Loading...
HomeMy WebLinkAbout841185.tiff - STATE OF COLORADO DEPARTMENT OF HIGHWAYS NIEID PRrr v.i.11 (.'^r9pR�SCI??tC1Y 4� sy,t 4201 East Arkansas Ave. D �1jflr7 u,� A Denver, Colorado 80222 I r ! ,t (303) 757-9011 J %,';r• 8j SEP 71994 , - FOR MORE INFORMATION: 757-9228 :�,-{�3,��30 7 G '7 x+ RELEASE AT WILL Aug. 30, 84 RAMP METERING EXTENDED ON DENVER'S INTERSTATE 25 It's time. Ramp metering, the red/green signal system used to monitor Denver's Interstate 25 and 225 on-ramps weekday mornings, goes to afternoon use Tuesday at two locations. Five northbound I-25 ramp locations began operation in 1981 , and since January five new locations have been operating. On September 4, the north- bound on-ramps to I-25 at Orchard and Belleview Ave. interchanges will be activated during afternoon peak periods. "Peak period" replaces the term "rush hour" ,since motorists caught in heavy traffic seldom get an opportunity to rush and the period for heavy traffic or congestion often lasts longer than sixty minutes. Hopefully, after- noon use at the I-25 Orchard and Belleview Ave. ramps will help remedy the recurrent stop-and-go-traffic conditions near the interchanges. Within two years, three new locations should help the mainline I-25 traffic even more. Ramp metering is scheduled for a redesigned Arapahoe Road interchange; at an East Dry Creek Road interchange, to be built by developers; and at County Line Road. In previous use the ramp metering system has reduced freeway delay, in- creased the volume of traffic using freeways during peak periods, and reduced the number of traffic accidents. (MORE) (OVER) �� (-i ( I Lc b._"bin (I I/ -7/,SV 841185 Highway News Page 2 Department of Highways Aug. 30, 1984 Motorists with questions about the ramp signal locations or their operation may phone the District VI Traffic Management Engineer, 757-9511 in Denver. O 00 IR 70-1 (92) LOMA PORT OF ENTRY, I-70 The Department's Division of Highways accepted three bids at the August 30 opening for a Set-Aside project which will build a Loma Port of Entry on Interstate 70. Bidding was open to certified, prequalified minority business enterprises only. The project begins 13.8 miles east of the Colorado/Utah state line and extends 1 .2 miles east in Mesa county. It consists of grading, struc- tures, hot bituminous pavement, signing, striping, lighting, signalization, and port of entry buildings and scales. An apparently successful bid of $1 ,574,309 was received from MG Concrete, Inc. of Pueblo. Resident engineer Bill Nelson of Grand Junction will coordinate the project, which is scheduled for completion within 90 working days. O 00 BRM 1409(1 ) STOUT ST. BRIDGE IN DENVER Replacing the Stout St. bridge over Cherry Creek in Denver drew three bidders at the Division of Highways August 30 opening. A. S. Horner Construction Company of Littleton submitted an apparently successful bid of $961 ,399. Work elements also include hot bituminous pavement, sod, planting, bikeway, curb and gutter, signing, striping and traffic signals. The time required for completion of this project is 180 workable days following the Notice to Proceed. Joe Seitz of Denver is resident engineer. O 00 Highway News Page 3 Department of Highways August 30, 1984 BIDS TO BE OPENED Sept. 20: 9:30 a.m. , Rehabilitating the I-70 bridge near Palisade, con- sisting of guard rail and hot bituminous pavement, beginning 10.5 miles east of Grand Junction and extending 0.2 mile easterly in Mesa county, IR 70-1 (97) . 9:45 a.m. , Bridge replacement on U.S. 24 near Simla, con- sisting of grading, structures, stabilization, hot bituminous pavement, striping, topsoil , seeding and mulching, beginning approximately 1 .4 miles east of Ramah and extending easterly 9.5 miles (net length 0.2 mile) , in Elbert county, FC 024-3(20) . 10:00 a.m. , U.S. 34, 26th Ave. signals in Greeley, consisting of signalization, in the City of Greeley, in Weld county, FRU 034-1 (25) . 000 CONTRACTS AWARDED Road/ Bid Contract Project Street Description Awarded To Opening Awarded FCU 121-1 (27) SH 121 to furnish signals for SH 121 The Gardner-Zemke 8/23/84 8/27/84 just north of 48th Ave. in Co. $49,000 Jefferson county MP 03-0085-19 8th Ave. to resurface segments Flatiron Paving 8/23/84 8/28/84 MP 03-0034-11 28th St. of the city's 8th Ave. & Co. $235,655 28th St. , in Greeley IR 70-2(127) I-70 to resurface a mile of B and B Excavat- 8/23/84 8/27/84 I 70 in Eagle county ing, Inc. $331 ,879 MP 05-0160-12 US 160 to resurface US 160 Carder, Inc. & HLM 8/23/84 8/23/84 east of Kim Construction, Inc. $232,510 * * * Hello