HomeMy WebLinkAbout20013065.tiff CHANGE ORDER NO. 2
Project: Bridge WEL027.0-058.0A (BRO C030-021)
7 T7:
TO: Sear-Brown
209 South Meldrum
Ft. Collins, CO. 80521-2603
FROM: Drew Sheltinga, P.E. , Engineering tanager
;;__z? Cou:::v Public Works
1111 H Street
Greeley, CO. 80632-0758
In accordance with Article II, Section 3, of the contract approved under
resolution number 2001-2415 EO00 `__, between Weld County Colorado and
Sear-Brown
executed August 27, 2001 for a period of 175 calendar days, the undersigned
hereby agree that the maximum amount payable by the County for the work as set
forth in the said contract is hereby increased by $ 0.00 , to a new total
of $
The services affected by this increase/decrease are modified as follows:
Add additional personnel to "Specific Rate of Pay" table. Expanded table
is attached.
The Consultant shall provide Design and Project/Construction Management
services in accordance with the attached scope of work dated July 13, 2001 and
the attached Consultant's Cost Proposal dated August 14, 2001. Work under
this change order shall be completed within an additional 0 calendar days,
for a new contract time of completion of calendar days. (or No
additional time will be given to complete the work under this change order) .
This amendment to the contract is intended to be effective as of
August 23, 2001
BUT IN NO EVENT SHALL IT BE DEEMED VALID UNTIL IT SHALL HAVE BEEN APPROVED BY
THE BOARD OF COMMISSIONERS OF WELD COUNTY COLORADO.
Please sign and return all copies of this letter on or before
FC
2001-3065
ACCEPTED BY: ORDERED BY:
spy/-/' /Qy//J THE BOARD OF WELD COUNTY COMMISSIONERS
Consultant Weld Cou y, Colorado
Name 1 Jorl6.Cr1 S /S/7.4963 ��,/'
(Please Print) By / itz,..
M. J. eile, Chair
By Krfentole) Date October 29, 2001
Date /61-"yo —6/
(Seal) (Seal) ) D� /qi���/// �
ATTEST: ATTEST: ���:�,��,/,��'���✓'" 1.. E14 ,r,,,
CONSULTANT: S P o ✓'- bUOWY __ Weld County Clerk t•the - •4`I
BY 724-OTCa a- )1(Y/4-71c-itr c.frtf BY -` - `Z 861 4V
u I(Please print) Deputy Clerk to :o.j ,
TITLE /�✓ CI L- fr tGt.je/ � gill 4��
5..��.'a�
3.
y„rA11�4�
itz:' NOTARY 1
000140-416-
,.PUBUC /f
ti
APPENDIX"B"
SEAR-BROWN SPECIFIC RATE OF PAY TABLE
PROJECT NUMBER: CO30-023(13495)
LOCATION : Saint Vrain Creek
FIRM NAME : Sear-Brown
NAME OF PREPARER: Doug Rames P.E. PHONE No: (970)482-5922
SCOPE OF WORK DATE: 13-Jul-01
1.SPECIFIC LABOR RATES
EMPLOYEE EMPLOYEE DIRECT SALARY INDIRECT SPECIFIC RATE
NAMF CLASSIFICATION COST/HOUR COST(141%) FEE(12%) S/HOUR
Phil Weisbach Transportation Manager $50.70 $71.49 $14.66 $136.85
Andrea Faucett Senior Engineer I $29.60 $41.74 $8.56 $79.90
Andrew Leifheit Engineer 1 $23.85 $33.63 $6.90 $64.38
Bill Bailey Survey Tech II $12.85 $18.12 $3.72 $34.68
Bryana Bamford Senior Engineer Tech $14.35 $20.23 $4.15 $38.73
Dale Stein Senior Engineer I $33.85 $47.73 $9.79 $91.37
David Thaemert Senior Engineer I $26.30 $37.08 $7.61 $70.99
Debbie Haferman Engineer I $22.85 $32.22 $6.61 $61.68
Doug Rames Transportation Manager $38.60 $54.43 $11.16 $104.19
Eric Smith Surveyor III $19.70 $27.78 $5.70 $53.17
Gary Gilland Survey Manager $33.20 $46.81 $9.60 $89.61
Gary Oberling Engineering Manager $40.70 $57.39 $11.77 $109.86
Gary Schumacher Sr.Designer II $27.30 $38.49 $7.90 $73.69
George Quillen Surveyor III $19.88 $28.03 $5.75 $53.66
Jeff Temple Senior Engineer I $33.20 $46.81 $9.60 $89.61
Jenni Kramar Secretary I $13.70 $19.32 $3.96 $36.98
Jeremy Franz Engineer I $21.95 $30.95 $6.35 $59.25
Joe Delich Engineer II $18.20 $25.66 $5.26 $49.13
Keith Smith Construction Administrator $20.10 $28.34 $5.81 $54.25
Lisa Winterrowd Secretary I $11.35 $16.00 $3.28 $30.64
Loren Lewis Drafter I $16.20 $22.84 $4.69 $43.73
Marilee Rayome Designer I $20.40 $28.76 $5.90 $55.06
Martina Wilkinson Sr. Engineer I $28.35 $39.97 $8.20 $76.52
Matt Lockwood Survey Tech II $13.20 $18.61 $3.82 $35.63
Paul Jagim Engineer 1 $19.55 $27.57 $5.65 $52.77
Paula Fox Admin.Assistant $16.90 $23.83 $4.89 $45.62
Stan Dunn Senior Engineer II $27.95 $39.41 $8.08 $75.44
Tom Butler Sr.Designer I $25.50 $35.96 $7.37 $68.83
4; % _.-..:Added 926/01
R -
e.
i !1 % j -'x'Added 926/01 C. e r
rgr �.: •. xo -.•. f :. s' .". 4° Added 9/26/01
_..v
fi: .e Added 926/01
_< n' <! '�.„"M Added 9/26/01
2. OTHER DIRECT COST RATES
Vehicle Expense $0.32 per mile
Film Processing $15.00 per roll*
Cellular Telephone $75.00 per month*
Incidentals-Delivery, Postage,etc.*
*Estimated-to be invoiced at actual cost
41 , \
MEMORANDUM
TO: Clerk to the Board DATE: October 19,2001
COLORADO• FROM: Frank B. Hempen, Jr.,
Director of Public Works/County Engineer
SUBJECT: Request for Chair's Signature
Please submit the enclosed Agreement for the Chair's signature.
Additional personnel to be added to contracts
Change Orders for Federal Bridge Replacement Projects: 13-26A and 27-58A
Enclosures
pc: Cameron Parrott,
a
MEMORANDUM
TO: Frank B. Hempen, Jr., P.E.
11 ' C Director of Public Works/County Engineer DATE: October 19, 2001
•
COLORADO FROM: Cameron H. Parrott, Public Works/Civil Engineer
SUBJECT: Change Orders for Federal Bridge Replacement
Projects
Weld County is currently contracting with Sear-Brown for the design of replacing bridges
13-26A over the St. Vrain, and 27-58A crossing Sheep Draw. These are two separate contracts and
are both federally funded.
Attached are two Change Order forms and a letter from Sear-Brown. These documents are
requesting additional Sear-Brown personnel to be added to these contracts. These Change Orders
do not affect the overall contract amounts, but are required by CDOT. These contracts are specific
rate of pay format. In order for additional people to work on these projects, they must be included
in the specific rate of pay table of each contract.
I recommend approving these Change Orders because they do not affect the contract
amounts. They also allow Sear-Brown to use sufficient personnel to complete these designs in a
timely matter.
M:\WPFILES\Cameron\Fed Bridge Change Order Memo.wpd
ARCHITECT URG 209 South Meld rum
ENGINEERING Fort Collins,CO 80521
PLANNING 970.482.5922 phone
SEARBROWN CONSTRUCTION 970.482.6368 fax
www.searbrown.corn
October 10, 2001
Mr. Cameron Parrott
Weld County Engineer
1111 H Street
Greeley, Colorado 80632
RE: Replacement of Bridge Project CO30-023 (13495), Saint Vrain Creek&
CO 030 021 (13363),Sheep Draw
Dear Cameron,
Attached for your review and action you will find two Change Order documents for the above captioned
bridge projects.
Both Change Orders are for the purpose of adding additional personnel from our staff to the"Specific
Rate of Pay"table for the two projects. As the weeks have gone by since our original submittal,
different individuals have become available to work on the project.
These Change Orders do not add additional cost or time to the project.
Please contact Doug Rames or Jeff Temple, by phone at(970)482-5922,by fax at (970)482-6368
with questions or information pertaining to this Proposal.
Sincerely,
Transpo tion Manager