Loading...
HomeMy WebLinkAbout20011361.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF WELD COUNTY ROAD 68 BETWEEN WELD COUNTY ROADS 61.5 AND 63 FOR THIRTY WORKING DAYS, TO REPLACE A BRIDGE WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 68 between Weld County Roads 61.5 and 63 be temporarily closed, with said closure being effective May 29, 2001, for approximately thirty working days to replace a bridge, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. pie d J/ c5D esh 20EG002 pL ; ,, EG0024 ROAD CLOSURE -WCR 68 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 23rd day of May, A.D., 2001. BOARD OF COUNTY COMMISSIONERS WELD COU TY, COLORADO ATTEST: 144# ' /- e / ' ` M. J. eile, Chair Weld County Clerk t,i %qu.. EXCUSED gh Glenn Vaad, Pro-Tern BY: ^ _,// Deputy Clerk to the , Will' H. Jerke APPROVED AS M: vi . Long ounty Attor y Robert D. Masd 2001-1361 EG0024 iaritt trif -I r) MEMORANDUM 6: . „ • TO: Clerk to the Board DATE: May 18, 2001 COLORADO FROM: Frank B. Hempen, Jr. Director of Public Works/County Enginee SUBJECT: Road Closure Weld County Road 68 between WCR 61.5 and WCR 63 will be closed for 30 working days beginning May 29 for a bridge replacement. The appropriate documentation is attached. m:\wpfiles\francie\eom-ctb 2001-1361 ',... Leger J00- `N\ -fi c 4 P ci b C Limp o 4O r a): w cte s X I • M^y i { V ( ,OL cueR 44 1 • a POOL,' SC Lv/- eI 4-e se Set sl 9/o �-- veplocepp e[-1+ (6g/6;7/4 B Fo v- 30 Loa/ TITLE V--e d �'-(S C,uC- wce GtJC f _fUI_ Q w� wr e °(v3 SURVEY 8Y DATE DRAWN BY L r DATE s/J/// f 7TT /�1 �+1 ' CHECKED BY DATE • COUNTY ROAD NO. 6 MULOTFULESMARC.VK4 APPROVED BY COUNTY ENGINEER PoRd• �Coj o�� t vC R a-4 G/ . mod, G3 Le3elAct a iac)-1e- U T pe- t at/r/ced . T %/fie sr o4,,e f e 5 a of e6,, d� 19163 crc 4 ED eked I C55 640 ,, f U�- ctR neUw Luce &if ` D C.vice ( 6 I 144i (-e_ ,grGLde l�vc R C�3 r--p 0,1" weP le Gv(R j vvi;4e, at-c"-"e Hello