Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20010832
CHANGE OWNER IK ORDER ARCHITECT CONTRACTOR ECI FIELD ❑ MA DOCUMENT G7O1 OTHER ❑ • PROJECT:SW Weld County Service Building CHANGE ORDER NUMBER:1 (One) (name, address)4209 WCR 24₹,Longmont, CO DATE: 4/2/01 915 10th St. ,Greeley, CO TO CONTRACTOR: ARCHITECT'S PROJECT NO: (name, address) Rus-Den Construction, Inc. CONTRACT DATE: 2/15/01 PO Box Z, 307 Welch Berthoud, CO 80513 CONTRACTFOR: SW Weld County Service Bldg. The Contract is changed as follows: 1 ) Masonry Deductions- See Attached ( 65, 437 .00 ) 2 ) Delete Skylight Shaft Walls- See Attached ( 3 , 818 . 00 ) 3 ) Electrical Deductions- See Attached ( 27, 320 .00 ) 4 ) Plumbing/Mechanical Deductions- See Attached ( 26, 111 .00 ) 5 ) Value Engineering Deducts- See Attached ( 29 , 400 .00 ) • Not valid until signed by the Owner, Architect and Contractor. The original(Contract Sum)( txtgtt;tsjjmftgekfwas $ 3 , 843, 086. 00 Net change by previously authorized Change Orders $ 0. 00 The(Contract Sum)f;C{gpxlxocyft$j q gEj(prior to this Change Order was $ 3, 843,086. 00 The (Contract Sum)(igr tg xixlxtx j;17tcx)will be*gcRe cja(decreased) jugthttjeack by this Change Order in the amount of $ ( 152, 086. 00 ) The new(Contract Sum)(S7}ttt4SNt4 tti4@XrftRity including this Change Order will be $ 3, 691 , 602 . 00 The Contract Time will be(kigign{I)( ,xqQ)(unchanged)by ( 0 )days, The date of Substantial Completion as of the date of this Change Order therefore is October 31 , 2001 NOTE: This summary does not reflect cllianges in tl Con • Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive AA / _ �+ �ttrie ,�� Lam, � , � ��_ Weld 6- aril .T CTOR OWNER ddr L/ ..f�j�i V t'( -C Le_ ddre/ /.5 �U ,S -,-- /� t , v/. ire f >> 7i 72e re- t0 Q 3 / E . 9 B //�// �/ BY T�/l BY DA'1'; 4. 0..1DATE "a DATE • y - 11- 01 III CAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE_. N.W., WASHINGTON, D 2(X063 3701-1987 WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to'iegal pros. GOO,- G&3.;:e t. Page of Pages Olig i V RUS-DEN CONSTRUCTION, INC. CHANGE ORDER GENERAL CONTRACTORS P.O. Box Z • Berthoud,Colorado 80513 NUMBER: #1 Page 1 of 5 (970)532-2599 �+p �yg P ADDITIONAL IONAL WORK ORDER PHONE: DATE: TO: 3/21/01 Bley Associates, Architects-Planners JOB NAME/LOCATION: 2020 Clubhouse Drive Loren Bley Greeley, CO 80634 SW Weld County Service Building CONTRACT/JOB NUMBER: JOB PHONE We hereby agree to the change(s)or additional work specified below: 1) Masonry Deductions per proposal Request#1- See attached 1) Install 4"x12" in lieu of 3"x12", Install 8"x8"x4" in lieu of (.24,200.00 6"x 12"x 4" 2) Delete Brick Plaza seating (8,952.00) 3) Delete Brick Veneer on Bath Shelter, Replace with split face (8,950.00) 8" block 4) Delete CMU brick entry sign with signage (16,215.00) 5) Delete interior brick veneer in corridor lobby 106 and 200 (7,120.00) 1 NOTE:This Change Order becomes part of and in conformance with the existing contract. ree hereby to make the ch nge(s) specified above at this price D —65,437.00 Date of greemenC PREVIOUS CONTRACT AMOUNT Auft Signature: (CONTRACTOR) REVISED CONTRACT TOTAL Payment will be made as follows: r Accepted -The above prices and specifications of this Change Authorized ( Order are satisfactory and are hereby accepted. All work to be Signature performed under same terms and conditions as specified in original (OWNER) contract unless otherwise stipulated. Date of acceptance PROPOSAL OWNER 6 REQUEST ARCHITECT CONSULTANT ❑ AIA Document G709 CONTRACTOR �7 FIELD ❑ (Instructions on reverse side) OTHER ❑ PROJECT: Southwest Weld County Services PROPOSAL REQUEST NO.: 1 (Name and addT225 Frontage Rd and WC RD 24-1/2 DATE OF ISSUANCE: 2-23-01 CONTRACT FOR: OWNER: (Name and address) CONTRACT DATED: 2-15-01 Weld County 915 10th Street ARCHITECT'S PROJECT NO.:2004 Greeley, Colorado TO CONTRACTOR: ARCHITECT: (Name and address) (Name and address) Rus-Den Construction Bley Associates Architects-Planners, Inc. 307 Welch Avenue 2020 Clubhouse Drive Berthoud, CO 80513 Greeley, CO 80634 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.Submit proposal within days,or notify the Architect in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. Description: (Insert a written description of the Work) Value Engineering Credit Deducts for brick masonry workscope as per attached information Attachments: (List attached documents that support description) Revised bath shelter elevation details as per attached. REQU1.TED BY: (Si (Printed name and tide) I i CAUTION: Y. u should sign an original AIA document which has this caution printed in red. An original a ures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. Jail AIA DOCUMENT G709 • PROPOSAL REQUEST • 1993 EDITION • AIA' • ©1993 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W., WASHINGTON,DC.20IXX-5292 •WARNING:Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. G709-1993 ATTACHMENT TO PROPOSAL REQUEST NO. 1 (Southwest Weld Co. Services) Value engineering credit request for cmu/brick masonry workscope as follows: 1. Furnish and install Norman standard utility size face brick 3-5/8" x 11-5/8" x 3-5/8" n 1i 3- of 3"x11-5/8" x 3" size specified. 5 ),e_ Submit Credit. Furnish and install 7-5/8" x 7-5/8" x 3-5/8" triple brick in lieu of 5-5/8" x 11-5/8" x 3-5/8" Giant Norman specified. Submit Credit. 2. Delete brick plaza bench seating/concrete footing at east/west plaza locations in its entirety as referenced at Detail 2/A3 . 0 IL Entrance Wall. Submit Credit. 3 . Delete brick veneer on bath shelter in its entirety. Chang to 8" ground face cmu with brick band accent Refer Attached Sketch) . c __?,1X4_2 ? c ,,,tJ w st l Submit Credit. 4 . Delete cmu/brick entrapsg sign in its eftirpy s indicated on Site Detail 2/A0.2 . ,-ILL eTh D Submit Credit. 5. Delete interior brick veneer in Corridor Lobby No. 106 and Corridor Lobby No. 200. Submit Credit General Notes 1. Concrete Block/cmu material approved manufacturers Clalite, Inc. 5050 Race Street, Denver, CO 80216 (800) 289-2562 Valley Block 6766 E. CO Hwy. 402 , Loveland, CO 80537 (970) 667-4480 2 . Brick Material approved manufacturers Endicott Clay Products Company, P.O. Box 645, Fairbury, NE 68352 (402) 729-3315 Yankee Hill Brick and Tile, 3705 S. Coddington Ave. , Lincoln, NE 68522 (402) 477-6663 iiii ai Page of Pages V I RUS-DEN CONSTRUCTION, INC. CHANGE ORDER GENERAL CONTRACTORS P.O.Box Z • Berthoud,Colorado 80513 NUMBER: #1 Page 2 of 5 (970)532-2599 p p R ADDS ller+JIONAIL WORK ORDER PHONE: DATE: TO: 3/21/01 Bley Associates, Architects-Planners JOB NAME/LOCATION: 2020 Clubhouse Drive Loren Bley Greeley, CO 80634 SW Weld County Service Building CONTRACT/JOB NUMBER: JOB PHONE We hereby agree to the change(s)or additional work specified below: 1- Deduct skylight, shift walls Per owner proposal request #2, see attached. 1) Delete Skylight, shift walls ust,12"curb for skylights (?,818;00) 1 NOTE:This Change Order becomes pail of and in conformance with the existing contract. fes IWO Are® hereby to make the change(s) specified above at this price D -3,818.00 Dale of agreement: PREVIOUS CONTRACT AMOUNT Authorized Signature: (CONTRACTOR) REVISED CONTRACT TOTAL Payment will be made as follows: 1 I AC6c''tee -The above prices and specifications of this Change ANhoraed Order are satisfactory and are hereby accepted. All work to be signature performed under same terms and conditions as specified in original (OWNER) contract unless otherwise stipulated. Date of acceptance _ • PROPOSAL OWNER 'b REQUEST ARCHITECT CONSULTANT ❑ AlA Document G709 CONTRACTOR XII FIELD U (Instructions on reverse side) OTHER ❑ PROJECT: Southwest Weld Co. Services PROPOSAL REQUEST NO.: 2 (Name and addreir-25 Frontage Rd and WC RD 24-1/2 DATE OF ISSUANCE: 2-23-01 CONTRACT FOR: OWNER: Weld County (Name and address) 915 10th Street CONTRACT DATED: 2-15-01 Greeley, Co. 80631 ARCHITECT'S PROJECT NO.: 2004 TO CONTRACTOR: ARCHITECT: (Name and address) (Name and address) Rus-Den Construction Bley Associates, Architects-Planners, Inc. 307 Welch Ave. 2020 Clubhouse Drive Berthoud, CO 80513 Greeley, CO 80634 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.Submit proposal within days,or notify the Architect in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. Description: (Insert a written description of the Work) Value Engineering Credit Deducts For Skylight Shaftwalls as per attached information Attachments: (List attached documents that support description.) Refer to attached 'Revised Roof Skylight Details, Sheet A3.2 REQU STED BY: (S' cure (Primed name an it e) I l CAUTIO : You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT O709 • PROPOSAL REQUEST • 1993 EDITION • MA* • O1993 ll.l% THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W.. . WASHINGTON,D.C.x0006-5292•WARNING:Unlicensed photocopying violates "'P.`. U.S. copyright laws and will subject the violator to legal prosecution. G709-1993 ATTACHMENT TO PROPOSAL REQUEST NO. 2 (SOUTHWEST WELD CO. SERVICES) 1. Delete vertical skylight lightwell shaft walls at north and south building wings at building Corridor Room Nos. 120, 219 as referenced and detailed on Sheet No. A3 .2 . Refer to Revised Sheet No. A3 . 2 as attached herewith. Submit Credit 4e,ett.A&.-01e-1-112.1a5L , ' II Page of Pages 1 i RUS-DEN CONSTRUCTION, INC. CHANGE ORDER GENERAL CONTRACTORS P.G.Box Z • Berthoud,Colorado 80513 NUMBER: #1 Page 3 of 5 (970)532-2599 R ADDITIONAL WORK ORDER PHONE: DATE: TO: 3/21/01 Bley Associates, Architects-Planners JOB NAME/LOCATION: 2020 Clubhouse Drive Loren Bley Greeley, CO 80634 SW Weld County Service Building CONTRACT/JOB NUMBER: JOB PHONE We hereby agree to the change(s)or additional work specified below: Electrical Deducts Per Owner Proposal Request#3 See Attached 1) Delete Emergency Power Generator in its entirety. (15,650.00) 2) Delete Lighting Conduit/Circutry to Frontage Road Entrance (1,080.00) sign. 3) Delete lighting conduit to ENV Plaza Fixture Type T (6,190.00) 4) Change parking lot pole lamp type P in building parking lot (4,400.00) 5) Upgrade Fire Alarm pane to Fire lite, per Electrical engineer Did Not Include MNOTE:This Change Order becomes part of and in conformance with the existing contract. iwe Area hereby to make the change(s) specified above at this price D -27,320.00 Date of agreement: PREVIOUS CONTRACT AMOUNT Authorized Signature: (CONTRACTOR) REVISED CONTRACT TOTAL Payment will be made as follows: ` 1 Accepted -The above prices and specifications of this Change Authorized Order are satisfactory and are hereby accepted. All work to be signature( _ performed under same terms and conditions as specified in original (OWNER) contract unless otherwise stipulated. Date of acceptance PROPOSAL OWNER REQUEST ARCHITECT [1 CONSULTANT ❑ AIA Document G709 CONTRACTOR RI] FIELD ❑ (Instructions on reverse side) OTHER ❑ PROJECT: Southwest Weld Co. Services PROPOSAL REQUEST NO.: 3 (Nameandaddress)I-25 Frontage and WC RD 24-1/2 DATE OF ISSUANCE: 2-23-01 CONTRACT FOR: OWNER: (Name and address) CONTRACT DATED: 2-15-01 Weld County 915 10th Street ARCHITECT'S PROJECT NO.: 2004 Greeley, c0 80631 TO CONTRACTOR: ARCHITECT: (Name and address) (Name and address) Rus-Den Construction Bley Associates, Architects-Planners, Inc. 307 Welch Ave. 2020' Clubhouse Drive Berthoud, CO 80513 Greeley, CO 80634 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.Submit proposal within days,or notify the Architect in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. Description: (Insert a written description of the Work.) Value Engineering Credit Deducts For Revised electrical system deducts, circuitry and fixture deletions or exterior fixture substitutions as per attached information Attachments: (List attached documents that support description.) Revised electrical One-Line, Main Distribution Power Layout, Sht. No. E8 of 9 REQ . • BY: LW+it , - (,St attire) (Printed na d title) CAUTION: You should sign an original AIA document which has this caution printed in red. I I An original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT G709 • PROPOSAI.REQUEST • 1993 EDITION • AIA' • ©1993 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W., Z. I! WASHINGTON,D.c.20006-5292 •WARNING:Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. G709-1993 ATTACHMENT TO PROPOSAL REQUEST NO. 3 (SOUTHWEST WELD CO. SERVICES) 1. Delete Emergency Power Generator System in its entirety as indicated on Electrical Drawings. Refer to Revised Electrical One-Line Diagram Sheet E8 attached herewith which reflects cost saving changes. Submit Credit. 2 . Delete lighting conduit and circuitry to Frontage Road entrance sign - (4) Fixture Type "h" as referenced on Sheet El of 11. Submit Credit. 3. Delete lighting conduit and circuitry to east/west plaza; (14) Fixture Type "T" as referenced on Sheet E3 of 11. Submit Credit. 4 . Change Parking Lot Pole Lamp Fixture Type "P" in building parking lot. Contractor shall submit cut sheet of more economical pole lamp fixture for AE review/approval. Submit Credit. ;ENT-BY: AALL ELECTRIC; 970 593 0384; MAR-21 -01 9:55AM; PAGE 1 /1 RUS-DEN CONST AT: 5322555 • A ;+ AALL Electric Contractors, Inc. PROPOSAL FOR ELECTRICAL WORK TO: RtJS-DEN CONSTRUCTION PROPOSAL NO.: 24014-IA P.O. Box Z DATE: 3/20/01 Berthoud, CO 80513 ATTN: Russell Parker We hereby propose to furnish all labor and material necessary to provide the Electrical installation at SW. Weld Counts' Services located in Weld County accordance with the following specification. CHANGE ORDER#1A-VALUE ENGINEERING DELETE EMERGENCY GENERATOR SYSTEM IN ITS ENTIRETY. DELETE TRANSFORMER`T3". DELETE PANEL"BP". RELOCATE CIRCUITS FROM"BP"TO PANELS TO BE DETERMINED BY ENGINEER PRICE:DEDUCT$15,650.00 DELETE (4)TYPE"h" FIXTURES INCLUDING CONDUIT AND WIRE FROM NEAREST POLE LIGHT. PRICE: DEDUCT S1,080.00 DELETE(14)TYPE"T" FIXTURES INCLUDING CONDUIT AND WIRE FROM EAST/WEST PLAZA. PRICE: DEDUCT$6,190.00 CHANGE 2x4 PARABOT.IC LIGHT FIXTURES FROM 24-CELL TO 18-CELL. CHANGE PARKING LOT POLE LIGHTING FROM"KVS" STYLE TO"KSF" STYLE. PRICE:DEDUCT$4,400.00 CHANGE FIRE ALARM CONTROL PANEL PROM A FIRE LITE""TO A FIRE LITE" " . PRICE: ADD S The price for the work above will be: See above Payable on the following terms: Addition to contract This proposal is void if not accepted in writing within 30 days after this date. Accepted by: By: AALL ELECTRIC CONTRACTORS. INC. Customer C sits Dale: Joh . orlhcm nivi.ion Manage 2379 West 8th Avenue • Loveland, Colorado 80537 • FAX 970.593-0384 Loveland/Ft. Collins 970-593-9800 • Greeley 970-392-9800 • Longmont 303-774-9800 03/21/01 WED 09:47 [TX/RX NO 5544] ;ENTRY: AALL ELECTRIC; 970 593 0384; µAR-8-01 10:13AM; PAGE 1 /1 "0: RUS-DEN CONST AT: 5322555 „ea AALL Electric Contractors, Inc. PROPOSAL FOR ELECTRICAL WORK TO: RUS-DEN CONSTRUCTION PROPOSAL NO.: 24014-1 P.O. Box Z DATE: 3/8/01 Berthoud. CO 80513 ATTN: Russell Parker We hereby propose to furnish all labor and material accessary lo provide the Electrical installation al 5W, Weld County Services located in Weld County accordance with the following specification. CHANGE ORDER#.1.-VALUE. ENGINEERING DELETE EMERGENCY GENERATOR SYSTEM IN ITS ENTIRETY. PRICE: DEDUCT$14,000.00 DELETE(4)TYPE"h"FIXTURES INCLUDING CONDUIT AND WIRE FROM NEAREST POLE LIGHT. PRICE: DEDUCT s1,OR0-MI DELETE(14)TYPE"T••FIXTURES INCLUDING CONDUIT AND WIRE FROM EAST/WEST PLAZA. PRICE; DEDUCT$6,190.00 CHANGE 2x4 PARABOLIC LIGHT FIXTURES FROM 24-CELL TO 18-CELL. CHANGE PARKING LOT POLE LIGHTING FROM"KVS"STYLE TO"KSF" STYLE. PRICE: DEDUCT 54,400.00 The price for the work above will be: See above Payable on the following teens: Addition to contract This proposal is void if not accepted in writing within 30 days after this date. Accepted by: By: AALL ELECTRIC CONTRACTORS. INC; Date: _..._ 1u reed,Northern I !vision Manager 2379 West 8th Avenue - Loveland, Colorado 80537 • FAX 970-593-0384 Loveland/Ft. Collins 970-593.9800 • Greeley 970.392-9800 • Longmont 303-774-9800 03/08/01 THU 10:07 [TX/RX NO 54861 9 Page of Pages CAA 1 V RUS-DEN CONSTRUCTION, INC. CHANGE ORDER GENERAL CONTRACTORS P.O.Box Z • Berthoud,Colorado 80513 NUMBER: (970)532-2599 p #1 p Page 4 of 5 R ADDITIONAL WORK ORDER PHONE: DATE: TO: 3/21/Q1 JOB NAME/LOCATION: Bley Associates, Architects-Planners 2020 Clubhouse Drive Loren Bley Greeley, CO 80634 . PHONE We hereby agree to the change(s)or additional work specified below: Deduct Engineering for Plumbing/HVAC, per owner proposal request#4 See Attached 1) Provide standard no HUB coupling (2,223.00) 2) Provide PVC Plastic for below slab waste/vent in lieu of cast (5,899.00) iron. 3) Provide sheet metal shield in lieu of Cal Sil inserts (409.00) 4) Provide standard lined duct in lieu of 12 GA Ins. Duct (12,900.00) 5) Provide custom pitched roof curb in lieu of HVAC rooftop skid (2,300.00) 6) Provide single wall spiral duct in lieu of double wall (1,280.00) 7)Combine heat zones N/A 8) Delete stenciling for duct. (1,100.00) 1 NOTE:This Change Order becomes part of and in conformance with the existing contract. iwe AEIl°( e hereby to make the change(s) specified above at this price D -26,111.00 Date of agreement: PREVIOUS CONTRACT AMOUNT Authorized Signature: (CONTRACTOR) REVISED CONTRACT TOTAL Payment will be made as follows: r Accepted -The above prices and specifications of this Change Authorized Order are satisfactory and are hereby accepted. All work to be signature performed under same terms and conditions as specified in original (OWNER) contract unless otherwise stipulated. Date of acceptance PROPOSAL OWNER REQUEST ARCHITECT CONSULTANT ❑ AIA Document G709 CONTRACTOR FIELD ❑ (Instructions on reverse side) OTHER ❑ PROJECT: Southwest Weld Co. Services PROPOSAL REQUEST NO.: 4 (Name and address) I-25 Frontage and WC RD 24-1/2 DATE OF ISSUANCE: 2-23-01 CONTRACT FOR: OWNER: Weld County (Name and address) 915 10th Street CONTRACT DATED: 2-15-01 Greeley, CO 80631 ARCHITECT'S PROJECT NO.: 2004 TO CONTRACTOR: ARCHITECT: (Name and address) (Name and address) Rus-Den Construction Bley Associates, Architects-Planners, Inc. 307 Welch Avenue 2020 Clubhouse Drive Berthoud, CO 80513 Greeley, CO 80634 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.Submit proposal within days,or notify the Architect in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. Description: (Insert a written description of the Work) Value Engineering Credit Deducts for HVAC, Plumbing workscope as per attached information. Attachments: (List attached documents that support description.) REQU STED BY: „ (Sl vat re) (Printed name and title) AIACAUTI0 : You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. • AIA DOCUMENT G709 • PROPOSAL.REQUFST • 1993 EDITION • AIA' • ©1993 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., Sn_ 1 WASHINGTON,D.C.2(X1065292• WARNING:Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. G709-1993 ATTACHMENT TO PROPOSAL NO. 4 (SOUTHWEST WELD CO. SERVICES) 1. Provide standard no hub coupling in lieu of heavy duty no hub couplings Submit Credit. 2 . Provide PVC plastic for below slab waste and vent piping in lieu of service weight cast iron. Submit Credit. 3 . Provide sheet metal shields for insulated domestic water piping and heat piping in lieu of cal sil inserts. Submit Credit. 4 . Provide standard lined duct in lieu of 12 gauge-insulated duct for the first 15 feet of supply and return duct. Submit Credit. 5. Provide custom pitched roof curb in lieu of HVAC rooftop skid (Refer to Detail 9/A1.2) Submit Credit. 6. Provide single wall spiral duct in lieu of double wall spiral duct. Submit Credit. 7. Combine heating zones which would eliminate quantity of zone dampers. Submit Credit. 8. Delete stenciling requirements for duct. Submit Credit. Please provide detail pricing and submit cut sheets as required to illustrate change in equipment. 03/06/01 14:31 FAX 970 484 4448 ALLEN PLUMBING Z002 aasitto 101 S. Link Lane • P.O. Box 567 • Fort Collins, CO 80522 Phone: (970)484-4841 • Fax: (970)484-4448 E-Mail: allenph@allenph.com PLUMBING & HEATING INCORpoR4tED VALUE ENGINEERING SUGGESTIONS DATE: 3/6/01 TO: Rus-Den Construction, Inc. 307 Welch Ave. P.O. Box Z Berthoud, Co. 80513 (970)532-2599 (970)532-2555 ATTENTION: Russ Parker REFERENCE: Southwest Weld County Services Building 1. Provide standard no hub coupling in lieu of heavy duty no hub couplings. (Deduct$2,223.00) 2. Provide PVC plastic for below slab waste and vent piping in lieu of service weight cast iron.(Deduct $5,899.00) 3. Provide sheet metal shields for insulated domestic water piping and heat piping in lieu of cal sil inserts.(Deduct$409.00) 4. Provide standard lined duct in lieu of 12 gauge-insulated duct for the first 15'of supply and return duct.(Deduct$12,900.00) 5. Provide custom pitched roof curb in lieu or HVAC rooftop skid (detail 9/A1.2)(Deduct$2,300.00) 6. Delete stenciling requirements for duct.(Deduct$1,100.00) 7. Delete specified return air sensors on each of the (8)air handing units.(Deduct$2,976.00) AO#8. Delete Graphic liustrator software package owner'fumished work station.(Deduct $1,915.00) YVS , 9. Deduct(1.807.00)to provide self-contained thermostatic control valves on baseboard radiation in lieu of the Specific automatic control valves.(Installation of control valves by others.) Sincerel Project Manager Allen Plumbing & Heating, Inc. Q"C.neiemiallpmpo .J\Sou.hweec Weld County SnlWs,ealue engi„ee dd kner.don 03/06/01 TUE 14: 27 [TX/RX NO 5469] 02/16/01 10:20 FAX 970 304 6498 WELD PLANNING U002 MEMORANDUM WI`P , To: Russell Parker February 16, 2001 COLORADO From: Jeff Reif, Building Official Subject: PVC plumbing drains Russ, PVC pipe is acceptable for all waste and vent piping including below the slab. PVC plastic must conform to one of the standards in Table 702.2 of the 1997 International Plumbing Code, which is the adopted code in Weld County. The following standards are recognized for DWV piping: ASTM D 2665; ASTM D 2949; ASTM F 891; CSA CAN/CSA-B181.2. For your information, the following codes have been adopted in Weld County: 1997 Uniform Building Code; 1998 International Mechanical Code; 1997 International Plumbing Code; 1999 National Electric Code; Weld County Building Code (WCBC). I can furnish you with a copy of the WCBC, if you would like, which outlines all of the amendments to the codes. Please call me at (970) 353-6100 ext 3543 if you have any questions. 02/16/01 FRI 09: 16 [TX/RX NO 5377] Page of Pages CAA i V RUS-DEN CONSTRUCTION, INC. CHANGE ORDER GENERAL CONTRACTORS • P.O. Box Z • Berthoud,Colorado 80513 NUMBER: #1 Page 5 of 5 (970)532-2599 O p ADDE p g p TIIONA L WORK ORDER PHONE: DATE: TO: 3/21/01 Bley Associates, Architects-Planners JOB NAME/LOCATION: 2020 Clubhouse Drive Loren Bley Greeley, CO 80634 SW Weld County Service Building CONTRACT/JOB NUMBER: JOB PHONE We hereby agree to the change(s)or additional work specified below: Alternate Deducts for Value Engineering 1) Direct Pay to Structural Steel/Masonry from Weld County (11,800.00) 2) Delete 1/2 of Clerestory Windows (17,600.00) TOTAL PAGE: 1 (65,437.00) 2 (3,818.00) 3 (27,320.00) 4 (26,111.00) 5 (29,400.00) NOTE:This Change Order becomes part of and in conformance with the existing contract. -Apv® AEn® hereby to make the change(s) specified above at this price D -152,086.00 Date of agreement: PREVIOUS CONTRACT AMOUNT 3,843,688.00 Authorized Signature: 3,691,602.00 (CONTRACTOR) REVISED CONTRACT TOTAL Payment will be made as follows: 1 I Accepted -The above prices and specifications of this Change Authorized Order are satisfactory and are hereby accepted. All work to be signature performed under same terms and conditions as specified in original (OWNER) contract unless otherwise stipulated. Date of acceptance
Hello