Loading...
HomeMy WebLinkAbout20011213.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Arlan Marrs that the following resolution be introduced for approval with amended attached Conditions of Approval by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: PLANNER: Kim Ogle CASE NUMBER: Z-556 �= 2 o APPLICANT: H. Leroy& Phyllis Johnson c/o Todd Hodges Design, LLC ADDRESS: 2412 Denby Court ~ Fort Collins, CO 80526 REQUEST: Change of Zone from A(Agricultural)to PUD with Estate uses for five (5) residential lots LEGAL DESCRIPTION: Lot A of RE-2308 being part of the N2 Section 25, Township 5 North, Range 65 West of the 6th P.M., Weld County Colorado LOCATION: South of and adjacent to Weld County Road 54; 0.5 mile east of WCR 47 be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 26-5-30 of the Weld County Code. 2. The submitted materials are in compliance with Section 27.6.120 of the Weld County Code as follows: A. Section 27-6-120.B.6.a The proposal is consistent with any intergovernmental agreement in effect influencing the PUD and Chapters 19(Coordinated Planning Agreements),Chapter 22 (Comprehensive Plan), Chapter 23(Zoning), Chapter 24 (Subdivision)and Chapter 26 (Mixed Use Development)of this Code. The proposed site is not influenced by an Inter- Governmental Agreement. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-2-60.A.1, A. Goal 1 -- "Preserve prime farmland for agricultural purposes which foster the economic health and continuance of agriculture." Chapter 22, Section 22-2-60.1.1, A. Goal 9 indicates that eighty (80) acres is considered the minimum lot size for a viable farming operation. The subject parcel is 27.85 acres net in size and is classified as "prime if irrigated"farmland on the Important Farmlands of Weld County map. Historically the subject parcel has not been utilized for crop production. Given the lack of viable soils, lack of irrigation water and shape of the parcel,the parcel is not economically viable for agricultural production. Therefore, prime farmland will not be removed from production. 2) Section 22-2-60.C.2, A. Policy 3— "Conversion of agricultural land to residential, commercial and industrial development will be discouraged when the subject site is located outside of a municipality's comprehensive plan area, urban growth boundary area, or 1-25 Mixed Use Development area and urban development 2 IXHielf 2001-1213 Swo., 'ST z '° RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 2 nodes." The application proposes non-urban scale development as defined by Section 27-2-140 of the Weld County Code. Section 27-2-140 defines urban scale development as "...developments comprising of five (5) or fewer residential lots, located in a nonurban area as defined in Chapter 22 of this Code, not adjacent to other PUDs, subdivisions, municipal boundaries or urban growth corridors." This proposal includes public water and consists of five (5) PUD Estate zoned residential lots and one 11.98 acre open space lot. The proposed minimum lot size is two and one-half (2 '/1 ) acres with an overall density of 5.57 acres per septic system. 3) Section 22-2-60.D.2, A. Policy 4 "Provide a mechanism for the division of land which is agriculturally zoned. The intent of this goal should be to maintain and enhance the highest level of agricultural productivity in Weld County." The proposed level of development is non-urban as defined in Section 27-2-140. The addition of five (5) PUD Estate zoned residential lots will have minimal impact on the local service providers. 3) Section 22-2-90.C.1, UGB. Goal 3 "The County and municipalities should coordinate land use planning in urban growth boundary areas, including development policies and standards,zoning,street and highway construction,open space,public infrastructure and other matters affecting orderly development." This proposal is located outside of the City of Greeley Long Range Expected Growth Area. The Towns of Kersey and Garden City have indicated that they find no conflict with their interests. 4) Section 22-2-170.C.2.b, R. Policy 3.2 "New residential development should demonstrate compatibility with existing surrounding land use in terms of general use, building height, scale, density, traffic, dust and noise." The proposed subdivision takes into consideration the surrounding properties,as well as the site advantages. The site is designed with a perimeter buffer around all lots separating the residential lots from WCR 54 and the Union Pacific Railway track. The Department of Planning Services will require Weld County's Right to Farm statement as stated in Appendix 22-E of the Weld County Code to be placed on the plat. 5) Section 22-2-190.D.2.b, PUD Policy 4.2 "A planned unit development which includes a residential use should provide common open space free of buildings, streets,driveways or parking areas. The common open space should be designed and located to be easily accessible to all the residents of the project and usable for open space and recreation...." This proposal includes more than three times the required open space. Further,the landscape treatment will focus on the entry into the PUD and in the buffer area between the Union Pacific Railway track and the residential lots with the remainder of the property planted in native grasses and drought tolerant vegetation in an effort to conserve available water. 6) Section 22-3-50.8.1, P. Goal 2"Require adequate facilities and services to assure the health, safety and general welfare of the present and future residents of the County." The proposed PUD will be serviced with Central Weld County Water for potable and fire protection requirements. I.S.D.S., septic systems will handle the effluent flow. RESOLUTION,Z-556 H. Leroy& Phyllis Johnson Page 3 B. Section 27-6-120.6.b-The uses which would be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Article II, Chapter 27 of this Code. The applicant has met the twenty performance standards as delineated in Section 27-2-10 regarding access, buffering and screening, bulk requirements, circulation, etcetera. The Conditions of Approval and Development Standards ensure compliance with Sections 27-2-20 through 27-2-210 of the Weld County Code. C. Section 27-6-120.6.c-That the uses which would be permitted shall be compatible with the existing or future development of the surrounding area as permitted by the existing Zoning, and with the future development as projected by Chapter 22 of this Code or master plans of affected municipalities. The proposed site is not influenced by an Inter-Governmental Agreement. The City of Greeley stated that the proposal is outside of the City of Greeley Long Range Expected Growth Area, however,in a letter dated April 10,2001,the City recommended denial of the proposal as the Planned Unit Development does not comply with the policies and intent of the City of Greeley's Comprehensive Plan and Resolution 7, 1985. The Towns of Kersey and Garden City also both indicated that they find no conflict with their interests. D. Section 27-6-120.6.d-That the PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Article II of this Code. Central Weld County Water District has indicated their ability and willingness to service this application. Sewage disposal will be served by Individual Sewage Disposal Systems (I.S.D.S.). Based on a geotechnical report from Terracon dated February 10,2000,the site is unsuitable for conventional septic systems because of shallow groundwater. Because of this the systems will be required to be designed by a registered professional engineer. The Department received a letter from Church & Associates, Inc. dated April 13, 2001 proposing optional septic systems for the property,considering the high groundwater table observed at the site. These proposed systems are acceptable for installation on the site, although a reduced size absorption field is not allowed for advanced treatment systems. Primary and secondary septic system envelopes have been designated on each lot as recommended. The application states that language restricting building on the septic system envelopes will be included in the homeowners association covenants,which will be submitted with the Final Plan application. E. Section 27-6-120.6.e-That street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. The Weld County Public Works Department has reviewed the proposal and has determined that the internal road to the PUD shall be paved and constructed in width that is consistent with Table III-21 of the AASHTO Green Book. Further,Weld County Road 54 is designated as a collector status road that requires eighty (80) feet of right-of-way. Presently there is sixty(60)feet of right-of-way. A total of forty(40)feet from the centerline of Weld County Road 54 shall be delineated on the plat as right-of-way reservation for future expansion of Weld County Road 54. The City of Greeley, in a letter dated April 10, 2001 has designated WCR 54 as an arterial roadway that requires one hundred (100)feet RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 4 of right-of-way. A total of fifty(50)feet from the centerline of Weld County Road 54 shall be delineated on the plat as right-of-way reservation for future expansion of Weld County Road 54. F. Section 27-6-120.6.f - An off-site road improvements agreement and an on-site improvements agreement proposal is in compliance with Chapter 24 of the Weld County Code as amended and a road improvements agreement is complete and has been submitted, if applicable. Development Standards and Conditions of Approval ensure compliance with Chapter 24, Article VII, and Sections 24-9-10 and 24-9-20 of this Code. The Weld County Public Works Department and Department of Planning Services shall require an Improvements Agreement in accordance with Section 27-6-120.6.f of the Weld County Code for improvements to Prairie Echoes Court and all on-site improvements. G. Section 27-6-120.6.g -That there has been compliance with the applicable requirements contained in Chapter 23 regarding overlay districts,commercial mineral deposits, and soil conditions on the subject site. The Greeley Weld County Airport, in their referral letter dated April 6, 2001, stated the location of the proposed development is within the Greeley-Weld County Airport's Area of Concern as defined in the Greeley-Weld County Airport Surrounding Land Use Guidelines. Specifically the site is located beneath the 7:1 Transitional Surface associated with the approach slopes for Runway 34 at the Greeley-Weld County airport, and is in close proximity to the final approach path for that runway. The Airport Authority recommends the applicant execute an Avigation Easement,which will protect the interests of Weld County, the City of Greeley, and the Greeley-Weld County Airport Authority in the future from potential nuisance complaints that may be generated by aircraft noise. The Colorado Geological Survey, in their referral letter dated March 22, 2001, identified several areas of concern for the site, including the potential for shallow groundwater. The natural topography of the site and the surrounding vicinity may lead to drainage problems on and off-site. Grading shall be undertaken to provide positive drainage around the buildings, and structural design should conform to any limitations imposed by possible shallow groundwater. The Weld County Department of Public Works stated that the submitted drainage plan, although adequate,would require the resolving of some minor issues and the submission of additional documentation as outlined in the memorandum dated March 16, 2001. In the referral response dated March 12, 2001, the Weld County Building Inspection Department is requiring engineered foundations for each structure. H. Section 27-6-120.6.h-Consistency exists between the proposed zone district(s),uses,the specific or conceptual development guide. r RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 5 The submitted Specific Development Guide does accurately reflect the performance standards and allowed uses described in the proposed zone district, as described previously. The applicant is requesting that the Final Plan be administratively reviewed. The Department of Planning Services' staff concurs with this request. This Approval recommendation is based upon compliance with Chapter 27 requirements. The Change of Zone from A (Agricultural)to PUD with Estate Zone District uses is conditional upon the following: 1. The applicant shall provide the Department of Public Health and Environment with viable alternatives to conventional septic system alternatives that will mitigate any contamination to groundwater and not pose a threat to the health,safety and welfare to citizens of Weld County. The applicant shall provide evidence to the Department of Planning Services' that the concerns and issues pertaining to the septic systems have been addressed and implemented to the satisfaction of the Weld County Department of Public Health and Environment. (Dept. of Public Health & Environment and Dept. of Planning Services) 2. Prior to recording the Change of Zone plat: �` A. The Change of Zone plat shall meet all requirements of Section 27-9-20 of the Weld County Code. (Dept. of Planning Services) B. The applicant shall submit a proposed estimate for time of construction of the PUD. (Dept. of Planning Services) C. The applicant shall submit a additional information, as required, for the drainage report, signed by a Colorado licensed engineer,to the Department of Public Works for approval. The applicant shall supply the Department of Planning Services with written approval from the Department of Public Works. (Dept. of Planning Services, Dept. of Public Works) D. The applicant shall address the concerns of the LaSalle Fire Protection District. Written evidence of a solution shall be provided to the Department of Planning Services. (LaSalle Protection District) E. The applicant shall address the concerns of the Weld County Sheriffs Department, in a memo dated November 28, 2000 and incorporate remedies for these concerns. Written evidence of a solution shall be provided to the Department of Planning Services. (Sheriff) F. The applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are.shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). (Dept. of Planning Services) 2. The plat shall be amended to include the following: A. The road cross-section for Prairie Echoes Court as approved by Weld County Department of Public Works. RESOLUTION, Z-556 H. Leroy&Phyllis Johnson Page 6 B. The applicant shall identify and illustrate how landscaping shall be incorporated along WCR 54 and the Julesburg Branch of the Union Pacific Railroad tracks. C. The applicant shall delineate primary and secondary septic envelopes on each parcel. D. The applicant shall delineate a fifty(50)foot right-of-way reservation from the centerline of Weld County Road 54 as stated in the City of Greeley referral date April 10, 2001. 4. The Change of Zone plat map shall be submitted to the Department of Planning Services'for recording within thirty (30) days of approval by the Board of County Commissioners. (Dept. of Planning Services) 5. The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: A. The site specific development plan is for a PUD Change of Zone from A (Agricultural) to PUD with Estate Zone District uses as indicated in the application materials on file in the Department of Planning Services and subject and governed by the Conditions of Approval stated hereon and all applicable Weld County Regulations. Noncompliance with any of the foregoing Conditions of Approval may be reason for revocation of the Permit by the Board of County Commissioners. B. Approval of this plan may create a vested property right pursuant to Article VIII,Section 23- 8-50 of the Weld County Code. (Dept. of Planning Services) C. The applicant shall obtain water from Central Weld County Water District. (Dept. of Public Health and Environment) D. A Weld County Septic Permit is required for each proposed septic system and shall be installed according to the Weld County Individual Sewage Disposal System Regulations. (Dept. of Public Health and Environment) E. Each septic system shall be designed for site-specific conditions, including but not limited to maximum seasonal high groundwater, poor soils and shallow bedrock. Maximum seasonal high groundwater has been documented at 1.4 feet below the surface, based on boring observations on October 3, 2000 from Terracon. (Dept. of Public Health and Environment) F. Each septic system shall be designed using a Colorado Department of Public Health and Environment approved advanced treatment system. (Dept. of Public Health and Environment) G. Primary and secondary septic envelopes shall be designated on each lot. Septic system envelopes shall meet the required setbacks as described in the Weld County Individual Sewage Disposal System Regulations. (Dept. of Public Health and Environment) H. Language for the preservation and/or protection of the second absorption field envelope shall be placed in the development covenants. The covenants shall state that activities such /"', as landscaping(i.e.,planting of trees and shrubs)and construction(i.e.,auxiliary structures, dirt mounds,etcetera)are expressly prohibited in the designated absorption field site. (Dept. of Public Health and Environment) f•-., RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 7 The applicant shall obtain a storm water discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and Environment, if required. Silt fences shall be maintained on the down gradient portion of the site during all parts of the construction phase of the project. (Dept. of Public Health and Environment) J. If land development creates more than a 25 acre contiguous disturbance,or exceeds six(6) months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice (A.P.E.N.), and apply for a permit from the Colorado Department of Public Health and Environment. (Dept. of Public Health and Environment) K. During the development of the site,all land disturbance shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. (Dept. of Public Health and Environment) L. In accordance with the Regulations of the Colorado Air Quality Control Commission, any development that disturbs more than five acres of land must incorporate all available and practical methods which are technologically feasible and economically reasonable in order to minimize dust emissions. (Dept. of Public Health and Environment) M. In the event that more than five acres of the site is disturbed during the construction and development of this site,the applicant shall obtain a storm water discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and the Environment. Silt fences shall be maintained on the down gradient portion of the site during all parts of the construction phase of the project. (Dept. of Public Health and Environment) N. A Home Owner's Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities and other facilities. Open space restrictions are permanent. (Dept. of Planning Services) O. Weld County's Right to Farm note as delineated in Appendix 22-E of the Weld County Code (Weld County Comprehensive Plan dated October 31,2000). (Dept.of Planning Services, Dept. of Public Health and Environment) P. Potential Purchasers are hereby notified that a dairy operation is located directly north of the intersection of Weld County Roads 54 and 49,and a turkey farm is located south southeast of the intersection of Weld County Roads 54 and 49. Off-site impacts that may be encountered include noise from trucks,tractors and equipment;dust from animal pens and odors from animal confinement, silage, and manure. (Dept. of Planning Services) Q. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. (Dept. of Planning Services) R. All signs including entrance signs shall require building permits. Signs shall adhere to Section 23-4-80 of the Weld County Code. These requirements shall apply to all temporary and permanent signs. (Dept. of Planning Services and Building Inspection) S. No development activity shall commence on the property, nor shall any building permits be issued on the property until the final plan as been approved and recorded. (Dept. of Planning Services) RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 8 T. Proper building permits shall be obtained prior to any construction, remodeling, demolition or excavation. (Dept. of Building Inspection) U. All foundations, structures and building systems are required to have engineered foundations shall be based on a site-specific geo-technical report performed by a Colorado licensed engineer. Any fill material shall contain no rock or similar irreducible material with a maximum dimension greater than twelve (12) inches. All fills shall be compacted to a minimum of ninety(90)percent of maximum density. Engineering reports shall be supplied for all fill material. (Dept. of Building Inspection) V. All structures shall conform to the Section 29-2-20 of the Weld County Code,Article II(1997 Uniform Building Code), Section 29-2-30 of the Weld County Code, Article 11 (1998 International Mechanical Code), Section 29-2-40 of the Weld County Code,Article II(1999 Electrical Code),29-2-50 of the Weld County Code,Article II (1997 International Plumbing Code)and Section 29-2-10 of the Weld County Code,Article II, Chapter 29 (current Weld County Building Ordinance). (Dept. of Building Inspection) W. All buildings or structures shall maintain distances from the property lines and adjacent structures as outlined in Section 29-3-160 of the Weld County Code. (Dept. of Building Inspection) X. Complete drawings shall be submitted for review by the LaSalle Fire Protection District. (Dept. of Building Inspection) Y. At the time an application is accepted for a building permit, a plan review will be done. A complete review of the building or structure by the Weld County Building Inspection Department or the LaSalle Fire Protection District may reveal other building issues or areas needing attention. (Dept. of Building Inspection) Z. The property owner shall be responsible for compiling with the Performance Standards of Chapter27,Article II and Article VIII,of the Weld County Code. (Dept.of Planning Services) AA. Personnel from the Weld County Departments of Public Health and Environment and Planning Services'shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County Regulations. BB. The applicant shall comply with Section 27-8-50 Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within two(2)years of the date of the approval of the PUD Zone District,the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD Final Plan, the Board of County Commissioners may, at a public hearing revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. (Dept. of Planning Services) RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 9 CC. The PUD Final Plan shall comply with all regulations and requirements of Section 27 of the Weld County Code. (Dept. of Planning Services) DD. The site shall maintain compliance at all times with the requirements of the Weld County Departments of Public Works, Public Health and the Environment, and Planning Services, and adopted Weld County Code and Policies. (Dept. of Planning Services) 6. At the time of Final Plan submission: A. The applicant shall submit final road layout and alignment plans with associated documents to the Department of Public Works for their review and approval. (Dept. of Public Works) B. The applicant shall submit an on-site (Private) Improvements Agreement that addresses all improvements associated with this development, per compliance with Section 24-9-10 of the Weld County Code. (Dept. of Planning Services) C. The applicant shall submit evidence to the Department of Planning Services that approval was received from the Department of Public Works of an Improvements Agreement Regarding Collateral for the Transportation portion of the PUD. (Departments of Public Works, Planning Services) D. The applicant shall submit a drainage report,signed by a Colorado licensed engineer,to the Department of Public Works for approval. The applicant shall supply the Department of Planning Services with written approval from the Department of Public Works. (Dept. of Public Works, Planning Services) E. Service Provision Impacts for ambulance shall be addressed as required by Section 27-6 - 50.6.4 of the Weld County Code. (Dept. of Planning Services) F. The applicant shall submit a Landscape Plan in accordance with Section 27-2-100 (PUD)of the Weld County Code. (Dept. of Planning Services) G. The applicant shall contact the Platte Valley School District, RE-7, to finalize a bus pick-up and drop-off location. (Dept. of Planning Services) H. The applicant shall address the concerns of the Greeley-Weld County Airport Authority as stated in a letter dated April 6,2001. Written evidence of a solution shall be provided to the Weld County Attorney's Office and the Department of Planning Services for review and approval. (Dept. of Planning Services) I. The applicant shall submit a time frame for construction in accordance to Section 27-2-200 of the Weld County Code. (Dept. of Planning Services) J. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are.dwg,.dxf,and.dgn(Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4)... (Group 6 is not acceptable). (Dept. of Planning Services) RESOLUTION, Z-556 H. Leroy& Phyllis Johnson Page 10 7. Prior to the release of any building permits: A. The applicant shall supply designated street and stop signs, as required by Weld County Public Works, at the appropriate locations. (Weld County Public Works) Motion seconded by Arlan Marrs. VOTE: For Passage Against Passage Absent Cristie Nicklas Stephen Mokray Fred Walker Arlan Marrs Jack Epple Michael Miller John Folsom Cathy Clamp Bryant Gimlin The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I,Vicki Hamilton,Recording Secretary for the Weld County Planning Commission,do hereby certify that the above and foregoing resolution,is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on, May 1, 2001. Date the 1st of ay, 2001 Vicki Hamilton Secretary Hello