May 11, 2001
Mr. Carl Eiberger
754 WCR 23 3/4
Brighton, CO 80601
Re: Paving of Weld County Road 23 ''
Dear Mr. Eiberger:
This letter will serve as a reply to your previous requests for an update on paving WCR 23 1/2. The
issue was reviewed by the Board of Weld County Commissioners and Frank Hempen, Jr.,Director
of Public Works/County Engineer.
As you may be aware, the composition of the Board of County Commissioners changed in January
of this year. The new Board determined it was appropriate to review all roadway improvement plans
currently scheduled by the Public Works Department. The Board made several changes to the
Improvement Plan. One of the changes was a determination not to pave WCR 23 '/ at this time.
In lieu of paving the roadway, a decision was made to cover it with a stabilized rock base. This
process incorporates a chloride based compound with good quality road base. The resulting product
is a hardened surface that greatly diminishes fugitive dust. It will be refinished once a year to
maintain the roadway surface, thus controlling the effects of a raveling and potholes.
The timing of this work will be discussed within the next two weeks when a revised Improvements
Plan is considered by the Board. I am directing Mr. Hempen to advise you of the timing of this
project as soon as a decision is made.
A signal is planned for the intersection of WCR 6 and U.S. Highway 85. It is the No. 3 priority
project in the Upper Front Range Regional Plan Project List. The Colorado Department of
Transportation (CDOT) staff has projected construction as early as 2002. It is the consensus of the
' t i,t/,, fi(((1 2001-1348
)/-4/I I
Mr. Carl Eiberger
May 11, 2001
Page 2
Board that installation of this signal will encourage motorists to use this intersection for access to
the south instead of WCR 23 1/2. The Public Works Department will monitor traffic counts to
determine whether this assumption is correct.
Sincerely,
BOARD 9F COUNTY COMMISSIONERS
r r 4 i/ L
M. J. Geile, Chair
pc: Frank B. Hempen, Jr., P.E.,Director of Public Works/County Engineer
WCR 231/2 file
C R E SE3ONDENC 3 RESPONSE
,
DEPARTMENT OF /" /�
* * * PLEASE RESPOND WITHIN THREE DAYS? * *
IF RESPONSE WILL BE DELAYED,
PLEASE NOTIFY "CTB GROUP" BY E-MAIL
OF EXPECTED DATE FOR RESPONSE.
l COh'.I .\iEE,NN 9:E;1D ACTION;
Narrative:
blI =Icf OF RESPONSE;
E;
Board Action
Work Session
Letter (Attached)
Telephone Call
No Response (explain)
Department Head Signature
M'.\CAROL\O P M A N\R D C O M P 2
DEPARTMENT OF / (d'-{/ 6,42O1.-e-
* * * PLEASE RESPOND WITHIN THREE DAYS.* * *
IF RESPONSE WILL BE DELAYED,
PLEASE NOTIFY "CTB GROUP" BY E-MAIL
OF EXPECTED DATE FOR RESPONSE.
RECOM MiEI.JEJD .A'fl'f T[Q_ .;
Narrative:
NI F,TH'i _)' '01 ,RESJPC>NSJ -
Board Action
Work Session
X Letter (Attached)
Telephone Call
No Response (explain)
Department Head Signature
M:\CAROL\OPMAN\RDCOMP2
w3 Y."G s f� .
��j
_ _ 7 r ��;; DEC' 2000
CORR_�,S1O DEN E� RESPONS 1
DEPARTMENT OF /�(-��'
* * * PLEASE RESPOND WITHIN THREE DAYS.` * *
IF RESPONSE WILL BE DELAYED,
PLEASE NOTIFY "CTB GROUP" BY E-MAIL
OF EXPECTED DATE FOR RESPONSE.
Ri CO MMvMENJEJD ACTION
.
Narrative:
NI E,TTIOD O 5 RESPONSE:
Board Action
Work Session
Letter (Attached)
Telephone Call
No Response (explain)
Department Head Signature
M:\CAROL\OPMAN\R DC O M P 2
RECEIVED
MAY 1 0 2001
Carl Eiberger
754 W.C.R. 23 34 WELD COUNTY
PUBLIC WORKS DEPT
Brighton, CO 80601
May 8, 2001
Frank B. Hempen Jr.
Director of Public Works
915 10th Street
Greeley, CO 80632
(Re): Paving Weld County Road 23 ''A.
Director, Frank B. Hempen Jr:
We did not hear a response regarding the paving of Weld County Road 23 ''A.
Last year,we received information indicating that the design, right of way, utility
relocations as well as paving would commence this year. Please forward a time
frame in which the above will occur.
Thank you in advance for you assistance. Please feel free to contact us at (303) 880-
4001.
Ciberger
RECEIVED
Carl Eiberger MAY 0 2 2001
754 W.C.R. 23 '/a WELD COUNTY
PUBLIC WORKS HEFT
Brighton, CO 80601
April 22, 2001
Frank B Hempen Jr.
Director of Public Works
915 10`h Street
Greeley, CO 80632
(Re): Paving Weld County Road 23 '/2.
Director:
We wanted to follow up with you regarding the paving of Weld County Road 23 ' .
Last year, we received information indicating that the design, right of way, utility
relocations as well as paving would commence this year. Please forward a time
frame in which the above will occur.
Thank you in advance for you assistance. Please feel free to contact us at (303) 880-
4001.
L" arl Eiberger
cc: Pete& Cindy Baurer
603 4^09 71oe 0. 01
Carl Eiberger
754 W.C.B. 23 '/,
Brighton, CO 80601
February 5, 2001
Barbara KKirkmeyer
Chair,Board of County Commissioners
915 10th Street
Greeley, CO 80632
(Re): Paving Weld County Road 23 '/z.
Commissioner Kirkmeyer:
We have not bad a response form you or other departments you may have asked to
respond to us regarding our previous letters,
We wanted to follow up with you regarding the paving of Weld Coon: Road 23 %z.
Please forward a time frame in which the design, right of way, and Mii-+ty
relocations will be completed. Your letter dated November 15, 2000 si 'led these
items were planned for 2000. Also, please forward a time frame in wh zh the actual
construction and paving will be taking place,
if you have driven the road,you wo!ld agree with Pc that time is of lb essence.
While this road is located at the most Southern end of Weld County, i there is
anything you could do to move up the time frame. it would oe greatly 'ppreciated.
If there is anything we can do to move up the schedule, please let us ki ow. The road
is not graded as much as you stated.
Once again, if you have not been able to drive the road, please do so t. e next time
you are near the South end of the County.
Please feel free to call us with any questions; we can be reached at (30 ') 880-4001.
Thank you in advance for you assistance.
f�
Carl Eiberger
r '
Carl Eiberger
754 W.C.R.. 23%
Brighton, CO 80601
January 4,2001
Barbara Kirkmeyer
Chair, Board of County Commis iioners
915100' Street
Greeley, CO 80632
(Re): Paving Weld County Lon i 23 '4.
Commissioner Kirkweycr: I'!'e is ,pe you had festive Holidays.
We wanted to follow up with yo: regarding the paving of Weld County Road "3 15.
Please forward a time frame in v itich the design, right of way, and utility
relocations will be completed. Y ur letter dated November 15, 2000 stated the.,c
items were planned for 2000. Al; o, please forward a time frame in which the actual
construction and paving will ;e alsng place.
If you have driven the road, you would agree with us that time is of the essence.
While this road is located at the host Southern end of Weld County, if there is
anything you could do to move up the time frame, it would be greatly appreciated.
If there is anything we can dc to Hove up the schedule, please let us know. The road
is not graded as much as you sta'ed.
Once again, if you have not betas able to drive the road, please do so the neat inte
you are near the South end of tho County.
Please feel free to call us with any questions; we can be reached at(303) 880-4901:
Thank you in advance for you assistance.
Carl Eiberger
17Y...�
•
Carl Eibe -ger
754 W.C.R. 23%
Brighton, CO 30601
December 4, 2000
Barbara Kirkmeyer
Weld County Commissioner
915 1e Street
Greeley, CO 30632
Commissioner Kirkmeyer:
(Re): Paving Weld County Road 23.5
Tha+:k you for your letter dated November 15, 2400 regarding the above matter
Road 23 Yz was not being graded twice a week as we previously discussed, but sonic
time:, it is three weeks between grading. Due to the chemical placed on the road to
reduce the amount of dust,the washboard/rippling of the road cannot be removed
by grading it. The additional gravel has helped in filling in sonic of the ruts. I am
not convinced the additional aggregate and routine maintenance will alleviate the
concerns with the road roughness. It needs to be maintained by grading said road a
minimum of twice daring a weekly period, and sometimes more than twice, due to
heavy traffic.
Thank you for help regarding the littering. Please inform the Department that most
of the debris is broken beer and liquor bottles and they should wear gloves for
protection. We continue to stop and pick up bottles and trash. As we stated :fore,
the added concern is the broken glass along the road,which is dangerous to people,
pets, horses and wildlife as you can imagine.
While we do not want to inundate you with letters, a politician once said, "the
squeaky wheel gets the grease". Boy do we have a lot of squeaky wheels driving the
aforementioned road.
Anything you can do or advise t ; to do, to speed up the paving schedule, please let
us know.
If you have not been able to drive the road, please do so when you are on the "oath
end of the County. I can be reached at(303) 330-4001.
Thank you,