Loading...
HomeMy WebLinkAbout20010003.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Hoshiko Farms Case Number Z-552 Submitted or Prepared Prior to At Hearing Hearing 1 Planning Commission Resolution 2 Staff Comments X 3 Department of Planning Services field check form X 4 Field check by Planning Commissioner None 5 Letter to Applicant X 6 Legal Notifications (2 pages) X 7 Application X 8 Preliminary Drainage Report- None 9 Referral list X 10 WC Public Works X 11 Colorado Department of Transportation X 12 WC Health and Environment x 13 DPS Zoning Compliance X 14 Eaton Fire District X 15 Town of Eaton X 16 West Greeley Soils Conservation District x 17 City of Greeley x 18 Deed (5 pages) X 19 Surrounding Property Owners ( 13 pages) X 20 Soil Survey(4 pages) X I hereby certify that the 20 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commission hearing. I further certify that these items were forwarded to the Clerk to the Board's office. Monica Daniels-Mika , Director STATE OF COLORADO ) 2001-0003 LAND USE APPLICATION WIiDc. SUMMARY SHEET COLORADO CASE NUMBER: Z-552 HEARING DATE: December 5, 2000 APPLICANT: Hoshiko Farms, Inc. ADDRESS: 28607 WCR 50 Kersey, CO 80644 REQUEST: Change of Zone from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District. LEGAL DESCRIPTION: Part of the SE4,of the NW4,of Section 29,Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado. LOCATION: South of and adjacent to WCR 66; east of and adjacent to State Hwy 85 ACRES: 109.91 +/-Acres PARCEL#0803 29 000079;80 and 91 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received responses from the following agencies: • Weld County Department of Public Works 9/29/00 • Colorado Department of Transportation 9/27/00 • Weld County Department of Health and Environment • Weld County Zoning Compliance 9/29/00 • Eaton Fire Protection District 9/28/00 • Town of Eaton 9/25/00 • West Greeley Soil Conservation District 9/28/00 • City of Greeley 11/14/00 The Department of Planning Services'staff has not received responses from the following agencies • Union Pacific Railroad EXHIBIT 1 64ji CHANGE OF ZONE "DC. ADMINISTRATIVE RECOMMENDATION COLORADO CASE NUMBER: Z-552 PLANNER: Monica Daniels-Mika APPLICANT: Hoshiko Farms, Inc. ADDRESS: 28607 WCR 50 Kersey, CO 80644 REQUEST: Change of Zone from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District. LEGAL DESCRIPTION: Part of the SE4, of the NW4, of Section 29, Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado. LOCATION: South of and adjacent to WCR 66; east of and adjacent to State Hwy 85 ACRES: 109.91+/- PARCEL # 0803 29 000079; 80 and 91 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 21.4 of the Weld County Zoning Ordinance, as amended. 2. The submitted materials are in compliance with Section 21.5 of the Weld County Zoning Ordinance, as amended as follows: A. Section 21.5.1.1 - That the proposal is consistent with the Weld County Comprehensive Plan. The site will encourage the expansion of the industrial economic base and provide for a variety of employment opportunities for Weld County citizens. 1. Goal 4 states "Promote industrial development that is appropriately located in relation to surround land uses, and that meets the necessary environmental standards." Surrounding land uses are primarily industrial with Big R Industries, Winograd Steel and Platte River Steel adjacent to the site. 1. Goal 2 states"Accommodate new industrial development within planned industrial areas. UGB. Goal 2 states " Concentrate urban development in or adjacent to existing municipalities... and maintain urban growth boundary area that provide an official designation between future urban and non-urban uses. The City of Greeley reviewed this proposal and states " the site is located in the City of Greeley's Long 2 Range Expected Growth Area and that an 1-3 zone is consistent with the City of Greeley Comprehensive Plan." The City of Greeley however expressed a concern for outdoor storage on a portion of this site, and further recommended a I-1 zone district on the western portion of this site. The Department of Planning Services staff considered this request, however, staff finds no support to concur with this recommendation. Furthermore, the Department of Planning Services staff finds the proposal, with the attached Conditions of Approval, satisfies UGB Goal 3 as stated,"The County and the municipal should coordinate land use planning in urban growth boundary areas, including development policies and standards, zoning, street and highway construction...and other matters affecting orderly development." The Department of Planning Services staff further concurs that UGB Policy 3.1,through 3.5 have been met with this proposal. B. Section 21.5.1.2 - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. Surrounding land uses include Commercial and Industrial uses. The road way to the north of the property is WCR 66 and to the west State Hwy 85. The site is located within a three (3) mile radius of the City of Greeley and Town of Eaton. The City of Greeley reviewed this request and requested a decrease in the intensity of the Industrial Zone District. The Town of Eaton also reviewed this request and found no conflicts. A Site Plan Review will be required prior to any Industrial use occurring on the property. The intent of the Site Plan Review is to"provide present and future residents and users of land in the County a means whereby orderly and harmonious development is ensured in the County. Site Plan Review process requires additional consideration to ensure that the uses permitted are established and operated in a manner that is compatible with existing and planned land uses in the neighborhood. Site Plan Reviews are designed to protect and promote the health,safety,convenience,and general welfare of the present and future residents of the county." Items addressed through the Site Plan Review include, but are not limited to, number of employees, building construction, signage, landscape treatment, drainage, parking, outside storage, loading service areas and environmental criteria. The Site Plan Review will ensure compatibility with surrounding land uses. C. Section 21.5.1.3 -Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. The applicant is proposing water be supplied by North Weld County Water District.The Weld County Department of Public Health and Environment had no conflicts with the use of an Individual Sewage Disposal System (I.S.D.S.) for the site. Referral agencies will have the opportunity to further address water and sewer during the Site Plan Review application process. D. Section 21.5.1.4 - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. The Weld County Public Works Department reviewed this request and indicated several conditions to be implemented regarding paving of the access roads, a drainage study and traffic study. These items will be required at the time of application for the Site Plan Review. Weld County Road 66 is designated as a collector road on the Weld County Comprehensive Transportation Plan. Collector roads require 3 eighty (80) feet of right-of-way. The Change of Zone plat map will be required to show the designated right-of-way reservation E. Section 21.5.1.5 - In those instances where the following characteristics are applicable to the rezoning request,the applicant has demonstrated compliance with the applicable standards: 1) Section 21.5.1.5.1 - The proposed Change of Zone does not lie within any overlay district identified by the maps officially adopted by Weld County. 2) Section 21.5.1.5.2-The proposed rezoning does not contain the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extraction to any greater extent than under the present zoning of the property. 3) Section 21.5.1.3 - Soil conditions on the site are not such that they present moderate or severe limitations to the construction of structures of facilities proposed for the site. The soil on the site is defined as Olney Fine Sandy Loam. As such the soil has good potential for urban and recreational uses. A soils report and two sets of building and engineered foundation plans(with registered Colorado engineer stamp) is required for all building permits. These issues are addressed through Conditions of Approval and will also be a part of the Site Plan Review process. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Change of Zone from A (Agricultural) to 1-3 (Industrial) is conditional upon the following: 1. The change of zone plat map shall be submitted to the Department of Planning Services for recording within 30 days of approval by the Board of County Commissioners. 2. Prior to recording the Change of Zone plat: A. The following notes and information shall be delineated on the Change of Zone plat: 1) The Change of Zone allows for Industrial uses which shall comply with the 1-3 Zone District requirements as set forth in Section 34 of the Weld County Zoning Ordinance. 2) Any signage located on the property shall require building permits and adhere to Section 42.2 of the Weld County Zoning Ordinance. (Dept. of Planning Services) 3) The site shall maintain compliance at all times with the requirements of the Weld County Departments of Public Works, Public Health and Environment, and Planning Services. 4 4) Any future structures or uses on site must obtain the appropriate zoning and building permits. 5) If applicable, installation of utilities shall comply with Section 12 of the Weld County Subdivision Ordinance. 6) The applicant shall adhere to all Site Plan Review requirements, as defined in Section 23 of the Weld County Zoning Ordinance. 7) Weld County Road 66 is designated on the Transportation Plan Map as a collector road, which requires 80 feet of right-of-way at full build out. There is presently 80 feet of right-of-way. A total of 40 feet from the centerline of Weld County Road 66 shall be delineated on the plat. 8) At the time of the Site Plan Review, a drainage report signed by a professional engineer, licensed in the state of Colorado, shall be submitted to the Weld County Department of Public Works. 9) At the time of the Site Plan Review, final roadway plans shall be submitted and approved by the Weld County Department of Public Works. 3. At the time of the Site Plan Review, the applicant shall work with Colorado Department of Transportation to determine if an off-site road improvements are required. m;wpfiles\wendi\monica\z522comments wpd • ' DEPARTMENT OF PLANNING SERVICES PHONE (970) 353-6100, EXT.3540 FAX (970) 304-6498 1555 N. 17TH AVENUE • GREELEY, COLORADO 80631 COLORADO September 20, 2000 Hoshiko Farms Inc. 28607 WCR 50 Kersey, CO 80644 Subject: describedZ-552- Request for a Change of Zone r (Agricultural) (Industrial) parcel as SE4 of the NW4 of Section 6 29, N, R65W of the 6th P.M,Weld County, Colorado. Dear Mr. Hoshiko: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for December 5, 2000, at 1:30 p.m. This meeting will take place in Room 210, Weld County Planning Department, 1555 N. 17th Avenue, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Greeley and Eaton Planning Commission's for their review and comments. Please call City of Greeley at 970-350-9780 and Town of Eaton at 970-454-3338,for further details regarding the date,time,and place of these meetings. It is recommended that you and/or a representative be in attendance at the Greeley and Eaton Planning Commission meetings to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway(access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, - Monida Daniels-Mika, AICP Director pc: Tom Collins, 109 Elm Ave., Eaton, CO 80615 EXHIBIT J 5 PLANNING STAFF FIELD CHECK CHANGE OF ZONE 552 PROPERTY LOCATION: Part of the SE4 of the NW4, of Section 29, Township 6 North, Range 56 West fo the 6th P.M. Weld County, Colorado LAND USE: N: Ag/machines... Farm House/production S:Big R manufacturing E: Farm production/ large scale operation W: Railroad tracts and State Highway 85 SUMMARY The site is lined with large telephone poles. The site is flat and has previously been in agricultural production. Access is off of WCR 66, a paved County roadway. This property adjoins the railroad activities to the west. Other than a pump house there are no other improvements on the site. While there are approximately five farm houses within a mile area of the site it appears that these are not being used for solely residential uses. Monica Daniels-Mika, AICP CASE NO.>- E: ACM. men / ires imasio ;Jr as�aK sum .Z I� IOC EXHIBIT 13 Hello