Loading...
HomeMy WebLinkAbout20011543.tiff .Kty, • mit py�s,.8,1�„�,��,,�-���! ACRES tlATSWRM ! _ C4•CE RIemac:. $, 4CONCERRIAG This SET COOATIy58 31 �tht CQORADO 80631. bAT 4.'"T•Bbl IM CELL iNE �°• 0E E0 EATI31 �38EgI�EAT 351p. 2001-1543 May. 15. 2301 12:41PM HS RESOURCES, INC. No, 1769 P. 1/1 HS GATHERING, LLC ---' 1999 BROADWAY,SUITE 3600 DENVER, COLORADO 60202 (303) 296.3600 FACSIMILE (303)298-7248 May 15th,2001 Weld County Colorado Via Facsimile(970) 304-6498 Department of Planning Services C/o Robert Anderson 1555 N. 17th Avenue Greeley,Colorado 80631 Re: Case No. 3r°AmUSR-1330/Jahn Zadel Township 1 North,Range 67 West, 6th PM Section 10: S/2SE/4 Weld County, CO Planning Department: In regards to the referenced case,this is to notify the Weld County Planning Department that HS Gathering, LLC ("HSG") owns and operates one sixteen inch natural gas pipeline that is situated within the boundaries of the proposed development. From the plans received by HSG it appears that the Zadel's planned use of the property should not adversely affect HSG's pipeline provided that Zadel ensures adegnate cover over the line where the heavy equipment will be entering and exiting the property. You had earlier indicated that Weld County Public Works was requesting 4 inches of asphalt for cover. Our pipeline engineer would like to see 8 inches of asphalt cover where the equipment will be crossing the line. Please be advised that any activity on HSG's right-of-ways is absolutely prohibited, without approval from HSG, and any approval plan concerning the proposed development must consider MSG's rights (and safety)need to access the pipeline. Please do not hesitate to contact me if I can be of any assistance. Yours very truly RS Ga ering,LLC Ma Miller Pipeline Landman /nun EXHIBIT 1 9 Hello