Loading...
HomeMy WebLinkAbout20013075.tiff SEP-25-01 TUE 04:53 PM FAX NO, P. 02 September 25, 2001 Board of County Commissioners of Weld County, Colorado VIA FAX TO 970-352-0242 915 Tenth Street Greeley, Colorado ATTN: Esther Gesick, Clerk to the Board Re: Docket#2001-65, PL1548-Change of Zone#557 Dear Board Members: The purpose of this correspondence is to request a continuance of the above-referenced item which is currently scheduled for your review tomorrow morning, September 26, 2001, at 10:00 a.m. My planer/architect, Mikal Torgerson,has encountered an unexpected family medical emergency which will prevent him from finalizing his hearing preparation and attending tomorrow's hearing. Mr. Torgcrson's wife has been in premature labor and was hospitalized in Fort Collins last week. Further complicating matters, the Torgersons have a three-year old son for whom alternate arrangements need to be made. I regret that Mr, Torgerson is not able to attend and request, in light of these difficult circumstances, that you grant a brief continuance to the October 17, 2001 meeting as we arc most anxious to have this matter heard and a decision made. I will be available in the morning to personally present this request, Thank you for your consideration. Sincerely,/10444_ , 1. 1� 0 4-Q.PN�� Ric Hansen,Manager Colorado Elk Ranch, L.L.L.P. Applicant 2001-3075 at MEMORANDUM TO: Board of County Commissioners pp�� COLORADO FROM: Chris Gathman, Planner a , 1 . SUBJECT: Recommended revisions to Z-557 (Stark Farm) resolution Planning staff recommends the following revisions to the Z-557 resolution: 1) Item G3 (page 3) should be deleted (and remaining items renumbered). 2) Item G6 (page 3) should be deleted (and remaining items renumbered). 3) The following condition should be added as item G6 (page 3): "The term "Outlot A" shall be removed from the parcel to the south of the Cross-Cut Lateral Ditch and shall be replaced with "not included in this PUD." 4) The following statement should be added as item G7 (page 4): "The southern boundaries of Lots 35, 36 and 37 shall be amended so that they are outside of the easement/right-of-way for the Cross-Cut Lateral Ditch. Lots 35, 36 and 37 shall remain a minimum of 1 acre in size." 5) Item 2H.20 (page 7) shall be modified from "compiling" to "complying". 6) The following condition should be added as item 5D (page 9): "The applicant shall provide evidence to the Department of Planning Services that the Plant Investment Fee portion of the "Tap Fee" and engineering fee have been paid per the applicant's agreement with the North Weld County Water District." 4. EXHIBIT SERVICE,TEAMWORK,INTEGRITY,QUALITY M #551? Weld County Planning Dept, Town of ,;UL 0 3 100' AULT RECEIVED 201 First Street • P.O. Box 1098 •Ault, Colorado 80610 • (970) 834-2844 • Fax (970) 834-2199 June 28, 2001 Weld County Department of Planning Services Attn: Mr. Chris Gathman 1555 N. 17th Avenue Greeley, CO 80631 Ref Case No. Z-557 Dear Mr. Gathman: Even though the Town of Ault has previously stated our views on the Weld County Referral for Mikal Torgerson, I do want to clarify one other point regarding zoning of the area in question. When we updated our Comprehensive Plan in 1999, we identified that area specifically to be most suited for "Estate-sized" residential dwellings/lots. We made this distinction because of the topography situation making city sewer service impractical. Our position on this point has not changed. Sincerely, CC Lix Stanlby D. Ca Mayor 111 cc: Mikal Torgerson 4. EXHIBIT AUnique Little Town I. INTRODUCTION Stark Farm is a residential development consisting of 39 single-family dwelling units. The site is generally located in the southwest corner of County Road 37 (CR 37) and County Road 84 (CR 84) in Weld County. A vicinity map is presented in Figure 1. This traffic impact study assesses the planned residential development and looks at critical intersections and site access points. The following key steps were undertaken as part of this study. • Obtain current traffic and roadway data in the immediate area of the site. • Evaluate current traffic operations to establish the base conditions. • Determine site generated traffic volumes and distribute this traffic to the nearby street system • Estimate roadway traffic volumes for both short- and long-term condi- tions. • Evaluate traffic operations at full project build-out (short-term) and long- term conditions. • Identify areas of potential deficiencies. • Recommend measures to mitigate the impact of site generated traffic as appropriate. A conversation with Weld County staff (Diane Houghtaling) was held at the onset of this study. Data provided during those discussions, areas of investigation, study parameters, and other such items are reflected in the balance of this report. '= EXHIBIT I .-.-•- S H N. B6 I 76 \ • 87 SITE 37 • k 93 L \ 5ti 4)1 tl .:j- 99 k. 1 ITird - i ndSt! a [ 14 S \ 3 \ 41/ \\1/4, 80 80 —\,. re-- \ ,„.,.i.‘ , . /, \ _ „......i.,, \ , \ N____________ \\\ \ ‘ :,,,, ,_, :a i___,._ 0mi 02 0.t 0.8 0.8 C 1 1.2 1A Copyright 01988-1997.Microsoft Corporation anaor Its uuppners. Figure 1 2 VICINITY MAP II. EXISTING CONDITIONS A).Existing Road Network This site is bordered on the east by CR 37 and on the north by CR 84. These streets are under Weld County control. CR 37 is an north-south roadway with one lane in each direction. It is a paved road- way from CR 86 to the south. CR 37 provides a direct route to Greeley and other communities. Weld County Road 84 (CR 84) is an east-west unpaved roadway which borders the site on the north. It has one lane in each direction and extends east and west of U.S. 85. CR 86 lies one mile to the north of CR 84 and is a paved east-west roadway. State Highway 14 (SH 14) is an east-west major roadway to the south of the site. It is a paved roadway with regional significance. A direct connection to Fort Collins and Intersection 25 is provided via SH 14. Current roadway features are shown on Figure 2. B).Existing Traffic Conditions Traffic counts were obtained at the CR 37 - SH 14, CR 37 — CR 84, and CR 37 — CR 86 intersections during both morning and afternoon peak hours as part of this study. Additional count data was extracted from Weld County and CDOT sources. Peak hour and daily traffic are presented on Figure 3. Count sheets are available in Ap- pendix A. 3 O CR 86 STOP CR84 SH 14 U Figure 2 4 CURRENT ROADWAY FEATURES c` c` o 1/0 X12/4 4/1 1227 203 CR 86 0/2 3/12 --10 CV0o 5/1 o " 1/0 o o f--- 1/1 4) l c- 1/2 131 62 CR84 111 1 011 —D. c.) ` 2/1 0 ccvo .6‘1- -0/1 I. Cr) ' 4-- 50/73 c.4/4 1650 SH 14 1350 3/3 (TP 64/89 —ID. M o 3/2 ti co LEGEND: AM/PM U Daily Figure 3 5 CURRENT TRAFFIC C). Surrounding Land Uses Stark Farm will be constructed on ground that is undeveloped. The site is surrounded by agricultural and residential uses. There are no significant traffic generators in the immediate area and therefore, only minimal traffic is currently using the area street system. The urban areas within and surrounding the Town of Ault lies to the west and south of the site. Fort Collins is located to the west with Greeley to the south. III. FUTURE TRAFFIC CONDITIONS A).Development Assumptions Groundbreaking is expected as soon as possible with some 4 — 5 years required to build out the Stark Farm development. At that time, 39 single family residences will be built and occupied. A concept plan is presented in Figure 4. For analysis pur- poses, the short-term horizon year of 2005 was selected. 8). Site Traffic Site generated traffic was estimated using the standard generation rates and proce- dures consistent with those presented in "Trip Generation, Sixth Edition". It is pre- pared by the Institute of Transportation Engineers (ITE) and is nationally recognized. 7 7 \ -V "i ' // . 2,-/ , I I i� Il , .,...,;:c........:_......tm..,....„.N./ ---N. _5, ,_\I .. '- L'"'' '... .- ._ __. _ _ ' 77-.-____-7-- _ w.roue Si w.x w.mue x w i— — .� - . > L__l- z -' NI Kph Figure 4 CONCEPT PLAN Stark Farm Trip Generation Table Daily AM Pk Hr PM Pk Hr Use Size Rate Trips Rate In Out Rate In Out Single Family 39 D.U. 9.57 I 373 0.75 8 22 1.01 25 14 As shown, trip activity related to this development has been estimated at 30 morning peak hour trips, 39 afternoon peak hour trips, and 373 trips per day. These trips are considered minor. C). Trip Distribution Trip distribution is a function of the origin and destination of site users, their work and shopping patterns and the available roadway system. In this case, major urban areas are situated to the south and west. A review of current peak hour traffic counts reveal directional traffic demands consistent with this statement. These counts reflect the impact of Greeley and Fort Collins on surrounding areas. All site traffic will use CR 37 to access roadways leading to and from shopping, schools and work. A logical determination of the directional distribution of the site traffic is shown on Figure 5. The distribution reflects the predominance of Fort Collins and Greeley in the overall area, the available access to Stark Farm, and the area street system. Site access is proposed via two full movement access points to CR 37. These access points will generally extend in a westerly direction from CR 37. The anticipated site traffic is shown on Figure 6. 9 C LL� a-5% 0- 5% CR 84 SITE • C 0) C ti co tY U Figure 5 10 SITE TRAFFIC DISTRIBUTION 2 1 r 1/1 10 10 CR 86 1/1 —)4 t IC 1/1 10 10 CR 84 1/1 N N N l North Access 2/1 1 17/11 Nc N it .� 1 South Access 1/1 3/2 T N CD 0 M CO N IM .) 1 ' X1/2 SH 14 —43/5 t m M co LEGEND: AM/PM U Figure 6 Daily 11 SITE TRAFFIC D). Background Traffic Volumes Future background traffic was developed using counts collected as part of this study supplemented by published traffic count data. Both short-term (2005) and long-term (2020) estimates were developed using the County suggested growth rate of one-half percent per year on the area streets. This rate is consistent with CDOT's published growth rate on SH 14 to the south. Background traffic considers a general growth in traffic volumes as well as growth resulting from other approved developments. There are no known developments in the area of the site at this time. Background traffic is presented in Figure 7 for the short-term horizon while Figure 8 presents long-term background traffic estimates. E). Future Total Traffic Total traffic (the combination of background traffic and site traffic) was developed for both the short- and long-term time frames. This information is presented on Figures 9 and 10 for the short- and long-term, respectively. F). Future Roadway System The future roadway system was estimated for the short- and long-term. Major wid- ening projects, which are likely to be needed whether or not Stark Farm is developed, were considered. Site specific improvements and improvements needed in conjunc- tion with this development are discussed in future sections of this report. The follow- ing major improvements are anticipated within the indicated time frames. Short-term: No improvements. Long-term: No improvements. As indicated, no improvements are anticipated and therefore, no change in the area street system is expected. 12 coo 1/0 .2:3 '4' 4-- 12/4 c4/1 CR 86 O/2 —)4 1 3/12 —* N LO 6/1 — - cvc*' M ' 1/0 � O � ° ' ° ♦` 1/1 X1/2 L 134 64 CR 84 1/1 -)4 1 I 0/1 —► 2/1 -4 sco 0) CO CV � o o/1 °' `V 1--52/75 4/4 SH 14 3/3 r 66/91 - + ` oC 3/2 -The •- N- LEGEND: AM/PM U Daily NOTE: Rounded to nearest vehicle. Figure 7 13 SHORT-TERM BACKGROUND TRAFFIC Mc\ o 1/0 avO X13/4 4) 1 4/1 CR 86 0/2 - 1 3/13 --► N O CD 6/1 N `o oTM = 1/0 ar- o x- 1/1 [144 4) 1 c c 1/2 68 CR 84 1/1 � rir 0/1 -+" O 2/1 T U) N O O 0/1 55/80 ,c--4/4 SH 14 3/3 1 70/98 --If" 3/2 ti LEGEND: AM/PM U [Daily NOTE: Rounded to nearest vehicle. Figure 8 14 LONG-TERM BACKGROUND TRAFFIC 2 Mvo 1/0 o n o 11--- 12/4 4 vic 5/2 CR 86 0/2 it 3/13 —► r> o CO 7/2 ThrN M v o 1/0 o OI F— 1/1 144 J. y 2/3 74 CR84 1/1 r ANN 3/2 m co N North Access 2/1 1 17/11 m N a N. N ch .4) l South Access 1/1 v 3/2 Thr N v rn o 1/3 O' N Co- t t 52/75 Jy 4/4 SH 14 6/8 v) 66/91 --+ co CO 3/2 c 0 N. LEGEND: AM/PM M CC Figure 9 Daily 15 SHORT-TERM TOTAL TRAFFIC Mho k- 1/0 "" o III--- 13/4 4/2 CR86 0/2 — '� 1 (' 3/13 --+ 7/2 1/0 o •- to f- 1/1 154 1 `� 2/3 78 CR 84 1/1 — t i 0/1 —► � rc) N T 3/2 co N N r 5l North Access 2/1 17/11 N cc o N r l South Access s� 1/1 -` f 1 3/2 —� i 0 M co co 1/3 14--55/80 A) 1 y '-4/4 SH 14 6/8 - 1`l 70/98 —♦ 3/2 -� LEGEND: AM/PM U Figure 10 Daily] 16 LONG-TERM TOTAL TRAFFIC IV. AUXILIARY LANES In order to assess operating conditions with Stark Farm fully developed, highway capacity analyses procedures were utilized at each key intersection. These intersec- tions are: 1) the CR 37— SH 14 intersection; 2) the CR 37 — CR 84 intersection; 3) the CR 37 — CR 86 intersection; and, 4) both site access intersections. At the onset of these undertakings, traffic volumes were reviewed at each location in order to identify the need for auxiliary lanes, an upgrade in intersection controls, and other such transportation related improvements. Findings are documented in the following paragraphs. Weld County currently uses CDOT's State Highway Access Code (the Access Code) to determine auxiliary lane needs. The 1998 version of the Code was used in this study, reflecting the latest edition. A review of long-term (2020) traffic volumes was conducted at the CR 37 — SH 14, CR 37 — CR 84, CR 37 — CR 86, and the site access intersections. Access Code requirements for the appropriate auxiliary lanes are summarized in the following table. Posted Turning Lane Speed Volume Lane May be Waived if (mph) Warrant LT Deceleration 40 or less 25 vph Opposing traffic less than Over 40 10 vph 100 vehicles per hour RT Deceleration 40 or less 50 vph Volume in travel lane less Over 40 25 vph than 150 vehicles per hour RT Acceleration 40 or less Not Needed Adjacent travel lane less Over 40 50 vph than 120 vehicles per hour 17 Given the long-term total peak hour traffic volumes and the 1998 Access Code war- rants, auxiliary lanes are not warranted at any of the investigated intersections. This is due to minor peak hour site traffic and/or the limited amount of background traffic using the area street system. These conditions are consistent with the rural nature of the area surrounding the Stark Farm site. V.TRAFFIC IMPACTS The above investigations resulted in the determination that no auxiliary lane improve- ments are needed in conjunction with this development. Based upon this finding, the existing street geometry is expected to remain constant through the long-term time frame. Two new intersections, however, are planned to serve the Stark Farm devel- opment. Short-term roadway geometry is presented on Figure 11. 18 0 CR86 North Access e Y South Access S Y \ 1,♦ O SH14 r'- M U Figure 11 19 SHORT-TERM ROADWAY FEATURES A). Short-Term Operations With Stark Farm To assess short-term operating conditions with Stark Farm fully built and occupied, peak hour levels of service were calculated. This involved loading short-term total traffic (with Stark Farm) onto the short-term roadway geometry. Resultant morning and afternoon peak hour levels of service are shown below. SHORT-TERM OPERATING CONDITIONS Movement/ Level of Service Intersection Control Direction AM Pk Hr. PM Pk Hr. CR 37 — SH 14 Stop T EB LT A A WB LT A A NB LT/TH/RT A B SB LT/TH/RT A A Overall A A CR 37— South Access Stop NB LT A A EB LT/RT A A Overall A A CR 37— North Access Stop NB LT A A EB LT/RT A A Overall A A CR 37— CR 84 Stop NB LT A A SB LT A A EB LT/TH/RT A A WB LT/TH/RT A A Overall A A CR 37— CR 86 Stop NB LT A A SB LT A A EB LT/TH/RT A A WB LT/TH/RT A A Overall A A 20 As indicated, all intersections will operate at LOS 'A' overall under peak hour condi- tions with Stark Farm fully built. This represents excellent operating conditions. Capacity work sheets are in Appendix C. B).Long-Term Operations With Stark Farm It is anticipated that the short-term roadway system will remain constant through the long-term. Long-term total traffic volume projections presented earlier in this report were used to determine long-term operating conditions at key intersections. This reflects conditions with Stark Farm fully built and background traffic which is indicative of the year 2020. Resultant levels of service are indicated below. 21 LONG-TERM OPERATING CONDITIONS Movement/ Level of Service Intersection Control Direction AM Pk Hr. . PM Pk Hr. CR 37 — SH 14 Stop EB LT A 1 A WB LT A A NB LT/TH/RT A B SB LT/TH/RT A A I Overall i A A I CR 37 — South Access Stop NB LT i A A EB LT/RT A {{ A Overall A I A . CR 37 — North Access Stop NB LT A A EB LT/RT A A Overall A A CR 37 — CR 84 ' Stop NB LT - A A SB LT A A EB LT/TH/RT A A WB LT/TH/RT A A Overall A A CR 37 — CR 86 Stop ' NB LT i A A SB LT A ' A EB LT/TH/RT A I A I WB LT/TH/RT A A Overall A A i As indicated, the current roadway system will provide acceptable operating conditions through the long-term time frame. Capacity work sheets are in Appendix D. 22 VI. CONCLUSIONS Based on the analyses and investigations described above, the following can be concluded: • Stark Farm will add minor traffic to the adjacent street system. Numeri- cally, 30 morning peak hour trips, 39 afternoon peak hour trips, and 373 trips per day can be anticipated. • In the short-term, no roadway improvements are needed to adequately serve the combination of Stark Farm traffic at build-out and background traffic. • No improvements are needed to accommodate the anticipated growth in background traffic between the short-term and long-term time frames. • All intersections will operate at level of service 'A' in both the short-term and long-term with this development fully built. This represents very acceptable operating conditions. • The proposed internal street system appears fully capable of serving the Stark Farm residential development. In summary, the current street system is capable of providing very acceptable oper- ating conditions in the vicinity of the Stark Farm development for the foreseeable future. 23 APPENDIX A Colorado Department of Transportation Division of Transportation Development Research Branch, Traffic Analysis Unit 1996 Traffic Data Highway Milepost Beginning Length Annual Single Percent Semi- Percent 20 DNV DD ACAS number Beginning point of of section average unit single tractor semi- Year with of section section in miles daily trucks unit trailer trailer factor 41 Log traffic trucks trucks trucks 14 C 153.622 RD N AND S (3RD AVE), AYES 0.661 1650 100 6.06 240 14.55 1.1 12 55 14 C154.210 RD N AND S (CO RD 37) 3.039 1350 80 5.93 240 17.78 1.1 12 55 14 C157.350 RD N AND 5 (CO RD 43) 2.017 1200 80 6.67 240 20.00 1.1 12 55 14 C 159.370 RD S (CO RD 47) • 1.034 1200 80 6.67 240 20.00 1.1 12 55 14 C160.424 RD N AND S (CO RD 49) 1.220 1200 80 6.67 240 20.00 1.1 12 55 14 C161.634 PD N AND S (CO RD 51) 4.664 1200 80 6.67 240 20.00 1.1 12 55 14 C166.053 RD N AND S (CO RD 57) RD W (CO RD 90) 10.154 1150 80 6.96 240 20.87 1.1 12 55 1 14 C 176.189 RD S CO RD ??, (OLD 392 5) (TO BRIGGSDALE) 5.956 1200 70 5.83 240 20.00 1.3 12 55 1 14 C182.090 RD N AND S (CO RD 89) 2.010 1150 70 6.09 240 20.87 1.3 12 55 14 C184.033 RD S (CO RD 93) 8.781 1150 70 6.09 240 20.87 1.3 12 55 14 c192.877 RD NW (CO RD 390) 2.738 1050 70 6.67 240 22.86 1.3 12 55 14 C195.604 RD S (co RD 115) (WHIPPLE ST) RD W (CORD 86.5),BUC1CMG 7.684 1100 80 7.27 240 21.82 1.3 12 55 1 14 C203.378 RD N AND S (CO RD 129), RATHER 2.048 1300 70 5.38 240 18.46 1.3 12 55 1 14 C205.236 JCS SE 52 S RD N (CO RD 133) 6.564 1300 80 6.15 290 22.31 1.3 12 55 1 14 C211.807 W JCT SE 71 N 4.257 1150 140 12.17 280 24.35 1.5 12 55 1 14 C215.828 E JCT SE 71 S RD N (CO RD 155) 6.323 840 120 14.29 270 32.14 1.5 12 55 1 14 C222.201 RD N AND S (CO RD 11) 7.048 1150 160 13.91 270 23.48 1.4 12 55 1 14 C229.233 RD N AND S (CO RD 25) 5.047 3350 160 4.78 270 8.06 1.4 12 55 1 1 14 C 234.263 RD S (CO RD 35) 0.966 3900 230 5.90 270 6.92 1.4 11 60 1 14 C235.226 RD NAND S (Co RD 37) 0.379 6800 250 3.68 270 3.97 1.4 11 60 14 C 235.605 RD S (14TH AVE), STERLING 0.302 14500 690 4.76 270 1.86 1.3 11 60 14 C235.906 RD S (S 10TH AVE), STERLING 0.326 17900 840 4.69 270 1.51 1.3 11 55 14 C236.234 RD N (N 7TH AVE), STERLING 0.037 19200 840 4.38 270 1.41 1.3 11 55 1 14 C236.273 RD N (N 6TH AVE) AND 5 (S 6TH AVE), STERLING 0.272 16900 820 4.85 270 1.60 1.3 11 55 1 14 C 236.547 AD N (N 3RD AVE) AND 5 (5 3RD AVE), STERLING 0.179 16900 820 4.85 270 1.60 1.3 11 55 14 C236.724 RD N AND S (N DIVISION AVE), STERLING 0.007 7100 300 4.23 270 3.80 1.3 11 60 21 Rocky Mountain Counts 1106 Cherry Court Fort Lupton, CO 80621 File Name : 3714AM 303-641-0445 Site Code : 00000048 Start Date : 07/21/2000 • Page No : 1 Groups Printed-Unshifted CR37 ISH 14 i CR37 SH14 From North From East From South From West ' Start Time Righ Thru Left App. Righ IThru Left I App. ' Righ Thru Left App. i Righ IThru Left App. Int. t Total t Total t ; Total t; Total Total Factor 1.0 1.0 i 1.0 i 1.0, 1.0' 1.0 i 1.0 i 1.0 1.0 ; .1.0 I 1.0 1.0 i 07:30 AM 3 3 1 7 0 8 0 8 1 1 0 2 0 16 2 18 35 07:45 AM 0 3 0 3 0 16 1 17 0 0 4 4 2 13 0 15 39 Total 3 6 1 10 0 24 1 25 1 1 4 6 2 29 2 33I 74 08:00 AM 0 2 0 2 0 10 0 10 1 0 1 0 1 0 10 0 10 I 23 08:15 AM 1 1 1 3 0 16 3 19 0 1 0 1 1 25 1 27 50 Grand 1 4 9 2 15 0 50 4 54 1 3 4 8 3 64 3 70 147 Total Apprch % 26.7 60.0 13.3 0.0 92.6 7.4 12.5 37.5 50.0 4.3 91.4 4.3 Total % 2.7 6,1 1.4 10.2 I 0.0 34.0 2.7 36.7 0.7 2.0 2.7 5.4 2.0 43.5 2.0 47.6 . Out CR 37 .o I 61,1 , Right Thru Left '1 r � * A rn North �-.otr- o 'o —a i co o y I m I l r— —1. /21/00 7:30:00 AM 42, - z y - /21/008:18:00 AM 10 ' •on • a' r* 1 241 Out In Total CR37 Rocky Mountain Counts 1106 Cherry Court Fort Lupton, CO 80621 File Name : 3714PM 303-641-0445 Site Code : 00000048 Start Date : 07/20/2000 Page No : 1 Groups Printed-Unshifted CR 37 SH 14 I CR 37 SH 14 From North From East From South From West Start Rig' Thr Lef Pe App. Rig Thr Lef Pe App. Rig Thr Lef I Pe App. I Rig Thr Lef Pe App. Int. Time ht u t ds Total ' ht u t ds Total ht u t ds Total ht u t ds Total Total Factor 1.0 ; 1.01 1.0 1.0 i 1.0 1.0 1.0 : 1.0 1.01 1.0_ 1.0 1.0 1.0 . 1.0 1.0 1.0 0 PM 2 3 0 0 5 0 20 0 0 20 1 0 1 0 2l 2 24 0 0 26 53 04:45 0 1 0 0 1 1 16 1 0 18 1 2 4 0 0 6 0 23 1 0 24 49 PM Total 2 4 0 0 6 i 1 36 1 0 38 3 4 1 0 8[ 2 47 1 0 50 102 • 05:00 0 1 0 0 1 0 24 2 0 26 1 4 2 0 7 0 22 2 0 24 58 PM 05:15 PM 0 0 0 0 0 0 13 1 0 14! 2 2 0 0 4 0 20 0 0 20 38 Grand 2 5 0 0 7 1 73 4 0 78 6 10 3 0 19 2 89 3 0 94 198 Total Apprch 28. 71. ! 93 31. 52. 15. 94 % 6 4 0.0 0.0 1.3 5.1 0.0 6 6 8 0.0 2.1 3.2 0.0 Total% 1.0 2.5 0.0 0.0 3.5 0.5 3 9 2.0 0.0 39.4 3.0 5.1 1.5 0.0 9.6, 1.0 9 1.5 0.0 47.5 CR 37 • Out In 4'' L 7J 21; _ 21 51 0I of Right T lru Left Peels r— A H J o, North w L-► N 7/20/00 4:30:00 PM I 5� 7/20/005:15:00 PM Unshifted � L a N . 5 1t 30 Out In Total CR 37 • Rocky Mountain Counts • 1106 Cherry Court Fort Lupton, CO 80621 File Name : 8437am 303-641-0445 Site Code : 00000049 • Start Date : 07/18/2000 Page No : 1 Groups Printed-Unshifted WCR 37 WCR 84 WCR 37 WCR M i From North i From East From South From West Start Time Righ Thru Left App' Righ Thru Left App' Righ Thru Left App. Righ ' Thru Left App' Int' t Total t Total t Total t Total Total Factor 1.0 1.0 1.0 1.0 l 1.0 1.0 1.0 1.0 1.0 1.0, 1.0 1.0 07:30 AM 0 1 0 1 0 0 0 0 0 2 0 2 0 0 0 0 3 07:45 AM 0 3 0 3 0 1 0 1 0 1 0 1 1 0 1 2I 7 Total 0 4 0 4 0 1 0 1 0 3 0 3 1 0 1 21 10 08:00 AM 0 4 0 4 0 0 1 1 0 2 1 3 1 0 0 1 9 08:15 AM 0 2 0 2 0 0 0 0 0 1 0 1 0 0 0 0 3 • Grand 0 10 0 10 0 1 1 2 0 6 1 7 2 0 1 3 22 Total Apprch % 0.0 10 0 0.0 0.0 50.0 50.0 0.0 85.7 14.3 66.7 0.0 33.3 Total % 0.0 45.5 0.0 45.5 0.0 4.5 4.5 9.1 0.0 27.3 4.5 31.8 9.1 0.0 4.5 13.6 WCR37 LJJI ToGI`I 17� n 1n o Right Thru Leo I fie* � North =- CO F—+ /18/00 7:30:00 AM A 3 — /18/008:15:00 AM W -41 L ii T r+ F_131 I ,ol Out In Total MICR 17 Rocky Mountain Counts 1106 Cherry Court Fort Lupton, CO 80621 File Name : 3784pm 303-641-0445 Site Code : 00000049 Start Date : 07/18/2000 Page No : 1 Groups Printed-Unshifted CR 37 84 I CR 37 84 From North From East From South From West Start Rig Thr Lef Pe+ App. Rig Thr Lef Pe App. Rig! Thr Lef I Pe App. Rig Thr Lef Pe App. int. Time ht u , t ds I Total ht u t ds Total ht. u t; ds Total ht u t ds Total Total Factor 1.0 1.0! 1.0 1.0; 1.0 1.0 1.0 1 1.01 1.0 C 1.0. 1.0E 1.0 1 1.0 1.0 1.0�1.0 04:30 0 2 0 0 2 0 0 1 0 1 1 3 0 0 4 0 0 0 0 0 7 PM 04:45 0 0 1 0 1 0 0 1 0 1 , 0 3 0 0 3 1 0 0 0 1 6 PM Total 0 2 1 0 3 , 0 0 2 0 2 I 1 6 0 0 7 1 0 0 0 1 13 05:00 0 1 0 0 1 0 0 0 0 01 0 2 0 0 2 0 1 0 0 1 4 PM 05:15 0 0 0 0 0 0 1 0 0 1 0 3 0 0 3 0 0 1 0 1 5 PM Grand 0 3 1 0 4 0 1 2 0 3 1 11 0 0 12 1 1 1 0 3 22 Total Apprch Q 0 75. 25. n.0 0 Q 33. 66. 0.0 8.3 91 0.0 0.0 33. 33. 33. 0.0 %0 0 3 7 7 3 3 3 Total % 0.0 1 6 4.5 0.0 18.2 0.0 4.5 9.1 0.0 13.6 4.5 5 0 0.0 0.0 54.5 4.5 4.5 4.5 0.0 13.6 CR 37 17 1 In 4] I Tot1s1 1 I o! 31 11 01 Right Thru Lei ft Peds O J North Z 1 118!00 430:00 PM LT T �T118100 515:00 PM r-' • w b I r� Unshifted N L m 6 a 4, T r Left Thru Right Peds 0I 111 1] Ol 6 I 12] 18 Out In Total CR 37 • Rocky Mountain Counts • 1106 Cherry Court Fort Lupton, CO 80621 File Name : 8637AM 303-641-0445 Site Code : 00000047 Start Date : 07/19/2000 • Page No : 1 Groups Printed-Unshifted WCR 37 WCR 86 WCR 37 WCR 86 • From North From East From South From West Start Time I Righ Thru Left App. I Righ Thru Left App. Righ Thru I Left App. Righ Thru - Left App. Int. t Total I t Total t Total t Total Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0T 1.0 1.01 1.OI 1.0 07:30AM 0 2 0 2 ; 0 3 0 3l 0 0 0 0I 1 1 0 2 7 07:45 AM 0 0 0 Oi 0 3 1 4I 1 1 0 2 ; 2 1 0 3l 9 Total 0 2 0 2 j 0 6 1 7 '1 1 1 0 2 I 3 2 0 5 j 16 08:00 AM 0 2 0 2 0 5 1 6I 2 0 1 3j 1 0 0 1 12 08:15 AM 0 0 0 0 1 1 2 4 0 1 0 1 1 1 0 2 7 OTotal 0 4 0 4 1 12 4 17 I 3 2 1 6 rand 1 5 3 0 8 35 ' Apprch % 0.0 100 0.0 5.9 70.6 23.5 ' 50.0 33.3 16.7 62.5 37.5 0.0 Total % 0.0 11.4 0.0 11.4 2.9 34.3 11.4 48.6 8.6 5.7 2.9 17.1 14.3 8.6 0.0 22.9 • Out WCR 37 1 • 4 Right Thru Lalk jJ North m To r — - /19100 7:30:00 AM 1 -i F m !79/008:15:00 AM E' m J_o 0 v— Left Thru Rght I 1I 2I 3, I 13] irk I 19] Out In Total WCR 17 Rocky Mountain Counts 1106 Cherry Court Fort Lupton, CO 80621 File Name : 3786PM 303-641-0445 Site Code : 00000048 Start Date : 07/19/2000 Page No : 1 Groups Printed-Unshifted CR 37 CR 86 CR 37 I CR 86 From North From East From South From West Start Rig Thr I Lef Pe App. Rig I Thr Lef Pe App. Rig; Thr Lef Pe App. Rig Thr Lef Pe App. Int. ' Time ht u I t ds Total ht u t ds Total ht u t ds Total ht u , t ds Total Total Factor 1.0 1.0 l 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 11.0 1.0 11.0 1.0 11.0 1.0 04:30 2 2 0 0 4 0 0 1 0 1 1 3 1 0 51 0 2 0 0 2 12 PM 04:45 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 2 1 0 4 5 PM Total 2 2 0 0 4 0 0 1 0 1 1 4 1 0 6 I 1 4 1 0 6 17 05:00 0 1 0 0 1 0 3 0 0 3 1 2 0 0 3 0 3 0 0 3 10 PM 05:15 1 0 0 0 1 0 1 0 0 1 3 3 1 0 7 0 5 1 0 6 15 PM Grand 3 3 0 0 6 0 4 1 0 5 5 9 2 0 16 1 12 2 0 15 42 Total Apprch 50. 50. 80. 20. 31. 56. 12. 80. 13. % 0 0 0.0 0.0 0.0 0 0 0.0 3 3 5 0.0 6.7 0 3 0.0 Total % 7.1 7.1 0.0 0.0 14.3 0.0 9.5 2.4 0.0 11.9 1 9 2 4 4.8 0.0 38.1 j 2.4 2 6 4.8 0.0 35.7 CR 37 Total 111 ' 61 171 I 1 31 31 Ol of Right Thru Left Peds 1-- 1 4 - EOj'IC+LIF'�+- ry , North r -'r-1 �V,I m c a 1 O K _ /19/00 4:30:00 PM 7J U ^L 7/19100 5:15:00 PM r m m r; d i v+ J — a w Left Thru Rioht Peds I 2: 91 51 01 i 1 1 5. I 161 I 211 Out In Total CR 17 APPENDIX B HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: : 37 - SH 14 Count Date' t ST LT TOTAL Time Period: M PM Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 3 64 3 4 50 0 4 3 1 2 9 4 HFR: 3 64 3 4 50 0 4 3 1 2 9 4 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 0 # of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 64 50 Shared In volume, major rt vehicles: 3 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 66 50 Potential Capacity 1004 1024 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1004 1024 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 67 50 Potential Capacity 1547 1570 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1547 1570 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 130 131 Potential Capacity 765 763 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 761 760 " Probability of Queue free St. 1.00 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 136 132 Potential Capacity 840 845 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.98 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 0.99 Cap. Adj. factor due to Impeding mvmnt 0.98 0.99 Movement Capacity 826 839 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II I I II I I I I 1 v(vph) 4 3 1 2 9 4 Movement Capacity 826 761 1004 839 760 1024 Shared Lane Capacity 818 827 Worksheet 10 delay,queue length, and LOS — Movement 1 4 7 8 9 10 11 12 I II I I II I I II I v(vph) 3 4 8 15 C m(vph) 1570 1547 818 827 v/c 0.00 0.00 0.01 0.02 95%queue length Control Delay 7.3 7.3 9.4 9.4 LOS A A A A Approach Delay 9.4 9.4 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 64 50 V i2 3 0 Si! 1700 1700 Sit 1700 1700 P*Oj 1.00 1.00 D maj left 7.3 7.3 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: 37 - SH 14 Count Date: EX S�LT TOTAL Time Period: M P Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 3 89 2 4 73 1 3 10 6 0 5 2 HFR: 3 89 2 4 73 1 3 10 6 0 5 2 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: #of vehicles: Northbound 0 #of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 89 73 Shared In volume, major rt vehicles: 2 1 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 90 74 Potential Capacity 973 994 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 973 994 Probability of Queue free St. 0.99 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 91 74 Potential Capacity 1517 1538 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1517 1538 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 178 179 Potential Capacity 719 719 Pedestrian Impedance Factor 1.00 1.00 • Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 716 715 Probability of Queue free St. 0.99 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 181 186 Potential Capacity 785 780 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.99 0.98 Maj. L, Min T Adj. Imp Factor. 0.99 0.99 Cap. Adj. factor due to Impeding mvmnt 0.99 0.98 Movement Capacity 776 764 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I II I v(vph) 3 10 6 0 5 2 Movement Capacity 776 716 973 764 715 994 Shared Lane Capacity 792 778 • Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II I II I v(vph) 3 4 19 7 C m(vph) 1538 1517 792 778 v/c 0.00 0.00 0.02 0.01 95%queue length Control Delay 7.3 7.4 9.7 9.7 • LOS A A A A Approach Delay 9.7 9.7 Approach LOS A A • • • Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 Vii 89 73 V i2 2 1 S it 1700 1700 S i2 1700 1700 P* 0j 1.00 1.00 D maj left 7.3 7.4 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP C0NTROL(TWSC)ANALYSIS ' Analyst: GC "' Intersection' 37 - CR 84 Count Date: ST LT TOTAL Time Period: PM - Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 1 6 0 0 10 1 1 0 2 1 1 1 HFR: 1 6 0 0 10 1 1 0 2 1 1 1 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 6 10 Shared In volume, major rt vehicles: 0 1 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 6 11 Potential Capacity 1083 1077 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1083 1077 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 6 11 Potential Capacity 1628 1621 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1628 1621 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1,00 Step 3: TH from Minor St. 8 11 Conflicting Flows 19 19 Potential Capacity 879 879 Pedestrian Impedance Factor 1.00 1.00 Cap.Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 878 879 Probability of Queue free St. 1.00 1.00 • Step 4: LT from Minor St. 7 10 Conflicting Flows 20 20 Potential Capacity 999 999 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1.00 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 997 997 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II II I v(vph) 1 0 2 1 1 1 ' Movement Capacity 997 878 1083 997 879 1077 Shared Lane Capacity 1052 977 Worksheet 10 delay,queue length, and LOS "- Movement 1 4 7 8 9 10 11 12 II I II • I II v(vph) 1 3 3 C m(vph) 1621 1628 1052 977 v/c 0.00 0.00 0.00 95%queue length Control Delay 7.2 8.4 8.7 LOS A A A Approach Delay 8.4 8.7 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 6 10 V i2 0 1 • Sil 1700 1700 Si2 1700 1700 P*Oj 1.00 1.00 D maj left 7.2 0.0 ' N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS • Analyst: GC Intersection: 37 . CR 84 Count Date EX ST LT TOTAL Time Perio PM Cl Intersection Orientation: NorthSouth Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 0 11 1 1 3 0 1 1 1 2 1 0 • HFR: 0 11 1 1 3 0 1 1 1 2 1 0 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N • Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channetized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 11 3 Shared In volume, major rt vehicles: 1 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tf 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 12 3 Potential Capacity 1075 1087 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1075 1087 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 12 3 Potential Capacity 1620 1632 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1620 1632 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 17 17 Potential Capacity 882 881 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj.factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 881 881 Probability of Queue free St. 1.00 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 17 18 Potential Capacity 1003 1002 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1.00 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 1002 1000 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I II v(vph) 1 1 1 2 1 0 Movement Capacity 1002 881 1075 1000 881 1087 Shared Lane Capacity 979 957 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I II I II I v(vph) 1 3 3 C m(vph) 1632 1620 979 957 v/c 0.00 0.00 0.00 95% queue length Control Delay 7.2 8.7 8.8 LOS A A A Approach Delay 8.7 8.8 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 11 3 V i2 1 0 S i l 1700 1700 Sit 1700 1700 P*Oj 1.00 1.00 D maj left 0.0 7.2 • N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: 7 - CR 86 Count LT TOTAL Time Perio M M PM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 1 2 3 0 4 0 4 12 1 2 12 1 HFR: 1 2 3 0 4 0 4 12 1 2 12 1 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Conflicting Flows 24 25 Potential Capacity 873 873 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 872 872 Probability of Queue free St. 1.00 1.00 Step 4: LT from Minor St. 7 10 • Conflicting Flows 25 24 Potential Capacity 991 993 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1.00 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 987 991 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I II I v(vph) 3 1 0 1 0 3 Movement Capacity 987 872 1072 991 872 1083 Shared Lane Capacity 956 1059 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II II • v(vph) 1 1 4 4 C m(vph) 1628 1616 956 1059 v/c 0.00 0.00 0.00 0.00 95% queue length Control Delay 7.2 7.2 8.8 8.4 LOS A A A A Approach Delay 8.8 8.4 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 Vil 13 5 V i2 2 1 • Sil 1700 1700 S i2 1700 1700 P*Oj 1.00 1.00 D maj left 7.2 7.2 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 CR 86 Count Date: EX S LT •TAL Time Period: PM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 2 3 5 0 5 0 4 13 1 0 3 7 HFR: 2 3 5 0 5 0 4 13 1 0 3 7 P H F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Conflicting Flows 15 17 Potential Capacity 884 881 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj.factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 883 880 Probability of Queue free St. 0.99 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 20 22 Potential Capacity 999 996 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1.00 0.98 Maj. L, Min T Adj. Imp Factor. 1.00 0.99 Cap. Adj.factor due to Impeding mvmnt 0.99 0.99 Movement Capacity 989 983 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II I II I I II I v(vph) 4 13 1 0 3 7 Movement Capacity 989 883 1083 983 880 1084 Shared Lane Capacity 914 1014 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I I II I I II I v(vph) 2 18 10 C m(vph) 1630 1625 914 1014 v/c 0.00 0.02 0.01 95%queue length Control Delay 7.2 9.0 8.6 LOS A A A Approach Delay 9.0 8.6 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 3 5 V i2 5 0 S it 1700 1700 Si2 1700 1700 P*Oj 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 — Delay, rank 1 mvmts 0.0 0.0 Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound ' Shared In volume, major th vehicles: 11 5 Shared In volume, major rt vehicles: 7 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 15 7 Potential Capacity 1071 1082 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1071 1082 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 18 8 Potential Capacity 1612 1625 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1612 1625 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1,00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 29 31 Potential Capacity 868 866 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 867 865 — Probability of Queue free St. 1.00 0.98 • Step 4: LT from Minor St. 7 10 Conflicting Flows 35 29 Potential Capacity 977 985 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.98 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 1.00 Cap. Adj. factor due to Impeding mvmnt 0.99 1.00 Movement Capacity 963 980 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 • I II I II I II v(vph) 2 4 0 2 13 2 Movement Capacity 963 867 1071 980 865 1082 Shared Lane Capacity 897 898 • Worksheet 10 delay,queue length, and LOS -- Movement 1 4 7 8 9 10 11 12 II II II I v(vph) 3 6 17 C m(vph) 1625 1612 897 898 v/c 0.00 0.01 0.02 95%queue length Control Delay 7.2 9.0 9.1 LOS A A A Approach Delay 9.0 9.1 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 11 5 V i2 7 3 Sil 1700 1700 S i2 1700 1700 P*01 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CCCCPPPP����37 - NO CCESS Count Date: LT TOT L Time Period: PM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 6 10 15 2 2 17 HFR: 6 10 15 2 2 17 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 1 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N - Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 10 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation, Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P by 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 - t c,T: 1 stage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P by 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 16 Potential Capacity 1069 Pedestrian Impedance Factor 1.00 Movement Capacity 1069 Probability of Queue free St. 0.98 Step 2: LT from Major St. 4 1 Conflicting Flows 17 Potential Capacity 1613 - Pedestrian Impedance Factor 1.00 Movement Capacity 1613 Probability of Queue free St. 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 38 Potential Capacity 979 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 Movement Capacity 976 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I I II I II v(vph) 2 17 Movement Capacity 976 1069 Shared Lane Capacity 1058 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II I II I II v(vph) 6 19 C m(vph) 1613 1058 v/c 0.00 0.02 95%queue length Control Delay 7.2 8.5 — LOS A A Approach Delay 8.5 Approach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V i1 10 5 V i2 0 3 S i l 1700 1700 S i2 1700 1700 P* Oj 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 • HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS • Analyst: GC Intersection: N 7 NOR A8 ESS Count Date: 7% ()TA • Time Period:;A Intersection Orientation: North-South Major St. Vehicle Volume Data: ' Movements: 1 2 5 6 10 12 Volume: 20 15 8 2 1 11 HFR: 20 15 8 2 1 11 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: • Movements: Flow: Lane width: Walk speed: % Blockage: • Median Type: None • #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 ' Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R ._ N N N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 • • Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 2 4 Shared In volume, major rt vehicles: 3 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 4 4 Potential Capacity 1086 1085 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1086 1085 Probability of Queue free St. 1.00 1.00 • Step 2: LT from Major St. 4 1 Conflicting Flows 5 4 Potential Capacity 1630 1631 L Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1630 1631 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 10 11 Potential Capacity 889 888 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 889 887 Probability of Queue free St. 0.99 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 16 16 Potential Capacity 1004 1004 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.99 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 0.99 Cap.Adj. factor due to Impeding mvmnt 0.99 0.99 Movement Capacity 993 993 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I I II II I v(vph) 4 12 1 2 12 1 Movement Capacity 993 889 1086 993 887 1085 Shared Lane Capacity 921 911 Worksheet 10 delay,queue length, and LOS -- Movement 1 4 7 8 9 10 11 12 II I I II I II v(vph) 1 17 15 C m(vph) 1631 1630 921 911 v/c 0.00 0.02 0.02 95%queue length Control Delay 7.2 9.0 9.0 LOS A A A Approach Delay 9.0 9.0 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V i 1 2 4 V i2 3 0 Sil 1700 1700 S i2 1700 1700 P* 0j 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC • Intersection: -7 - CR 86 Count Datce) S T TOTAL Time Period: AM PM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 2 9 5 0 3 3 1 4 0 2 12 1 HFR: 2 9 5 0 3 3 1 4 0 2 12 1 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 — Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 9 3 Shared In volume, major rt vehicles: 5 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1,0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 12 5 Potential Capacity 1075 1085 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1075 1085 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 14 6 Potential Capacity 1617 1628 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1617 1628 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 22 23 I Potential Capacity 876 875 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 875 874 Probability of Queue free St. 1.00 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 27 22 Potential Capacity 989 995 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.99 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 1.00 Cap. Adj. factor due to Impeding mvmnt 0.99 1.00 Movement Capacity 977 991 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II 1 I II I I II I v(vph) 1 4 0 2 12 1 Movement Capacity 977 875 1075 991 874 1085 Shared Lane Capacity 894 900 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I I II I I II 1 v(vph) 2 5 15 C m(vph) 1628 1617 894 900 v/c 0.00 0.01 0.02 95% queue length Control Delay 7.2 9.1 9.1 LOS A A A Approach Delay 9.1 9.1 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V i1 9 3 V i2 5 3 S i 1 1700 1700 Si2 1700 1700 P*Oj 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 APPENDIX C HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC — Intersection: CR 3 SH 14 Count Date: E ST LT TOTAA� Time Period: AM PM Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 6 66 3 4 75 3 4 6 1 5 21 9 HFR: 6 66 3 4 75 3 4 6 1 5 21 9 PHF: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 0 # of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 66 75 Shared In volume, major rt vehicles: 3 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 68 77 Potential Capacity 1002 990 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1002 990 Probability of Queue free St. 1.00 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 69 78 Potential Capacity 1545 1533 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1545 1533 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 166 166 Potential Capacity 731 731 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 0.99 0.99 Movement Capacity 726 726 Probability of Queue free St. 0.99 0.97 Step 4: LT from Minor St. 7 10 Conflicting Flows 179 168 Potential Capacity 787 801 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.96 0.99 Maj. L, Min T Adj. Imp Factor. 0.97 0.99 Cap. Adj. factor due to Impeding mvmnt 0.96 0.99 Movement Capacity 759 791 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I II I v(vph) 4 6 1 5 21 9 Movement Capacity 759 726 1002 791 726 990 Shared Lane Capacity 757 789 Worksheet 10 delay,queue length, and LOS — Movement 1 4 7 8 9 10 11 12 II I II I II I v(vph) 6 4 11 35 C m(vph) 1533 1545 757 789 v/c 0.00 0.00 0.01 0.04 95%queue length Control Delay 7.4 7.3 9.8 9.8 LOS A A A A Approach Delay 9.8 9.8 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 66 75 V i2 3 3 Sil 1700 1700 S i2 1700 1700 P*Oj 1.00 1.00 D maj left 7.4 7.3 N number major st lanes 1 I Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 SH 14 Count Date: EX aV`�LT TOT _ Time Period: AM C Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 8 91 2 4 75 3 3 26 7 1 14 6 HFR: 8 91 2 4 75 3 3 26 7 1 14 6 PH F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 -- Flared approach Movements: # of vehicles: Northbound 0 #of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 91 75 Shared In volume, major rt vehicles: 2 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 92 77 Potential Capacity 971 990 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 971 990 Probability of Queue free St. 0.99 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 93 78 Potential Capacity 1514 1533 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1514 1533 Probability of Queue free St. 1.00 0.99 Maj. L Shared In. Prob. Queue Free St. 1.00 0.99 Step 3: TH from Minor St. 8 11 Conflicting Flows 194 194 Potential Capacity 705 705 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 0.99 0.99 Movement Capacity 699 699 Probability of Queue free St. 0.96 0.98 Step 4: LT from Minor St. 7 10 Conflicting Flows 203 209 Potential Capacity 760 753 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.97 0.95 Maj. L, Min T Adj. Imp Factor. 0.98 0.97 Cap. Adj. factor due to Impeding mvmnt 0.97 0.96 Movement Capacity 739 721 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II I I II I I II I v(vph) 3 26 7 1 14 6 Movement Capacity 739 699 971 721 699 990 Shared Lane Capacity 743 765 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I I II I I II I v(vph) 8 4 36 21 C m(vph) 1533 1514 743 765 v/c 0.01 0.00 0.05 0.03 95%queue length Control Delay 7.4 7.4 10.1 9.8 LOS A A B A Approach Delay 10.1 9.8 Approach LOS B A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 0.99 1.00 V it 91 75 V i2 2 3 Sil 1700 1700 S i2 1700 1700 P*Oj 0.99 1.00 D maj left 7.4 7.4 N number major st lanes 1 1 -- Delay, rank 1 mvmts 0.0 0.0 Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N — Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 9 12 Shared In volume, major rt vehicles: 1 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 ' t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 • G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations ' Step 1: RT from Minor St. 9 12 Conflicting Flows 10 12 Potential Capacity 1078 1074 Pedestrian Impedance Factor 1.00 1,00 Movement Capacity 1078 1074 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 10 12 Potential Capacity 1623 1620 - Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1623 1620 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3:TH from Minor St. 8 11 • Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 • Data for Computing Effect of Delay to Major Street Vehicles: • Northbound Southbound Shared In volume, major th vehicles: 11 5 Shared In volume, major rt vehicles: 7 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 •- t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4,0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 15 7 Potential Capacity 1071 1082 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1071 1082 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 18 8 Potential Capacity 1612 1625 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1612 1625 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 • Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N Channelized: N Grade: 0.00 • Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 15 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 • Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 • Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 • t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 t c,T: 1 stage 0.00 0.00 0.00 tc • 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 9 Potential Capacity 1079 Pedestrian Impedance Factor 1.00 Movement Capacity 1079 Probability of Queue free St. 0.99 • Step 2: LT from Major St. 4 1 Conflicting Flows 10 Potential Capacity 1623 _ Pedestrian Impedance Factor 1.00 Movement Capacity 1623 Probability of Queue free St. 0.99 Maj. L Shared In. Prob. Queue Free St. 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 64 Potential Capacity 947 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 Cap. Adj. factor due to Impeding mvmnt 0.99 Movement Capacity 938 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II II I v(vph) 1 11 Movement Capacity 938 1079 Shared Lane Capacity 1065 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II I II I v(vph) 20 12 C m(vph) 1623 1065 v/c 0.01 0.01 ' 95%queue length Control Delay 7.2 8.4 — LOS A A Approach Delay 8.4 Approach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 0.99 1.00 V it 15 5 V i2 0 3 S 1700 1700 S i2 1700 1700 P*Oj 0.99 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.1 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS ' Analyst: GC _ Intersection: C 7 - SOUT. •CCESS Count Date: g LT OTA Time Period: A PM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 1 15 31 1 1 3 HFR: 1 15 31 1 1 3 P H F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 15 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 - t c,T: 1 stage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 32 Potential Capacity 1048 Pedestrian Impedance Factor 1.00 Movement Capacity 1048 Probability of Queue free St. 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 32 Potential Capacity 1593 Pedestrian Impedance Factor 1.00 Movement Capacity 1593 Probability of Queue free St. 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 49 Potential Capacity 966 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 Movement Capacity 966 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I I II II v(vph) 1 3 Movement Capacity 966 1048 Shared Lane Capacity 1026 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II I II v(vph) 1 4 C m(vph) 1593 1026 v/c 0.00 0.00 95%queue length Control Delay 7.3 8.5 — LOS A A Approach Delay 8.5 Approach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 15 5 V i2 0 3 Sil 1700 1700 S i2 1700 1700 P*Oj 1.00 1.00 D maj left 7.3 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 • HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS • Analyst: GC Intersection: 7 • SOU LESS Count Date: TOTA • Time Period: AM PM Intersection Orientation: North-South Major St. • Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 3 34 17 2 2 1 HFR: 3 34 17 2 2 1 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 • Pedestrian Volume Data: • Movements: Flow: • Lane width: ' Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R• • N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N • Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R • Y N Y N N N N N N Channelized: N Grade: 0.00 • • Data for Computing Effect of Delay to Major Street Vehicles: • Northbound Southbound Shared In volume, major th vehicles: 34 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 • Length of study period, hrs: 0.25 • Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P by 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 - t c,T: 1 stage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P by 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 18 Potential Capacity 1066 Pedestrian Impedance Factor 1.00 Movement Capacity 1066 Probability of Queue free St. 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 19 Potential Capacity 1611 Pedestrian Impedance Factor 1.00 Movement Capacity 1611 Probability of Queue free St. 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 58 • Potential Capacity 954 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cap. Adj.factor due to Impeding mvmnt 1.00 Movement Capacity 953 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II I II I v(vph) 2 1 Movement Capacity 953 1066 Shared Lane Capacity 988 Worksheet 10 delay,queue length, and LOS • Movement 1 4 7 8 9 10 11 12 I II I II I • II I v(vph) 3 3 C m(vph) 1611 988 v/c 0.00 0.00 95%queue length Control Delay 7.2 8.7 — LOS A A Approach Delay 8.7 Approach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 • V i l 34 5 V i2 0 3 S 1700 1700 Sit 1700 1700 P* Oj 1.00 1.00 • D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 APPENDIX D HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 SH Count Date: E. T L OTAL Time Perio•. A PM Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 8 70 3 4 55 1 4 6 7 5 22 9 HFR: 8 70 3 4 55 1 4 6 7 5 22 9 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 — Flared approach Movements: #of vehicles: Northbound 0 # of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 70 55 Shared In volume, major rt vehicles: 3 1 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow•up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,1t 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 72 56 Potential Capacity 996 1017 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 996 1017 Probability of Queue free St. 0.99 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 73 56 Potential Capacity 1540 1562 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1540 1562 Probability of Queue free St. 1.00 0.99 Maj. L Shared In. Prob. Queue Free St. 1.00 0.99 Step 3: TH from Minor St. 8 11 Lane 1 Lane 2 Lane 3 L T R L T R L T R • Y Y Y N N N N N N - Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 98 80 Shared In volume, major rt vehicles: 2 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: - Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 "- t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 99 82 Potential Capacity 962 984 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 962 984 Probability of Queue free St. 0.99 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 100 83 Potential Capacity 1505 1527 - Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1505 1527 Probability of Queue free St. 1.00 0.99 Maj. L Shared In. Prob. Queue Free St. 1.00 0.99 Step 3:TH from Minor St. 8 11 Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N "' Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 9 12 Shared In volume, major rt vehicles: 1 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 10 12 Potential Capacity 1078 1074 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1078 1074 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 10 12 Potential Capacity 1623 1620 _ Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1623 1620 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 CR :4 Count Date: EX ST LT •T Time Period: AM P i Intersection Orientation: North-South Major St. Vehicle Volume Data: ' Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 1 13 2 1 5 1 3 1 0 1 0 3 HFR: 1 13 2 I 5 1 3 1 0 1 0 3 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: #of vehicles: Eastbound 0 #of vehicles:Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound . Shared In volume, major th vehicles: 13 5 Shared In volume, major rt vehicles: 2 1 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 14 6 Potential Capacity 1072 1083 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1072 1083 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 15 6 Potential Capacity 1616 1628 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1616 1628 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3:TH from Minor St. 8 11 Conflicting Flows 24 25 Potential Capacity 873 873 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 872 872 - Probability of Queue free St. 1.00 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 25 24 Potential Capacity 991 993 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1.00 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 987 991 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I I II I v(vph) 3 1 0 1 0 3 Movement Capacity 987 872 1072 991 872 1083 Shared Lane Capacity 956 1059 Worksheet 10 delay,queue length, and LOS - Movement 1 4 7 8 9 10 11 12 I II II II I v(vph) 1 1 4 4 C m(vph) 1628 1616 956 1059 v/c 0.00 0.00 0.00 0.00 95% queue length Control Delay 7.2 7.2 8.8 8.4 LOS A A A A Approach Delay 8.8 8.4 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 13 5 V i2 2 1 Sit 1700 1700 Sit 1700 1700 P*Oj 1.00 1.00 D maj left 7.2 7.2 N number major st lanes 1 1 - Delay, rank 1 mvmts 0.0 0.0 Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N — Channelized: NI Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 3 5 Shared In volume, major rt vehicles: 5 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 6 5 Potential Capacity 1083 1084 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1083 1084 Probability of Queue free St. 1.00 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 8 5 Potential Capacity 1625 1630 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1625 1630 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 LOO Step 3: TH from Minor St. 8 11 Conflicting Flows 15 17 Potential Capacity 884 881 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 883 880 Probability of Queue free St. 0.99 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 20 22 Potential Capacity 999 996 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 1,00 0.98 Maj. L, Min T Adj. Imp Factor. 1.00 0.99 Cap. Adj. factor due to Impeding mvmnt 0.99 0.99 Movement Capacity 989 983 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 ' I II I I II I I II I v(vph) 4 13 1 0 3 7 Movement Capacity 989 883 1083 983 880 1084 Shared Lane Capacity 914 1014 Worksheet 10 delay,queue length, and LOS — Movement 1 4 7 8 9 10 11 12 I II I I II I I II I v(vph) 2 18 10 C m(vph) 1630 1625 914 1014 v/c 0.00 0.02 0.01 95%queue length Control Delay 7.2 9.0 8.6 LOS A A A Approach Delay 9.0 8.6 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 3 5 V i2 5 0 S i 1 1700 1700 Sit 1700 1700 P* Oj 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 - C =• Count Date: EX ST L TOTA Time Period: AM M Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 3 11 7 0 5 3 2 4 0 2 13 2 HFR: 3 11 7 0 5 3 2 4 0 2 13 2 P H F: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: # of vehicles: Eastbound 0 #of vehicles:Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 • Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared in volume, major th vehicles: 3 5 Shared In volume, major rt vehicles: 5 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 • Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 6 5 Potential Capacity 1083 1084 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1083 1084 Probability of Queue free St. 1.00 0.99 • Step 2: LT from Major St. 4 1 Conflicting Flows 8 5 Potential Capacity 1625 1630 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1625 1630 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N — Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 11 5 Shared In volume, major rt vehicles: 7 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,It 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: -- 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tc 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 15 7 Potential Capacity 1071 1082 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1071 1082 Probability of Queue free St. 1.00 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 18 8 Potential Capacity 1612 1625 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1612 1625 Probability of Queue free St. 1.00 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 1.00 Step 3: TH from Minor St. 8 11 Conflicting Flows 29 31 Potential Capacity 868 866 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 1.00 Movement Capacity 867 865 Probability of Queue free St. 1.00 0.98 Step 4: LT from Minor St. 7 10 Conflicting Flows 35 29 Potential Capacity 977 985 Pedestrian Impedance Factor 1.00 1.00 Maj. L, Min T Impedance factor 0.98 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 1.00 Cap. Adj.factor due to Impeding mvmnt 0.99 1.00 Movement Capacity 963 980 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I • I II v(vph) 2 4 0 2 13 2 Movement Capacity 963 867 1071 980 865 1082 Shared Lane Capacity 897 898 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II I II II I v(vph) 3 6 17 C m(vph) 1625 1612 897 898 v/c 0.00 0.01 0.02 95% queue length Control Delay 7.2 9.0 9.1 LOS A A A Approach Delay 9.0 9.1 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V i1 11 5 V i2 7 3 S i 1 1700 1700 S i2 1700 1700 P* Oj 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 ORT CESS nt Date: 0 LT OTA .ie Period: AM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 6 10 15 2 2 17 HFR: 6 10 15 2 2 17 P H F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: (vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N nnelized: N urade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N V N N N N N N Channelized: N le: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: • Northbound Southbound Shared In volume, major th vehicles: 10 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 t c,T: "-tage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 t f 2.2 3.5 3,3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 16 Potential Capacity 1069 Pedestrian Impedance Factor 1.00 Movement Capacity 1069 Probability of Queue free St. 0.98 Step 2: LT from Major St. 4 1 Conflicting Flows 17 Potential Capacity 1613 Pedestrian Impedance Factor 1.00 Movement Capacity 1613 bability of Queue free St. 1.00 ,.,aj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 38 Potential Capacity 979 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cap. Adj. factor due to Impeding mvmnt 1.00 vement Capacity 976 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I II I v(vph) 2 17 Movement Capacity 976 1069 Shared Lane Capacity 1058 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II II v(vph) 6 19 C m(vph) 1613 1058 v/c 0.00 0.02 95%queue length Control Delay 7,2 8.5 LOS A A --oroach Delay 8.5 )roach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 Vil 10 5 V i2 0 3 Sil 1700 1700 Si2 1700 1700 P*0] 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 OR4k CESS ' ItDate: ST ",1 ' c A .a Period: AM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 20 15 8 2 1 11 HFR: 20 15 8 2 1 11 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N .nnelized: N ade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N Channelized: N le: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 15 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 t c,T: tage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 9 Potential Capacity 1079 Pedestrian Impedance Factor 1.00 Movement Capacity 1079 Probability of Queue free St. 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 10 Potential Capacity 1623 Pedestrian Impedance Factor 1.00 movement Capacity 1623 bability of Queue free St. 0.99 iviaj. L Shared In. Prob. Queue Free St. 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 64 Potential Capacity 947 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 0.99 Maj. L, Min T Adj. Imp Factor. 0.99 Cap. Adj.factor due to Impeding mvmnt 0.99 ' Iment Capacity 938 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II II II I v(vph) 1 11 Movement Capacity 938 1079 Shared Lane Capacity 1065 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II I I I v(vph) 20 12 C m(vph) 1623 1065 v/c 0.01 0.01 95%queue length Control Delay 7.2 8.4 LOS A A mach Delay 8.4 . oach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 0.99 1.00 ✓ it 15 5 ✓ i2 0 3 S i l 1700 1700 S i2 1700 1700 P*Oj 0.99 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.1 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37 - •UnSS lnt Date: LT OTAL ..,ne Perio•. AM Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 1 15 31 1 1 3 HFR: 1 15 31 1 1 3 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: if vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N ,annelized: N tirade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N Qbannelized: N 'e: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 15 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 t c,T: 'age 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 t 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 32 Potential Capacity 1048 Pedestrian Impedance Factor 1.00 Movement Capacity 1048 Probability of Queue free St. 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 32 Potential Capacity 1593 Pedestrian Impedance Factor 1.00 "'—vement Capacity 1593 Lability of Queue free St. 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 49 Potential Capacity 966 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cap. Adj.factor due to Impeding mvmnt 1.00 ement Capacity 966 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II I I II I v(vph) 1 3 Movement Capacity 966 1048 Shared Lane Capacity 1026 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II I I I I v(vph) 1 4 C m(vph) 1593 1026 v/c 0.00 0.00 95%queue length Control Delay 7.3 8.5 LOS A A nroach Delay 8.5 roach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V i1 15 5 V i2 0 3 Si! 1700 1700 S i2 1700 1700 P* Oj 1.00 1.00 D maj left 7.3 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC)ANALYSIS Analyst: GC Intersection: CR 37•OUTH : ESS it Date: ST OTA ..,ie Period: AM P Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 5 6 10 12 Volume: 3 34 17 2 2 1 HFR: 3 34 17 2 2 1 PHF:F: 1.00 1.00 1.00 1.00 1.00 1.00 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: %Blockage: Median Type: None #of vehicles: 0 Flared approach Movements: . vehicles: Eastbound 0 #of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N nnelized: N ( made: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N Y N N N N N N Cbannelized: N le: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 34 5 Shared In volume, major rt vehicles: 0 3 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 10 12 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,It 0.0 0.7 0.0 t c,T: tage 0.00 0.00 0.00 tc 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 1 10 12 t f,base 2.2 3.5 3.3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0.00 tf 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 18 Potential Capacity 1066 Pedestrian Impedance Factor 1.00 Movement Capacity 1066 Probability of Queue free St. 1.00 Step 2: LT from Major St. 4 1 Conflicting Flows 19 Potential Capacity 1611 Pedestrian Impedance Factor 1.00 "-hvement Capacity 1611 ibability of Queue free St. 1.00 Maj. L Shared In. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 58 Potential Capacity 954 Pedestrian Impedance Factor 1.00 Maj. L, Min T Impedance factor 1.00 Maj. L, Min T Adj. Imp Factor. 1.00 Cn. Adj. factor due to Impeding mvmnt 1.00 ment Capacity 953 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II I II II I v(vph) 2 1 Movement Capacity 953 1066 Shared Lane Capacity 988 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II I II I I v(vph) 3 3 C m(vph) 1611 988 v/c 0.00 0.00 95%queue length Control Delay 7.2 8.7 LOS A A 'oach Delay 8.7 roach LOS A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 V it 34 5 V i2 0 3 S i 1 1700 1700 S i2 1700 1700 P*0j 1.00 1.00 D maj left 7.2 0.0 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 Hello