HomeMy WebLinkAbout20011162.tiff BEFORE THE PUBLIC UTILITIES COMMISSION
OF THE STATE OF COLORADO 1..:_
Docket No. 01A-167R �}11!' +
APR 2 rn 9: 25
IN THE MATTER OF THE COLORADO DEPARTMENT OF TRANSPORTAfiE14961O19 AUTHORITY
TO ELIMINATE THE GRADE SEPARATION STRUCTURE WHICH CARRIES THE UNION PACIFIC
RAILWAY COMPANY RAILROAD TRACKS OVER INTERSTATE HIGHWAY 25 NEAR RAILROAD
MILEPOST 18 .82, MORE OR LESS, NEAR THE GRADE SEPARATED CROSSING, NATIONAL
INVENTORY ID NO. 804-959D, AT INTERSTATE HIGHWAY 25 IN WELD COUNTY, COLORADO.
ENTRY OF APPEARANCE AND
NOTICE OF INTERVENTION
TO THE PARTIES IN THIS MATTER AND ALL INTERESTED PERSONS, FIRMS OR
CORPORATIONS:
You are notified that the Staff of the Commission hereby enters its
appearance and intervention in the above captioned application. By this
intervention, the Staff of the Commission does not oppose or contest the
granting of this application, but rather indicates to the parties and all
interested persons, firms or corporations that Staff will participate in any
hearing which results from an intervention contesting or objecting to any
portion of this application. If no other interventions are filed or if no
other petitions seeking interventions are granted, other than interventions in
support, so that this application is noncontested or unopposed, the Staff will
then participate to the extent necessary to insure that the Commission file in
this proceeding is complete and accurate. However, Staff reserves the right to
object, and will participate in any matters herein as its interests may
require.
For information concerning this application contact Jack Baier at
(303) 894-2855. Service upon Staff as required by Rule 9 (b) (2) , of the
Commission' s Rules of Practice and Procedure, may be made by serving documents
on Jack Baier of the Commission Staff.
Dated at Denver, Colorado, this 20th day of April, 2001.
FOR STAFF OF THE COMMISSION
tb7k,,A., . ,3 tI�h
Bruce N. Smith, Director
Public Utilities Commission
Logan Tower, Office Level 2
1580 Logan Street
Denver, Colorado 80203
(303) 894-2007
CDl75er7A �e/Id2
er molt)
/-2(7 ,-
2001-1162
CERTIFICATE OF MAILING
I hereby certify that I mailed a true and correct copy of the foregoing ENTRY OF APPEARANCE AND
NOTICE OF INTERVENTION OF THE STAFF OF THE COMMISSION in the US mail, postage
prepaid,this 20th day of April, 2001 addressed as follows: ti's�L'/ l)D
?� din uzv_ C 11
Dawn
BARBARA KIRKMEYER
RENNY FAGAN COMMISSION CHAIR
DEPUTY ATTORNEY GENERAL WELD COUNTY
REGULATORY LAW SECTION 915 10TH ST
1525 SHERMAN, 5TH FLOOR GREELEY, CO 80632
DENVER, CO 80203
BRUCE BARKER
RANDOLPH. R. REYES, P. E. ATTORNEY
MANAGER, CDOT RAILROAD PROGRAM WELD COUNTY
COLORADO DEPARTMENT OF 915 10TH ST
TRANSPORTATION GREELEY, CO 80632
4201 EAST ARKANSAS, EMPIRE PARK
DENVER, CO 80222 ERIE ROAD JOINT VENTURE
C/O ROBERT P. MARX
KARLA HARDING 7 FAIRWAY LANE
REGIONAL TRANSPORTAITON DIRECTOR LITTLETON, CO 80123
REGION 4
1420 2ND ST OXFORD DEVELOPMENT, LLC
GREELEY, CO 80631 5249 NORTH ADOBE CIRCLE
TUCSON, AZ 85715
TRACY KINSELLA
ASST. ATTORNEY GENERAL DACONO PROPERTIES, LLC
DEPT. OF NATURAL RESOURCES 2500 ARAPAHOE, SUITE 220
1525 SHERMAN, ROOM 500 BOULDER, CO 80302
DENVER, CO 80203
COLUMBINE ITON AND METAL
MIKE PARAS, SUPERINTENDENT C/O PENNY LOVELY
OF TRANSPORTATION SERVICES 3747 WCR 8
UNION PACIFIC RAILROAD COMPANY ERIE, CO 80516
1400 W. 52ND AVE
DENVER, CO 80221 DAVID JOSEPH
C/O KEVIN SMITH
JAMES P. GATLIN, ESQ. 728 HARLAN
UNION PACIFIC RAILROAD COMPANY PUEBLO, CO 81004
LAW DEPARTMENT
1416 DODGE STREET, ROOM 830 DORTHY LOVELY, TRUSTEE FOR
OMAHA, NEBRASKA 68179 NORMAN D. LOVELY FAMILY TRUST
1484 FRONTNINE DRIVE
SUSAN K. GRABLER FT. COLLINS, CO 80525
MANAGER OF INDUSTRY
AND PUBLIC PROJECTS FIRST DACONO DEVELOPMENT, LLC
UNION PACIFIC RAILROAD COMPANY 6950 S. POTOMAC STREET
1400 W. 52ND AVE ENGLEWOOD, CO 80112
DENVER, CO 80221
Page 1 of 2
CERTIFICATE OF MAILING
I hereby certify that I mailed a true and correct copy of the foregoing ENTRY OF APPEARANCE AND
NOTICE OF INTERVENTION OF THE STAFF OF THE COMMISSION in the US mail, postage
prepaid,this 20th day of April, 2001 addressed as follows:
Dawn G. Ken.al �---
BILL MEIER
UNITED POWER
18551 EAST 160TH AVENUE
P.O.BOX 929
BRIGHTON, CO 80601
BART GARNER
US WEST COMMUNICATIONS
12680 WCR 58
GREELEY, CO 80634
Page 2 of 2
BEFORE THE PUBLIC UTILITIES COMMISSION
OF THE STATE OF COLORADO
Docket No. 01A-167R
IN THE MATTER OF THE COLORADO DEPARTMENT OF TRANSPORTATION FOR
THE AUTHORITY TO ELIMINATE THE GRADE SEPARATION STRUCTURE WHICH
CARRIES THE UNION PACIFIC RAILWAY COMPANY RAILROAD TRACKS OVER
INTERSTATE HIGHWAY 25 NEAR RAILROAD MILEPOST 18 . 82 , MORE OR LESS,
NEAR THE GRADE SEPARATED CROSSING, NATIONAL INVENTORY ID NO. 804-
959D, AT INTERSTATE HIGHWAY 25 IN WELD COUNTY, COLORADO.
NOTICE OF APPLICATION FILED
TO THE PARTIES IN THIS MATTER AND ALL INTERESTED PERSONS, FIRMS
OR CORPORATIONS :
You are notified that this application has been filed with
the Colorado Public Utilities Commission, and any person desiring
to intervene in or participate as a party in this proceeding
shall file his petition for leave to intervene, or under the
Commission' s Rules of Practice and Procedure, file other
appropriate pleadings to become a party, within 30 days after the
date of this notice .
At the time of this notice, the Commission has not deemed
this application to be complete within the meaning of § 40-6-
109 . 5 , C. R. S .
The Commission may consider and decide this application upon
the record without a formal public hearing if the application is
deemed complete and no notice of intervention or petition to
intervene contesting or opposing the application has been timely
filed.
If a hearing is required in this matter, the Commission will
notify the parties of the hearing date, time and location.
Applicants must appear at the hearing, if one is set, and present
evidence in support of their application. Other parties may
appear and present evidence in support of their position.
Unless previously filed, the applicant shall file its list
of witnesses and copies of its exhibits at least 20 days before
the first day of hearing. The applicant shall also serve each
party and staff with its list of witnesses and copies of each of
its exhibits .
Each intervenor shall file with the Commission a list of
witnesses and copies of its exhibits at least 10 days before the
first day of the hearing. Each intervenor shall also serve each
party and staff with a list of its witnesses and copies of each
of its exhibits .
Upon objection by a party, no witness will be permitted to
testify and no exhibit will be received in evidence, except in
rebuttal , unless filed and served as provided in this notice .
If a party does not meet the requirements of this notice,
the Commission may dismiss the application or intervention upon
motion filed by any other party, or upon the Commission ' s own
motion, unless good cause is shown.
No motion for continuance of any hearing set in this
proceeding will be granted except as stated in Rule 69 of the
Commission ' s Rules of Practice and Procedure .
Dated at Denver, Colorado, this 20th day of April 2001 .
(S E A L)
THE PUBLIC UTILITIES COMMISSION
OF THE STATE OF COLORADO
4pF COLOR
Is
_ o
BRUCE N. SMITH, Director
O Colorado Public Utilities Commission
mui 1580 Logan, OL2 ,
lat
Denver, Colorado 80203
CrO O./LETO GO�`
ATTEST: A TRUE COPY
Bruce N. Smith
Director
G:\NOTICE\01A167R\04/20/2001\DGK
2
BEFORE THE PUBLIC UTILITIES COMMISSION 3 r
OF THE STATE OF COLORADO
IN THE MATTER OF THE COLORADO ) =43430)•ON
DEPARTMENT OF TRANSPORTATION, FOR )
THE AUTHORITY TO ELIMINATE THE )
GRADE SEPARATION STRUCTURE WHICH )
CARRIES THE UNION PACIFIC RAILWAY )
COMPANY RAILROAD TRACKS OVER )INTERSTATE Q 16 161
HIGHWAY 25, ) DOCKET NO.
NEAR RAILROAD MILEPOST 18.82, )
MORE OR LESS, NEAR THE GRADE )
SEPARATED CROSSING, NATIONAL )
INVENTORY ID NO. 804-959D, AT )
INTERSTATE HIGHWAY 25 IN WELD )
COUNTY, COLORADO )
The Colorado Department of Transportation, Division of Engineering and Construction, hereinafter
referred to as the State, hereby submits this application to the Public Utilities Commission,
hereinafter referred to as PUC, for an order approving the elimination of the grade separation
structure which carries The Union Pacific Railway Company (hereinafter referred to as UPRR)
railroad tracks over Interstate highway 25, near railroad milepost 18.82, more or less, at the grade
separated crossing National Inventory ID No. 804-959D at Interstate highway 25, in Weld County,
Colorado. The existing grade separated crossing, National Inventory ID No. 804-959D near railroad
milepost 18.82, more or less, will be discontinued.
Supporting information follows:
1. The Department of Transportation, an Administrative Department of the State of Colorado,
is duly authorized to construct, maintain, and operate public highways in the State of
Colorado.
2. The State's mailing address is:
4201 E. Arkansas Ave., Denver, CO 80222
3. Under authority of the laws and statutes of the State of Colorado,federal and state funds have
been allocated and authorized,under project number NH 0253-151, 11925,for widening the
roadway of Interstate highway 25 from Weld County Road No. 6 to Weld County Road No.
10. Total estimated cost of this project is $83,000,000.00.
4. The following exhibits are attached hereto and made a part hereof:
Exhibit A- Vicinity Map
1
Exhibit B - Layout of the existing Railroad Overpass w/proposed limits of removal
5. The grade separation structure, structure number D-17-J is 305 feet long and is located near
railroad milepost 18.82, more or less,National Inventory ID No. 804-959D.
6. Average daily traffic (ADT) on Interstate highway 25 was66,058 in 1999, with projected
ADT estimated at 128,000 in the year 2020. The maximum design speed is 80 mph.
7. At present there are approximately two (2) train movements- three (3)times per week at this
location with a maximum speed of 10 mph.
8. The State will prepare detailed construction plans and specifications, award a construction
contract and provide general supervision for the demolition of the grade separation structure
and removal to insure compliance with the plans and specifications. Said plans and
specifications shall have been approved by UPRR.
9. The UPRR will furnish a cost estimate,to be accomplished by railroad force account method.
The State will be required to reimburse the UPRR for these railroad force account services.
UPRR estimated costs for force account work will be filed at a later date.
10. The State requires UPRR to provide flagging and protective services during periods of the
elimination of the grade separation. The State's contractor will be required to reimburse
UPRR for flagging and/or protective services done by UPRR.
11. The State will require its contractor to furnish, maintain and install advance warning signs
or barricade protection which may be required for the duration of the project work for the
protection of UPRR's facilities.
12. Construction for this project is scheduled to commence, in July 2001, and be completed
within approximately 24 months.
13. It is anticipated that the State will need to acquire a right to immediately possess and use
certain property belonging to UPRR including ingress and egress, in order to eliminate the
grade separation structure, structure no. D-17-J.
14. Names and addresses of property owners adjacent to the grade separation are as follows:
Erie Road Joint Venture
C/O Robert P. Marx
7 Fairway Lane
Littletown, CO 80123
•
Oxford Development, LLC
5249 North Adobe Circle
Tucson, AZ 85715
Dacono Properties, LLC
2500 Arapahoe Suite 220
Boulder, CO 80302
Columbine Iron and Metal
C/O Penny Lovely
3747 WCR 8
Erie, CO 80516
David Joseph
C/O Kevin Smith
728 Harlan
Pueblo, CO 81004
Dorthy Lovely,Trustee for
Norman D. Lovely Family Trust
1484 Frontnine Drive
Ft. Collins, CO 80525
First Dacono Development, LLC
6950 S. Potomac Street
Englewood, CO 80112
15. A pending contract between the State, and UPRR will provide for, among other things, a
lump sum payment,to be determined,payable to the Union Pacific Railroad Company as the
entire settlement for eliminating the railroad overpass at Interstate highway 25. The UPRR
will be responsible for any costs of the railroad overpass replacement, should it be needed
in the future. The State will furnish the PUC a copy of the finalized contract as a late-filed
exhibit.
16. The State will be responsible for obtaining clearance and/or approval from utility companies
which may be involved in the project, in writing or formal agreement, if utility adjustments
are required. Names and addresses of public utilities adjacent to the improvement are:
Bill Meier Bart Gamer
United Power US West Communications
18551 East 160th Ave. 12680 WCR 58
3
P.O. Box 929 , Brighton, CO 80601 Greeley, CO 80634
17. The State's Regional Transportation Director, Karla Harding, Region 4, 1420 2" Street,
Greeley, Colorado 80631, telephone (970) 350-2103, will administer the project.
18. The State's attorney, representing the State in all proceedings concerning the project is Tracy
Kinsella, Department of Law, Civil Litigation Section, 1525 Sherman St., 5th floor, Denver,
CO 80203.
19. The State waives the time limits set forth in CRS 40-6-109.5, (1) and (2), as amended, for
this application.
4
THEREFORE, the State requests the Public Utilities Commission to enter an order
authorizing the elimination of the grade separation structure that carries The Union Pacific Railway
Company railroad tracks over Interstate highway 25, near the grade separated crossing at railroad
milepost 18.82, more or less, National Inventory ID No. 804-959D, in Weld County, Colorado, as
described herein.
Dated at Denver, Colorado, this 9 day of A(f l'I , 20st.
DEPARTMENT OF TRANSPORTATION
STATE OF COLORADO
ATTEST:
By --1;191 By
SeA Mark Tieman John M. Unbewust
Chief Clerk cceac Chief Engineer
The foregoing instrument was acknowledged before me this 9‘7"4 day of
20 AI , by John M. Unbewust, as Chief Engineer for Engineering and Const ction, k Ta aa
, Tieman, as Chief Clerk, of the Colorado Department of Transportation.
WITNESS my hand and official seal.
My commission expires:
_ l t 13-O4
Notary Public
•
EXHIBIT A
last/
FT. COLLINS a
kr
6 m.b
im-
Ii
PI
1104 -11.
to
Irma. -El ItSill it pith.
sa
} .a' I
p
i ' r
:ilia-Tu,L.0._
F
6
LOCATION OF RAILROAD III m
STRUCTURE TO BE
REMOVEDAll J
i
dmourpipir
"tip
3..-L, gtip ..t
4 asg=
f'4
�( .TT i' r -F � lr
�+ y .fir
,�=r` Deniiiir
ier r , �1a : _
r
o $gf .0
EXHIBIT B
/ '`
5,_____,),_______, �i=—,fr i� — �i — �n
'/'
PROPOSED LIMITS ;j'
OF REMOVAL ;;
_ ____ ____/____.
+ if o
O tilt/, +
CV
1.O iii,
iv I la
a
n
— — —
7 O IFt
go
i s i if ±11
/
I
-'
*0-
—I —' ;+ '"
M— - a --
i I
I-
1 _I
N
/
!. ! �1/ EXISTING UPRR \ . "
/ l BRIDGE
i /1'. .
/
1 ''jam JL
z
/ ' -
{{ II
0- -. -sew _ y20- 180 -
I a a
SCALE IN FEET
Hello