HomeMy WebLinkAbout840630.tiff RESOLUTION RE: APPROVAL OF PROJECT COMPLETION REPORT FOR WATTENBERG COM- MUNITY DEVELOPMENT BLOCK GRANT AND AUTHORIZATION FOR CHAIR- MAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Larimer-Weld Regional Council of Governments has administered a Community Development Block Grant for Weld County on behalf of the community of Wattenberg, and WHEREAS, said project was for improvements to the domestic water system for the community of Wattenberg, and WHEREAS, said project has been completed and Weld County must certify to said completion by executing the Project Comple- tion Report, a copy of which is attached hereto and incorporated herein by reference, and WHEREAS , after study, the Board deems it advisable to approve said Project Completion Report, to be submitted to the Colorado Department of Local Affairs. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado, that the Project Completion Report for the Wattenberg Community Development Block Grant be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign same . The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 1st day of October, JJA.D. , 1984 . . . (L4Q4 / BOARD OF COUNTY COMMISSIONERS ATTESTr,�:' " 1Q1''/�/ LD COUNTY, COLORADO Weld Count Clerk and Recorder and Clerk to the BoarddNorman Carlso , Chairman B pD4pttSk ue ' ne Jo n on, Pro-Tem APPROVED S TO FORM: 07 Ge an County Attorney C c Car .son J n T. Martin 540630 ,C N e 33-f CC; cob jah _c� . r. Gr doc LARIMER - WELD REGIONAL COUNCIL OF GOVERNMENTS PHONE(303)532-4480 SUITE 201 201 EAST 4TH STREET LOVELAND.COLORADO 80537 PROJECT COMPLETION REPORT for the Wattenberg Community Development Block Grant Weld County P.O. Box 758 Contract Number C-853328 Greeley, CO 80632 • I. Final Progress Report The unincorporated area of Wattenberg was the beneficiary of a CDBG grant for improving the town's public water system. The grant from the Department of Local Affairs (DOLA) was made to Weld County with the Larimer-Weld Regional Council of Governments providing grant administration. The DOLA contract with Weld County was amended twice with the final award being $154,200. The following provides the requested information for the two line items: administration and construction. A. Administration - $22,732.40 (as amended) 1. National Objectives Served ' Grant administration has included project management as well as final design engineering. While neither of these activities directly serve the CDBG objectives, both indirectly meet the objectives by insuring that the water system improvements constructed are well designed and that the construction process has met all state and federal requirements. The construction of the water system improvements meets the objective of upgrading community facilities to aid in the prevention of health and safety hazards. 2. Actions Accomplished The administration of the grant accomplished the following activities: - had adjudicated the town' s water rights for the Wattenberg Improvement Association; - completed a flood plain review and environmental assessment leading to a "finding of no significant impact"; Wattenberg CDBG Completion Report Page 2 - selected, by a competitive process, a State licensed engineer, and contracted for the final design engineering and resident inspection of the project during construction; - completed necessary activities for the civil rights, labor standards, and Davis-Bacon prevailing wage rates regulations; - selected, by a competitive process, a contractor and contracted for the construction and installation of the water system improvements; and 4W;': - completed all accounting, audit and other documentary activities necessary for managing the grant. 3. Actions Remaining and Anticipated Completion Date The only administrative activities which remain and the estimated completion dates are: - completion and submittal of the final quarterly report and pay request - 10/5/84; - provision of the as-built drawings and maintenance and operation manual to the Wattenberg Improvement Association - 10/5/84; - provision of the engineer's certification of the water system improvements to the Colorado Water Quality Control Division - 10/5/84; and - completion of the LWRCOG project and agency audit for 1984 (January-December) - 4/15/85. • 4. Total Actual Expenditures, It is estimated that when all bills are received, total actual expenditures for the administration line item will be $22,733. 5. Summary of Benefits for Low/Moderate Income Households and Minorities Project benefits from administration are identical to those accrued from project construction and are fully described in Section B-5 which follows. Wattenberg CDBG Completion Report - Page 3 B. Construction - $131 ,467.60 (as amended) 1 . National Objectives Served The project served the national objective of upgrading community facilities to aid in the prevention of health or safety problems. The project installed a standby electric generator, new booster pumps on the well , a flashing light alarm system, electrical surge protection and low water sensors for the purpose of eliminating health hazards associated with an emergency shut-down of the water system. The above items will help protect the water supply in times of electric power failures and will provide advance warning should the well or booster pumps fail . New 6" water mains, booster pumps, and fire hydrants were installed to provide increased water pressure and meet fire insurance standards. 2. Actions Accomplished The contractors constructed and installed the following water system components; - 4098' of 6" PVC pipe, 149' of 4" PVC pipe, and 189' of 2" PVC pipe; - seven 6" gate valves, six 4" gate valves, and five 2" gate valves, all with boxes; - four fire hydrants with valves; - 36 service connections; - 542' of 3/4" service tubing; - connection of nine, 4" mains, and seven 2" mains; - one 6" x 4" and six 6" x 2" tee fittings; - one 6" x 4" and two 4" x 2" reducers; - four 6" plugs; - nine 4" and seven 2" Smith Blair couplings; - 100 residential service meter pit assemblies; - 83 installed meter pits; - 1 gas-fired standby electric generator; Wattenberg CDBG Completion Report Page 4 - 1 low water alarm and control system; - 1 master meter; - additional tee and bend fittings; and - two 10 Hp booster pumps and electrical equipment. 3. Actions Remaining and Completion Date All construction work has been completed and accepted by the Wattenberg Improvement Association as of 9/28/84. 4. Total Actual Expenditures Total expenditures actually spent on construction will be $131 ,467.60. ($1 ,467.60 was moved from administration to construction with the approval of DOLA staffer Don Sandoval . ) 5. Summary of Benefits for Low/Moderate Income Households and Minorities A total of 100% of the grant funds or $154,200 benefited the low and moderate income and minority residents because without the expenditure of the grant no one would have benefited at all . The project benefited approximately 338 people or 100% of the residents in Wattenberg of whom 256 are estimated to be of low or moderate income. The project also benefited the estimated 330 Wattenberg residents of Hispanic origin. II. Citizen Comments There were no written citizen comments received by Weld County or the LWRCOG from the date of the grant award to the present. Oral comments were received at public hearings held in Wattenberg. III. Certifications As chief elected official of the grantee jurisdiction, I certify that: a. the information contained in this report is accurate to the best of my knowledge, Wattenberg CDBG Completion Report Page 5 b. all records related to grant activities are available on request, and c. CDBG funds were not used to reduce the level of local financial support for housing and community development activities. Signature of Chief Elected Official Date Norman Carlson, Chairman, Board of Weld County Commissioners Name and Title of Chief Elected Official ATTEST: Q E4 ,Lt # WELD CODC E K TO THE BOARD NT. CLERK AND RECORDER Dep y County Clerk STATE OF COLORADO Department of Local Affairs v. • � DIVISION OF LOCAL GOVERNMENT \ Pat Ratliff,Director ■t69 4 ' .rs'"""—nr1 Richard D. Lamm September 21 , 1984 Governor f;fir.—r,, SEP 2 *719m 1" The Honorable J. Chuck Carlson l' Chairman GREELEY. CO-cf. Weld County Commissioners 915 10th St. Greeley, CO 80631 Dear Commissioner Carlson: I am writing in response to a letter requesting a budgetary modification of the Wattenberg Community Development Block Grant contract from Sally Janett, Program Administrator, Larimer-Weld Regional Council of Governments. The request is to transfer funds from the administrative line item to the construction line item as follows: Existing Budget This Request Expenditure Expenditure Construction $130,200.00 Construction $131 ,467.60 Administration 24,000.00 Administration 22,732.40 Total $164,200.00 $154,200.00 The amount of the transfer is less than 10% and therefore this letter will serve as the approval of such transfer. If you have any questions concerning this or any other matter of the Wattenberg project please feel free to contact me at 532-4501 . Sincerely, Donald E. Sandoval Field Representative cc: CDBG Accting Ross Fraser Sally A. Janett 1313 Sherman Street, Room 520, Denver, Colorado 80203 (303)866-2156 ® LARIMER - WELD REGIONAL COUNCIL OF GOVERNMENTS PHONE(303)532-4480 SUITE 201 201 EAST 4TH STREET LOVELAND.COLORADO 80537 TO: Weld County Commissioner FROM: Sally A. Janett, Project Administrator A SUBJECT: Wattenberg Community Development Block Gra t DATE: September 27, 1984 Over the last year and a half, the Larimer-Weld Regional Council of Governments has administered a CDBG grant for Weld County on behalf of the community of Wattenberg. The project was for improvements to the Town's domestic water system. As of September 21st, the project has been completed and to close-out the grant, it is necessary for Weld County to certify that all work is done. Attached is a project completion report with the necessary certification at the end. Upon signature by the County, the report will be submitted to the Colorado Department of Local Affairs. Once the State approves the Completion Report, they will release the $7,700 of grant money they have retained and the COG will complete reimbursements to the Project engineer and contractors. Hello