Loading...
HomeMy WebLinkAbout20013110.tiff BOARD OF COUNTY COMMISSIONERS 414içv 4 PHONE (970)356-4000, EXT.4200 FAX: (970) 352-0242 P.O.O. BOX 758 GREELEY, COLORADO 80632 WI C. COLORADO October 19, 2001 Dale and Donna Kiehn 23467 WCR 7 Berthoud, CO 80513-9136 Re: Improvement Request for Weld County Road (WCR) 7 from WCR 48 to State Highway 60 and WCR 48 from WCR 7 to Interstate 25 Dear Mr. and Mrs. Kiehn: Thank you for you letter dated October 11, 2001, to Commissioner Glenn Vaad requesting improvements be made to the referenced roadway segments. I have referred your request to the Weld County Public Works Department for review. The Department does not have current traffic counts on these roadways. New counts will be acquired within the next several weeks. Current traffic counts are necessary for determining whether a roadway should be considered for an improvement project. If the volume of traffic on a roadway consistently exceeds 200 vehicles per day, it will be placed on a list of similar roadways that will be evaluated annually. From that evaluation process, the Public Works Department will make recommendations to the Board of County Commissioners for projects to be included in its 5-Year Roadway Improvement Plan. I think it is appropriate to note that Weld County has a listing of roadways that require improvement or upgrades which far exceed its current fiscal capability. Rest assured your roadways will be evaluated based on their comparative merits with others on the list. I have instructed the Public Works Director to advise you of the counts when they are completed. Sincerely, BOARD OF COUNTY.COMMISSIONERS ` M. J. Geile, Chair cc: Frank B. Hempen, P.E., Director of Public Works/County Engineer Dean Dreher, Public Works "�y,<2.0jy, Gt9e7'4 2001-3110 iD/a 9/D/ it-11?:1 . 16 BOARD OF COUNTY COMMISSIONERS PHONE (970)356-4000, EXT.4200 FAX: (970) 352-0242 P.O. B 758 8 GREELEY, COLORADO 80632 illiC. COLORADO October 19, 2001 Darin and Darla Rome 23115 Weld County Road 7 Berthoud, CO 80513-9136 Re: Improvement Request for Weld County Road (WCR) 7 from WCR 48 to State Highway 60 and WCR 48 from WCR 7 to Interstate 25 Dear Mr. and Mrs. Rome: Thank you for you letter dated October 11, 2001, to Commissioner Glenn Vaad requesting improvements be made to the referenced roadway segments. I have referred your request to the Weld County Public Works Department for review. The Department does not have current traffic counts on these roadways. New counts will be acquired within the next several weeks. Current traffic counts are necessary for determining whether a roadway should be considered for an improvement project. If the volume of traffic on a roadway consistently exceeds 200 vehicles per day, it will be placed on a list of similar roadways that will be evaluated annually. From that evaluation process, the Public Works Department will make recommendations to the Board of County Commissioners for projects to be included in its 5-Year Roadway Improvement Plan. I think it is appropriate to note that Weld County has a listing of roadways that require improvement or upgrades which far exceed its current fiscal capability. Rest assured your roadways will be evaluated based on their comparative merits with others on the list. I have instructed the Public Works Director to advise you of the counts when they are completed. Sincerely, BOARD F COUNTY COMMISSIONERS ///' ` M. JIGeile, Chair cc: Frank B. Hempen, P.E., Director of Public Works/County Engineer Dean Dreher, Public Works CORRESPONDENCE RESPONSE DEPARTMENT OF YOGIC: /1z. " 1 * * * PLEASE RESPOND WITHIN THREE DAYS.* * * IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL RECEIVE° OF EXPECTED DATE FOR RESPONSE. OCT 16 2001 RECOMMENDED ACTION: vvao ,. =P PUBLIC Wolf Narrative: MG RM BJ DL GV BOARD ACTION: (Initial by Approval) Agree with Recommendation 7 \l Worksession METHOD OF RESPONSE: - Board Action - Work Session Letter'(Attached) L2� Telephone Call - No Response (explain) :part ent H ignature M:\CAROL\O P MA N\R D C O M P2 .,t r. ► October 11,2001 Glenn Vaad Weld County Commissioner District 2 915 10th St Box 758 Greeley, CO 80631 Dear Mr.Vaad: What are your plans for county roads 7 and 48? The traffic on these roads has increased considerably since the opening of the Johnstown Gateway Center. We have unofficially heard that the traffic count warrants paving them. We definitely need something done to control the dust! I am enclosing some pictures of the dusty conditions around our homes. We know that you advocate the use of magnesium chloride for dust control. We are not in favor of using this because any amount of moisture and the roads are almost impassable. This magnesium chloride is also very damaging to vehicles. Larimer County uses a"chip and seal"method,which is more effective than just the magnesium chloride. We are asking that county road 48(west of 1-25)to road 7 be paved and that road 7 be paved from road 48 north 1 mile to highway 60. This would certainly alleviate the unhealthy environment that exists now. We need some relief as soon as possible. We anxiously await your reply. Thank you, Dale an nna Kiehn 23467 CR 7 Berthoud, CO 80513-9136 Darin and Darla Rome 23115CR7 Berthoud, CO 80513 Encl. .,�� ..�...d._• • Ti3A Q\ - Q f x44 ;.ti vt 3 • C s Y+ 0 • 1r Sot<lit w a 5s • • , • ti4. to '.' 3 r ,T NY r( f� N :.S. - l j �t-v..- r.. .tag ��'•��,.��:' ........'..1%.1'''.i3:'.";'2'. •.1%. 'sa.i 2 r if,,-....- a i Ta • Y; n i , o n _J� + _ + r_ }.n-.kear.. .. _ •[ 0i-';Lt OD g - ----.,., , .„:,:‘..% •.,.i.:4•�c '^ti a3 r to,:. a j 'f r r .w -i- 4 f+« Lv/ . Hello