water Development July 1, 1999 Mr. Ben Patton Weld County Planning Department 1550 North 17th Avenue Greeley, CO 80634 RE: RiverDance PUD—PUD Change of Zone Application Dear Ben: RiverDance is a Planned Unit Development proposal for residential and commercial development. The parcel is located north and adjacent to the St. Vrain Creek and one mile north of Interstate 25 and State Highway 119. The development is 486.75 acres in size (see Exhibit A) and provides a range of residential densities and a commercial area. Key amenities within the development include; two lakes,which will be used for water sports and fishing, a clubhouse, riding stable, swimming pool, pocket parks, wildlife viewing areas, and several miles of hiking, biking, and equestrian trails. A "riverside" theme is proposed for this development and will be expressed through the architecture, landscaping, and water features. Native stone and wood will be implemented in the common buildings, entry walls, and fences and indigenous or"native looking" riparian vegetation will be used within the creek corridor and around other water bodies. Streams located along roads will also add interest and reinforce the development's theme. The residential development includes Lakefront Estate (12,000 SF lots), Equestrian Estate (10,000 SF lots), Large Suburban(10,000 SF lots), Suburban (8,000 SF), Patio Homes (5,500 SF) and Townhomes (8 DU/AC). Commercial development is proposed along the I-25 frontage road and will serve mainly the residents within the development. A gasoline station, video store, bakery, dry cleaners, and professional offices are uses that are most likely to appear in the commercial area. This letter supplies the narrative segment of the Change of Zone application requirements, formatted in the same numerical order as indicated in the application. 1. Enclosed are the PUD Change of Zone, application forms, and an application fee of$2,000.00. 11990 Grant Street, Suite 304 n Denver, Colorado 80233 a(303) 452-6611 a Fax (303) 452-2759 RiverDance PUD-- Change of Zc Page 2 of 12 2. Letters of agreement for the relocation of oil/gas lines will be provided with the Final Plat. 3. Enclosed is a certified list of the names, addresses and the corresponding parcel Weld County Assessor identification number of owners of property within 500 feet of the subject property (see Exhibit B). 4. Enclosed is a certified list of the names and addresses of mineral owners and lessees of mineral owners on or under the parcel of land being considered (see Exhibit C). 5. The Change of Zone Plat Map is enclosed in the plan set provided. 6. Major components of the Development Plan are described below. 7. The following information is included in order to address concerns expressed in the Sketch Plan. • Weed Management Plan • Water Quality Management Plan Development Guide Components: The following development guide is submitted in the conceptual format. Component One - Environmental Impacts 1A. Noise and vibration within the development will be minimal and will comply with all rules and regulations of the Weld County Health Department. 1B. Smoke, dust, and odor will not be an issue with the proposed development. The land uses proposed will not generate smoke or odors. Additionally, all roads will be paved, therefore no dust will be generated. IC. Heat, light, and glare will be controlled by landscape and development design. 1D. Visual/aesthetic impacts of the development will blend with its' natural surroundings and will adhere to Weld County development requirements. 1E. No high voltage uses are proposed within the development, therefore, electrical interference is not an issue. 1F. By installing erosion control measures (i.e., straw bales and silt fences) on-site during construction, monitoring existing oil and gas facilities, and providing public sanitary sewer, no water pollution is anticipated. In addition, all storm water will be directed to detention areas and released at 100-year rates. Water quality issues are further discussed in the Preliminary Drainage Report and Water Quality Management Plan. RiverDance PUD - Change Lone Page 3 of 12 1G. The St. Vrain Sanitation District will handle wastewater disposal for this development. New sanitary sewer lines are proposed to bisect the site in an east- west direction with the option of extending service under I-25. This line will also extend north along the east side of the northwest quarter section of Section 35. It is anticipated that the line will be extended next spring. 1H. Existing wetlands on-site will be maintained as much as possible and many are within proposed open space of the development. However, wetlands that are impacted will be mitigated by constructing new wetlands around the lake adjacent to the 1-25 frontage road and the major drainageway along the eastern edge of the property. The applicant has met with Rex Fletcher of the Army Corps of Engineers to discuss the wetlands on-site. A 404 permit application will be submitted with the Final Plat. 1I. Erosion and sedimentation will be kept to a minimum through adequate landscaping and site design. Water quality issues are further discussed in the Preliminary Drainage Report and Water Quality Management Plan. 1J. Excavation, filling, and grading will occur on-site. The slopes north of both lakes will require grading in order to create roads and residential building sites. Cut from these slopes will provide adequate grades for the entrance road and other areas throughout the site. 1K. Drilling, ditching, and dredging will occur on-site. Normal excavation related to construction of buildings and roads are expected. Excavated material will be used in areas on-site that require fill. 1L. Air pollution (e.g., burning of trash, diesel trucks, etc.) within the development will not occur. 1M. A local trash company will dispose of the solid waste within the development. The commercial area will have trash receptacles and residential development will have curbside service. IN. A portion of the property is being farmed which does not provide quality wildlife habitat. The wildlife that is present on-site resides in the wetlands, lakes, and creek corridor and a majority of these areas will be enhanced or preserved as open space. Small areas of wetlands will be impacted but disturbances will be kept to a minimum and new wetlands created. 1O. Existing vegetation has been removed through mining activities on the property. However, there are areas on-site with native vegetation (i.e., wetlands and creek corridor) and where possible, will be preserved. RiverDance PUD-Change Lone Page 4 of 12 1P. No radiation or radioactive material exists on-site. At the time of development of each lot, a radon test will be conducted, and if necessary, a radon mitigation design will be incorporated into the dwelling. Component Two - Service Provision Impacts 2A. The site is within the St. Vrain School District. Scott Toillion of the St. Vrain School District has been contacted and a school site on the property is not necessary. The District will accept a cash-in-lieu of land dedication which the applicant is willing to pay (see Exhibit D). 2B. Law enforcement will be provided by the Weld County Sheriffs Office. This development will assist the Sheriffs department by establishing clearly marked streets and homes within the development. 2C. The Mountain View Fire Protection District will provide fire protection. A majority of their Sketch Plan comments is addressed in this submittal; however, detailed information such as size of water lines and a water model will be covered in the Final Plat. 2D. Pridemark serves the property for ambulance service. To assist in a quick response time for this service, streets and addressing will be clearly marked within the development. 2E. The access roads into the site are collectors and the remaining streets are local residential (see Plat Map). The right-of-way widths for collector and local streets are 80 and 60 feet, respectively. However, the local streets abutting the lakefront lots maintain an 80-foot right-of-way to accommodate the proposed sanitary sewer line and other utilities. The development's road sections deviate from the County standards by proposing two detached sidewalks and two attached sidewalks for the collector and local roads respectively. Providing detached sidewalks along the collector roads will enable more separation and buffering between vehicular traffic and pedestrians. Attached sidewalks along the local streets will eliminate a small strip of landscaping between the back of curb and sidewalk, which will reduce the amount of maintenance within the development. Improvement agreements for roads on and off the property will be submitted with the Final Plat. 2F. A revised traffic impact analysis prepared by a registered engineer is attached. Comments from Felsburg, Holt and Ullevig have been addressed in this analysis. 2G. Storm water drainage from the development will be held in detention basins and released at historic rates (see Preliminary Drainage Report). These basins not only detain the water but also improve the quality of the water by removing silts RiverDance PUD-Change of Z, Page 5 of 12 and contaminants. The release of the water will be directed toward the lakes and St. Vrain Creek. 2H. Utility providers for the property include: Gas - KN Energy Phone - US West Electric - United Power See Exhibit D for letters of service. Gas, water, and electric lines are present on- site. Gas Three gas lines are located on the property (1 - Kaneb, 2 - KN Energy). Portions of the KN Energy lines need to be relocated to allow for the development on-site. The developer is presently working with this company to obtain approval for these relocations and to establish easements. A 30-foot strip along the main collector is provided for the placement of these gas lines. Water Little Thompson Water District/Central Weld Water District has a waterline that bisects the property in a north-south direction. This line will not be relocated; however, a portion of the line's easement within the proposed collector will be vacated and rededicated as road right-of-way. Electric A Union Rural Electric Association(a.k.a. United Power) line and easements (10' and 16') are situated on-site. These lines will be removed and the easements vacated. The developer is working with United Power on vacating the easements on-site. Proposed locations of utilities are illustrated on the Preliminary Utility Plan of the plan set submitted. 21. The Little Thompson Water District provides potable water. See Exhibit D for the letter of service. A service agreement will be submitted with the Final Plat. 2J. St. Vrain Sanitation District will provide sanitary sewer service to the development. See Exhibit D for the letter of service. A service agreement will be submitted with the Final Plat. Component Three - Landscaping Elements 3A. See landscape plans enclosed. Landscape elements within the development include: RiverDance PUD- Change Lone Page 6 of 12 Entry Landscape The entrances of the development will be landscaped and contain an entry wall or walls with the development's name. Three rail fencing with stone pilasters will also be incorporated in these areas (see Preliminary Landscape Plans). Pocket Parks Two pocket parks are proposed (see Plat Map and Preliminary Landscape Plans). The park adjacent to the townhomes will consist of a playground and a shelter. All structures within this park will be setback a minimum of 150 feet from all oil and gas wells to allow sufficient accessibility to these structures. The other park will contain a multi-use field for soccer, football, volleyball, etc. A picnic area will also be provided within this park. Both parks are linked to surrounding neighborhoods through sidewalks and accessible to the development's trail system. Water Features A fountain will be situated in the lake adjacent to the 1-25 frontage road. The fountain will serve as a focal point but also assist in aerating the lake. A stream will be situated along the main collector road and several of the local roads (see Plat Map). This element will provide interest and reinforce the development's "waterside" theme. The developer is presently working with the Little Thompson Water District and Highland Ditch Company regarding this matter. There are several ponds illustrated on the Plat Map and are both are located in the northwest portion of the site. The most northern pond will serve as a focal point but also an area to store water for irrigating the development's landscape. The other pond will serve mainly as a visual amenity but also habitat for wildlife within the area. A streambed connects the two ponds, which will assist in the water quality of the lower pond. The developer is presently working with the Little Thompson Water District and Highland Ditch Company regarding this matter. The application of these water features and their water source will be solidified in the Final Plat. Round About The raised median area within the round about will be landscaped and serve as a focal point along the road corridor. No plantings will inhibit sight distances. Lake Open Space Areas surrounding the lakes that are disturbed will be re-vegetated with the appropriate grass species (see Preliminary Landscape Plans). RiverDance PUD -Change Zone Page 7 of 12 Trail System See Component Five. Landscaped Berm See Component 3B. 3B. Compatibility between different land uses on-site and off-site will be achieved through landscape buffers and berms, and fencing. A 50 foot wide area adjacent to the I-25 Frontage Road will contain a vegetated berm. This berm will serve as a buffer between the proposed commercial area and the I-25 corridor. This vegetative screen will also assist in screening the parking within the commercial area. A two-story layer of vegetation will be implemented and plant species will consist of a mixture of deciduous and evergreen plant species. A berm will not be required along the development's west lake since the lake itself acts as a buffer. The application of these landscape treatments will be further identified in the Final Plat. The developer will landscape the CDOT right-of-way and the common open space whereas, individual homeowners will landscape their properties at the time of construction. Landscaping and open space designs will adhere to the intent of Section 2.6 of the MUD Plan. 3C. A maintenance schedule for the development's landscaping will be provided with the Final Plat. 3D. An On-Site Improvement's Agreement will be submitted with the Final Plat. 3E. The developer is presently working with Little Thompson Water District and the Highland Ditch Company to determine what water source will be used for irrigating the development's landscape. Evidence of this water source will be submitted with the Final Plat. Component Four- Site Design 4A. Unique features on the property include: St. Vrain Creek, wetlands, two lakes, one pond, and south facing slopes that command views of the lakes and creek corridor. A majority of the property possesses views of the mountains including Longs Peak. Consideration of these features is evident by the orientation of the residential lots toward the mountains and lakes. 4B. The proposed development is consistent with the Weld County Comprehensive Plan by encouraging planned and managed growth within the MUD area. 4C. The proposed uses within the PUD are RI, R4, and C2. Development guidelines for each use are as follows: RiverDance PUD-Change ?one Page 8 of 12 RI Residential Type: Lakefront Estate, Equestrian Estate, Large Suburban, Suburban, and Patio Home. Minimum Lot Size: Lakefront Estate: 12,000 SF, Equestrian Estate: 10,000 SF, Large Suburban: 10,000 SF, Suburban: 8,000 SF, and Patio Home: 5,500 SF Minimum Setback: Patio Home: Front and Rear - 20', Side - 0' and 15', Other RI: 20' Maximum Building Height: 48' Maximum Building Coverage (%): 50 R4 Residential Type: Townhome Minimum Setback: 10' Maximum Building Height: 48' Maximum Building Coverage (%): 70 C2 Commercial Type: General Commercial Minimum Setback: 20' Maximum Building Height: 35' Maximum Lot Coverage (%): 85 Uses: To include restaurants with outdoor seating, gas station, and stores and shops with 24 hours of operation as a use by right. Community Center Minimum Setback: 20' Maximum Building Height: 35' Uses: Club house with meeting rooms and a small restaurant, swimming pool, tennis courts, picnic areas, and dock areas for boats. The maximum building coverage will be determined at time of Final Plat. Equestrian Center Minimum Setback: 10' Maximum Building Height: 35' Uses: A riding stable with associated out buildings, small riding arena, office, and picnic area. Homeowners within the development will be able to rent or stable their horses at this facility. The maximum building coverage will be determined at time of Final Plat. The development guidelines within the zoning ordinances have been modified to provide a more aesthetic development. This is consistent with the flexibility allowed through the PUD process. No conflicts are anticipated with this development since surrounding land uses will be similar in nature. 4D. The proposed uses within the PUD zoning district will be compatible with the surrounding land uses. The surrounding properties are currently zoned agricultural and when developed, as identified in the MUD Plan, will compliment the PUD with residential and commercial uses. Those moving into the RiverDance PUD- Change Zone Page 9 of 12 development will be made aware of existing agricultural uses in the surrounding area. 4E. The proposed development is located within the flood hazard overlay district, however, no structures are proposed within the floodway. FEMA lists the lake area as Zone A; therefore there are no detailed base flood elevations. Mining has occurred in the floodplain, which has increased the ability of the over bank to handle more floodwater. To establish the new floodplain boundary, a Conditional Letter of Map Revision (CLOMR) will be submitted to FEMA and approval received prior to on-site construction. Component Five - Common Open Space Usage 5(1). The development is approximately 486 acres in size of which 227 acres is open space. The open space acreage includes any land or water that is natural or manmade (i.e., landscaped entry areas). Forty-seven percent of the total property is dedicated, as open space, which exceeds the 20% required. A Preliminary Weed Management Plan is included in this submittal to address concerns of undesirable plant species that are existing or may occur on the property. See attached plan. Trail System Through a trail system, open space and neighborhoods throughout the PUD are interconnected (see Plat Map). The trail system encircling the development consists of a pedestrian and bicycle path and an equestrian trail. Neighborhoods will be connected to this trail system by sidewalks throughout the development. The pedestrian/bicycle path is separate from the equestrian trail (see Preliminary Landscape Plans) and the distance between these paths will vary depending on the topography. The pedestrian/bicylce path is ten feet wide and constructed of concrete. The equestrian trail consists of existing soil and five feet in width. Specific trail design will be presented in the Final Plat. The equestrian trail will be located within the 30 foot wide area adjacent to the development's main collector. A portion of this 30' strip will also accommodate the relocated oil and gas lines (see Plat Map). The pedestrian path along the collectors deviates from the County's standard section. To provide more of a buffer between pedestrians and vehicular traffic, a 7.5 foot landscape strip is proposed. Shade trees with grass will be planted within this landscape strip. The County has been contacted about connecting to a regional trail but no meetings have occurred. RiverDance PUD -Changt Zone Page 10 of 12 Lake Area This open space consists of two lakes (the two western most lakes are to be combined), natural area surrounding the lakes, and a portion of the St. Vrain Creek corridor. The lake perimeter is open to all of the development's residents, except the north shore of both lakes, which are private. Many of the Lakefront Estate lots abut the lake. The east end of the east lake will also be private and used only by a few homeowners within the development. Motor boats and water skiing are allowed on the large lake whereas more passive uses such as fishing, canoeing, etc. will occur on the west lake. Dock areas will be provided on both lakes and the Lakefront Estate lots will have the option of locating a dock on their property. Wetlands Wetlands will be preserved as much as possible on the property. These areas will be natural and viewed from adjacent trails. Pocket Parks See Component Three Other Open Space Areas See Component Three 5(2). All the common open spaces will be owned by the Homeowner's Association (HOA). The open space will be maintained through a monthly homeowner's fee. Monthly fees are difficult to determine at this time and will be further explored in the Final Plat. 5(3). An On-Site Improvements Agreement will be provided with the Final Plat. Component Six - Signage 6(I)A. Prior to construction of any sign, a Weld County building permit will be obtained from the Weld County Planning Department. 6(1)B. Construction of all signs will not obstruct the free and clear vision of motorists. 6(1)C. Signs shall not be erected, constructed, or maintained within, over, or upon the right-of-way of any County, State or Federal road or highway except as expressly allowed by state statue and permitted by CDOT. 6(1)D. All signs and their components will be of sound structural quality and will be kept in a state of good repair with a clean and neat appearance. 6(2). All signs will be constructed according to the specifications as stated in Section 6.3.6.4 of the Weld County PUD Ordinance. RiverDance PUD-Change Zone Page 11 of 12 6(3)A. A set of sign standards will be submitted at Final Plat. 6(3)B. All signs will comply with the sign regulations of the County and shall be for the purpose of assuring harmony and visual quality throughout the development. 6(3)C. Sign standards will be approved prior to Final Development approval. 6(3)D. All signs in the development will adhere to the sign standards as stated in the Weld County MUD Ordinance and in the development sign standards. 6(4)A. Roof signs will be mounted and supported wholly upon or over the roof of any structure with slopes less than 75% from horizontal. 6(4)B. Motor vehicles, trailers, or portable bases with wheels will not be used as a sign structure. 6(4)C. No attracting devices, including mechanical or electrical appurtenances will be allowed within the development. 6(4)D. All temporary signs will be removed within ten days after the promoted event. 6(5). There are no non-conforming signs presently on-site. Component Seven - MUD Impact The PUD is within the MUD Plan area. Majority of the PUD follows the Structural Land Use Map. The development is consistent with the Land Use Map by preserving the area identified as Limiting Site Factors as open space. A portion of the townhome and single family residential components overlap the area identified as Employment Center. This development aligns with the residential lots proposed to the north, encouraging compatibility between the two developments. Commercial uses will be oriented mainly towards residents within the development since the property is more than a mile from the I-25/SH 119 Interchange. The commercial uses proposed (i.e., gas station) will provide convenience and reduce unnecessary trips for the development's resident. The 20.7 acres provided for the commercial component is sufficient in meeting the needs for this development and the surrounding area. The PUD will meet the MUD Plan by adhering to the following: • Community Form and Structure - This component of the plan will be fulfilled through a creative site design that encourages: preservation of natural on-site features, aesthetic building sites, open space, an extensive trail system, a range of residential densities, commercial services that are conducive to residential development, a safe environment, and compatibility with surrounding land uses. RiverDance PUD- Change Zone Page 12 of 12 • Public Facilities and Services - The PUD will provide adequate infrastructure and services without burdening surrounding communities and will provide mechanisms for funding public facilities and services through development fees. • Transportation and Circulation - safe vehicular and pedestrian systems will be provided in the PUD. • Structural Land Use Categories - The PUD will provide a variety of residential densities. The type of residential uses proposed within the development will adhere to the MUD Plan. • Common Open Space - Open space is for the enjoyment of the residents within the development. However, the public is expected to use the trails within the development if linked to a regional trail system. The percent open space required is achieved, with approximately 47% designed as open space. All open space will be maintained by the HOA. • Lot Coverage - The maximum lot coverage regulations will be adhered to in the PUD by the specified uses in Component Four— Site Design. • Landscaping - The PUD's landscaping will be sensitive to the character of the area by preserving, as much s possible, the vegetation along the St. Vrain Creek and wetlands on-site. Landscaping techniques will be used to buffer the development and to soften buildings in the landscape. All parking landscape requirements will be upheld. • Signs - All signs within the development will adhere to the MUD regulations and the sign standards will be approved prior to Final Development approval. Component Eight- Intergovernmental Agreement Impacts No IGA agreements govern the development proposed. Should you have any further questions, please do not hesitate to contact me. Sincerely, TUTTLE APPLEGATE, INC. Molly Orkild-Larson, AICP cc: Mike Siegrist, File 99-122 Hello