APR - 6 2001 Ms. Beverly Beverly A. Cook, Manager
Idaho Operations Office
U. S. Department of Energy
850 Energy Drive
Idaho Falls, ID 83401-1563
SUBJECT: NRC INSPECTION REPORT 72-09/2001-02
Dear Ms. Cook: —`
On March 26-27, 2001, an NRC inspection was conducted at your Fort St. Vrain Independent
Spent Fuel Storage Installation (ISFSI). The enclosed report presents the scope and results of
that inspection.
Based on the results of this inspection, the NRC has determined that your security program was
effectively implemented.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public
Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Dwight D. Chamberlain, Director
Division of Nuclear Materials Safety
Docket Nos.: 72-09
License Nos.: SNM-2504
Enclosure:
NRC Inspection Report
72-09/01-02
Co sei?/ q end4Zi
4-/I aDO/ 2001-1056
U. S. Department of Energy -2-
cc:
Mr. Jan Hagers
TMI/FSV Licensing Project Manager
Department of Energy
Idaho Operations Office
850 Energy Drive
Idaho Falls, ID 83401-1563
Ms. Mary J. Fisher
General Manager, Nuclear
Public Service Company of Colorado
P. O. Box 840
Denver, CO 80201-0840
Mr. M. H. Holmes
Project Assurance Manager
Public Service Company of Colorado
16805 Weld County Road 19-1/2
Platteville, CO 80651
Chairman
Board of County Commissioners
of Weld County, Colorado
Greeley, Colorado 80631
Regional Representative
Radiation Programs
Environmental Protection Agency
Region 8
1 Denver Place
999 18th Street, Suite 1300
Denver, Colorado 80202-2413
Robert M. Quillin, Director
Laboratory and Radiation Services Division
Colorado Department of Public Health
and Environment
8100 Lowry Boulevard
Denver, Colorado 80220-6928
ENCLOSURE
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket No.: 72-09
License No.: SNM-2504
Report No.: 72-09/2001-02
Licensee: U. S. Department of Energy
Facility: Fort St. Vrain Independent Spent Fuel Storage Installation (ISFSI)
Location: 16805 Weld County Road 19-1/2
Platteville, Colorado 80651
Dates: March 26-27, 2001
Inspector: A. Bruce Earnest, Senior Physical Security Specialist
Plant Support Branch
Division of Reactor Safety
Approved by: D. Blair Spitzberg, Ph.D., Chief
Fuel Cycle and Decommissioning Branch
Division of Nuclear Material Safety
-2-
EXECUTIVE SUMMARY
Fort St. Vrain (FSV) Independent Spent Fuel Storage Installation (ISFSI)
NRC Inspection Report 72-09/01-02
The FSV ISFSI has been in operation since December 1991. The facility had been maintained
and operated by Public Service Company of Colorado until June 4, 1999, at which time the
NRC license was transferred to the U. S. Department of Energy (DOE). The Idaho Operations
Office of the DOE was assigned responsibility for the FSV facility. This inspection was the
second annual physical security inspection since DOE assumed responsibility for the facility.
Operation of an ISFSI - Annual Inspection
• Physical security plan changes were submitted in accordance with NRC requirements,
and the changes had not decreased the effectiveness of the plan. Security procedures
were consistent with the physical security plan (Section S1.1)
• The audit program was effectively implemented (Section S1.2).
• The licensee's safeguards event log program was effectively maintained. The security
staff understood the reporting requirements (Section S1.3).
• The protected area barriers were adequate to delay an attempted intrusion (Section
S1.4).
• An effective detection system was installed and maintained (Section S1.5).
• The assessment aids system provided effective assessment of the protected area
(Section S1.6).
• The lighting system met physical security plan requirements (Section S1.7).
• The FSV alarm station operator was efficient. The alarm station met physical security
plan requirements (Section 1.8).
• The licensee maintained an effective communications capability (Section 1.9).
• The lock and key control program was effectively implemented (Section S1.10).
• The training and qualification program for security officers was effective.
(Section S1.11).
-3-
Report Details
S1 Independent Spent Fuel Storage Installations (ISFSI) (81001)
S1.1 Security Plans
a. Inspection Scope
The licensee's ISFSI Physical security plan, Amendment 2, dated April 6, 2000, and
implementing procedures were inspected to determine compliance with the
requirements of 10 CFR 72.186. The ISFSI physical security plan incorporated the
ISFSI contingency response plan.
b. Observations and Findings
The inspector determined from a review of the plan change noted above that the
changes to the licensee's NRC-approved physical security plan did not decrease the
effectiveness of the plan. The inspector determined that the licensee maintained an
effective management system for the development and administration of procedures
and verified that the procedures were consistent with requirements of the physical
security plan.
c. Conclusions
Physical security plan changes were submitted in accordance with NRC requirements,
and the changes had not decreased the effectiveness of the plan. Security procedures
were consistent with the physical security plan.
S1.2 Audits
a. Inspection Scope
The inspector reviewed Audit Report 00-ISFSI-S-005 to determine compliance with the
requirements of 10 CFR 72.176 and the requirements of the physical security plan.
b. Observations and Findings
The audit was comprehensive, thorough, and timely. Licensee corrective actions
appeared to be effective.
c. Conclusions
The audit program was effectively implemented.
-4-
S1.3. Records and Reports
a. Inspection Scope
The safeguards event logs for calendar year 2000 and the first quarter of 2001 were
inspected to determine compliance with the requirements of the physical security plan.
b. Observations and Findings
The licensee's safeguards event logs were effectively maintained and the information
from the logs was tracked and trended in order to identify potential problem areas. The
security staff understood the security events that needed to be included in its 24-hour
event log and those events that needed to be reported to the NRC within 24 hours of
occurrence.
c. Conclusions
The licensee's safeguards event log program was effectively maintained. The security
staff understood the reporting requirements.
S1.4 Physical Barriers - Protected Area
a. Inspection Scope
The protected area physical barriers were inspected to determine compliance with the
requirements of the physical security plan.
b. Observations and Findings
The walls and doors are of substantial construction and would provide an adequate
delay to adversaries attempting to enter the protected area. The inspector confirmed
that all openings in the barrier were smaller than 96 square inches or the openings had
substantial barriers in place to cover the openings.
c. Conclusion
The protected area barriers were adequate to delay an attempted intrusion.
S1.5 Detection Aids - Protected Area
a. Inspection Scope
The detection aids program for the protected area was inspected to determine
compliance with the requirements of the physical security plan.
b. Observations and Findings
The licensee's protected are'i detection aids consist of balanced magnetic switches on
the portals leading into the protected area and motion detectors within the building and
-5-
the fuel storage vault. The inspector observed licensee tests of the detection aids.
Every test of all detection devices was successful. The licensee's detection aids system
met the physical security plan requirements.
c. Conclusion
An effective detection system was installed and maintained.
S1.6 Assessment Aids
a. Inspection Scope
The assessment aids program was inspected to determine compliance with the physical
security plan. The areas inspected included the application of closed-circuit television to
provide observation of both the inside and outside of the facility and the adequacy of the
monitoring system in the alarm stations.
b. Observations and Findings
The areas inspected included adequacy of the closed-circuit television system and the
monitoring system in the alarm station. The inspector observed tests of the assessment
aids system. The monitors were placed in an appropriate manner for use by the alarm
station operators to monitor activities around and inside the protected area. The
assessment aids system met physical security plan requirements.
c. Conclusion
The assessment aids system provided effective assessment of the protected area.
S1.7 Lighting
a. Inspection Scope
The lighting system was inspected to determine the licensee's compliance with the
requirements of the physical security plan.
b. Observations and Findings
The lighting effectively ensured cameras and security officers can visually inspect the
areas inside the facility. Access control points, outside areas of the ISFSI, and alarm
stations were lighted in an adequate manner.
c. Conclusion
The lighting system met physical security plan requirements.
-6-
S1.8 Alarm Stations
a. Inspection Scope
The alarm stations were inspected to determine compliance with the requirements of the
physical security plan.
b. Observations and Findings
Access to the alarm station was strictly controlled. Any attempt to enter the alarm
station would create an intrusion alarm. The alarm station console was constructed in
such a manner as to allow one operator to effectively operate the station under all
conditions. The inspector asked questions of the station operator and determined that
the operator was effectively trained and knowledgeable of the operator duties. The
alarm station is a hardened facility and met bullet resistance standards as described in
10 CFR 73.2.
c. Conclusion
The licensee's alarm station operator was efficient. The alarm station met physical
security plan requirements.
S1.9 Communications
a. Inspection Scope
The communications capabilities were inspected to determine compliance with the
requirements of the physical security plan. The areas inspected included the operability
of both radio and telephone systems, and the capability to effectively communicate both
telephonically and by radio with the local law enforcement agencies.
b. Observations and Findings
The inspector confirmed that the licensee had telephone and radio systems capable of
meeting all communications requirements of the security organization. The inspector
observed a test of the radio system. The alarm station operator demonstrated the ability
to communicate by radio with local law enforcement authorities. In addition, the
inspector observed an on-site communications check with security officers. The radio
equipment was effective and well maintained.
c. Conclusion
The licensee maintained an effective communications capability.
-7-
S1.10 Locks, Keys, and Combinations
a. Inspection Scope
The locks, keys, and combinations program was inspected to determine the licensee's
compliance with the requirements of the physical security plan.
b. Observations and Findings
The inspector reviewed lock and key inventory records and determined that annual
inventory records indicated inventories were completed as required by procedure.
Further, the records indicated that annual rotation of locks and keys had occurred.
c. Conclusion
The lock and key control program was effectively implemented.
S1.11 Security Training and Qualifications
a. Inspection Scope
The security training and qualification program was inspected to determine compliance
with the requirements of the training and qualifications plan.
b. Observations and Findings
The inspector reviewed the training and qualification records of 11 security officers. The
training and qualifications records of the officers were complete and readily available for
inspection. The officers were confident in their training and were proficient in their duty
performance.
c. Conclusion
The training and qualification program for security officers was effective.
S8 Miscellaneous Security and Safeguards Issues (81700)
S8.1 Followup (92904)
S8.1.1 (Closed) Violation 72-09/9902-01: Inadequate Alarm Station Operation.
During a test of the alarm station operation, the Warning Control Center (secondary
alarm station) operator was unfamiliar with the alarm station duress system operation
and failed to authenticate properly. The licensee completed a retraining program as
corrective action. A similar test was completed successfully during this inspection.
-8-
V. Management Meeting
X1 Exit Meeting Summary
The inspector presented the inspection results to members of licensee management
and others at the exit meeting on March 27, 2001. The licensee's management
acknowledged the findings presented. The licensee's management did not identify as
proprietary any information provided to, or reviewed by, the inspector.
ATTACHMENT
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Licensee
M. Gardner, FSV Facility Director, DOE
R. Coombs, Security Specialist, DOE
Contractor
T. Borst, ISFSI Manager, Bechtel BWXT,
K. Jensen, Physical Security Officer, Bechtel BWXT
J. Leger, Project Manager, Burns Security
J. Newkirk, Facility Safety Officer, Bechtel BWXT —�
INSPECTION PROCEDURES USED
81001 Independent Spent Fuel Storage Installations
92904 Followup
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None.
Closed
72-09/9902-01 VIO Inadequate Alarm Station Operation