HomeMy WebLinkAbout20031164.tiff AGREEMENT
ROADWAY IMPROVEMENTS FOR WCR 6
THIS AGREEMENT,made this /5, day of Ai,¢It- ,20 0 33 ,by and between Weld County,
Colorado,hereinafter called"County"and
CuTLEl2 QEPAVJtJCs IrIC• doing business
as(a,:..l:v:daal,) or (a-t a.h..aoldyr) or (a corporation)hereinafter called"Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The Contractor will commence and complete the following: The roadway improvements of WCR 6 from
STATE HIGHWAY 85 WEST TO WELD COUNTY ROAD 15 as described in the Invitation for Bids,Bid
No.B030052.
2. The Contractor will furnish all of the material,supplies,tools,equipment, labor and other services necessary
for the construction and completion of the Project described herein.
3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after
the date of the Notice to Proceed and will complete the WCR 6 Project within 20 calendar days unless the
period for completion is extended otherwise by the Contract Documents.
4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the
terms therein for the sum of$ / 3 O, /b o.ow , or as shown in the Bid Schedule.
5. The term"Contract Documents" means and includes the following:
(A) Invitation for Bids
(B) Instructions to Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Agreement
(F) General Conditions
(G) Project Special Conditions
(H) Labor and Materials Payment Bond
(I) Performance Bond
(J) Notice of Award
(K) Notice to Proceed
(L) Change Order
(M) Certificate of Substantial Completion
(N) Lien Waiver
(O) Notice of Acceptance
(P) Drawings prepared by the Weld County Public Works Department.
(Q) Specifications prepared or issued by the Weld County Public Works Department.
(P) Colorado Department of Transportation "Standard Specifications for Road and Bridge
Construction"
(R) Colorado Department of Transportation Standard Plans"M&S Standards"
(T) Addenda: No. , dated ,20_
No. , dated ,20_
6. The County will pay to the Contractor in the manner and at such times as set forth in the General Conditions
such amounts as required by the Contract Documents.
dohzszi f itdcc" Page 19
2/-.2003 EOrix7Lfil
gin: et) ac>v� 11Coq
7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors,administrators,
successors,and assigns.
8. Contract Appropriations: The County hereby states and affirms that the amount of money appropriated for this
Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional
compensable work to be performed,which work causes the aggregate amount payable under the Contract to
exceed the amount appropriated for the original Contract shall be issued by the County unless the County
assures the Contractor,in writing,that lawful appropriations to cover the costs of the additional work have been
made or unless such work is covered under a remedy-granting provision contained in the Contract.
IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials,
this Agreement in three(3)copies each of which shall be deemed an original on the date first above written.
ORDERED BY: ACCEPTED BY:
THE BOARD OF COUNTY COMMISSIONERS CONTRACTOR
WELD C NTY,COLORADO D
BY J BY elnrJf$V,.J4 li
NAME David E.Lon NAME Luy� I
(Please Type) /jab/ EA/c
TITLE Chair
9a1 E. a�nr S r
Date April 21, 2003 ADDRESS ,(,gw'CErleki'6 64."
(SEAL) (SEAL)
ATTEST: / / ATTEST: .LCL�Ii tC .
� d
NAME Donald D. War.3 ;e . N A M E
x• (Please Type)
1861
TITLE Weld Coun Cle e i. .. TITLE dEC1'TREASuREX.
BY L1(44 id
Deputy Clerk to the Board
Page 20
Kee
MEMORANDUM
willes TO: Clerk to the Board DATE: April 11, 2003
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Item for Chair's Signature
Please submit the enclosed item for the Chair's signature.
Two original, duplicate Agreements for Roadway Improvements for WCR 6 contract
with Cutler Repaving.
Please send immediately after executed one original Agreement back to Public Works
for distribution.
The appropriate documentation is enclosed
Enclosures
pc: Dean Dreher, Engineering Tech III
M:\FRANCIE\SIGNATURE.WPD