Loading...
HomeMy WebLinkAbout20012673 RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF WELD COUNTY ROAD 24.5 FROM 1-25 FRONTAGE ROAD EAST TO WELD COUNTY SERVICES CENTER ENTRANCE UNTIL NOVEMBER 7, 2001, FOR UPGRADES WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 24.5 from the 1-25 Frontage Road east to the Weld County Service Center Entrance be temporarily closed, with said closure being effective September 18, 2001, and ending November 7, 2001, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2001-2673 ,P& • �lV � 45O, CSiD EG0024 ROAD CLOSURE -WCR 24.5 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 24th day of September, A.D., 2001, nunc pro tunc September 18, 2001. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: th ► %/ �� EXCUSED La M. J. Geile, Chair Weld County Clerk to th' oa+- `�u� pg er, /l 47,C 4 �� Glenn Vaad, Pro-Tun„ BY: Deputy Clerk to the ��� � ' L-1 / ci7/ I past Willi H. Jerke AP O ED AST F M: vi çLo ounty Attorne Robert D. asden Date of signature: �7 2001-2673 EG0024 rest‘-" , MEMORANDUM • - r. , CTO: Clerk to the Board DATE: September 18, 2001 • COLORADO FROM: Frank B. Hempen, Jr. Director of Public Works/County Enginee SUBJECT: Road Closure WCR 24.5 from the I-25 Frontage Road east to the Weld County Service Center Entrance will be closed from September 18, 2001 to November 7, 2001 for upgrade. The appropriate documentation is enclosed. Enclosures pc: Jeff Jerome Drew Scheltinga Dean Dreher WCR File 2001-2673 SOUTHWEST WELD COUNTY SERVICE CENTER WELD COUNTY ACCESS ROAD PROJECT Project Location: - - �IAIl ■s WCR 24.5 From the 1-25 frontage road east - - - I• ■■ . to the Weld County Service Center Entrance. _iJ : ■ Project Description: w ■ ■1 • 1- I ' WCR 24.5 will be upgraded to a paved Iww ■ • four lane road with curb and gutter. r - t_ .' k Project Time: �..... ■ - The project will start September 18 1■ww - \ and will end November 7. 11111 _ • MI 1 1 �■7,��r�ma■ ROAD CLOSURE MAP PROJECT LOCATION i��■i' 1iiC�■ ww 1�� ■ w.w■sn..Iw.■w1 1 w■w CI H ...91■i■I!.r; I N - �� rail�.ieeee� J / L" w.w CA — \.P■lUi.. I I - H 119 try'I 24 �� _� ' � '� A■■�� r i- 1�1 _I "ri IAA! w.■I� ■ r b; .. ..+ ■Iw. w z w. 11.■.AP . I�ra•ww�swl' ��,t }wn■ p r Hello