Loading...
HomeMy WebLinkAbout20010007.tiff Weld County Planning Dept.. MEMORANDUM 00T 03 2000 RECEIVED TO: Monica Daniels-Mika DATE: September 29, 2000 119 Director of Planning Services FROM: Diane Houghtaling, P.E., Traffic Engineer C SUBJECT: Z-552,Hoshiko Farms, Change of Zone COLORADO The Weld County Public Works Department has reviewed this change of zone request. Our comments and requirements are as follows: COMMENTS: WCR 66 is designated as a collector roadway in the Weld County Comprehensive Transportation Plan. Collector roadways require a minimum of 80 feet for right-of-way. The developer will be required to verify the right-of-way has been dedicated to the County. It would be preferable to have all three lots access an internal roadway and only one access added to WCR 66. The internal roadway needs to be extended to the edge of the land locked parcel. The typical section was not submitted. All roads should be paved unless waived by the Director of Planning. The minimum paved road is 32 feet wide(two 12-foot lanes with four-foot gravel shoulders). If this development is within the urban growth boundary of the City of Greeley, curb, gutter and sidewalk will be required. Final roadway construction plans will need to be submitted with the final plat. The drainage study was not submitted. It appears that nothing is planned for this site at this time. If that is the case,the traffic impact study can be made a condition of the building permit. RECOMMENDATION: Approval DEVELOPMENT CONDITIONS (If Approved): The right-of-way for WCR 66 shall be dedicated to the County. A drainage report signed by a professional engineer licensed in the State of Colorado shall be submitted to the Weld County Public Works Department for review. An internal cul-de-sac shall be provided extending to the land-locked parcel. A typical section shall be provided. Final roadway plans acceptable to the Weld County Public Works Department shall be submitted for review. A traffic impact study shall be required before any building permits are issued. If you have any questions,please call. pc: Z-552 WCR 66 M:\WPFILES\dianc\DEVELOPMENTZ-552.wpd EXHIBIT In 2001-0007 Weld County Planning Dept. �J 2 r , t. V: ) SFP 29 2000 • 4! Rct:;0 0tj'0� September 20, 2000 inigC. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Hoshiko Farms Inc. Case Number Z-552 Please Reply By October 10, 2000 Planner Monica Daniels-Mika Project Change of Zone from A (Agricultural) to 1-3 (Industrial). Legal SE4 of the NW4 of Section 29, T6N, R65W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 66; east of and adjacent to State Hwy 85 . Parcel Number 0803 29 000079; 80; and 91 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) December 5, 2000 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with cur interests. ❑ See attached letter. 11 44 Y�0 Comments: ilitt prop0 Cd I usb-1 a' Iuci `Y12 s trIck b'eC''n ic;e4ri+I fed . Tha Cou v $t( u II v C.24 -tn AP; r Ion"4. i 4' -1-ht rvtu l t,C`v.C u.l H (rCV &Art!.4'i': ay"r3vi tv1^ pri1\J?. fr'VCO..� i Shy ` 5 . Signature ririte..Q lef Date " 2 1O0 Agency (tO?- - /\[c.:'_ :•Weld County Planning Dept. H555 N. 17th Ave. Greeley,CO.80631 4(970)353-6100 ext.3540 +(970)304-6498 fax EXHIBIT f II (itociti4 Weld County Referral ' September 20, 2000 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Hoshiko Farms Inc. Case Number Z-552 Please Reply By October 10, 2000 Planner Monica Daniels-Mika Project Change of Zone from A (Agricultural) to I-3 (Industrial). I Legal SE4 of the NW4 of Section 29, T6N, R65W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 66; east of and adjacent to State Hwy 85 . Parcel Number 0803 29 000079; 80; and 91 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) December 5, 2000 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: UpCrYI f 1AA-1- ti re Diane h c Ck/\!j aomptdeJ'i ne p P-Q i v i(in+i cri&o uTtn.o Prra d told on 4h40 ahcnv r&o , oi' .p&.reed M-• Signature ( 6(1- n Date q jaq Irv) Agency q ( .�'Y1 (ni 11C P� Y ❖Weld County Planning Dept. 41555 N. 17th Ave. Greeley,CO.80631 :•(970)353-6100 ext.3540 4(970)304-6498 fax EXHIBIT 13 jr- Weld County Referral Weld County Planning Oen ISeptember 20, 2000 CNOV ZC 2000 COLORADO RECEIVED non' s; The Weld County Department of Planning Services has received the following item for review: Applicant Hoshiko Farms Inc. Case Number Z-552 Please Reply By October 10, 2000 Planner Monica Daniels-Mika Project Change of Zone from A (Agricultural) to 1-3 (Industrial). Legal SE4 of the NW4 of Section 29, T6N, R65W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 66; east of and adjacent to State Hwy 85 . Parcel Number 0803 29 000079; 80; and 91 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) December 5, 2000 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. 1 See attached letter. Comments: Signature 1 Date t� �416cO Agency 0� reo�e� �.ovv.mw,�"I cw. 1�tt2\ . •:•Weld County Planning Dept. •:•1555 N. 17th Ave. Greeley,CO.80631 ••(970)353-6100 ext.3540 •}(970)304-6498 fax EXHIBIT ) r OFFICE OF COMMUNITY DEVELOPMENT City1100 le STREET,GREELEY,COLORADO 80631 (970)350-9780 FAX(970)350-9800 Greeley November 14, 2000 Monica Daniels-Mika Weld County Department of Planning Services 1555 N. 17th Avenue Greeley, CO. 80631 RE: Z-552 Dear Ms. Daniels-Mika: The City of Greeley Planning Commission discussed during its regular meeting on 14 November 2000 the Hoshiko Rezone request. After reviewing the request for I-3 zoning and the City of Greeley 2020 Comprehensive Plan, the Planning Commission found that the requested change of zone is located in the City of Greeley's Long Range Expected Growth Area and that an I-3 zone at this location is consistent with the following City of Greeley Comprehensive Plan Policy: • LU4.1 Heavy industrial uses should be located where conflicts with other land uses are minimal and where there is good rail access or proximity to major arterial roads. And that an I-3 zone at this location is not consistent with the following City of Greeley Comprehensive Plan Policy: • LU4.8 Incorporate design techniques to plan and develop new industrial sites that are attractive and compatible with adjacent land uses; And recommends to the Weld County Planning Commission that the western parcel consisting of approximately 30 acres be zoned I-1 to prohibit outside storage on that property and the balance of the site be zoned I-3. Please see the enclosed staff report for a more comprehensive review of the request. Sin er y, S E R v I N G OUR COMMUNITY • IT S A TRADITION Jeff Hofman, Planner II 7L/e promise to preserve and improve tkie dual y o-Lb/or 9reeley IFirouy%timely, courteous and cost e//ectr'oe service. FILE COPY PLANNING COMMISSION SUMMARY ITEM: Weld County Referral for a Change of Zone From A (Agricultural) to I-3 (Industrial) PROJECT: Hoshiko Rezone LOCATION: South of and adjacent to WCR 66; east of and adjacent to State Highway 85 APPLICANT: Hoshiko Farms Inc. CITY PLANNER: Jeff Hofman PLANNING COMMISSION HEARING DATE: November 14, 2000 PLANNING COMMISSION FUNCTION: To review the proposed change of zone for compliance with the City of Greeley Comprehensive Plan and make a recommendation to the Weld County Planning Commission. PROJECT BACKGROUND AND OVERVIEW: The proposal is for a change of zone from the A (Agricultural) district to an I-3 (Industrial) district in unincorporated Weld County. The I-3 zone district allows the widest range of industrial uses in unincorporated Weld County including those that may create adverse visual impact (outdoor storage) for adjacent uses. The site is south of WCR 66 and east of U.S. Highway 85 and is located in the Eaton Fire Protection District. Water service is to be provided by North Weld Water District. Waste water will be treated by individual sewage disposal systems. The subject property is approximately a half-mile from the City's municipal boundaries and is located in the City of Greeley's Long Range Expected Growth Area (LREGA). The LREGA includes those lands anticipated to accommodate the City of Greeley's urban development over the next two decades. The site is also within the Urban Growth Area (UGA). This is the area where a full complement of land uses at urban densities is anticipated. The site is outside the Mid Range Expected Service Area (MRESA). The MRESA is the area that is expected to develop in the next five years. The property is outside the Greeley - Weld County Airport influence area as identified on the 1980 Weld County Airport Environment Assessment for the year 2000. It is the practice of the City of Greeley Planning Commission to review Weld County requests principally for conformance with the City's Comprehensive Plan policies. Specific design issues are addressed only to the degree necessary to ensure consistency with the City's Comprehensive Plan and Development Code. SITE DATA: Site Size 109.91 Acres Surrounding Zoning: North - Weld County C-3 (Commercial) South - Weld County I-3 (Industrial) East - Weld County A (Agriculture) West - Weld County C-3 & I-3 Surrounding Land Uses: North - Cultivated Fields and Rural Residential South - Industrial East - Cultivated Fields West - U.S. Hwy. 85 KEY ISSUES AND ANALYSIS: Does the request comply with the City of Greeley Comprehensive Plan? The following Comprehensive Plan Policies apply to this request. Comprehensive Plan Policy LU4.1 Heavy industrial uses should be located where conflicts with other land uses are minimal and where there is good rail access or proximity to major arterial roads. Staff Comment: The site is adjacent to existing industrial uses and agricultural operations. Conflicts with adjacent land uses should be minimal. The property is adjacent to a rail line and in close proximity to U.S. Highway 85. The proposal complies with this policy. Comprehensive Plan Policy LU4.3 Disallow high impact agricultural and heavy industrial land uses that generate obnoxious influences, such as noise,fumes, or hazards. Planning Comm. Summary 2 WCR Hoshiko Rezone Staff Comment: The I-3 zoning would allow any use of a research, repairing, manufacturing, fabricating, processing, assembly or storage nature plus commercial junkyards through a Use by Special Review. Noise is restricted in unincorporated Weld County to State standards found at CRS 25-12-101. The noise levels for industrial uses of 80 db(A) during the day and 75 db(A) at night are similar to the City's standards found in the City Charter. The State standard allows for an additional 10 db(A) increase in the levels for periods not exceeding 15 minutes in any one hour period. Air quality standards in unincorporated Weld County are the standards established by the Colorado Air Pollution Control Commission. The proposal may allow uses that would generate obnoxious noise and fumes. Comprehensive Plan Policy LU4.4 Facilitate the development of business and industrial parks to group like uses together with a coordinated design and site development scheme. Staff Comment: The area around the proposed rezone has a number of existing industrial and commercial types of land uses and is seeing increased industrial development. An existing industrial user with unscreened outdoor storage is highly visible along the highway corridor. During the past year a steel fabrication/distribution facility has located in this area. A pet seed distributor is also planning to locate in this area. The planning and development in this area appears to be incremental and not well coordinated. As an example, fire flow in this area would not meet the standards used by the Union Colony Fire Rescue Authority and the area would be difficult to incorporate into the city without upgrades to the water system. The proposal partially meets • this policy. Comprehensive Plan Policy LU4.8 Incorporate design techniques to plan and develop new industrial sites that are attractive and compatible with adjacent land uses. Staff Comment: Design techniques cannot be conditioned on a "standard" or "straight" zone district request. The 1-3 zone requested by the applicant allows outside storage. An existing industrial user with unscreened outdoor storage is highly visible along the U.S. 85 highway corridor. The Entryway Master Plan (1994) identifies this Planning Comm. Summary 3 WCR Hoshiko Rezone area as an entryway to the City of Greeley. An industrial zone district that does not allow outside storage would be more appropriate in this entryway area. The subject property appears to consist of three different parcels. The western parcel contains approximately 30 acres and has frontage along the entire length of the highway corridor. This portion of the property should be zoned I-1 to prohibit outside storage along this entryway. The proposal can meet this policy. ADMINISTRATIVE REVIEW TEAM: The Administrative Review Team informally reviewed this item on November 6, 2000. The Union Colony Fire/Rescue Authority (UCFRA) confirmed that the site is in the Eaton Fire Protection District and that the fire flow in the area does not meet the standards of the UCFRA. RECOMMENDATION: Planning Staff recommends that the Planning Commission find that the requested change of zone is located in the City of Greeley's Long Range Expected Growth Area (LREGA), that an I-3 zone at this location is consistent with the following City of Greeley Comprehensive Plan Policy: • LU4.1 Heavy industrial uses should be located where conflicts with other land uses are minimal and where there is good rail access or proximity to major arterial roads. And that an I-3 zone at this location is not consistent with the following City of Greeley Comprehensive Plan Policy: • LU4.8 Incorporate design techniques to plan and develop new industrial sites that are attractive and compatible with adjacent land uses. And recommend to the Weld County Planning Commission that the western parcel consisting of approximately 30 acres be zoned I-I to prohibit outside storage on that property and the balance of the site be zoned I-3. ATTACHMENTS: Attachment A - Vicinity Map Attachment B - Applicant's Narrative Planning Comm. Summary 4 WCR Hoshiko Rezone ' " ' WCR Hoshiko Attachment A °oN'` Vicinity Map City ofRezone Gnaw Recomended Re en ed I For 1-1 For 1-3 WC 66 I ' Site �!- City • Limits Legend N OParcels �) Roadcl W E „t� . Strcture s Attachment b - Applicant's Narrative August 25, 2000 C o Pr Current Planner Weld County,Colorado Department of Planning Services 1555 N. 17th Avenue Greeley,CO 80631 RE: Application to rezone the following described property,a parcel of land located in the North Half of Section 29,Township 6 North, Range 65 West,of the 6th P.M., Weld County, Colorado. Containing 5,223,280 SF(120 Acres,more or less). See attached legal description. Dear Current Planner: Hoshiko Farms,Inc.,a Colorado corporation,requests a change of zoning for the above described parcel, from the existing Agriculture Zone to I-3 Zone. Hoshiko Farms, Inc., respectfully requests that a hearing be granted to consider the application for change of zone to coincide with surrounding land. The requested zoning is consistent with the policies of the Weld County Comprehensive Plan. The proposed zoning is compatible with the surrounding land use. The land to the North is Zoned C-3,to the South is 1-3,to the East is Agriculture and to the West is a combination of 1-3 and C-3. The roads to the North of the above-described parcel are W.C.R. 66 and to the West is US/Colorado State Highway 85. The above-described parcel is unimproved property, so Hoshiko Farms, Inc.may need additional water or fire protection to the property(see letter from Water District). Soils have no limitations for construction(see attached Soils Report). Road and/or highway facilities providing access to the property are adequate and meet the requirements of the proposed Zone District. Hoshiko Farms, Inc. is not requesting any changes in road and/or highway facilities. To the best of Hoshiko Farms, Inc.'s knowledge there is no sand or gravel resources on or under the subject property. There has been oil and gas exploration and production in the area, however, there has been no production on the land herein described parcel. The change of zone area, is not located in a flood Hazard District or a Geologic Hazard District, nor is it located in the Airport Overlay District. The zone change is not inconsistent with the efficient and orderly growth of the area. It is consistent with the growth of the area in that the use and nature of the land will not change by this zoning process. The subject land is currently zoned Agriculture,however, its current use will not change with the I-3 Zoning. Thus insuring this request is consistent with the intent of the zone district requested herein. The uses permitted in the I-3 will be compatible with the future development of the surrounding area as permitted by the various existing zonings in the general area and with future development as projected by the Comprehensive Plan of the county. The property is located within a three-(3)mile radius of Greeley and Eaton,Colorado and is considered in the future growth of the City of Greeley. The subject property complies with the Overlay Districts outlined in the Weld County Comprehensive Plan dated November 21, 1995. We honorably ask your sincere consideration of our request to change the zoning and ask that you approve the application. Respectfully submi Dennis Hoshiko, President Hoshiko Farms,Inc. Hello