HomeMy WebLinkAbout20030770.tiff AGREEMENT
THIS AGREEMENT, made this 6th day of March , 2003, by and between
THE BOARD OF WELD COUNTY COMMISSIONERS, and
doing business as
hereinafter called "Contractor" .
WITNESSETH: That for and in consideration of the payments and agreements
hereinafter mentioned:
1. The Contractor will commence and complete the phased construction of
2003 RUBBERIZED CRACK FILLING PROJECT
2. The Contractor shall furnish all material, supplies, tools,
equipment, labor and other services necessary for the construction and
completion of the project described herein.
3 . The Contractor shall commence the work required by the Contract
Documents in accordance with the date stated in the Special Conditions
and shall complete the work within the time stated in the Special
Conditions unless the period for completion is extended otherwise by
the Contract Documents.
4. The Contractor agrees to perform all of the work described in the
Contract Documents and comply with the terms of herein for the sum of:
Fifty-five Thousand Six Hundred and 00/100 ($ 55,600.00 )
for the project: 2003 RUBBERIZED CRACK FILLING PROJECT
5. The term "Contract Documents" means and includes the following:
(A) Advertisement for Bids
(B) Information for Bidders
(C) Non-Collusion Statement
(D) Bid
(E) Bid Schedule
(F) Bid Bond
(G) W-9 Taxpayer Identification Number
(H) Notice of Award
(I) Acceptance of Notice
(J) Agreement
(K) Performance Bond
(L) Payment Bond
(M) Insurance Requirements
(N) Notice to Proceed
(0) Change Order
(P) Notice of Contractor's Settlement
(Q) Final Receipt and Guarantee
(R) Drawings prepared by Weld County Engineering
Department, numbered
(S) Specifications prepared or issued by the Weld County Public Works
Department.
-15-
Cr
EC—OO'1?
-l 7 `z'-` CC_ : G'W 2003-0770
(T) Addendum
No. , dated , 2003
No. , dated , 2003
No. , dated , 2003
(U) Other
6. The County will pay the Contractor in the manner and at such time as
set forth in the General Conditions such amounts required by the
Contract Documents.
7. This Agreement shall be binding upon all parties hereto and their
respective heirs, executors, administrators, successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by
their duly authorized officials, this Agreement, each of which shall be deemed an
original on the date first written above.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO CONTRACTOR Quality Resurfacing Co.
BYvAIF
gy _
NAMEerry L. Rhea
David E. Long, C r (Please Type)
(3/Illi G") TITLE President
ADDRESS
9700 Alton Way
Henderson, CO 80640
(SEAL) (SEAL)
gdyr%1�
ATTEST: �� �j 'r � ATTEST:��
Weld County Clerk .. t B. `>
d !
7 �s
BY: � ..,/�. . ;� ,�l},� . NAME Troy A. Beer
Deputy Clerk t4 t B ₹P (Please Type)
'r r
1:'''�`t TITLE Vice President
-16-
MEMORANDUM
TO: Clerk to the Board DATE: March 7, 2003
COLORADO
FROM: Frank B. Hempen, Jr.,
Director of Public Works/County Enginee
SUBJECT: Agenda Item
Please submit the enclosed item for the Board's next agenda:
2003 Rubberized Crack Filling Project Agreement with
Quality Resurfacing in the amount of$55,600
The appropriate documentation is enclosed
Enclosures
pc: Dean Dreher, Engineering
M:\W PFILES\Francie\AGENDA-I.wpd
Hello