Loading...
HomeMy WebLinkAbout20011293.tiff Weld County Referral February 26, 2001 "lige COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Sparboe Horizon Corporation Case Number USR-1322 Please Reply By March 27, 2001 Planner Lauren Light t Project Site Specific Development Permit and Special Review Permit for a Pullet y Replacement Farm. Legal SW4 of Section 29, Township 2 North, Range 65 West of the 6th P.M., Weld County, Colorado. Location East of and adjacent to WCR 39; approximately 1/2 mile west of WCR 41. Parcel Number 1307 29 000035 and 1307 29 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 17, 2001 ❑ 1Ne have reviewed the request and find that it does/does not comply with our Comprehensive Plan 0/We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Signature Of/. 4„� Dam~ M t L trio t Agency Q 7v. l VA0 %Las tartly. • :•Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO. 80631 4(970)353-6100 ext.3540 4(970)304-6498 fax EXHIBIT 2001-1293 1 �j RECEIVED FEB 2 8 2001 WELL)COUNTY PUBLIC WORKS DEPT Weld County Referral February 26, 2001 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Sparboe Horizon Corporation Case Number USR-1322 Please Reply By March 27, 2001 Planner Lauren Light Project Site Specific Development Permit and Special Review Permit for a Pullet Replacement Farm. Legal SW4 of Section 29, Township 2 North, Range 65 West of the 6th P.M., Weld County, Colorado. Location East of and adjacent to WCR 39; approximately Yz mile west of WCR 41. on a r r G co Parcel Number 1307 29 000035 and 1307 29 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 17, 2001 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: • Signature ffrj Date O3 - rgr _ ,9€20 Agency (third≥ i 4-Weld County Planning Dept. +1555 N. 17th Ave. Greeley, CO. 80631 •-(970)353-6100 ext.3540 +(970)304-6498 fax EXHIBIT s &if/ ‘r MEMORANDUM _ #10 TO: Lauren Light, Planner DATE: March 21, 2001 lungweld County Planning Dept- ?FROM: Donald Carroll, Engineering Administrator ≥,r ? 2001 COLORADO SUBJECT: USR-1322, Sparboe Horizon Corporation RECEIVE- I) The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Use by Special Review Requirement. Our comments and requirements are as follows: COMMENTS: WCR 16 is designated on the Transportation Plan Map as a local gravel road, which requires a 60 -foot right-of-way at full build out. There is presently a 60-foot right-of-way. This road is maintained by Weld County for approximately Yz mile,from that point west to the section line access only. Pursuant to the definition of SETBACK in the Weld County Zoning Ordinance (Ordinance 89, as amended), the required setback is measured from the future right-of-way line. WCR 16 is not a"through"road at this location; therefore, we have no traffic counts available. There is an existing access to the facility. REOUIREMENTS: Access Lane: The access lane shall be a minimum of 20 feet in width to accommodate emergency vehicles and any additional two-way traffic that may utilize the facility. The road shall be graded and drained to provide an all-weather access to the facility. Off Street Parking: The off street parking spaces,including the access drive,shall be surfaced with gravel, asphalt, concrete, or equivalent, and it shall be graded to prevent drainage problems. Storm Water Drainage: The storm water drainage item will be referred to the Health and Environment Department as it deals with a confined animal feeding operation controlled regulations. pc: USR-1322 m:\wpfi les\don-c\plan 8u sr.wpd lh 11; 1 2110: ,i IipFebruary 26, 2001 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Sparboe Horizon Corporation Case Number USR-1322 Planner Lauren Light Please Reply By March 27, 2001 Project Site Specific Development Permit and Special Review Permit for a Pullet Replacement Farm. Legal SW4 of Section 29, Township 2 North, Range 65 West of the 6th P.M., Weld County, Colorado. Location East of and adjacent to WCR 39; approximately 1/2 mile west of WCR 41. Parcel Number 1307 29 000035 and 1307 29 000036 4 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date epartmen of Planning Services. If yu ther questions ego diong the application, please call tbe a positive response to theh t e Planner with the request. have any furrequest. Weld County Planning Commission Hearing (if applicable) April 17, 2001 Cl We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Date Signature Agency •}Weld County Planning Dept. +1555 N. 17th Ave. Greeley, CO. 80631 +(970)353-6100 ext.3540 +(970)304-6498 fax EXHIBIT STATE OF COLORADO — OFFICE OF THE STATE ENGINEER oeco� Division of Water Resources a�', Department of Natural Resources Vie, $ + * 1313 Sherman Street,Room 818 • a:,. .. r Denver,Colorado 80203 "1876 Phone:(303)866-3581 FAX:(303)866-3589 Bill Owens March 5, 2001 Governor http://water.state.co.us/default.htm Greg E.Watcher Lauren Light Weld County Planning Dept Executive Director Weld County Planning Department p Hal D.Simpson,P.E. p State Engineer 1555 North 17th Avenue Mn? 07 2001 Greeley, CO 80631 Re: Sparboe Horizon Company, USR-1322 RECEIVED Dear MS. Light: As you know, pursuant to the State Engineer's August 7, 1995 memorandum to county planning directors, this office is no longer providing comments on land use actions that do not involve a subdivision as defined in Section 30-28-101(10)(a), C.R.S. This referral does not appear to qualify as a "subdivision". However, we are willing to comply with your request to review this referral due to the size of the operation. Your memorandum and the enclosed materials refer to use of the Laramie-Fox Hills aquifer to supply the water for this operation. You also have referred to an alluvial well on the property. There is a significant amount of information included in this referral, however, the applicant did not provide the "Water Supply Information Summary" form which was provided to the county along with the State Engineer's August 7, 1995 letter. At a minimum, the information requested by this form is necessary for our office to assess the water supply plan for this operation. If the applicant plans to use water from the alluvial well, additional information regarding its use and augmentation will be required by our office. At this time well permit no. 54648-F, issued to Sparboe Horizon Corporation in S35, T2N, R65W, is a valid permit with the State Engineer's Office. It allows an average annual withdrawal of 72.5 acre-feet from the Laramie-Fox Hills aquifer. It does not guaranty the physical availability of that water. If you submit more detailed information regarding the water needs of this operation and the applicant's plan for supplying those needs, our office will be happy to perform further review. If you have any questions in this matter please call Kevin Rein in this office. ly Puru hoot m Dass • Supervising Professional Engineer PD/KGR .•7 ,p2.' C ' /f)cA 0 a ito f\C Avinit' Weld County Referral / 119 February 26, 2001 111 C COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Sparboe Horizon Corporation Case Number USR-1322 Please Reply By March 27, 2001 Planner Lauren Light Project Site Specific Development Permit and Special Review Permit for a Pullet Replacement Farm. Legal SW4 of Section 29, Township 2 North, Range 65 West of the 6th P.M., Weld I County, Colorado. t Location East of and adjacent to WCR 39; approximately 1/2 mile west of WCR 41. i Parcel Number 1307 29 000035 and 1307 29 000036 _ , , The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 17, 2001 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan I] We have reviewed the request and find no conflicts with our interests. XSee attached letter. Comments: Signature Date 3 -Q s - 0 ( Agency P ail-Q. O(1U+ t4 Sr. 0 •:•Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO. 80631 3(970)353-6100 ext.3540 4(970)304-6498 fax EXHIBIT I 11 Platte Valley Soil Conservation District 57 West Bromley Lane - Brighton,CO 80601 - Phone(303)659-7004 March 14, 2000 CASE NUMBER: USR-1322 PROJECT: Site Specific Development Plan and Special Review Permit for Sparboe Horizon Corporation PLANNER: Lauren Light NRCS REPESENTATIVE: Andrea Leonard, Soil Conservationist In consultation with the Natural Resources Conservation Service (NRCS), we have reviewed the above referenced case and have the following comments: SOILS/LIMITATIONS: Small commercial buildings constructed on Vona loamy sand 3%to 5% slopes will encounter moderate limitations because of steep slopes. PRIME FARMLANDS: There is no prime farmland where the shed extension will be constructed. SOIL EROSION POTENTIAL: All of the soils covered by this application are extremely erosive and should be protected. Construction should be planned so as to disturb as little soil as possible and measures should be taken to prevent soil movement offsite. Any areas that are disturbed should be stabilized with perennial vegetation, gravel, or pavement once construction is complete. OTHER: The applicant should contact Ron Broda, Vegetation Weed Management Specialist with the Weld County Public Works Department at (970) 356-4000 X 3770 to develop a weed management plan. In addition, the applicant may want to consider participating in the Conservation Reserve Program to install windbreak buffers around the poultry sheds. Participants can receive cost share to install windbreaks on eligible farmland. Contact the NRCS at (303) 659-4177 for more information. The District welcomes the opportunity to review and comment on proposals such as this. Conservation and wise use of out natural resources are foremost in our goals and objectives. We look forward to working with you in the future. If you or the applicant should have any questions, please feel free to contact the NRCS representative at 303-659- 4177. Sincerely,OLSVICASDs strict Board o Supert+I§ors CONSERVATION-DEVELOPMENT-SELF-GOVERNMENT ° Memorandum TO: Lauren Light, Department i g WilDe DATE: April 2, 2001 COLORADO FROM: Trevor Jiricek, partment of Health and Environment SUBJECT: USR-1322, Sparboe Horizon Corp. The Weld County Department of Public Health and Environment has reviewed this application. We recommend for approval of the pullet farm with numerous recommended conditions and standards. We have attempted to simplify our referral by separating the proposed conditions into conditions of approval and development standards. The following are recommended to be conditions of approval: 1. Prior to recording the plat: A) All septic systems located on the property shall have appropriate permits from the Weld County Department of Public Health & Environment. The Environmental Health Division of the Weld County Department of Public Health & Environment was unable to locate a septic permit for the septic system currently serving the existing structure that will be converted into a biosecurity/garage/restroom, located south of the poultry houses. Any existing septic system(s) which is not currently permitted through the Weld County Department of Public Health & Environment will require an I.S.D.S. Evaluation prior to the issuance of the required septic permit(s). In the event the system(s) is found to be inadequate, the system(s) must be brought into compliance with current I.S.D.S. regulations. B) Apply for an Underground Injection Control (UIC) Class V Injection Well permit through the Environmental Protection Agency (EPA), for the floor drain system that serves the maintenance shop, or provide evidence that the applicant is not subject to the EPA Class V requirements. C) The facility shall demonstrate compliance with the Confined Animal Feeding Operations Control (CAFO) Regulations and the additional requirements outlined below. This shall be demonstrated by submitting a comprehensive manure and waste water management plan for the proposed operation to the Weld County Department of Public Health and Environment for review and approval. This plan shall include, but EXHIBIT a Sparboe Horizon Corporation Page 2 limited to the following: (1) If applicable, demonstration that all manure stockpile areas and waste water collection, conveyance, and retention facilities are adequately sized and constructed to handle and retain the storm water run-off generated from a twenty-five year, twenty-four hour storm event. This shall be conducted by a Registered Professional Engineer . (2) If applicable, demonstration that any existing or proposed waste water retention structure has been or will be constructed in accordance with the criteria described in the CAFO Regulations. The demonstration shall be conducted by a Registered Professional engineer. (3) A site map demonstrating the layout of the site. This should include the locations of all barns, structures, feed storage areas, any water courses through the property, manure storage areas, lagoons, etc. (4) Demonstration that the facility has the ability to manage, dispose, and/or land apply manure and waste water at agronomic rates in accordance with the CAFO regulations. (5) The method that wastewater, produced from washing the interior of the barns, will be collected, treated, and/or disposed. Including a description of all containment features and any specific practices that will be incorporated to prevent a discharge from the facility. (5) Demonstration that adequate measures are in place to prevent any discharges except those which are allowed by the CAFO Regulations. (6) Other necessary measures which are required in order to comply with the CAFO Regulations. (7) A description of the types of records that will be maintained on the facility, as required by the CAFO Regulations. D) In accordance with CAFO, the applicant shall submit the facility's manure and waste water management plan to the Colorado Department of Public Health and Environment for review and comment. The following are recommended to be development standards: 1. Fugitive dust shall be controlled on this site. At all times, the facility shall be Sparboe Horizon Corporation Page 3 operated in accordance with the control measures described in the Management Plan for Nuisance Control, dated February 19, 2001. 2. All liquid and solid waste shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 3. There shall be no permanent disposal of solid wastes, as defined in the Regulations Pertaining to Solid Waste Disposal Sites and Facilities (6 CCR 1007-2), at this site. 4. The facility shall maintain compliance with Confined Animal Feeding Operations Control Regulations (5 CCR 1002-19) and, Section 23-4-710 of the Weld County Code, as amended. 5. The facility shall adhere to the maximum permissible noise levels allowed in the Light Industrial Zone as delineated in Section 25-12-103 C.R.S, as amended. 6. Any required NPDES Permit shall be maintained in compliance with the Water Quality Control Division of the Colorado Department of Public Health & Environment. 8. The facility shall not discharge run-off or other waste waters to surface or groundwater with exception to what is allowed by the Confined Animal Feeding Operations Control Regulations. 9. Wastes materials, not specifically addressed by other development standards, shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 10. The applicant shall remove and handle manure and waste water from the poultry houses in a manner that will prevent nuisance conditions. In no event shall the facility impact or degrade waters of the State in violation of the Confined Animal Feeding Operations Control Regulation (5 CCR 1002-19). 11. The facility shall be operated in accordance with the odor control measures described in the Management Plan for Nuisance Control, dated February 19, 2001. Odors detected off site shall not equal or exceed the level of fifteen-to-one dilution threshold, as measured pursuant to Regulation 2 of the Colorado Air Pollution Control Regulations. Additional controls shall be implemented at the request of the Weld County Department of Public Health and Environment in the event odor levels detected off site of the facility meet or exceed the level of fifteen-to-one dilution threshold, or in the judgement of the Weld County Health Officer, there exists an odor condition requiring abatement. 12. A spillage retention berm shall be required around any fuel container with a volume greater than 50 gallons. The volume retained by the spillage berm Sparboe Horizon Corporation Page 4 should be greater than the volume of the largest tank inside the berm. 13. The facility shall be operated in a manner to control flies. The facility shall be operated in accordance, at all times, with the control measures described in the Management Plan for Nuisance Control, dated February 19, 2001. Additional fly control measures shall be implemented at the request of the Weld County Department of Public Health and Environment in the event that flies (which can be determined to be associated with the facility) are in such a number to be considered a nuisance condition. The plan shall also be implemented in the event the Weld County Department of Public Health and Environment receives a significant number of fly (associated with facility) complaints, and in the judgement of the Weld County Health Officer, there exists a fly condition requiring abatement. 14. Any septic system located on the property must comply with all provisions of the Weld County Individual Sewage Disposal System Regulations. 15. There shall be no burning conducted at the site, with exception to burning defined as "agricultural open burning" as defined by Regulation No. 1 of the Colorado Air Quality Control Commission Regulations. 16. With exception to emergency conditions, no manure shall be stored, on the property, outside of the poultry houses. The facility shall maintain evidence that it has the ability to prevent the stockpiling of manures on the property. The evidence may consist of any contract(s) or agreement(s) with any property owner, composting firm, or other entity, that will dispose, treat, process, etc. any manures generated on this facility. 17. The facility shall attempt to assure that any individual, corporation, etc. that removes manure from the property has the ability to manage the manure to prevent nuisance conditions and has the ability to comply with any Local, State, or Federal rules. The facility shall provide an accurate analysis of the nutrient content of any manure produced on the property to any individual, corporation, etc. that removes the manure from the site. 0\CAF0\Sparboe Horizon Pullet Farm\referral wpd Hello