Loading...
HomeMy WebLinkAbout20030020.tiff RESOLUTION RE: APPROVE ROAD SIGNALIZATION AGREEMENT FOR USE BY SPECIAL REVIEW PERMIT#1360 AND AUTHORIZE CHAIR TO SIGN - LAFARGE WEST, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Road Signalization Agreement for Use by Special Review Permit#1360 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and LaFarge West, Inc., with terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Road Signalization Agreement for Use by Special Review Permit#1360, between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and LaFarge West, Inc., be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 6th day of January, A.D., 2003. BOARD OF COUNTY COMMISSIONERS £SCWEUY, COLORADO ATTEST: < _ g i Lo , Ch ' Weld County Clerk to th o rr •�� V n . . Ro ert D. Masden, Pro-Tem BY: Deputy Clerk to the Board EXCUSED M. J. Geile A DASTOF ) �i William H. Jerke ounty ttorne �� mil p, t 1/444-A Glenn Vaad Date of signature: //„ Glenn 2003-0020 C'C- , low, Z a la ye EG0047 167 RECORDER'SMEMORANDUM THIS JOCJME=ti BVFA c ND TO BEINADE"U SCANNING FURPC ES- COUNTY OF WELD, STATE OF COLORADO ROAD SIGNALIZATION AGREEMENT This AGREEMENT, made and entered into the 6th day of January 7003, between the COUNTY of WELD, STATE of COLORADO, hereinafter called"County" and LAFARGE WEST, INC. hereinafter called"Lafarge." WHEREAS, Lafarge has been granted a Weld County Use by Special Review Permit (USR 1360) for a ready-mix concrete plant operation known as the Heaton Plant, on part of the East 1/2 (E 1/2) of the Northeast Quarter (NE 1/4) of the Northeast Quarter (NE 1/4) of Section 9, all located in Township 2 North, Range 68 West of the 6th Principal Meridian, Weld County, Colorado, and WHEREAS, the intersection of Colorado State Highway 119 and Weld County Road 7 that serves the Heaton Plant requires signalization due to current traffic volumes, and WHEREAS, the County and Lafarge agree to share the cost of signalizing the intersection of Weld County Road 7 and Colorado State Highway 119 (Hwy 119). NOW, THEREFORE, in consideration of the mutual covenants and conditions hereinafter set forth, the County and Lafarge agree as follows: 1. Lafarge will fund the signalization and roadway improvement project until Weld County's 2003 budget year begins. 2. Lafarge's share of the cost to signalize the intersection of Hwy 119 and WCR 7 will not exceed $100,000.00. 3. The balance of the cost for signalization and road improvements will be paid by the County. 4. Lafarge has asked the civil engineering firm of Felsburg, Holt &Ullevig (FHU) to prepare a"Proposal for Traffic Signalization and Roadway Improvement Design —Weld County Road 7 at State Highway 119 in Weld County, Colorado," a copy of which is attached as Exhibit 'A' to this Agreement. 5. The County will coordinate the design review process with the Colorado Department of Transportation(C-DOT) and FHU. 6. Lafarge will contract with FHU for signalization and roadway improvement design once this Agreement is executed and the County provides Lafarge with written authorization to proceed including confirmation that the County has obtained all necessary authorizations including but not limited to funding for same. 111111IIIIIII1111111IIIII III IIIIIIIIIIIII 3026167 01/23/2003 10:23A Weld County, CO 1 of 8 R 0.00 D 0.00 Steve Moreno Clerk& Recorder ,goo -0O;1d Page Two—Road Signalization Agreement 7. It is the intent of the parties to this Agreement that C-DOT solicit bids, select the contractor, and provide construction management oversight of said signal installation and related improvements if any. 8. The County will apply to C-DOT for authorization to signalize the intersection. 9. No Third Party Beneficiary Enforcements: It is expressly understood and agreed that enforcement of the terms and conditions of this Agreement, and all rights and action relating to such enforcement shall be strictly reserved to the undersigned parties, and nothing contained in this Agreement shall give or allow any claim or right of actions whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be deemed an incidental beneficiary only. 10. Modifications and Breach: This Agreement contains the entire agreement and understanding between the parties to this Agreement and supersedes any other agreements concerning the subject mater in this transaction, whether oral or written. No modifications, amendment, renewal, or other alteration of this Agreement shall be deemed valid or any force of affects whatsoever, unless mutually agreed upon in writing by the undersigned parties. No breach of any term, provision, or clause of this Agreement shall be deemed, waived, or excused, unless such waiver or consent shall be in writing or signed by the party claimed to have waived or consented. Any consent by any party hereto, or waiver of, a breach by any other party, whether expressed or implied, shall not constitute a consent to waiver of, or excuse for any different or subsequent breach. 11. Non-Assignments: This Agreement shall not be assignable without prior written consent of County or Lafarge, whichever is the non-assigning party. IN WITNESS WHEREOF, the parties hereto have duly executed the agreement the day and year written above. LAFARGE WEST, INC. By: ATT ST: Title: iicrele 4q's.i fro"-4vr By: y. 111111111111111111 liii liii 111111111111 III IIIII liii 1111 3026167 01/23/2003 10:23A Weld County, CO 2 of 8 R 0.00 0 0.00 Steve Moreno Clerk & Recorder Page Three—Road Signalization Agreement ATTEST: i77 /l / C! BOARD OF COUNTY COMMISSIONERS � WELD COUNTY, COLORADO •'"era Weld County Clerk to the ar `•, By: /' � By: Deputy Clerk to the Board David E. Long, Cha (01/06/03) 1111111111111111111111 11111111111111111 111111111111111 VIII 1111 IIII 3026167 01/23/2003 10:23A Weld County, CO 3 of 8 R 0.00 D 0.00 Steve Moreno Clerk& Recorder 070O3-mod • EXHIBIT "A" FELSBURG Pier ' HOLT & ULLEVIG engineering paths to transportation solutions November 25, 2002 Mr. Myron Moorhead Lafarge West, Inc. P.O. Box 215001 Denver CO 80221-0599 Re: Proposal for Traffic Signalization Design Weld County Road 7 at State Highway 119, Weld County, Colorado Dear Mr. Moorhead: Pursuant to your request, Felsburg Holt& Ullevig is pleased to submit this proposal to provide traffic signalization and roadway improvement design for the above referenced project. As we understand it, the work will be performed in two basic parts: • Traffic signal design, and • Design of an eastbound right turn acceleration lane on SH 119. The design of these improvements will be to Colorado Department of Transportation (CDOT) standards and specifications. From a conversation with CDOT personnel, the traffic signal will be designed for a mast arm installation utilizing the latest CDOT M&S Standard Detail Drawings. It is FHU's understanding that Weld County and CDOT will coordinate the design review process and that Weld County will serve as the lead agency on the project. We have prepared the following scope of work, schedule and fee estimate for the proposed project: I. SCOPE OF WORK Task 1 - Data Collection and Base Sheet Preparation We will utilize the services of the Farnsworth Group to survey the project boundary. We will use that information to prepare the base mapping of the subject intersection and those areas for the right turn lane. The mapping will include all of the existing physical features of the project area, such as pavement and shoulder locations, utility boxes or pedestals, the existing right-of-way, overhead and underground utilities, and existing and proposed signing and striping. 303.721.1440 fax 303.721.0832 fhu@fhueng.com I IIIIII'III'lllllll II'I I'll 11IIIII'I'II III VIII3026167 01/23/2003 10:23A II'I llll Greenwood Corporate Plaza 7951 E. Maplewood Ave.Ste. 200 4 of 8 R 0.00 0 0.00 Steve Moreno Clerk& Recorder Greenwood Village,co 80111 November 25, 2002 Mr. Myron Moorhead Page 2 The mapping coverage area will include 150 feet along each intersection approach from the center of the intersection. In addition, mapping will be provided along the south side of SH 119 for approximately 800 feet to the east of Weld County Road 7. Mapping coverage in this area will be of sufficient length to design the acceleration lane and for any required grading improvements. We will format the mapping at an appropriate scale that includes all of this information. Task 1.2 - Traffic Signal Design Traffic signalization plans will be prepared through a "design-build" concept which delegates authority for items such as wiring and traffic control details to the contractor. The plans will consist of design information on pole, controller, detector and signal head placement, and on traffic signal phasing. We will also include information on signing and striping changes or additions related to the traffic signal installation. Preparation of traffic signal timing plans is not part of this proposal. Task 1.3 - Right Turn Acceleration Lane Design The design of the eastbound right turn acceleration lane on SH 119 will complement the criteria of the State Highway Access Code. A horizontal and vertical alignment will be created at the edge of asphalt as part of the design. We have assumed that the additional pavement width to construct the acceleration lane will be of the same pavement section as exists on SH 119. If CDOT requires a soils investigation and a designed pavement section, we can contact a geotechnical firm to perform this work. A pavement section design is not included in this proposal, however. We anticipate that drainage adjacent the new acceleration lane can be accommodated by a roadside ditch or by sheet flow. Hydraulic design is not included in this proposal. We will utilize CDOT pay item descriptions and quantity tabulation format. Preparation of a Survey Control Diagram, Right-of-Way Plans and Construction Phasing Plans are not part of this proposal. We will prepare a construction traffic control plan for the project, however, with appropriate signing and striping revisions for the new acceleration lane. Task 1.4 - Plan Preparation The traffic signalization and right turn lane plan sheets will be prepared as a "stand-alone" document. We estimate that the following plan sheets will be necessary to provide the design plans: Sheet Description Number of Sheets Title Sheet 1 Summary of Approximate Quantities 1 Project Notes 1 Typical Section 1 Signalization Plan 1 111111lin1111111IltIIII1111111IIIIIIII I1 IIIIIIII 3026167 0112312003 5 of 8 R 0.00 0 0.00 Steve Moreno Clerk& Recorder November 25, 2002 Mr. Myron Moorhead Page 3 Right Turn Lane Plan 2 Right Turn Lane Profile 2 Signing/Striping Plan 1 Construction Traffic Control 2 Cross-Sections 6 Standard CDOT Traffic Signal 12 Construction Details from the M & S Standards TOTAL 30 We will submit preliminary plans to you and CDOT for review, and will incorporate review comments into the plans and assemble a final set of design plans ready for bidding. Task 1.5- Specifications & Contract Documents We will prepare the necessary project-specific construction specifications as a supplement to CDOT's "Standard Specifications for Road and Bridge Construction", 1999. We will provide these specifications to you and CDOT for review, and we will incorporate any review comments regarding these specifications. We will prepare a complete set of Contract Documents to serve as the contracting basis between you and the selected contractor. This document will include such information as Instructions to Bidders, Bid forms, the Agreement, and General and Supplementary Conditions. We will incorporate the final project specifications into the Contract Documents. Tabulations of project pay item quantities will be provided in the form of a Bid Schedule. It will be necessary for your attorney to review the Contract Documents to assure that insurance requirements and other contracting issues meet with your standards. Task 1.6- Cost Estimating We will provide an Opinion of Probable Cost to you based on current bid prices from the CDOT, and on recent projects in which we have been involved. Tasks 1-6 will provide you with the necessary construction plans, specifications, Contract Documents, and an estimate of the cost for construction of the project. Task 1.7- Coordination Meetings We anticipate that meetings with CDOT will be necessary during the design of the project to discuss design parameters and any other project details. This proposal assumes two meetings will be required during the design process and that those meetings will be held at CDOT offices. 11111111111IIIIn III I11111111111III111111111VIII 3026167 01/23/2003 10:23A Weld County, CO 6 of 8 R 0.00 D 0.00 Steve Moreno Clerk& Recorder November 25, 2002 Mr. Myron Moorhead Page 4 II. SCHEDULE It is estimated that the above scope of work can be completed within a ten to twelve week period, dependent upon weather-related survey delay and upon COOT review time. III. FEE We propose to conduct this work on a time and materials basis. In such an agreement, we are compensated at hourly rates for all labor and other direct costs are also reimbursed at 1.1 times actual cost. The following are our standard hourly billing rates for 2002: Principal II $150.00/hour Principal I $130.00/hour Associate $120.00/hour Senior Engineer $100.00/hour Engineer III $ 90.00/hour Engineer II $ 80.00/hour Engineer $ 70.00/hour Senior Designer $ 85.00/hour Designer II $ 65.00/hour Designer $ 60.00/hour Administrative $ 60.00/hour At these rates, we estimate that the traffic signalization design can be completed for the following fees: Surveying $ 9,000.00 Traffic Signalization Design $ 7,000.00 RT Acceleration Lane Design $13,000.00 Specifications/Contract Documents $ 3,500.00 Cost Estimate $ 500.00 TOTAL $33,000.00 We will not exceed this amount without your prior approval. If the conditions of this proposal are acceptable, please sign below and return the original to serve as our contract for services, keeping a copy for your files. If you have any questions, please call either Jeff Ream or me. 111111111111 1111111 IIII I'll 111111111111 III 11111 11111111 3026167 01/23/2003 10:23A Weld County, CO 7 of 8 R 0.00 D 0.00 Steve Moreno Clerk& Recorder November 25, 2002 Mr. Myron Moorhead Page 5 Thank you again for allowing us to provide our services. Sincerely, FELS G HOLT LLEVIG Accepted By Robert G. Refve , P.E. Principal Title Date J ff eam, P.E. Senior Transportation Engineer 111111111111X111111IIII IIII111111111111III111111111IIII 3026167 01/23/2003 10:23A Weld County, CO 8 of 8 R 0.00 D 0.00 Steve Moreno Clerk& Recorder i MEMORANDUM j Arc__ C TO: Clerk to the Board DATE: December 17, 2002 • COLORADO FROM: Frank B. Hempen, Jr., Director of Public Works/County Engineer SUBJECT: Agenda Item Please submit the enclosed item for the Board's January 6, 2002, agenda: Road Signalization Agreement with Lafarge West,Inc.as required by Weld County's Use by Special Review Permit 1360 for the Heaton Ready-Mix Concrete Plant. The appropriate documentation is attached. Enclosures pc: Drew Scheltinga, Engineering Division Manager Mona Weidenkeller M:\WPFILES\Francie\AGENDA.wpd 2003-0020 Hello