Loading...
HomeMy WebLinkAbout20032466.tiff .� r , l►�r� - RannlrJ Todd Hodges Design, LIE Substantial Change Application Non-Urban Development (specific guide) Prepared for: Cattail Creek Group, LLC C/0 George Dullard 304 Immigrant Trail Windsor, Colorado 80550 Prepared by: Todd Hodges Design, LLC 1269 North Cleveland Avenue Loveland, Colorado 80537 Submitted: EXHIBIT April 20, 2003 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (970)613-8775 email: toddhodgesdesign(a)earthlink.net 2003-2466 DEPARTMENT OF PLANNING SERVICES 1555 N. 17th Avenue, Greeley, Colorado 80631 Phone (970) 353-6100, Ext. 3540- Fax#(970) 304-6498 APPLICATION FOR SUBSTANTIAL CHANGE Application Fee Receipt Number Case Number Receipt Number Zoning District Application Checked By Planner Assigned to Case TO BE COMPLETED BY APPLICANT: (Print or type only except for required signatures). Legal Description: Lot C. RE-2637,pt. SW4 09-06-66 Total Acreage: 161.34+/- Zoning Agriculture Parcel No: 0805 09 000055 (12 digit number-found on Tax I.D. Information or obtained at the Assessor's Office). Case number under which you are requesting the substantial change: PZ-613 FEE OWNERS OF PROPERTY NAME Cattail Creek Group, LLC Go Georne DuBard PHONE(970)690-6963 ADDRESS 304 Immigrant Trail,Windsor, Colorado 80550 Applicant or Authorized Agent: Todd Hodges Design. LLC do Todd A. Hodges Phone#(970) 207-0272 Address: 2412 Denby Court City/State/Zip Code Fort Collins, CO 80526 I hereby state that all statements and plans submitted with the application are true and correct to the best of my knowledge. 31/ 7/0f Signature: er or Authorized Agent Cattail Creek Group,LLC George DuBard, Managing Partner 304 Immigrant Trail Windsor, Colorado 80550 To Whom It May Concern: Please be advised that I, George DuBard, Managing Partner, Cattail Creek Group, LLC, hereby authorize Todd Hodges Design, LLC, to represent me in my endeavor to subdivide my land, located in the SW 'A 09-06-66 West of the 6th P.M., Weld County, Colorado. The parcel is known as Lot C of RE-2637. 7(O.? Georg DuBard, Managing Partner date r^• RESOLUTION OF THE MEMBERS AND MANAGERS OF CATTAIL CREEK GROUP LLC A Colorado (USA)Limited Liability Company This special meetingn of the Members O02 an DuBanI, eanagers mber/m er acattail Greek tedd aup LsLCChaair of Company')was held on May /3 , George the meeting_ The members/managers waived formal notice of the meeting. It came to the attention of the members/managers that it was necessary to ratify a resolution authorizing George P. DuBard the of the Company, to act on behalf of the Company and to undertake all activities necessary on Company's behalf for the purchase and sale of the following real property: Lot C, Amended Recorded Exemption No. 0805-09-3-AmRE2637, according to the Map recorded September 11 , 2000 at Reception No. 2793115, being a part of Section 9, Township 6 North, Range 66 West of the 6th P.M. , County of Weld, State of Colorado Address; 14265 Weld County Road 70, Greeley, CO 80631 After full discussion and upon motion duly made,seconded and unanimously approved it was: RESOLVED, that George P. DuBard is hereby authorized to take all actions necessary for the Company's benefit for the purchase and sale of the above-referenced real property. � C /4C6Z 1 g7 ohn A. Sher r.,Member/Manager Nathan A.Mielke,Member/Manager �`— in . rdon R.Shepardson,Memb /Manager George .DuBard,Member/Manager nr Todd Hodges Design, LLC Individuals living on lots created through the Recorded Exemption process are not affected by the maintenance and aesthetic guidelines typical of lots within a Subdivision. This subdivision will be affected by such controls outlined in the Covenants and Home Owners Association, to be presented to the County Attorney at the time of Final Plat. These Covenants and the Home Owners Association will benefit the area and ensure an aesthetically pleasing development and the elimination of on-site nuisance conditions. The applicant is working with the Division of Wildlife to design a fence to allow for free movement of wildlife and for security. The applicant will work with the Division of Wildlife on site to determine the most environmentally sensitive method of fencing prior to submitting the Change of Zone application. The applicant has placed a conceptual fenced yard on an attached map. It is important to realize this illustration is not a final design, however, it is intended to be used for concept only. Each lot owner will have the opportunity fence a portion of their property for children and domestic pet safety. Fence material is defined in the Covenants. Excerpts from the Covenants are included in application materials. The attached illustration is for concept purposes only and does not stipulate the final location of building footprints, septic fields and replacement fields or the play yards. Buffering and Screening In the Board of County Commissioners' Resolution, it is noted the"uses and buildings or structures within the Planned Unit Development will not be adequately buffered and screened to make their appearance and operation harmonious with the surrounding uses". In addition, the Board of County Commissioners noted "there was not an adequate buffer zone or buffer area, also referred to as a transition zone between the proposed site and surrounding uses." Please refer to the section in this letter titled, "Common Open Space Designation" for explanation of how adjacent properties will be screened from this property, and vice versa. The revised internal road alignment, increased lot sizes, placement of a plant material screen, and proposed fence construction mitigates concerns raised at the Change of Zone Board of County Commissioner's hearing in 2002. Incompatible Surrounding Land Uses The Board of County Commissioners noted, "the density, design, and location of land uses within the Planned Unit Development are not compatible with surrounding uses." More specifically, the Board of County Commissioners referred to the Coal Bank Creek/Draw/Drainage area and the buffering of the previous Lots 1 — 8 from the property located to the immediate west. Catttail Creek PUD proposes to be harmonious with adjacent properties and the draw area in the following manner: • A seventy-five foot wide buffer between the residence to the west and the back lot line of the proposed Lots 6-8. This buffer will be planted with a combination of deciduous and evergreen trees and shrubs. The sizes of these proposed trees was discussed previously. The irrigation of this area is discussed in a section to follow. 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (561)613-8775 email: toddhodgesdesign(a)gwest.net Todd Hodges Design, LLC • A seventy-five foot wide buffer between the residence to the west of Lots 6 — 8 and Lot 9. • Lots 1 through five have been extended east to the property line, incorporating flood plain area. The dimension of the flood plain area is approximately 50 to 75 feet wide and runs along the eastern property boundary. This area is specified and enhanced with a 200 foot setback from the seep/draw area. Future building activity within this area is prohibited and specified as so on all recorded plats and in the Covenants. Access to this area is limited to owners of Lots 1 through 5 based on private ownership. • The Board of County Commissioners further noted, "the proposed use could attract persons to the steep slopes and riparian areas of Coalbank Creek which could alter the integrity and character of the area." The applicant's representative has been in contact with Mr. Larry Rogstad with the Colorado Division of Wildlife to discuss the viability of fencing for safety and wildlife movement. Future applications will address how these two important factors will be handled. In addition, the Home Owner's Association and restrictive covenants will address "No-Trespassing" areas. Access and Internal Road Design The access to the internal road has been moved east by approximately 400 feet. Access will still occur from Weld County Road 70. The length of the internal road has been reduced from approximately 1,400 feet to 1,000 feet in length. r B. Within the concept of rehearing the previously denied application. 1. Is there newly discovered evidence that the applicant could not have discovered with diligent effort at the time of the original application? Domestic and Irrigation Water The Resolution also states, "the development, as designed, would not be compatible with the existing or future development of the surrounding area as permitted by the existing Zone District and with future development as projected by the Comprehensive Plan or master plans of affected municipalities." The Board of County Commissioners moved to deny the request for the Change of Zone in part due an appeared incompatibility and lack of water as an outcome of public testimony. Public testimony at the Change of Zone hearing indicated North Weld County Water does not have the capacity or interest in serving this development. North Weld County Water District has the capacity and interest in serving this development. Evidence to support this statement has been included with the application packet. Public testimony at the Change of Zone hearing indicated illegal water diversion activities were occurring on the site. Attached is a report prepared by Mr. Doug Seely from Rocky Mountain Consultants/Tetra Tech. This report indicates the legal right to water associated with this property. 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (561)613-8775 email: toddhodgesdesign(;ywest.net Todd Hodges Design, LLC Irrigation water for each residential lot and the open space areas will be delivered through an easement on open space between Lots 5 and 6 for the benefit of Lots 1 through 5. Irrigation water for the open space areas as well as Lots 6 through 8 will be through the existing ditch. Irrigation water for the building envelope of Lot 9 will be delivered by the existing southern line. Closing Remarks In closing, the Cattail Creek Group, LLC has met and exceeded requirements outlined in the County Code to justify a Substantial Change hearing. The Cattail Creek Group, LLC would respectfully request that upon determination of Substantial Change, the re- application process begin at the Change of Zone phase rather than repeating the Sketch Plan phase. Information beyond typical application materials for the Substantial Change hearing have been provided to expedite this process. These items include the Traffic Impact Study and support materials, information from North Weld County Water District and the State Division of Water Resources and support materials, and a new GeoTechnical Report based upon the new design. 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (561)613-8775 email: toddhodgesdesign(tegwestnet r miti6 PUBLIC WORKS DEPARTMENTH STREET 1111 H STREET P.O. BOX 758 GREELEY, COLORADO 30632 WEBSITE: WWW.CO.WELD.CO.US PHONE (970) 356-4000,EXT. 3750 FAX: (970)304-6497 • WI 1 C. COLORADO September 13, 2002 Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Re: PZ-613 Cattail Creek, WCR 70 Road Improvements Agreement Dear Matt: This is in response to your memorandum of August 28,2002, and to document our telephone conversation of September 10, 2002. I agree with your methodology in determining 27%to be the cost allocation for the Cattail Creek development. r Roadway stabilization consisting of additional aggregate base course treated with chemical additives is an appropriate roadway improvement given the level of traffic anticipated at the build out of Cattail Creek. The cost for material and placement for one mile is approximately$50,000. Your cost share contemplated stabilizing 0.8 of a mile from the Cattail Creek access east to WCR 31. Because we anticipate Cattail Creek will generate 40%of its trips west to WCR 29, and because the County would stabilize the entire mile, the cost share should include the entire mile. Therefore,the cost share for the development would be ($50,000 X 27%) $13,500. It is my understanding you agree. This proposal meets the roadway improvements agreement requirement for the change of zone hearing. The final agreement to be submitted to the Board of Weld County Commissioners for approval will be required with the final plat application materials. rSincerely Drew Scheltinga P. E. Engineering Division Manager PC: John Shepherdson, Cattail Creek Group LLC Todd Hodges/Ann Johnson,Todd Hodges Design Sheri Lockman,Planning File PZ-613 M:\W PFILES\DREW\Panning PZ-613 WCR70ageemenLwpd '--... MEMORANDUM - Q.P. R�-.."9,,e ., i° r0; 4\N J.O.:-ccp CO co TO: John Shepherdson, Cattail Creek Group LLC S 22 I , `• n Todd Hodges, Todd Hodges Design . . f Oo I. A Drew Scheltinga, Weld County Public Works ° a o CC co 0 o FROM: Matt Delich `S/OiVAtt`_ U a • X DATE: May 17, 2002 a O LL SUBJECT: Cattail Creek Development - Traffic impact study w (File: 0229ME01) 0 J w (. The Cattail Creek Development is a nine lot planned unit > N development proposed in Section 9-6-66 in Weld County. Figure 1 o coo shows the location of the Cattail Creek Development. As indicated z W on Figure 2, eight lots will access WCR70 from a cul-de-sac. A > o single lot, on a parcel that cannot readily be connected to the cul- 2 o de-sac will have a driveway access to WCR70. Weld County Road 70 and z i,i Weld County Road 29 are gravel roads. Drew Scheltinga, Weld County a C7 Public Works Department, has indicated that the traffic impact study N Cl- for Cattail Creek Development should determine whether the future N traffic will exceed the 200 vehicle per day (vpd) volume threshold. CV A volume greater than 200 vph on a gravel road will require mitigation to provide dust suppression. Typically, the mitigation takes the form of paving the subject road. The determination of the future traffic volume must consider current counts, site generated traffic, and traffic generated from recorded exemptions in the area. Recorded exemptions are land divisions that have been approved by Weld County. These land divisions may be occupied by a dwelling unit at some time in the future. No further approvals are required for recorded exemptions, therefore, it must be assumed that a dwelling unit can and will be constructed. In addition, concern was expressed regarding the separate access to WCR70 from the single lot. W Daily traffic counts were obtained on May 6 and 7, 2002, at the locations shown on Figure 3. Raw traffic count data is provided in C. z Appendix A. = w The Cattail Creek Development will generate approximately 80 al Vz daily trip ends from the cul-de-sac and 10 daily trip ends from the z single lot. The trip distribution for the site generated traffic is nz shown on Figure 4. The trip distribution is based upon the location W O of employment attractions using information contained in the "North O a Front Range Regional Transportation Plan," and in consideration of the road system in the area. Figure 5 shows the assignment of the • 0site generated traffic on the key unpaved public roads in the z immediate area of the Cattail Creek Development. a 5 �F- An additional component of future traffic on the key unpaved W go public roads in the area is that which is attributed to the recorded I a exemptions . Research at the Weld County Planning Department I— a indicated that there was one recorded exemption in section 9-6-66 and I— ¢ one recorded exemption in section 16-6-66. These are the recorded '"Q H exemptions that would contribute traffic to the key unpaved roads in G the area. Other recorded exemptions in the area are either built or would have little impact on the key unpaved public roads in the area of the Cattail Creek Development. Traffic from the recorded exemptions that are built are reflected in the current traffic counts. Traffic from the unbuilt recorded exemptions are shown in Figure 6. These two components of the future traffic were added to the current counts to get a future daily traffic forecast for the key unpaved roads in the area of the Cattail Creek Development. This is shown on Figure 7. The daily traffic volumes shown on Figure 7 indicate that no segments of the key unpaved roads will exceed the 200 vpd threshold. Therefore, no dust suppression treatment is necessary for WCR70 or WCR29. As indicated on the site plan (Figure 2) , eight lots will access WCR70 via a cul-de-sac and one lot will access WCR70 via a driveway. The building envelope for the single lot is not near the cul-de-sac that serves the eight lots that are clustered. From an operations perspective, the cul-de-sac and the single lot driveway intersections with WCR70 will operate acceptably. It is concluded that no unpaved road segments in the area of the Cattail Creek Development will exceed the 200 vpd mitigation threshold. Connecting the single lot to the cul-de-sac does not appear to be feasible. The separate driveway and cul-de-sac intersections with WCR70 will operate acceptably. N EATON GREAT WESTERN R.R. pi IH r (iii Cattail Creek NvaPrY 14111/4 O sfe WC R70 rn Q_' v SH392 D 6V� TON NO RTyFRN R R. SCALE: T"=4000' SITE LOCATION Figure 1 r. I -- _ ' a ;" N • • ,, r 1 1 s i Lot9 \\:, t441g4t4x. _ S ££ R!, Y's Lot$�.., '�t 3 5 1 .',. '44, S; -:". Y• liLotC t .7y ,, r L ,A lLot 5 S •'` iu 5tf ` r ,f F. •,e4t '` e , ti - Lock k IF;t1_,.. _-4 4-•-� �r'en•Spa '',.[Lot 3, :r �� '�t t @ zyt fw i. ,i s ,`, Lot2 ' Sr?' ' ,9 r `',is.. ,,� �bUliding. 1 envelope ' ! ILot tt .2-- k 1 Weld County Road 70 Scale: I "=COO' SITE PLAN Figure 2 rn N N Adik& Site 41 89 WCR70 Daily RECENT DAILY TRAFFIC Figure 3 N Al& Site 10% 60% WCR70 TRIP DISTRIBUTION Figure 4 Nalk 3taiSite 9 5a WCR70 N N Daily SITE GENERATED DAILY TRAFFIC Figure 5 N N O Site 2 12 WCR70 %alDaily DAILY TRAFFIC FROM RECORDED EXEMPTIONS Figure 6 as N a N d' U ch HSite 52 127 KI 155 WCR70 ini co 1- Daily TOTAL DAILY TRAFFIC FORECAST Figure 7 CATTAIL CREEK PUD FENCING EXHIBIT MAP \ Western Split Roil Fence, 3—Rail Vinyl Fence or approved equal. 10' Utility Easement \\ \--Building Envelope Line 4 00 t A O, • • '< N Proposed Leach \ (gross) ' Field Envelope „ �\ \ �I - \ \' ./..' , Acres LA ta fn 3\ . o Proposed Leach \ Field EnvelopeWestern Split Rail Fence, 3—Roil \\ Vinyl Fence with wire attached m for Child or Pet containment. Im\ (Approximately 0.5 Acres in size) 3 \ \ Ig \ \ 7.Building Envelope Line J 20' Utility Easement --- - o - - - _ S89'35'16"W' , Weld County Road 70 NOM NOTE: This exhibit map is for graphic purposes only and is not intended to reflect size, type or location of proposed residence or driveway. It is soley for the \ht:51 EA5f benefit of delinlating fence options and/or ideas. ,42 SOUTH Prepared By: is 715 I INTERMILL LAND SURVEYING,INC. i" b so bo 110 200 1301 North Cleveland Avenue 922 ; I" - 100' Loveland,Colorado 80537 May 9, 2003 (970)669-0516 According to Colorado law you must commence any legal action based on this survey within three years after you discover such defect. In no event, may ony action based upon any defect in this survey be commenced more than ten years from the date of the certification shown hereon. APPENDIX A i.eather Rooky Mountain Counts, _L_. =_ ed Cherry2 5 _-.- a. 2. '5th : Phone 7303) 641-0445 Fax (303) 85'-9191_ rile T.D. : _R70E 229 Street name :CR 70 EAST OF Cg 29 1241-4.14 LN2-EB Page 4"... egi Combined Tues. Combnuad .: ..: ,.� n - - --... ?.'5. .... - m - r 12:1'5 2 I ' 1 1 0 ` 1 0 0 12:34: 0 ! 0 I 0 0 I 'ei:(5 p 00 ` 6 - 01:Se0 I ` - 0 - - C: 01:45 • I 1 I 0 0 • i 0 02:00 - U j - 0 , _ 0 - I 02:15 6 0 0 30 0 i ' 2 2 0 j 0 02:45 1 , « 1 . 2 0 0 I 0 03:00 4 1 - 0 4 I 0 4 0 .. 03:15 0 ' 0 ' 0 0 0 ' i 0 03:30 0 ' 0 4 I 0 - I 0 03:45 1 ' 0 1 0 0 ' I 0 04:00 1 . 0 : ' 1 0 • 0 0 04:15 3 • 1 ' a 0 - 0 04:30 4 1 . ' I 0 5 0 0 . i 0 04:45 0 ` 0 ' 0 0 I 05:00 0 . 0 „0 0 « 0 0 05:15 1 0 ' 1 1 1 ' 2 05:30 1 1 . 2 0 0 0 05:45 0 0 ' 0 1 " 0 ' 1 06:00 - 1 . 0 0 • 0 . 0 06:15 1 ' 0 ' 1 0 ' 0 0 06:30 0 ' 0 - 0 0 - 0 - 0 06:45 1 0 ' 1 0 4 0 ' 0 07:00 0 1 ' 1 0 ` 07:15 1 • I 4 2 7 3 07:30 1 •. 1 * 0 . 1 1 07:45 1 . 0 . . . 4 00:00 0 ' 0 0 . 0 • 0 00:15 1 - 0 . 2 4 08:30 0 ' 1 - 3 . 3 6 08:45 U . 0 • 1 . 3 69:00 0 • 0 ` ' 1 0 1 09:15 0 s 0 ) tr2 . 4 03:3(1 0 0 ' 0 ' 1 • 1 09:45 0 0 • 0 . U . 0 10:00 0 ' 0 • 0 ' 1 1 / 40:15 0 ' 0 ' 0 ' 0 . 0 1:30 0 ' 0 • 0 , 0:45 0 0 « 0 ' I 0 0 11:00 0 ' 1 . 0 I 0 ' 00 11:15 0 . 0 • U 0 ' I 0 0 I 1 11:30 0 ' 0 • 0 1 • 2 11:45 0 ' 0 ' 0 0 1 - Totals 0 32 0 20 0 52 17 0 20 0 37 Day Totals 32 20 52 17 20 37 9 Total .09 61.52 .0% 36.4% 45.9% .0% 54.0% .0% Peaks 02:15 02:15 02:15 08:15 07:45 07:45 Volume 9 6 15 0 7 14 F.H.F. .56 .75 .62 .66 .58 .58 r N'ea ber Rocky ?tour.tain __ 100 __ ,_-- t_ _ _ GO:. 20a 4 Ft.. CC £0621 5t4z a 2 -., Other Phone (303) 641-0445 Fax (3031 057-9191 File CR29 Ck'O Street name :0(4 29 59:i/T0 OF CR 70 LN1=SB 1.2=NU Pane . '''cegl. Tues. Combined Wed. Combined 1 2 1 2 :.N. riTin ._ . . _. i c .r] 0 .a t C. 0 12:15 I ' I * 0 C I 0 2 2 12:30 I . 1 . _ 0 1 1 0 1 12:45 « . , . 101:13 2 ! . 2 - 4 0 0 (1:30 3 1 43 0 . i 0 - c . 01:45 0 ) 0 C' 0 02:00 2 I ' 3 2 ' 1 3 ' 02:15 2 r 1 1 0 I 0 0 02:30 1 i ' 0 I 1 0 0 I 02:15 0 I - 0 1 * 0 0 * 1 0 * t ` 93:00 - 0 I ' 2 1 2 0 + 03:15 1 I ` 1 I * 2 0 ' I 0 33:30 3 I ' 1 I 4 0 ' • 03:45 0 1 + 1 0 * i 0 ' . 04:00 1 . 0 1 0 • I 0 « 04:15 ' 1 " 0 4 1 0 I 0 4 1 . 04:30 ' 1 ' 3 ' 4 0 ' i 0 ' 04:45 1 0 . 1 0 ' 0 ' 1 05:00 2 ' 2 ' 4 0 ' 1 '05:15 • 1 . 1 . 3 1 0 05:30 2 1 ' 3 0 0 « 05:45 * 3 * . 1 . 0 . 09:00 ' 0 ' 0 . 0 1 * 0 - 06:1 1 0 1 0 * 1 06:30 4 2 ' 1 * 3 1 " 06:45 t 1 ' 0 * 1 1 ' 1 * 07:00 . 1 • 2 3 1 4 0 ' 1 * 07:15 * 0 * 1 1 ' 4 07:30 ' 0 * 0 + 0 3 ' 1 4 * 07:45 ' 0 4 0 * 0 4 * 2 6 * 08:00 0 4 0 * 0 0 * 0 0 00:15 ' 1 ' 0 A 1 4 ' 3 ' 7 ' 08:30 1 , ' 1 * 2 1 1 ,. 2 ' 00:45 0 ' 2 ' 2 1 * 0 1 00:00 1 ' 0 ` 1 1 " 0 * 1 * 09:15 0 * 1 * 1 2 4 3 09:30 1 ' 0 1 1 ' 3 09:45 0 * 1 4 1 0 0 0 ' 10:00 0 ' 0 ' 0 2 * 1 " 3 * .x.10:15 0 ' 0 * 0 1 2 * 3 3:30 0 0 * 0 3 * 2 5 .0:45 0 * 0 ' 0 0 * 1 * 1 ' 11:00 0 * 0 ' 0 3 + 1 * 1 4 11:15 0 0 ' 0 0 ' 2 ' 11:30 0 * 0 * 0 0 * 0 ' I 0 ' 11:45 1 * 0 1 0 ' 0 ' 1 0 ' Totals 0 30 0 33 0 71 36 1 27 3 63 4 Day Totals 38 33 71 37 30 67 Total .0% 53.5% .0% 46.4% 53.7% 1.4% 40.3% 4.4 Peaks 01:00 01:15 01:15 07:30 12:0U 07:30 12:00 07:30 12:00 Volume 8 7 15 11 1 6 3 17 4 F.H.F. .66 .58 .62 .68 .25 .5 .37 .60 ._ �r . Rocky runts, o_a,. '. Fort r- 31621 Start a[e: 5'O1'0002 Other : Phone (303) 641-0445 Fax (303) 857-9191 ?Ile _.D. : CR29140900 Street name :CR 20 NORTH OF !T 70 lv'1SD U42=1,10 Paae 1 ,�"+ea Moo. Combined Tues. Combined ^t .. - I • 2 I 1!3C 12:11 - 1 t + 0 . 0 4 t 0 * 12:30 ' 0 1 • 0 I 4 0 0 4 I 0 0 - 12:45 . . 1 4 ' i 0 _ C . I 0 0 00:45 ' - 3 : 00 . 02:0; 0. 0 ) 0 . 0 t 0 0 O •2:15 i ' I - 4 0 0 • 0 . I 02:35 - 0 i . 0 I • 0 0 • i 0 0 ' 0_:45 7 4 2 i ,.4 0 0 1 0 . 033:00 0 i 0 I ' 0 0 - 0 0 ' 03:15 - 1 ! 2 I ' 3 0 0 • 0 • 03:30 4 2 I ' 1 I * 3 0 - 0 0 ' 03:45 2 I ' t] ' 2 0 0 ' 0 04:00 1 I 1 ` 2 0 0 0 . 04:15 ' 1 I • 1 • 2 0 ' I 0 - 0 - 04:30 1 ' 2 3 0 • 04:45. ' 1 3 0 ' I 0 0 ' I 0 0 05:00 • 1 - 0 • 1 0 - 0 ' 1 05:15 0 • 1 . 11 0 I 1 05:30 1 ' 0 0 . 1 1 05:45 2 * 1 0 ' 1 1 06:00 ' 1 • 1 : - 2 0 • 0 ' 0 06:15 ' ' 0 • 2 0 ' 0 - 0 06:30 • 4 ' 6 1 • 3 • 4 06:45 ' 2 • 0 • 2 1 . 0 1 07:00 • 1 • 2 ' 3 3 • 6 . 9 07:15 . 1 ' 0 * 1 3 • 1 • 4 07:30 ' 1 • 1 ' 2 1 * 1 07:45 ' 0 1 4 1 1 0 • I 06:00 • 0 ' 2 1 • 3 ' 4 00:15 • 0 • 1 • 1 2 2 • 'I 08:30 • 1 + 0 1 2 • 0 00:45 ' 0 ' 0 * 0 0 . 0 - 0 09:00 • 0 • 0 * 0 0 * . 2 09:15 . 0 . 0 ' 0 2 . 0 2 09:35 ' 0 • 0 ' 0 3 ' 1 4 09:45 • 1 ' 0 . 1 0 ' 1 • 1 10:00 - 0 ' 0 4 0 1 ' 0 ' 1 ,.30:15 • 0 . 0 . 0 1 • 1 ' :30 0 ' 0 0 1 * 0 ' 1 .:45 • 0 ' 1 1 1 0 ' 1 11:00 0 • 0 ' 0 0 • 1 . 1 11:15 ' 0 0 . 0 1 . 2 ' 3 11:30 0 ' 0 0 1 • 1 ' 11:45 ' 1 • 0 ' 1 3 • 2 ' 5 Totalr 0 41 0 33 0 74 30 0 29 0 59 0 Day Totals 41 33 74 30 29 59 4 Total .0% 55.4% .0% 44.5% 50.0% .0% 49.1% .01 Peaks 05:45 05:45 05:45 06:30 06:30 06:30 Volume 7 14 8 10 18 P.ILF. .87 .43 .58 .66 .41 .5 n'aat^e: 2,oky Mountain Counts, LLC. x 1106 Ci:err. Court _ Code : 00000000017. Lupton, 33'_ Start ..e: 70 /q __ Other Phone (303) 641-0445 Fax (303) 857-9191 File 1.0. ('1370 e0Street name :CI<Tu 70Tues. WEST OF CR 29 iM=WB I,NZ=EFi WCk`9� lime Combined Wed. 1 Combined 32:00 . 12:30 ' ) • ' 0 0 0 0 ) 0 0 :45 . a . I . 0 1 I 0 1 I 0 2 ^.+;.::0 0 _ 0 0 0 0 0 0 01:15 0 . 0 0 0 - i. 01:30 _ 2 ! . 0 0 0 0 .. 011:45 0 .. 02:0u 1 1 ' C i • 0 0 0 I 0 . 02:15 - 0 I . 0 * 0 0 0 ' 0 • 02:30 0 1 _ 0 0 0 ' 0 • 0 . 0;::15 0 1 . 0 0 0 0 03:U:0 . i t 1 0 0 0 0 - 2 0 ' 0 03:15 _ 2 0 , . 0 - 03:30 . 5 • 0 - . 2 0 0 0 5 0 03:45 . 1 4 1 . 0 0 04:00 ' 1 . 0 2 0 0 . 0 04:15 1 0 1 0 0 4 0 04:30 0 * 0 • 0 1 0 0 0 ;4:45 1 1 0 1 . 1 2 05:00 0 . 0 ! , 0 0 . 1 1 * 0 05:15 . 1 • 1 0 0 05:30 0 . . 2 0 ' 0 ' 0 0 05:45 . 1 . 0 0 0 ' 0 0 1 0 0 06:00 0 06:15 . 00 . . 0 ' 0 ' 0 06:30 0 0 . 0 0 . 1 1 0 0 ' 0 0 06:45 - 0 0 . 07:00 . 1 . 0 1 0 0 0 07:15 1 * 0 0 ` 0 0 07:30 . 0 0 . 1 0 • 0 0 07:45 • 0 . 0 . 0 0 . 0 0 0 08:00 . 1 . 0 . 1 0 1 10 0 ' 0 00:15 , 0 . 0 0 08:30 . 0 . 0 0 ' 0 0 08:45 . , . 2 ' 0 0 0 0 0 ' 0 0 09:00 0 • 09:15 . 0 . 00 0• 0 ' 0 1 ' 0 10 1 09:30 4 0 . 0 09:45 • 0 . 0 • 0 0 0 ' 0 -' 0 10:00 .. 0 4 0 . 0 0 ' 0 1 ,,,0"• 10:15 . 1 0 1 1 • 0 0 10:30 0 0 . 0 0 0 10:45 C . 0 . 0 1 0 0 0 0 ' 0 0 11:00 . 0 . 0 • 0 0 ' 0 0 11:15 . 0 0 . 0 0 11:30 . 0 0 . ' 0 0 0 0 ' 0 0 11:45 ' 0 . 0 0 0 1 0 0 Totals 0 23 0 7 0 30 6 1 3 1 9 Day Totals 23 7 30 7 4 11 3 Total .0% 76.6% .0% 23.3% 54.5% 9.0% 27.2% 9.0% Peaks 03:00 12:45 03:00 08:30 12:00 04:00 12:00 07:45 12:00 Volume 9 P.H.F. .45 .25 .55 .37 .25 .25 .25 .37 .25 CHURCH & Associates, Inc. ENGINEERS & GEOLOGISTS ENGINEERING GEOLOGY REPORT FOR PROPOSED CATTAIL CREEK P.U.D. PART OF SECTION 9, TOWNSHIP 6 NORTH, RANGE 66 WEST OF THE 6TH P.M. WELD COUNTY, COLORADO Prepared for: CATTAIL CREEK, LLC. C/O TODD HODGES DESIGN, LLC 1269 NORTH CLEVELAND AVENUE LOVELAND, COLORADO 80537 JOB NO. 15255-L MARCH 18, 2003 DENVER 4501 Wadsworth Boulevard Wheat Ridge,CO 80033 CASTLE ROCK 303 660 4358 303.463.9317 Fax:303.463.9321 EVERGREEN 303.816.1455 LOVELAND 970.663.2124 TABLE OF CONTENTS SCOPE 1 PROPOSED DEVELOPMENT 1 SILL CONDITIONS 1 INVESTIGATION SITE GEOLOGY 2 MINERAL RESOURCES 3 GEOLOGIC HAZARDS 4 GEOLOGIC IMPACTS ON DEVELOPMENT 4 LIMITATIONS 5 LIST OF REFERENCES 6 FIGURE 1 -VICINITY MAP FIGURE 2 - SITE PLAN AND LOCATION OF EXPLORATORY BORINGS FIGURE 3 -AREA GEOLOGY FIGURE 4-MAP OF SAND, GRAVEL AND QUARRY AGGREGATE RESOURCES FIGURE 5 - SOIL SURVEY MAP FIGURE 6-LOGS OF EXPLORATORY BORINGS FIGURE 7 THROUGH 9- SWELL-CONSOLIDATION TEST RESULTS FIGURES 10-GRADATION TEST RESULTS SCOPE As requested, we have conducted this engineering geology report for the subject site. The purpose of our investigation was to identify site conditions regarding area suitability for the proposed development as requested by the Weld County Planning Department. PROPOSED DEVELOPMENT The 161±-acre parcel is located in part of Section 9, T. 6 N., R. 66 W. of the 6th P.M. It is proposed to divide the parcel into 8 rural-residential lots of approximately 4.00±acres and one lot of approximately 114± acres, as presented on Figure 2. Domestic water is to be supplied by public water. Sewer services are to be constructed on-site for each individual residence. A paved roadway is proposed to access the 8 lots. SITE CONDITIONS The site is located approximately 6 miles east of Windsor, east of County Road 29 on the north side of County Road 70, The eight 4-acre lots are located at the southeast part of the property. This part consists of an irrigated, plowed field with slopes approximately 1% to 3% general to the east. A southward flowing drainage way with a delineated 100-year floodplain is located along the east boundary. Water was flowing in the drainage during this investigation. A concrete lined ditch is located between the 114-acre lot and the 4-acre lots. INVESTIGATION This investigation was conducted by means of a site reconnaissance and test hole observations conducted on March 3 and 6, 2002 by the author of this report, a Professional Geologist as defined under House Bill 1574. Readily available maps and literature by the Colorado Geological Engineering Geology Report Job No. 15255-L Page 2 -- Survey and US Geological Survey were also reviewed for this preliminary evaluation. Refer to the attached List of References. SITE GEOLOGY The area lies in the Colorado Piedmont Section of the Great Plains Physiographic Province. The Colorado Piedmont is an elongated trough situated adjacent to the Front Range. As mountain uplifting occurred in Laramide times, increased stream energies at the foot of the mountains resulting in erosion and scouring, creating the Piedmont. The site also lies in the Denver Basin, a thick accumulation of Mesozoic sediments, which have been producers of fossil fuels. The referenced geologic map indicates Quaternary Age eolium (Qe) underlies the west side and Quaternary Age Piney Creek Alluvium (Qpc) underlies the east side of the property, as presented on Figure 3. Qe is described as wind-blown clay, silt and sand. The Qpc is described as sandy to gravelly alluvium, deposited by water. Claystone and sandstone of the upper Cretaceous Laramie Formation (KI) was encountered in the borings underlying 7 feet to 20 feet, or more, of the surficial soil, No outcrops of the KI were observed on the property, The rock encountered in the test holes was severely weathered to firm. A swell test of weathered claystone, or shale, indicates a low swell potential. There were no faults, folds or other structural features observed in the field or delineated on the referenced maps in this area. Surficial soils encountered in the test holes consisted, primarily, of 6 feet to 9 feet of loose to very loose silty sand with sandy silt underlain to 7 feet to 20 feet, or more, by gravelly sand underlain to the maximum depths explored of 20 feet by weathered and firm claystone with sandstone. The silty sand is moist to wet, loose to very loose and compressible having low strength characteristics. The gravelly sand is moist to wet, dense and having moderate strength characteristics, The Soil Conservation Service (SCS) maps indicate 2 general soil types; Kim loam and Olney Engineering Geology Report Job No. 15255-L Page 3 fine sandy loam. Kim loam is described as mixed alluvium and parent (bedrock) material. Olney fine sandy loam is described as mixed outwash. The SCS maps indicate moderate erosion potential in the Kim loam and low erosion potential in the Olney fine sandy loam. The SCS tables suggest slight limitations in the Kim and Olney fine sandy foams for building site development and sanitary facilities. Preliminary percolation tests provided in a report by Northern Colorado Geotech, Project No. 034-01, dated August 30, 2001 indicates percolation rates which would support the "slight limitation" category for sanitary facilities for the 3 sites tested. Free groundwater was encountered in all 5 test holes at depths ranging from 5.0 feet to 9.6 feet, as indicated on Figure 6. Free water encountered in the borings is perched on relatively impervious weathered rock. The groundwater appears to flow generally from the west to the east. Maximum seasonal groundwater levels were not determined during this investigation, however, are expected to rise during irrigation and wet seasons. Existing groundwater conditions are at levels in some areas which will effect basement-level construction, onsite waster water system (OWS) placement and roadway construction. MINERAL RESOURCES Colorado Geological Survey (CGS) Special Publication 5-B, referenced geologic map and test hole data from this report were reviewed as the primary references for the preliminary evaluation of sand, gravel and quarry aggregate resources and field verified by the geologist. The CGS publication indicates that the east side of this parcel lies in terrace deposits (T) with a probable aggregate resource (4) rating, as presented on Figure 4. Part of this area lies in a 100-year floodplain. Minimal gravel was encountered in the test holes. Due to the poor quality of aggregate and relatively small size of the deposit, it is our opinion that aggregate resources encountered on the property do not meet quality/quantity standards for being economically commercial deposits. Three oillgas wells and tank Engineering Geology Report Job No. 15255-L Page 4 batteries are located on the property. GEOLOGIC HAZARDS Environmental Geology 6 of the Colorado Geological Survey indicates very gentle to moderate slopes exist on the property. Our observations indicated no signs of active or past movement due to unstable slopes. Based on this information, it is our opinion that there are no geologic hazards caused by gravity on the property. Man-made activities, such as deep excavations, may create conditions, which could result in gravity-caused geologic hazards. GEOLOGIC IMPACTS ON DEVELOPMENT The interaction of the proposed development and the geology of the site will depend on the types of structures proposed and specific geologic influences. The primary structures to be built are building foundations, paved roadway and onsite wastewater systems (OWS). POT MTh TIONS- The upper silty sand and sandy silt exhibits low to very low bearing characteristics. Shallow groundwater, which may interfere with basement-level construction, also exists in some of the proposed building areas. Foundation depths should be limited to provide a safe buffer between potential high groundwater and floors. Dewatering methods may also be useful in lowering groundwater, allowing lower foundation levels. Foundation subgrades may require a stabilizing layer of gravel or other methods to improve bearing support. Site-specific geotechnical investigations are recommended for each structure to determine soil strengths, swell potentials, groundwater levels and make recommendations for design and construction. ROADWAYS It is our understanding that the proposed interior roadway is to be paved. A geotechnical investigation is recommended for the roadway so that the pavement structure can be designed for the appropriate soil, groundwater and traffic conditions. The high groundwater and very Engineering Geology Report Job No. 15255-L Page 5 loose to loose soil conditions often result in pavement subgrades that may not be able to be stabilized with conventional compaction methods. Subgrades for paved roadways must be relatively non- yielding in order to compact the base course and asphalt layers. Various methods, which may consist of soil replacement, chemical stabilization, or geogrid/geotextile placement, may be required to provide a stable subgrade for paving. ONSITE WASTEWATER SYSTEMS (OWS) Preliminary percolation tests provided in a report by Northern Colorado Geotech indicates percolation rates of 12, 20 and 45 minutes per inch (MPI) at the 3 locations tested. Groundwater levels and high as 5 feet were encountered for this investigation and are expected to rise during irrigation and wetter seasons. Four feet of separation is required from maximum seasonal groundwater to the bottoms of the drain fields. Mounding of drain fields is a common method to accommodate shallow groundwater conditions. Site-specific percolation investigations for OWS are required by the County Health Department prior to issuance of a building permit. Engineered systems will be required where groundwater separation requirements cannot be met with existing conditions. GEOLOGIC HAZARDS- The site observations and referenced map did not indicate signs of geologic hazards caused by gravity, such as landslides, debris flows, rock fall, or unstable or potentially unstable slopes. Man-made activities could produce conditions, which may result in hazardous conditions, if not carefully planned. No geologic hazard mitigation is anticipated for this site. Excavations for foundations, utilities and other structures may need to be protected from caving. Refer to OSHA standards for the appropriate protection methods. LIMITATIONS This study was preliminary in nature and did not include an extensive exploration program for the presence of oil, natural gas, uranium or other mineral resources. Based on existing maps, Engineering Geology Report Job No. 15255-L Page 6 —. literature and field data potential sand, gravel and quarry aggregate resources are not believed to exist in economic quantities or quality. Although no geologic or soil hazards appear to exist in the present condition, site-specific geotechnical and onsite wastewater investigations should be conducted for each lot. If we can be of further service in discussing the contents of this report, or to conduct site- specific investigations, please call. CHURCH&Associates, Inc. 40.\V- ppOFFssl l�prr _t ir: t yy ..'"•Nt�,r iii, •J 0 V Thomas W. Finley,C.P.G� a \\n1r G 3 copies sent LIST OF REFERENCES Colton, Roger B., 1978, Geologic Map of the Boulder-Fort Collins-Greeley Area, Colorado: U.S. Geological Survey Map I-855-G Johnson, Erin J., and Himmelreich, John W. Jr., 1998, Geologic Hazards Avoidance or Mitigation: Colorado Geological Survey Information Series 47 Leafgren, Doug, 2001, Preliminary Geotechnical Engineering Report — Proposed Shepardson PUD- Weld County Roads 20 and 29, Weld County, Colorado, Northern Colorado Geotech Project No. 034-01 Rogers, W.P., Ladwig, L.R., Hombaker, A.L., Schowchow, S.D., Hart, S.S., Shelton, D.C., Scroggs, D.L., and Soule, J.M., 1979, Guidelines and Criteria for Identification of Land-Use Controls of Geologic Hazard and Mineral Resource Areas, Colorado Geological Survey Special Publication 6 Schowchow, S.D, Shroba, R.R., and Wicklein, P.C., 1974, Atlas of Sand, Gravel, and Quarry Aggregate Resources Colorado Front Range Counties: Colorado Geological Survey Special Publication 5-B Shelton, D.C., Rogers, W.P., 1987, Environmental and Engineering Geology of the Windsor Study Area, Larimer and Weld Counties, Colorado, Colorado Geological Survey Environmental Geology 6 Tweto, Ogden, 1979, Geologic Map of Colorado: U.S. Geological Survey , 1980, Soil Survey of Weld County (Northern part, Southern part), Colorado: U.S. Department of Agriculture Soil Conservation Service PROPOSED CATTAIL CREEK P.U.D. SCALE PART OF SECTION 9, 1 : 50,000 T. 6 N., R. 66 W. OF THE 6TH P.M. k WELD COUNTY, COLORADO N I y I J u T.6N. \ Lake u e<> 6 ��_ A 5 /� V � � A 4918 •1 A 1 A � 1499 1 \,4in �`9M J�J� c---,, 4846 '���'SITE I L.o COUNTY ROAD 70 • . !` e� __ _ P • i a . is l \ 17 1 15 l --�� z ' , v �;� �� �I cl! v B. \Laka 1 �� �� ?� CJ Cam( �hOp ... .. TO WINDSOR — �� ' _ - — — . \ , ' - HIGHWAY 392 -Well' "Re e/pg �� �(� 1 fteow tau C.J� L\ 4� -,,r5 _ II J) i 20 ..-1 ) A 21 �. 22 \ •`� R.66W. VICINITY MAP JOB NO. 15255-L FIGURE 1 PROPOSED CATTAIL CREEK P.U.D. SCALE PART OF SECTION 9 1" = 600' T. 6 N., R. 66 W. OF THE 6TH P.M. WELD COUNTY, COLORADO \ t siLt ;r N LOTS v 100-YEAR 114.56 t ACRES -- ' FLOODPLAIN • • .. 4 W5,, -- V........ . IN iS� , 1 I TH4 APPROXIMATE LOCATION OF TH-5 ■ "1 OIL/GAS WEL , HEADS i 1 \v t N TH-3 Y 4 i � C TH2 ii I w fi tss 41 04i Lj I '1 ; It AC ? BRIDGE ..--,_.WELD--COUNTY-ROAD-70 TH-I • DRAWING BASED ON PRELIMINARY PLAT BY INTERMILL LAND SURVEYING PROJECT NO. P-02-5081, DATED 1-17-03 SITE PLAN AND LOCATION OF JOB NO. 15255-L EXPLORATORY BORINGS FIGURE 2 PROPOSED CATTAIL CREEK P.U.D. SCALE PART OF SECTION 9, 1 : 50,000 T. 6 N., R. 66 W. OF THE 6TH P.M. WELD COUNTY, COLORADO N I T 7 -7-\ 1 uDeT I "),. lig Z. ake l Wands 1�F: Lake i Nix 49/8 RM 2 -. (1499% M 828 B (1 72 IA SITE ® fie aeis I 1� '� ... \•'`• (14681\CD` Neff Lake /\ i , �J t � I 392 • / KEY QE - QUATERNARY EOLIUM, WIND-BLOWN CLAY, SILT AND GRANULES QPC- QUATERNARY PINEY CREEK ALLUVIUM, SANDY TO GRAVELLY ALLUVIUM O - DEFLATION BASIN BASED ON USGS MAP I-855-G r AREA GEOLOGY JOB NO. 15255-L FIGURE 3 PROPOSED CATTAIL CREEK P.U.D. SCALE PART OF SECTION 9, 1 :37,500 T. 6 N., R. 66 W. OF THE 6TH P.M. WELD COUNTY, COLORADO N I . I:� Wood• Lake .....j/N�/� e. y , Na SITE o• J1 ,1 � 9 \Thia,--1:-<NTN:i_j___ ___,.:_,.. .fi \,... ._,,i77 1^�� 1•'_4 �r\s e- KEY V - VALLEY FILL DEPOSITS 4 -PROBABLE AGGREGATE RF"RCE BASED ON: ATLAS OF SAND, GRAVEL a QUARRY RESOURCES - COLORADO FRONT RANGE COUNTIES COLORADO GEOLOGICAL SURVEY SPECIAL PUBLICATION 5-B (1974) MAP OF SAND, GRAVEL & QUARRY AGGREGEATE RESOURCES JOB NO. 15255-L FIGURE 4 PROPOSED CATTAIL CREEK P.U.D. y SCALE ,,, PART OF SECTION 9, 1" - 2000' T. 6 N., R. 66 W. OF THE 6TH P.M. i WELD COUNTY, COLORADO N I r sL 4 '" rt 3z i. I .':'3S 32 •. 47 52 !� fa r? 32 ,s 4 ? 33 rk3 °- •s::24 I34 \33 33 .1 x t 47 3 ti<: ,F, sm8 b sn b 1 t 32 -SITE ; i., 32 8 p 6� 47 9 32 33 32 ' - 32 3e ' 65 i ; -fib 33 \ - - 47 16 S If3 KEY 32 -KIM LOAM - I% TO 3% SLOPES, MIXED EOLIAN AND PARENT MATERIAL 33 -KIM LOAM -3% TO 5%SLOPES. MIXED EOLIAN AND PAINT SEDIMENT 46 - OLNEY FINE SANDY LOAM, MIXED OUTWASH SOIL SURVEY IS BASED ON USDA SOIL SURVEY OF WELD COUNTY, COLORADO SOIL SURVEY MAP JOB NO. 15255-L FIGURE 5 ) ) ) . TH-1 TH-2 TH-3 TH-4 TH-5 o 7 .'] W12 7/12 6/12 2/12 6/12 5 — 'WC WC A .'• WC-23.5 WC-Ito 5 DD=9a LL=27 - j. _a_ -200-55 I 3 PI=NP 7 20/12 50/12 4 18/12 20/12 -4- 6/12 10 WC=14.1 WC=21.9 WC-120 WC-11.1 1 DD-110 00-.125 28/12 1W12 E 15 1 72 50/11 50/10 EGG 20 WC=23.7 20 DD=105 EXPLANATIONS: '.. FALLINGFI 6/12 INDICATES THAT 6 BLOWS OF A 140 POUND HAMMER FALLING 30 INCHES WERE REQUIREDTO DRNE A 2.5 INCH OA.SAMPLER 12 INCHES ) ® TOPSOIL . SAND,SLIGHTLY GRAVELLY TO GRAVELLY, WET,DENSE,LIGHT BROWN 1 INDICATES DEPTH TO FREE WATER AND THE NUMBER OF DAYS AFTER DRILLING THE - MEASUREMENT WAS TAKEN SAND,SILTY,SLIGHTLY CLAYEY,MOIST TO ® WEATHERED CLAYSTONE WRH 9• WET,VERY TO LOOSE, BROWN TO SANDSTONE, TO ��MEDIUM TO FIRM, Z- UGHT BROWN AR NOTES: 1. THE EXPLORATORY BOWNGS WERE DRILLED ON 3303 USING A 4-INCH DIAMETER CONTINUOUS FLIGHT AUGER POWERED BY CME 45B DRIWNG RIG. ' CLAYSTONE WITH SANDSTONE,MOIST, 2. FREE WATER WAS ENCOUNTERED AT THE TIME OF DRILLING AS SHOWN. FIRM TO HARD,DARK GREY TO OLIVE 3. WC- WATER CONTENT(%) DO-DRY DENSITY(PCF) -200-PERCENT OF FlNES PASSING THE NUMBER 200 SIEVE. LL-LWUID OMIT PI-PLAWRCTTY INDEX NP-NOT POSSIBLE LOGS OF EXPLORATORY BORINGS JOB NO.15255-L FIGURE 6 • 2 I ! a -1 0 z F .m Ii I I I 3 LL CONSOLIDATION UNDER CONSTANT PRESSURE DUE TO WETTING I I I I I I s -6 I ! jI I -7 -8 ICI I I ! I 1 I l .Ocn ! ' j 9 ; I iF l I -io U 11 I F 1 II I I -12 „ -13 I F 14 0.1 1 10 100 APPLIED PRESSURE - ksf Sample of Silty Sand From TH-1 @ 3' Natural Dry Unit Weight = 99 PCF Natural Moisture Content = 27.1 % JOB NO. 15255-L SWELL-CONSOLIDATION TEST RESULTS FIGURE 7 8 7 I l 6 I 5 FJ 4 1 1 1 ! i I I C„-4 EXPANSION UNDER CONSTANT 2 PRESSURE DUE TO WETTING t l 'I l ! I I � ! t ! I I I ' it III it I � I -2 � , illl I I I III, I O _3 4 (.) -5 6 i I j 0.1 1 10 100 APPLIED PRESSURE - ksf Sample of Claystone from TH-3 @ 19' Natural Dry Unit Weight= 108 PCF Natural Moisture Content = 23.7 % JOB NO. 15255-L SWELL- CONSOLIDATION TEST RESULTS FIGURE 8 .-. g L. 7 6 I ICI 5 II II I' II I I � O q O-i3 I 4 w I I I 1 NO MOVEMENT UNDER CONSTA NT 2 ! PRESSURE DUE TO WETTING I 1 \ II I III III p 4"..„.7)( I i ' I 1 it .o III en 3 I I l 0 _q I I I O I I I I I U I ! III ' , ! I I j ! j I II I I ! ! � � � I 1 , I I 1 I I ! !` 1 I III II 1 , -8 0.1 I 10� 100 APPLIED PRESSURE - ksf Sample of Clayey Sand from TH-4 @ 9' Natural Dry Unit Weight = 126 PCF Natural Moisture Content = 12.4 % JOB NO. 15255-L SWELL - CONSOLIDATION TEST RESULTS FIGURE 9 r. CHURCH & Associates, Inc. Engineers & Geologists Denver,Colorado 303-463-9317 Evergreen,Colorado 303-816-1455 Castle Rock,Colorado 303-660-4358 Loveland,Colorado 970-663-2124 Gradation Test Results #200 #100 #50 #30 #16 #8 #4 3/8" 3/4" 1-1/2" 3" 100.0 L 4 I It 1 I o 90.0 t' �I 9 I 80.0 20 I / Il I #, j 70.0 r 30 I I IItt a 60.0 I i ti` 4 {I 1 40 z iI le 50.0 j ! I e La' G III h 50 Y W 40.0 , !, il o. I 30.0 k h --� I i I� L 1. I I ' ' j II I 70 I ' zo.o F ' ! & [ j 1 b— , 1--N 80 o.o I I I r I 'III 1 III 1 90 0.0 ! @ 3 I b I 'I I 'I II' Ii loo 0.01 0.1 1 10 100 Diameter or Particle in Millimeters DESCRIPTION: SILT, VERY SANDY, CLAYEY, VERY MOIST, VERY LOOSE,BROWN GRAVEL 3% HOLE/SAMPLE TH-4 SAND 41% DEPTH 4' FINES 56% LIQUID LIMIT 27 MOISTURE 23.8% PLASTICITY INDEX NP DRY DENSITY(pet) N/A DATE: 3-17--03 JOB NAME: Cattail Creek, LLC r JOB NUMBER: 15255-L FIGURE 10 03/26/2003 09:54 6613229954, BONANZA CREEK OIL CO PAGE 02/03 BONANZA CREEK, OIL COMPANY, LLC 370/CalglnM Aremee ilakseaficlA CA H}0! P.O.an71/7I Of a'001.37LIlN 1249.78 S.&s.#M C4 LI,HO Cells MI I 16371 Cells em.su,oers March 19,2002 Mr.George DnBard Sent Via Fax Cattail Creek Group LLC 304 Immigrant Trial Windsor,Colorado 80550 Re: Cattail Creek Planned Unit Development Located north of and adjacent to WCR 70 in the SW/4 S9,T6N-R66W Weld County,Colorado As shown on the map attached hereto as Exhibit"A" Dear Mr.DuBard, After reviewing the proposed Cattail Creek PUD,it appears as planned the development will not hinder continued operations and maintenance of existing or future oil and gas wells. This observation of the project is conditional on the following: • Execution of a mutually agreeable Surface Use Agreement between the surface developer and Bonanza Creek Oil Company,which among other items,recognizes Bonanza Creek Oil Company's rights of ingress and egress to the existing wells and facility locations and Bonanza Creek Oil Company's rights to develop additional well and facility locations per State of Colorado regulations. • All structures are located in accordance with State of Colorado regulations concerning setback distances from existing and future well and facility locations. We would appreciate any updates as your project progresses. This approval is conditional upon your current development proposal. Should there be any changes to your proposal as presented that would impede our current or future operations,Bonanza Creek Oil Company would refuse approval. Smurel Patrick A.Graham Vice President—Rocky Mountain Region ) ) ) a O N d 01 _ N C e uNr..ra CATTAIL CREEK P.U.D. s ar u. taw-r e a• "9111111C.�.aktilliti 'li riL'�"�"w"r n .r.MIL • . .. ............... V N •. ..r.r..w.. N • •.•.r..S...al W • �} �� atisivl;l y • �ItJ� -.fits a . ..un v. • ii. A7 U W't�44w.. 'I} Y - at.F .w. .r•(Vs-- '/E2 zit: 1 + &:.1. * ..._...r_. II! 1/4jest. • INNS rwaa•as ar MIL ass a xi .oJ1 c ��sr+tr `react—vannor jig ... .>. • ...�. a, D ' :1num ' .frY•wI W art INN la u. L �e� /4" S7x:+ ��,'' ..rS Q. t`:w ` :T.;_c: 5,k ) L:. tf }L � i�T: op ti sa.�.o ,i . ti •t 34-1T..- - fir g ....... __ •• - �. tr t I i S. V t'. • • mg DWI/LS4 sewf Ihra i i ' . rvnctanu LAND saut,11NDL. tNo. __ ..#yam s_Wm 4.. • qat r o 4 l IO We.1t T i.•�G.wY... Gw'V.O.•.S 4/G dle/6 K. NA 4.- m w m W r. CERTIFICATE OF MAILING I hereby certify that the letters regarding the Open House regarding Cattail Creek PUD Substantial Change Application was mailed on April 16, 2003 to the following: Booth Land&Livestock Co Michael&Debra Page P.O. Box 72 14379 Weld County Road 70 Lucent, CO 80646 Greeley, CO 80631 Carpenter Enterprises William&Barbara Perusek 14953 Weld County Road 70 34024 Weld County Road 29 Greeley, CO 80631 Greeley, CO 80631 Michael Erbes R H Farms, Inc. 14099 Weld County Road 70 12315 WCR 72 Greeley, CO 80631 Eaton, CO 80615 Haythom Brothers Allen&Dawn Skoglund P.O. Box 4 34556 Weld County Road 29 Eaton, CO 80615 Greeley, CO 80631 Gary&Wendy Jurgensmeier Bryan White 34416 Weld County Road 29 4126 W. 15th Street Greeley, CO 80631 Greeley, CO 80634 MC Construction CO 1138 N. 11th Avenue Greeley, CO 80631 �~ 74/ Patrick& Claire McNear 34499 WCR 31 Greeley, CO 80631 Michael Miller 2650 64th Avenue Greeley, CO 80634 Jon Scott Moser 34824 County Road 29 Greeley, CO 80631 Gene Oblander 34645 Weld County Road 31 Greeley, CO 80631 r OTIS, COAN & STEWART, LLC C • Attorneys And Counselors At Law G. Brent Coen gbcoan®acslaw.corn April 16, 2003 Allen&Dawn Skoglund 34556 Weld County Road 29 Greeley, CO 80631 RE: Open House regarding Cattail Creek PUD Substantial Change Application Dear Mr. and Ms. Skoglund: Please accept this letter as an invitation to an open house to discuss the Cattail Creek PUD Substantial Change Application. We are holding the open house in an attempt to open discussions and answer any questions you may have with regard to the above mentioned application. The open house will be held on Tuesday, April 29, 2003 from 6:00 to 7:30 p.m. at: Old Town Hall of Severance Frances Brownell Park/Old Town Hall Park 336 1° Street Severance, Colorado The Old Town Hall is located across the street from Bruce's Bar. We look forward to seeing you at the open house. Thank you.aSinc ely, G. Brent an /gh r` The Doyle Building, 1812 56th Avenue,Greeley,Colorado 80634 Telephone: 970-330-6700 Fax: 970-330-2969 Metro: 303-659-7576 CERTIFICATE OF MAILING I hereby certify that the letters regarding Additional Information Regarding Cattail Creek PUD Substantial Change along with the referenced attachments were mailed on May 9, 2003 to the following: Booth Land&Livestock Co P.O. Box 72 Michael&Debra Page Lucern, CO 80646 14379 Weld County Road 70 Greeley, CO 80631 Carpenter Enterprises 14953 Weld County Road 70 William&Barbara Perusek Greeley, CO 80631 34024 Weld County Road 29 Greeley, CO 80631 Michael Erbes 14099 Weld County Road 70 R H Farms, Inc. Greeley, CO 80631 12315 WCR 72 Eaton, CO 80615 Haythorn Brothers P.O. Box 4 Allen& Dawn Skoglund Eaton, CO 80615 34556 Weld County Road 29 Greeley, CO 80631 Gary& Wendy Jurgensmeier 34416 Weld County Road 29 Bryan White Greeley, CO 80631 33877 County Road 31 Greeley, 80631-9379 MC Construction CO 1138 N. 11th Avenue Greeley, CO 80631 Patrick& Claire McNear 34499 WCR 31 Greeley, CO 80631 Michael Miller 2650 64th Avenue Greeley, CO 80634 Jon Scott Moser 34824 County Road 29 Greeley, CO 80631 Gene Oblander 34645 Weld County Road 31 Greeley, CO 80631 C/ CS OTIS, COAN & STEWART, LLC Attorneys And Counselors At Law G.Brent Coen gbcoan®ocalaw.com May 9, 2003 Allen&Dawn Skoglund 34556 Weld County Road 29 Greeley, CO 80631 RE: Additional Information Regarding Cattail Creek PUD Substantial Change Dear Mr. and Ms. Skoglund: Thank you to those who attended the Cattail Creek PUD open house held at Old Town Hall in Severance on Tuesday, April 29, 2003. We had 10 people attend the open house and we believe that the changes made to the proposed Cattail Creek PUD were generally well received by those in attendance. Some of those attending the open house asked questions about the architectural standards for construction within the proposed PUD. Therefore, I am enclosing with this letter copies of relevant portions of a draft declaration of Covenants, Conditions and Restrictions for the Cattail Creek PUD. Please submit any proposed modifications and/or concerns you may have about the restrictions on use or minimum architectural standards to my office in writing for consideration by Cattail Creek Group, LLC. I am also enclosing with this letter a copy of the traffic study that may answer some of the questions that were asked at the open house about expected traffic patterns and volumes associated with the planned PUD. We sincerely appreciate your willingness to discuss the Cattail Creek PUD substantial change application with us. We hope the open house was productive and that it helped you understand the nature of the proposed application. If'you have any suggestions about the project that my client should consider, please do not hesitate to send those suggestions to my office. We sincerely want to consider all suggestions and/or proposed modifications to the proposed PUD that would assist in integrating said PUD into the neighborhood. Thank you for your time at the public open house if you were able to attend and thank you for taking the time to review the enclosed documents and for providing any comments, questions or concerns that you may have associated with the proposed Cattail Creek PUD application. Sin ely, rent oan The Doyle Building, 1812 56th Avenue,Greeley, Colorado 80634 Telephone: 970-330-6700 Fax: 970-330-2969 Metro: 303-659-7576 prior to commencing any onsite work, the Architectural Review Committee shall famish notice of noncompliance to the Owner. Upon such notice, the Owner shall immediately cease all work other than is required to bring the Improvements into compliance. If the Owner fails to immediately cease all such work, or fails to bring the Improvements into such compliance within a reasonable period of time not exceeding thirty (30) days, the Architectural Review Committee and the Association shall have all rights and remedies available pursuant to this Declaration, at law or in equity. Such rights and remedies include but are not limited to the following: a. Injunctive Relief. The Architectural Review Committee and the Association may seek appropriate injunctive relief in order to compel the Owner to cease all work and bring the Improvements into compliance or authorize the Architectural Review Committee or the Association to undertake all steps and actions, on the Owner's behalf and expense. Said expense shall be a personal obligation of the Owner and a charge and lien against said Owner's Unit as with Assessments as provided herein. b. Damages,Costs,and Attorney Fees. The Architectural Review Committee and the Association may recover from the Owner all damages, costs, and attorney fees suffered or incurred in connection with the existence or remedy of any Improvements found by a court of competent jurisdiction to be in noncompliance with this Declaration, the Architectural Design Standards or approved plans, as applicable. Said damages, costs, and attorney fees shall be a personal obligation of the Owner and a charge and lien against said Owner's Lot as with Assessments as provided herein. Section 7. Authority to Hire,Assess Costs,and Raise Funds. The Architectural Review Committee has the authority to hire or retain such professionals or other persons as it deems neces- sary for the purposes described herein. The Architectural Review Committee shall also have the power to require the Owner submitting matters to it for approval to pay reasonably necessary costs of the submission prior to their review and as a necessary condition thereof. Any excess funds shall . be returned, but the submitting Owner shall remain liable to pay any additional expense(s) if prepayment is insufficient. Section 8. Records. The Architectural Review Committee shall maintain written records of all applications submitted to it and all actions taken thereon. Section 9. Restrictions on Use. Use and enjoyment of each Unit shall be subject to the following restrictions and such additional restrictions as are adopted by the Owners holding not less than seventy-five percent (75%) of the votes possible to be cast under this Declaration: a. Land Use. No Unit or portion thereof shall be used for any purpose other than a Single Family residence. No group housing or board and care homes shall be permitted. 22 x b. No Further Subdivision. No Unit or any building shall be further subdivided or separated into smaller units by any Owner, and no portion less than all of any such Unit or building or any easement or other interest therein shall be conveyed or transferred by an Owner, provided that this shall not prohibit deeds of correction, deeds to resolve boundary line disputes, and similar corrective instruments. c. Nuisances. No noxious or offensive activity shall be carried on upon any Unit, nor shall any thing be done thereon which may become an annoyance to the neighborhood. No annoying light, sound, or odor shall be emitted from any Unit onto any other Unit(s)which can be considered offensive or intrusive to other Unit Owners or occupants. d. Temporary Structures. No structures of a temporary character such as trailers, mobile homes, tents, shacks, garages, barns, or other outbuildings shall be used on any Unit at any time as a residence either temporarily or permanently. e. Accessory Buildings. No accessory buildings, storage barns, or sheds shall be constructed or moved onto any Unit without written consent of the Architectural Review Committee. Said structures shall not be unreasonably prohibited so long as full consideration is given to architectural integration of materials, colors, and placement on the property. f. Move and Set Structures. All structures within the Project shall be new construction and no previously erected building, structure, or Improvement shall be moved and set upon any Unit from any other location. Modular homes, factory-built homes, and mobile homes are not permitted. Exceptions may be made for prefabricated storage buildings with written approval of the Architectural Review Committee. g. Signs. No sign of any kind shall be displayed to the public view on any Unit except as specifically permitted by the Association. h. Oil, Gas, and Mining. No oil drilling, oil development operations, oil refining, quarrying, or mining operations of any kind shall be permitted upon, in or under any Unit. Nor shall any oil wells, tanks, tunnels, mineral excavations, or shafts be permitted upon any Unit. No derrick or other structures designed for use in boring for oil or natural gas shall be erected, maintained, or permitted on any Unit. Animals, Livestock and Poultry. No animals, livestock, or poultry of any kind shall be raised, bred, or kept on any Unit, except for dogs, cats, or other 23 r household pets, provided that they are not kept, bred, or maintained for any commercial purposes and do not constitute a nuisance. No more than two (2) dogs and two (2) cats may be kept on any Unit. Notwithstanding the foregoing,the Association may adopt Rules and Regulations permitting horses on the property subject to the Ordinances of Weld County. Animals shall not be permitted to roam onto other Units. No animals shall be allowed on the Common Elements except in strict compliance with Rules and Regulations adopted by the Association. The Owners of a Unit shall be responsible for any damage or injury caused by any animals owned or kept by the Owners. Without limiting the foregoing,continuous and/or frequent barking or howling by dogs is hereby defined as a nuisance. j. Garbage and Refuse Disposal. No Unit shall be used or maintained as a dumping ground for rubbish,trash, or garbage- Trash,garbage, or other waste shall not be kept except in sanitary and secure containers. All containers shall be kept in a clean and sanitary condition and shall not be kept in public view except during the scheduled day of pick up. k Storage of Materials. Storage of materials shall be done in accordance with the following provisions: (i) No occupant or Owner of any Unit shall store or permit to be stored or to accumulate, upon any Unit, any debris, any piles of manure, piles of dirt, machinery or equipment or any part thereof, old or rusted pieces of metal, rubber or any type of junk, or other miscellaneous items unless concealed from public and neighbor views within an enclosed structure. (ii) Storage of building materials is permitted only to facilitate continuous building projects in progress. Unit Owners shall supervise and assure secure storage of all building materials during construction to prevent damage to other structures or littering throughout neighborhood as a result of heavy winds. (iii) No tanks for the storage of gas, fuel, oil or other flammable materials shall be erected, placed, or permitted above or below the surface of any Unit. Any firewood pile shall be screened and located within the confines of a privacy fence approved by the Architectural Review Committee. 1. Hazardous Activities. No activities shall be conducted on any Unit which are or might be unsafe or hazardous to any person or any property. No firearms shall be discharged upon any Unit and no open fires shall be lighted 24 x or permitted on any Unit except in a contained barbecue unit while attended and in use for cooking purposes or within an interior approved fireplace. No burning of trash, leaves, or other materials shall be allowed. The storage of any type of explosive devices, compounds, chemicals, or materials is prohibited. m. Motor Vehicles, Recreational Vehicles, Disabled Vehicles, Vehicle Storage and Repair. No more than two of the following may be parked on a Lot except in an enclosed building: motor vehicles, motor cycles, motor homes, campers, trailers, recreational vehicles, tractors and equipment. All of the above must be operable and, if applicable, properly licensed. No tractor-trailers or semi-trucks may be parked on a Lot at anytime. Except as set forth above nothing else shall be parked or stored on a Lot except in and enclosed building unless specifically permitted by Rules and Regulations adopted by the Association. No motor vehicles, motor cycles, motor homes, campers,trailers,recreational vehicles,tractors,and equipment shall be stored or parked for more than 72 hours on any street within the Project. No tractor-trailer or semi-truck shall be allowed at any time on any street in the Project except for delivery of materials during construction or moving vans, while being used to move personal property to or from a Lot. Nothing contained herein shall prevent the Owner or Owners of any Lot from storing any of said vehicles(except tractor-trailers or semi-trucks)in a garage on their Lot. No automotive repairs shall be done on any street, or Lot which may be seen from the view of adjacent properties. The restrictions set forth above shall not restrict the parking of trucks or other commercial vehicles for a reasonable time upon a Lot, which vehicles are necessary for the construction of a building on said Lot. n. Antennas. No exterior radio antennas,television antennas, or other antennas may be erected unless approved in writing by the Architectural Review Committee. Any facility for the transmission or reception of audio or visual signals shall be kept and maintained, to the extent reasonably possible, underground or within an enclosed structure. Notwithstanding the foregoing, neither the restrictions nor the requirements of this Section shall apply to those antennas (which may include some satellite dishes and other devices) that are specifically covered by the Telecommunications Act of 1996, as amended from time to time. As to antennas which are specifically covered by the Telecommunications Act of 1996, as amended, the Committee shall be empowered to adopt rules and regulations governing the types of antennas that are permissible hereunder, and to the extent permitted by the Telecommunications Act of 1996, as amended, establishing reasonable, non- discriminatory restrictions relating to appearance, safety, location, and ,—. maintenance. 25 • o. Home Occupations/Businesses. The conduct of a home occupation or business within the Project is prohibited unless the following requirements are met: home occupations or businesses must be conducted inside the residence and not occupy more than fifteen percent (15%) of the total floor area of the residence. Home occupations or businesses must be conducted only by the residents of said dwelling with no nonresidents employed at the residence. No retail sales shall be conducted on the Lot or in public view. Home occupations or businesses must be conducted within the scope of the zoning ordinances of Weld County. Customer visits must be limited to an occasional frequency. Customer parking must be in the driveway or immediately in front of the residence. There shall be no evidence of a home occupation or business from the outside of the residence. p. Clothes Lines and Dog Runs. No clothes lines shall be located on any Lot and dog runs must first be approved by the Architectural Review Committee. q. Maintenance and Repair of Landscaping and Improvements: Maintenance and repair of landscaping and Improvements shall be subject to the following provisions: (1) Each Owner shall provide prudent and regular exterior maintenance upon each Unit including painting, repairs and/or replacement of roofs, gutters, downspouts, exterior building surfaces, trees, shrubs, grass and other landscaping, fences, walks, driveways and other surfaces, and all other exterior Improvements to maintain the value of said property. Owners shall comply with mandatory landscaping requirements as set forth in the Architectural Design Standards adopted by and available from the Architectural Review Committee. Unit Owners shall not allow weeds or other unsightly vegetation on unimproved Units to exceed twelve inches in height. • (ii) Failure to maintain: In the event an Owner of any Unit in the Project shall fail to maintain the premises and the Improvements thereon as provided herein, the Association or the Architectural Review Committee, after Notice to the Owner and a reasonable opportunity for the Owner to perform all necessary work, may undertake such work on behalf of and at the Owner's expense. Any such expense shall be reimbursed to the Association or Architectural Review Committee within thirty(30) days of the furnishing of Notice to such Owner that such reimbursement is owed, together with costs of collection thereof; attorney fees,and interest thereon. Said obligation shall be a personal obligation of the Owner and a charge and lien against each Owner's Unit as provided herein for Assessments. 26 A r. Non-Owner Occupants. All covenants, restrictions, rules, regulations, and provisions of this Declaration shall be binding on non-Owner occupants without exception.Property Owners who lease their property shall be required to furnish to lessees copies of this Declaration along with a written lease referencing this Declaration; leasing or being absent from the property shall not release property Owners from liabilities and responsibilities described herein. s. Water and Sewer. No individual water supply system or sewage disposal system shall be permitted on any Unit unless it is in compliance with all state and county health regulations and approved by the Weld County Department of Public Health and Environment. All dwellings must attach to a public water source. Leach fields must be designed by a licensed engineer. Space for two septic systems must be reserved and maintained by each lot owner. All activities such as landscaping and construction are expressly prohibited in any designated absorption field site. t. No Violation of Law. Nothing shall be done or kept in or on any portion of the Project by a Unit Owner or occupant which would be in violation of any statute, rule, ordinance, regulation, permit, or validly imposed requirement of any governmental body having jurisdiction over the Project. The Association shall have no duty or obligation to enforce any such statute, rule, ordinance, regulation, permit or validly imposed requirement. u. Fencing. No fencing of any type shall be constructed by any Lot Owner on any Lot within the Project without prior approval in writing by the Architectural Review Committee. All fencing, except dog runs, shall reasonably match the fencing installed on the Common Elements. v. No Imperiling of Insurance. Nothing shall be done or kept in or on any . portion of the Project which might result in an increase in the premiums with respect to insurance obtained for all or any portion of the Project or which might cause cancellation of such insurance, except with the prior written consent of the Architectural Review Committee. w. Architectural Design Standards. The minimum Architectural Design Standards for the Project are set forth in Exhibit B attached hereto and made a part hereof. The Architectural Review Committee has the power and authority to make additional requirements for any residential construction or reconstruction within the Project. The Architectural Review Committee may modify or amend the Architectural Design Standards so long as such modifications and amendments are consistent with this Declaration. During 27 x the period of Declarant's reserved Rights, the minimum standards set forth in Exhibit B cannot be altered without Declarant's approval: x. Underground Lines. All electric, television, telephone, and other lines running from any property line of a Lot to a residence or other structure shall be placed underground. y. Trash Burning. Trash, leaves,and other similar materials shall not be burned within the Project. z. Drainage. No Owner shall change the topography or drainage pattern of a Lot including, not by limitation, any drainage easement areas, from the topography or drainage pattern established by the Declarant unless such change is approved by the Architectural Review Committee. Any Owner who in any way materially modifies the topography or drainage pattern of a Lot without such consent shall be liable for any and all damages stemming therefrom, and may be required to return such topography or drainage patterns to their original state. If any Owner fails to fully abide by this provision, the Association or the Architectural Review Committee, after Notice to the Owner and a reasonable opportunity to perform all necessary work restoring drainage patterns, may undertake such work on behalf of and at the Owner's expense. Any such expense shall be reimbursed to the Association or Architectural Review Committee within thirty(30) days of the furnishing ofNoticeto such Owner that such reimbursement is owed,together with costs of collection thereof, attorney fees, and interest thereon. Said obligation shall be a personal obligation of the Owner and a charge and lien against each Owner's Lot as provided herein for Assessments. Section 10. Waivers;No Precedent. The approval or consent of the Architectural Review Committee or any representative thereof, or of the Board of Directors, to any application for architectural approval shall not be deemed to constitute a waiver of any right to withhold or deny approval or consent by the Committee or any representative thereof, or by the Board of Directors, as to any application or other matters whatsoever as to which approval or consent may subsequently or additionally be required. Nor shall any such approval or consent be deemed to constitute a precedent as to any other matter. ARTICLE XII MORTGAGEE'S RIGHTS The following provisions are for the benefit of holders, insurers, or guarantors of First Mortgages on Units. To the extent permitted under Colorado law and applicable, necessary or 28 ARTICLE XIV WELD COUNTY'S RIGHT TO FARM Section 1. Rural Weld County. Weld County is one of the most productive agricultural counties in the United States, ranking fifth in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with longstanding agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural area: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Section 2. Agricultural Uses. Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment;slow-moving farm vehicles on rural roads;dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. Ditches and reservoirs cannot simply be moved "out of the way" of residential development without threatening the efficient delivery of irrigation to fields which is essential to farm production. Section 35-3.5-102, Colorado Revised Statutes, provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Section 3. Rural Services. Weld County covers a land area of over four thousand (4,000) square miles in size(twice the size of the State of Delaware) with more than three thousand seven hundred(3,700)miles of state and county roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Snow removal for roads within subdivisions are of the lowest priority for public works or may be the private responsibility of the homeowners. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. • Section 4. Parental Supervision. Children are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation 31 x • ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock present real threats to children. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. Parents are responsible for their children. ARTICLE RV GENERAL PROVISIONS Section 1. Restriction on Declarant Powers. Notwithstanding anything to the contrary herein, no rights or powers reserved to Declarant hereunder shall exceed the time limitations or permissible extent of such rights or powers as restricted under the Act. Any provision in this Declaration in conflict with the requirements of the Act shall not be deemed to invalidate such provision as a whole but shall be adjusted as is necessary to comply with the Act. Section 2. Enforcement. Except as otherwise provided in this Declaration,the Executive Board, Declarant, Architectural Review Committee, or.any Owner shall have the right to enforce, by a proceeding at law or in equity, all restrictions, conditions, covenants, reservations, liens, and charges now or hereafter imposed by the provisions of this Declaration. Failure by the Executive Board of the Association, Declarant, Architectural Review Committee, or by any Owner to enforce any restriction, condition, covenant, reservation, lien, or charge now or hereafter imposed by the provisions of this Declaration shall in no event be deemed a waiver of the right to do so thereafter. Section 3. Registration of Mailing Address. Each Owner and each security interest holder, insurer, or guarantor of a security interest, shall register their mailing address with the Association. All notices, demands, or other notices intended to be served upon the Board of Directors or the Association during the period of Declarant control shall be sent by registered or certified mail, postage prepaid, do Cattail Creek Group, LLC, P.O. Box 68, Windsor, CO 80550, unless such address is changed by the Association during the period of Declarant control. Subsequent to the termination of the period of Declarant control, the Association shall notify the Owners of a different address for notices. Section 4. Limitation on Liability. The Association, Board of Directors, Architectural Review Committee, Declarant, and any member, agent, or employee of any of the same, shall not be liable to any person for any action or for any failure to act unless the action or failure to act was not in good faith and was done or withheld with malice. Section 5. No Representations or Warranties. No representations or warranties of any kind, express or implied, shall be deemed to have been given or made by the Declarant or its agents and employees, in connection with any portion of the community, or any Improvement, or their physical condition,zoning,compliance with applicable laws, fitness for intended use,or in connection r 32 EXHIBIT B TO DECLARATION OF COVENANTS,CONDMONS AND RESTRICTIONS FOR CATTAIL CREEK MINIMUM ARCHTILCTURAL DESIGN STANDARDS Section 1. Architectural Styles. It is the intent of these guidelines to insure a high quality, aesthetically pleasing neighborhood. The homes should have a diversity of architectural styles and be compatible with the neighborhood as a whole. The Architectural Review Committee shall have the authority to deny any building plan for any reason including that the plan is not compatible with the neighborhood for aesthetic or other reasons. Section 2. Minimum Square Footage and Building Height The ground floor finished area of any residence, exclusive of open porches, patios and vehicle garages, shall not be less than one thousand, five hundred (1,500) square feet for a one-story residence and not less than one thousand (1,000) square feet for the first floor of a two-story residence. The total square footage minimum for the main floor and upper floors of a multi-level residence shall not be less than one thousand, eight hundred (1,800) square feet. The maximum building height of any residence constructed shall be thirty-five (35) feet measured from the top of the foundation to the crest of the highest roof line (excluding chimneys, cupola). Section 3. Roof Pitches. The roof pitch on any residence must be from-six-twelve (6/12) to twelve-twelve (12/12). Section 4. Standards Regarding Use of Exterior Materials. Exterior materials shall be limited as follows: a. Stone, brick or stucco shall be required for a minimum of forty percent (40%) of the first floor facade of the front elevation of the residence b. The roofing material to be utilized upon buildings in the subdivision shall be approved by the Architectural Review Committee. No wood roofs or shingles shall be allowed. c. Foundation walls shall not be exposed more than twelve (12) inches above grade. d. All fascia on residences shall be a minimum of eight (8) inches. 4- 1.2 e. All soffits on residences shall be a minimum of twelve (12) inches except that where brick adjoins the soffit, the soffit shall be a minimum of eight (8) inches. f. All plumbing vents shall be located on the back portion of the residence. Section 5. Color of Exterior Materials. ALL EXTERIOR COLORS, INCLUDING ROOFING COLORS,MUST BE APPROVED BY the Architectural Review Committee PRIOR TO CONSTRUCTION. Section 6. Setbacks. All structures shall be constructed such as to meet the buiding setbacks required by Weld County, Colorado. Section 7. Site Grading. Exterior grading shall be adequate for drainage away from the buildings and adjacent buildings. Section 8. Paved Areas. Hard-surfaced private driveways and parking areas are required. Concrete is the preferred surface for private driveways and parking areas. If alternative materials are proposed, they must be submitted to and approved by the Architectural Review Committee prior to construction. Section 9. Garages. Each residence must have an attached garage of not less than twenty- two feet by twenty-two feet (22' x 22'). Section 10. Accessory Buildings. All accessory buildings shall be subject to Architectural Review Committee approval as set forth in the Declaration. Each Lot may have up to two (2) accessory buildings. One building shall be a storage building which shall not exceed twelve feet by twelve feet (12' x 12'). The maximum size of the other building may not exceed the maximum size permitted by Weld County, Colorado. 1.3 PUBLIC WORKS DEPARTMENT • 1111 H STREET P.O. BOX 632 GREELEy, COLORADO 80632 WEBSITE: WWW.CO.WELD.CO.US PHONE (970)356-4000,EXT. 3750 wineFAX: (970)304-649T COLORADO September 13,2002 Matthew L Delich,P.E. 2272 Glen Haven Drive Loveland,CO 80538 Re: PZ-613 Cattail Creek, WCR 70 Road Improvements Agreement Dear Matt: This is in response to your memorandum of August 28,2002, and to document our telephone conversation of September 10, 2002. I agree with your methodology in determining 27%to be the cost allocation for the Cattail Creek development. • Roadway stabilization consisting of additional aggregate base course treated with chemical additives is an appropriate roadway improvement given the level of traffic anticipated at the build out of Cattail Creek. The cost for material and placement for one mile is approximately$50,000. Your cost share contemplated stabilizing 0.8 of a mile from the Cattail Creek access east to WCR 31. Because we anticipate Cattail Creek will generate 40%of its trips west to WCR 29, and because the County would stabilize the entire mile,the cost share should include the entire mile. Therefore,the cost share for the development would be ($50,000 X 27%)$13,500. It is my understanding you agree. This proposal meets the roadway improvements agreement requirement for the change of zone hearing. The final agreement to be submitted to the Board of Weld County Commissioners for approval will be required with the final plat application materials. ,_Sincerely Drew Scheltinga P.E. Engineering Division Manager PC:John Shepherdson,Cattail Creek Group LLC Todd Hodges!Ann Johnson,Todd Hodges Design Sheri Lockman,Planning File PZ-613 MAW PflIFStDREW tPlanning1PZS t3 WCR7W geemrnLwpd • A^ m MEMORANDOM PFpo AEcsa m o: wr U CO c, TO: John Shepherdson, Cattail Creek Group LLC eie' =a' 1 Todd Hodges, Todd Hodges Design 4• C31..)G" f eo co Drew Scheltinga, Weld County Public Works -o ' U I-- FROM: Matt Deiich �G CD DATE: May 17, 2002 CI LL SSuBZECT: Cattail Creek Development - Traffic impact study w (File: 0229ME01) 0 -J•> N The Cattail Creek Development is a nine lot planned unit m development proposed in Section 9-6-66 in Weld County. Figure 1 O CO shows the location of the Cattail Creek Development. As indicated w O on Figure 2, eight lots will access WCR70 from a cul-de-sac. A a r single lot, on a parcel that cannot readily be connected to the cul- S rn de-sac will have a driveway access to WCR70. Weld County Road 70 and z Li w z Weld County Road 29 are gravel roads. Drew Scheltinga, Weld County C7 o Public Works Department, has indicated that the traffic impact study w a for Cattail Creek Development should determine whether the future cm traffic will exceed the 200 vehicle per day (vpd) volume threshold= cat A volume greater than 200 vph on a gravel road will require mitigation to provide dust suppression. Typically, the mitigation �^ takes the form of paving the subject road. The determination of the future traffic volume must consider Current counts, site generated traffic, and traffic generated from recorded exemptions in the area. Recorded exemptions are land divisions that have been approved by Weld County. These land divisions may be occupied by a dwelling unit at some time in the future. No further approvals are required for recorded exemptions, therefore, it must be assumed that a dwelling unit can and will be constructed. In addition, concern was expressed regarding the separate access to WCR70 from the single lot. W Daily traffic counts were obtained on May 6 and 7, 2002, at the locations shown on Figure 3. Raw traffic count data is provided in a z Appendix A. W I Z The Cattail Creek Development will generate approximately 80 V z . daily trip ends from the cul-de-sac and 10 daily trip ends from the = single lot. The trip distribution for the site generated traffic is -a shown on Figure 4. The trip distribution is based upon the location z o of employment attractions using information contained in the "North Q a Front Range Regional .Transportation Plan," and in consideration of the road system in the area. Figure 5 shows the assignment of the • a site generated traffic on the key unpaved public roads in the z immediate area of the Cattail Creek Development. t F- An additional component of future traffic on the key unpaved W as public roads in the area is that which is attributed to the recorded I U exemptions . Research at the Weld County Planning Department aindicated that there was one recorded exemption in section 9-6-66 and one recorded exemption in section 16-6-66. These are the recorded OC I— exemptions that would contribute traffic to the key unpaved roads in the area_ Other recorded exemptions in the area are either built or would have little impact on the key unpaved public roads in the area of the Cattail Creek Development. Traffic from the recorded exemptions that are built are reflected in the current traffic counts. Traffic from the unbuilt recorded exemptions are shown in Figure 6. These two components of the future traffic were added to the current counts to get a future daily traffic forecast for the key unpaved roads in the area of the Cattail Creek Development. This is shown on Figure 7. The daily traffic volumes shown on Figure 7 indicate that no segments of the key unpaved roads will exceed the 200 vpd threshold. - Therefore, no dust suppression treatment is necessary for WCR70 or WCR29. As indicated on the site plan (Figure 2) , eight lots will access wCR70 via- a cul-de-sac and one lot will access WCR70 via a driveway. The building envelope for the single lot is not near the cul-de-sac that serves the eight lots that are clustered. From an operations perspective, the cul-de-sac and the single lot driveway intersections with WCR70 will operate acceptably. • It is concluded that no unpaved road segments in the area of the Cattail Creek Development will exceed the 200 vpd mitigation threshold_ Connecting the single lot to the cul-de-sac does not appear to be feasible. The separate driveway and cul-de-sac intersections with WCR70 will operate acceptably. n EATON GREAT WESTERN R.R. • Cattail Creek ce a Al WCR70 co N St-I392 Av1 Nis-roivae eaNRR SCALE: 1=4000' SITE LOCATION Figure 1 -- u _ N • • • 1 t 3 Lot9 1 1 ' "`/ r. Wit 1 .ii y y 1 ,}c`y. T w \t° t}ti pen 5 . —�� ATst\ s !' Lot.2..: Ar;, it �'xt 1 y 1Lt4z, YA budding .r 4 T . N. Weld County Road 70 Scale: I "=COG Figure 2 SITE PLAN N as- � N Site 41 89 � i ■ i WCR70 m Daily RECENT DAILY TRAFFIC Figure 3 � N Site 10% - 60% H _ WCR70 N TRIP DISTRIBUTION Figure 4 N intSite 9 54 WCR70 N ■ Daily --SITE GENERATED DAILY TRAFFIC Figure 5 ce NJ Site 2 12 WCR70 Daily DAILY TRAFFIC FROM RECORDED EXEMPTIONS Figure 6 N a c+7 Site 52 127 155 WCR70 CD CD r Daily TOTAL DAILY TRAFFIC FORECAST Figure 7 APPENDIX A 4. ii •'N O t:ii ti C',`1g • . 0.r,O p.[i el" .. I u aa In i' -' ur ..1 LI -lao OCO<..00000O0OOCOOO0.IONC,C,OC)[n..,.4R 0- nn_. .,e..C OOO ON C- em 'Libra, .. .In n: c. •" 414 • + , 11 [ „ 4 W 4 1 + 4114 { 1 . > . II • • 114 14444444 4 I4 . 4 f• 'L' O O N 1+1 .0000CIOC>CI OO 000000000..0.4000•-.O0 NH•+N O41nyO[Jnl➢.iO OO0 ONO $ III hN 1 O n ,[i 0 _ •111 [ 11III1 . , , , , , 44 . 14414 . 14 Y 4Y + 41 , i . s • . 4 , , . a 44 ♦ a O ( 01 P r- vO()O[YOC>O(JOp0OOOOO OOO JNGn0O0OOt1GNCNr1N.aN^_.p OG OOpQ.{O... IC )• VI M n NOV .1 CO • In1n O 41't ni•. 1. •1 1 C 1. m. I .$�N^` , t. 3 0 ri mj0 4 41-4 L1'� us,r• L n 1:,5 :.. il� .0100:{.LION0 ONNNONv-1,-,4100•'Iel ON.,O.I.iN(H.1. -.00 OOC O0O0,OOON n0N II -1 0-41.0 it L n I N, N 'An CI O 0 0 10 rl Al 14 .1 , 4 ♦ I „ 111 , . 1 • 444 . 44 . 44 ♦ 4 . 1 144 ,. { 44 • • y:e $ :I:y ..__._, .. F l .20.-100000.♦0 PIN,.+O(IOo.., 0o0,.C,00 0141+.-Io,O.-.0 0000 oce'o.-1000r n 000 N ( a: N m 00 N .4 4 . 11 . 144 . . 4 i 4. 111 , . . 4. 444 . 4 . 4 ♦ , , 4 ♦ . • 4 . 444 , • , . 10 Y O 0 •O[JOp:.....0..40".o.-,00.♦,n14O0,..J...-4 O,r,y O-I00O0000000CCCON „ Ci01N re..5h n, CJ, LJ en.a. o 6. 11')11 r4 I . 4 •. I I • , 44 • - 4 , ♦ 4444 . • . . • • 44 a 44 , 4 . . . 4444 , 1 ♦ . 4 . 440 w 0 INC-• • 0 - I' CO A C`0 rr a 11 11 a I C n , v ,, ., 'Y, ay • erne.0On.^,ulC:aar.OOq VI avl0+10.0000Al Cv,c.[ 00 o m 01,0.YC':::ccn,YC0;,oml+� is ..-; ,: r0,,r , otcl1O..n•t o.,nl-[C..un,.0...n•.C..n a . 0•,;ow0-4n-0- 14 n.,.,-0-.1- . , 0 ;] e . m i ,. I:... .. a... . .. .. O 1111. .. 1111 .. .... .. .. .... .. .. .. 1111 .. .... .... .. a . ape, N(ir4.,.,.I.:..(JOI;+•+- I..II1 .4 an m n mr'v.n v-rr r 00 c>4 ec 0 C,///•. '0.4a.... in 00 • t .1.111' it f,.1.J.4,11,:)(50,•0:50 CQp OOC 000 O 0O 0O0 C OOO0 OC C.C.00 CO H,,-t •4 Y'J4 ?later $ cl:y Mountain Co::ncs. LW. For, '-04on. CC 00622 File Dace: 25/0'/_00: Other : Phone (203) 641-0445 Fax (3031 057-9191 Pile I.D. : Ca; Sfr..er enma ,C7. 70 WET .F Ss 29 LNlawn 1.142—Ell +x f.R29 9e.:" Tues. _ - au Combinedred 1 ::-„= ` n .' 'r A: a s-, 19 A.I i CS 1 _ Cec.Slaed 12:00 - . �.j0.. A.H. ?_li_ FL .i.3. 72:15 • - C 0 j0 0 0 ..:40 12:34 0 0 1 0 0 ' 0 0 _2:45 •• 0 0 1 1 0 2 01:•5 0 ; 0 I .. 0 0 - ; a ' I 01:30 . 0 0 I Si0 01:4_ - c i • 0 C - 0 .. 02:00 I . 0 1 1 - 0 • I 0 0 . 0_:15 a i 0 1 • 0 - I 0 0 , 02:30 0 0 • 0 0 • I 0 0 . 0 0 • 0 03::00 0 I - 1 i 0 0 0 0 03:15 2 1 0 • 2 0 • 0 - 0 03:30 5 • 0 • 2 0 • 0 • 0 • 03:45 1 1 5 0 0 - 0 • 04:00 1 • 0 • 1 0 • 0 _ 0 0 - 0 • 04:1.5 1 • 0 0 1 0 04:30 0 00 1 • 0 1,.1:45 1 1 • 0 • 1 • 115:00 0 0 02 0 - 1 1 • 05:15 1 1 , 0 0 - 0 . 05:30 0 . 0 . 0 0 ' 0 0 09:45 1 - 0 • 0 0 0 . 06:00 0 • 1 • 1 0 • 0 • 0 • 06:15 0 . 0 0 ' 0 - 1 0 06:30 0 • 0 0 0 - 1 ' 1 , 0 0 06:45 0 • 0 - 0 0 ' 07:00 1 0 • 0 0 0 0 1 0 07:15 1 . 0 ' 0 0 07:20 0 0 0 0 - • 0; 1 0 0 , fl 07:45 0 . 0 00:00 0 • 0 3 • 0 • 0 ' 00:15 0 -. 00 • 1 p 1 • I 00:30 0 - 0 0 0•0 0 • 08:45 0 . 0 • 0 0 • 0 - 0 0 09:00 0 . 0 • 0 ` 0 • 09:15 0 • 0 • 0 0 • 0 • 0 • 09:30 0 . 0 . 0 0 I • 0 • 1 . �\ 09:45 0 0 • 0 0 0 ; 0 10:00 0 0 . 0 1 0 1 . 1 • 0 • 1 • 10:15 I 0 1 0 10:30 0 00 0 - 10:45 0 0 - 0 1 • 0 1 • 0 0 •11:0,1 0 0 0 o • 0 • 11:15 0 0 0 0 • I •t a ' 0 ' 11:30 • 0 - 0 • 0 0 . 0 0 ' I 0 ' 11:45 4' 0 0 4 0 0 1 I 0 9 0 • toto1r a 23 0 1 0 30 Day Total^ 23 7 d 1 J j 9 20 ' 4 11 2 Total .U1 76.69 .01 23.31 54.59 9.01 27.22 9.04. Peaks 03:00 12:45 03:00 08:30 12:00 04:00 12:00 07:45 12:00 volume 9 2 11 3 1 1 1 3 0.11.k .45 .25 .55 .37 .25 .25 .25 .37 •`- /am, :ea= nrr - — Rocky F'•, -[a::. ts• - OE C1t4rr Coact 5_:9 C 0000:11070^(:'__ ri_�__ --- - -- ape__ - _17e: - -- c!...v : Phone (303: 641-0445• Fax (303) 857-9191File L0. : CR29NC87C_ Street same :CR. 29 NORTH OF CR 70 1241=S9 LII2-N9 ?acre 1 A4,7::: IYu. 1 o Cc.bined Due8_ :ombtaea "- ,75•�E .R _:.:!. 10..14. ?.;• 5407 A.M. : 2 r 12:15 - -1 I ` 0 : • 1 0 - t 0 - 12:30 ' 0 1 • 0 I 0 0 - I - r,. • I 0 -• - . - 0 , - 00 - C - 1 0 - - 0 1 - 0 1 - 0 0 • 1 - 0 _ • i U • 01:4C - 3 , 0 0 • ' 0 • 02:0: 0 1 ' 0 i • 0 0 r 0 i 0 - 02:15 I I 3 I + 4 0 ' 1 0 0 02:30 - a 1 + 0 1 0 0 0 • 0 fl2:45 2 i 2 1 4 0 ` 0 0 03:04.. 0 1 0 4 0 0 - 0 • i 0 - 03:25 • 1 I 2 • 3 0 • 0 0 • 03:34 2 1 3 0 0 • - 03:45 _. 2 • 0 + 0 • 0 0 04:00 1 - 1 ' 0 0 • 0 04:15 1 • 1 0 ' , 0 0 - 04:30 1 2 • 3 0 • I 0 • 0 • 04:45 1 3 0 0 0 - 05:00 1 - 0 + 1 0 • 0 ' 0 • 05:15 0 • 1 • I 1 0 • I • 05:30 0 0 • 0 • 1 0 - 05:.15 4 0 • 1 • 1 06:00 - 1 • 0 • 0 ❑ • 06:15 U 0 • 0 • 0 06:3U 2 4 6 1 3 4 • 06:45 2 0 , - 2 1 0 1 07:00 1 ` 2 • 3 3 - 6 • 3 • 07:15 1 0 1 3 • 1 4 ' 07:30 1 • 1 • 2 1 • 1 + 07:45 0 A I ' 1 1 a 0 1 + 98:00 2 • 0 1 • 3 ' 4 00:15 0 1 1 2 4 • 08:30 1 0 ' 1 2 ' 0 00:45 0 0 0 0 • U II • 00:00 0 - 0 • 0 0 • 2 • - ::15 0 • 0 a 0 2 • 0 • 2 09:30 U • 0 • 0 3 • 1 - 4 • -:.I 5 1 ' 0 • 1 0 • 1 ' 1 + , :00 0 + 0 • 0 1 0 * :15 0 • 0 0 1 1 • _0:30 - C • 0 ` -0 1 • 0 - - 10:45 0 • 1 - 1 1 • 0 + 12:00 0 • 0 • 0 a - 1 1 I1:15 0 0 • U 1 • 3 11:30 0 - 0 • 0 1 - 3 ' 11:45 1 ` 0 1 3 • 5 'F:+ralc 0 41 0 33 0 "74 30 0 20 0 59 0 Day totals 41 33 74 30 29 59 2 Tutal -01 55.43 .08 44-54 50.8s -0% 49.14 _04 Peaks 05:45 05:45 05:45 06:30 06:30 06:30 Volum0 2 2 14 8 10 18 P.0i.1. .87 .43 .58 .66 ..11 .5 r 1 -4n, Jsa.i_Ywr', ' COJCOOOC OODOOOOC : -COp'OD06DOCCDOCJO:ana+.' •I- 11 C a0..,-4'I U U'`.•C N O C J v J J A p,[.C.V'NN!+ ri-?W!+:J W NIINt.I,• •'1,•IJ N'JI•. , l t L.,., 11.•2 n w t' • I C. Gal-�Oa.Ww O' I Y„ T�t ••p•, aWY 0�': ^i i•.••-•O a.!•r•C.•IJ•.•0..'J•,.C a t•1.0 cr., � ryhily •1 :1 ANC'-+Ott'^✓i 0 N O N C tI CO O U'O 0^•JiJ:n LACn0:a Cl+0 y.p•A O EP C N 0 Mp lr 04'p v., ts0 , c,e.• re 5't .-b r,1L E1 Y u r, a C:0.i W i)a N i 0.1v p C - - . . • . II . I . , a • 1 . 11 . t , • . 4 t • e. O 3 wm.• •u o g . w g pCC •+O00000C DYp wCw Y000 G�Y4J Y.)uNwl:wuur O W•..OOY..I.-•t.:,WN.+ • I ♦ .1 C. • 0 I PP p . . . • . . . . . 14441 V 44 . 1fati t'• • t 4 . . . . , . t1 . • 4444 ta , ttt 1•. O K W .I I ) TW U GJV' .:. 400000 OCOYO.+DIJ.•C000wNOw OON-•IJN CWu O•"W V N O Co..N JIJ 1. - I } • :PI! C :1.6 '° 0 • I . . 4 . . . . It a 44 , 4 • I - a o IY O - Wry II O y IV' a,La to i a t a ri i'C a.,La Ul •.0000006r+Yr.4'til'aNO00.•VYW.•p Vita F:Lw la C...0 WN PI.•In r I:•OI) JAI to 1: I A ,[� I I It I VIi lu d'IA:1.J Y it Nil, O 0 NY 0 0 CO, LiO'I CI 3'.\,I IJ IJ u :I. r' w I) CYO "A M000WOUYN''ONw.--,1 Wraf N•-'Grr'0-'0000000000301!10302.OOOp•�, .4 W Li pr V w-1 II, tC .. 14 {i_'C , .• 144 . 41 • . . tt r 44414 . 1I . . t t n..DO•• __..._.. _._...._.._. 1 O a -1 o 14 N N1,0 0 DONY..tNF•oYDao0.•WONT+NCYNI+OCOOYDOC00000000Y4op00o0 'IY • na as c ,41.0 c. 1,4 . 4 . 4 4 '• I I .t 4 t . • • O'+N0` 0 V .I'O CCI'Ir 41' - 7C '4.9(II:II 0.10 WOO(.aYwNWWOI+U.'.'4a_:0[1-..w1JWuu.I+0uu a00.000000OOW0:1OLIC:COC' SJ Par l.* P. He 6 0 .1, W n: J I il II Y I 2- .a'a< N. d , Ilp. v Todd Hodges Design, LLC Introduction This outline serves the purpose of defining how the applicant has met the intent of established criteria for such hearing. The Board of County Commissioners moved to deny the request for the Change of Zone (PZ-613) due to the potential for incompatibility as an outcome of public testimony, potential lack of irrigation and domestic water as an outcome of public testimony, and buffering adjacent properties as an outcome of public testimony. A Public Open House was held in late April. The Certificate of Mailing and a copy of the letters mailed to Surrounding Property Owners is included herein. Suggestions were positive and have been incorporated into this application. A follow-up response to the Surrounding Property Owners is also included herein with a Certificate of Mailing. The procedural guide for a Substantial Change Hearing specifies that one of four defined scenarios must be met to qualify for a Substantial Change hearing. Two of the four listed scenarios illustrate the criteria this particular application has met. These scenarios, coupled with details on how the application has been substantially changed from the initial application, are described below. Criteria scenarios are listed in bold-face type. The explanation of how each scenario has been met follows each criteria scenario. A. Within the concept of a new application, the facts and circumstances of which are substantially changed from the initial application). 1. Has the land-use application substantially changed? (eg, substantial changes in lot size or density, in internal or external roads, or, in the case of a rezoning, in the uses proposed) Lot Sizes The lot sizes and common open space designation have been substantially changed from the original Change of Zone application. The internal road design and access point have also been modified. The lot sizes have been increased from one acre to four acres in size. This 400% lot size increase, coupled with the lot arrangement have changed substantially from the previous proposal. The previous proposal illustrated eight one-acre lots in a row configuration in the original application materials (PZ-613). The original plat and the revised plat are attached to application materials. Both plats have been reduced and attached herein. The lots have been reconfigured based upon public testimony and Board of County Commissioners comments and resolution. Lots one through eight are now four acres in size. Public testimony dictated one acre lots arranged in a row formation were not compatible with surrounding land uses. The applicant has rearranged Lots 1 through 8 around the internal road. The lot sizes for Lots 1 through 8 are also similar in size to those in the immediate vicinity. The ninth lot and respective building envelope have not substantially changed in size or configuration. 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (561)613-8775 email: toddhodgesdesign(igivest.net � r Todd Hodges Design, LLC Lots 1 through 5 have been extended east to the property line, incorporating flood plain area. This area is specified and enhanced with a 200 foot setback from the seep/draw area. Building activities shall not occur within this setback area and shall be noted as such on all recorded plats and in the Covenants. The access to the internal road has been moved east by approximately 400 feet. Access will still occur from Weld County Road 70. The length of the internal road has been reduced from approximately 1,400 feet to 1,000 feet in length. The Traffic Impact Report and approval from the Department of Public Works has been included. The impact to Weld County Road 70 will not change due to this application. The applicant is proposing the internal road be paved. The applicant is still in agreement with the proportional share of improving Weld County Road 70 as outlined in support materials provided with this application. Common Open Space Designation Section 27-6-80.B.7 of the Weld County Code notes all Planned Unit Developments containing a residential component shall provide a fifteen percent common open space allocation. The section further states the Department of Planning Services has the authority to grant a departure from this standard as long as the intent of providing common open space has been met. As proposed in this revised plan, Cattail Creek PUD will provide common open space in the following manner: • Lots 1 — 8 will each have "no-build" areas to encompass the lower draw area, septic fields and replacement envelopes, and increase the buffer area from adjacent properties. This "no-build" area for Lots 1 — 8 is 18.01 acres in size. This acreage is 53.869% of the total area covered by Lots 1 — 8 and 11.168% of the entire site. • Open space is also accomplished by a proposed 75 foot wide buffer between the residence to the west of Lots 6 — 8 and the back lot lines of the proposed Lots 6-8 as well as three acres north of the proposed Lot 5. This common open space area is 7.9 acres, or 4.456% of the total site. The 75 foot wide buffer will be planted in a mixture of deciduous and coniferous trees. The minimum sizes of trees to be planted exceed the standard minimum and is the result of discussions with adjacent property owners at the April Open House meeting. • The two components described above total 25.2 acres, or 15.642% of the total site area. • All open space areas will be planted in a dryland or native species mix. Future owners of the property included in this Subdivision will be notified of the Weld County Right to Farm and the uses allowed in the Agricultural Zoned district of unincorporated Weld County. Individuals living in the vicinity of this property are living in an agricultural area of unincorporated Weld County. Many of the existing small acreage residential lots in the area were created through the Recorded Exemption process. 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • fax: (561)613-8775 email: toddhodgesdesign(a?gwest.net ._.._.._. . . p Todd Hodges Design, LLC May 16, 2003 Ms. Sheri Lockman, Planner Weld County Planning Department 1555 North 17s'Avenue Greeley, Colorado 80634 RE: Cattail Creek, PZ-613, located on Lot C of Recorded Exemption, RE-2637, in part of the SW4 09-06-66 West of the 6th P.M., Weld County, Colorado. Dear Ms. Lockman: Attached you will find an application for a Substantial Change Hearing for the aforementioned land use application. The attached narrative follows criteria outlined for submitting the Substantial Change application. Submitted herein are items above what is required for this particular land use application. This is due to the applicant's wish to proceed with a Change of Zone hearing rather than the Sketch Plan should the Substantial Change determination be made. These additional items include an updated Geology Report, Traffic Study, North Weld County Water District information, Public Open House Information, and Bonanza Oil and Gas approval. Your kind consideration of this request is appreciated. Sincerely, &n'no Anne Best Johnson, AIC Todd Hodges Design, LL 1269 North Cleveland Avenue • Loveland, Colorado 80537 • (970) 613-8556 • lax: (561)613-8775 email: toddhodgesdesign(a)gwest.net Weld County Treasurer Prusuant to the Weld County Subdivision Ordinance, the attached Statement(s) of Taxes Due, issued by the Weld County Treasurer, are evidence of the current status as of this date of all property taxes, special assessments and prior tax liens attached to this (these) account(s). Current year's taxes are due but not delinquent. Signed: 1(.- ( Date: ;—)1 �01 3 r r. Report Date: 03/21/2003 12:43PM WELD COUNTY TREASURER Page: 1 STATEMENT OF TAXES DUE SCHEDULE NO: R8765900 r% ASSESSED TO: CATTAIL CREEK GROUP LLC PO BOX 68 WINDSOR, CO 80550 LEGAL DESCRIPTION: PT 9-6-66 LOT C AMD REC EXEMPT RE-2637(1.45R) PARCEL: 080509000055 SITUS ADD: TAX YEAR CHARGE TAX AMOUNT INTEREST FEES PAID TOTAL DUE 2002 TAX 2,320.44 0.00 0.00 0.00 2,320.44 TOTAL TAXES 2,320.44 GRAND TOTAL DUE GOOD THROUGH 03/21/2003 2,320.44 ORIGINAL TAX BILLING FOR 2002 TAX DISTRICT 0226- Authority Mill Levy Amount Values Actual Assessed WELD COUNTY 20.056 536.71 AGRICULTUR 92,269 26,760 SCHOOL DIST RE2 46.678 1,249.10 NCW WATER 1.000 26.76 TOTAL 92,269 26,760 NWC WATER 0.000 0.00 EATON FIRE 9.000 240.84 AIMS JUNIOR COL 6.316 169.01 WELD LIBRARY 3.249 86.94 WEST GREELEY SOIL 0.414 11.08 TAXES FOR 2002 86.713 2,320.44 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY AND MOBILE HOMES-AUGUST 1, REAL PROPERTY-AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIERS CHECK. e^ P.O. Box 458 Greeley, CO 80632 (970)353-3845 ext.3290 TETRA TECH RMC May 12, 2003 Mr. George DuBard Cattail Group, LLC 304 Immigrant Trail Windsor, CO 80550 Re: Raw Water Supply System Evaluation Dear Mr. DuBard: Pursuant to our proposal dated January 17, 2003, I have completed my evaluation of the proposed raw water supply system at the Cattail Creek P.U.D. This evaluation is based upon my site inspection of the property and delivery facilities and also upon information provided by Mr. John Shepardson and your contracted planner, Todd Hodges Design. This letter report provides a summary of my observations and conclusions. OVERVIEW The subject Cattail Creek P.U.D. is located in Section 9, Township 6 North, Range 66 West of the 6th P.M.,Weld County, Colorado. The property includes a total of nine lots, eight of which are residential lots of approximately four acres each and one that is approximately 115 acres within which 103 acres is irrigated by a center pivot sprinkler system(see Figure 1). The gross area of the entire property is about 161 acres. It is proposed to irrigate the property with native water rights that have historically been utilized for irrigation purposes on these same lands. It is proposed to improve the existing irrigation delivery system to provide a means of delivering water directly from Woods Lake to the proposed Cattail Creek residential lots. The proposed improvement includes approximately 700 lineal feet of new pipeline that will connect an existing system of canals and pipelines. WATER RIGHTS Cattail Creek Group, LLC owns 180 shares of stock in the Wood Lake Mutual Water& Irrigation Company(WLMWIC) and 3.75 shares of stock in the Larimer&Weld Irrigation Company. These shares were acquired from Shepardson Farm and historically irrigated the Cattail Creek property. It .-� is proposed to utilize 20 shares of WLMWIC for irrigation of the residential lots and the remaining 160 shares will be utilized to irrigate approximately 103 acres of land under the center pivot. 19O0 5.Sunset Street Suite I-F Longmont.CO 80501 Tel 303.7725282 Fax 303.665.6959 www.ttrmc.com MTh TETRA TECH RMC Mr. George DuBard May 12,2003 Page 2 The Wood Lake irrigation system includes two irrigation laterals (East Lateral and South Lateral) as shown on the attached Figures 1 and 2. Catttail Creek Group, LLC owns 40 shares of stock in the East Lateral and 140 shares of stock in the South Lateral. During times when maximum deliveries are being made through each lateral, Cattail Creek would be allowed to run a maximum of 40 shares of WLMWIC through the East Lateral and 140 shares of WLMWIC through the South Lateral. The 40 shares of ownership in the East Lateral is more than adequate to convey 20 shares of WLMWIC to the proposed residential lots. The following table summarizes the share ownership in WLMWIC and ditch laterals. Cattail Creek Group Total Residential Center Pivot Lots Irrigation Wood Lake Mutual Water&Irrigation 180 shares 20 shares 160 shares Wood Lake East Lateral 40 shares 40 shares - Wood Lake South Lateral 140 shares - 140 shares Larimer&Weld 3.75 shares 0.50 shares 3.25 shares Historical records of water deliveries from the Wood Lake system are limited and a detailed analysis of the expected yield of the water rights has not been performed. However, it is our understanding that the original allocation of Wood Lake shares was performed such that a single share of WLMWIC was adequate to irrigate a single acre of land by means of flood irrigation. Utilizing this general assumption, 20 shares of WLMWIC should be adequate to irrigate 20 acres of land growing a typical agricultural crop such as alfalfa or corn. The eight proposed residential lots have a gross area of approximately four acres each. It is estimated that an average of three acres per lot will be irrigated in addition to 7.2 acres of open space area, resulting in a total irrigated area of 31.2 acres at the residential area of Cattail Creek. The resulting ratio in WLMWIC shares to irrigated acreage is 0.64 shares per acre(20 shares/31.2 acres=0.64 shares per acre). The proposed residential lots at Cattail Creek will require irrigation water for purposes of maintaining the growth of native grass at each lot and within the open space areas. The irrigation water requirement for maintaining native grass is much lower than that for a typical agricultural crop. An irrigation application of 3.0 feet is typical for most agricultural crops irrigated by means of flood irrigation. Therefore, it is expected that the irrigation water supply in the amount of 0.64 shares per acre should provide about 1.9 feet of application, which is an adequate supply for irrigation of native grass in the residential area of Cattail Creek. It is proposed to utilize 160 shares of WLMWIC to irrigate approximately 103 acres of land under the center pivot sprinkler on the Cattail Creek property. The160 shares of WLMWIC and 140 shares in the South Lateral should provide a more than adequate water supply for the irrigation of typical agricultural crops under the center pivot, including corn, alfalfa, and other crops. n TETRA TECH RMC n Mr. George DuBard May 12, 2003 Page 3 DELIVERY SYSTEM Water has historically been delivered to the Cattail Creek property through both the East and South Laterals of the Wood Lake irrigation system. It is proposed that future deliveries to the center pivot are made through the South Lateral,just as they have been during the last two irrigation seasons. It is proposed that future deliveries to the residential lots are made through the East Lateral. Deliveries into the East Lateral are made through a pumping facility located at the south end of Wood Lake. Water flows by gravity from reservoir storage into a pump sump located near the southeast abutment of the dam. Two vertical turbine pumps are mounted within the sump and discharge into the East Lateral. The combined capacities of the two pumps exceed the capacity of the East Lateral; the pumping system includes redundancy that improves the reliability. From the pump system to Weld County Road (WCR) 29, the East Lateral is a concrete lined open channel that travels in a southeast direction for a distance of approximately 3,800 feet. At the west side of WCR 29, the lateral transitions into an underground pipeline that continues under the road and toward the east. The pipeline then travels in a southward direction to an existing concrete control structure. From this point, it is proposed to install approximately 700 lineal feet of new 10- inch diameter pipeline. The new pipeline will convey water from the control structure to an existing 10-inch diameter pipeline as shown on the attached Figures 1 and 2. From this point, the existing pipeline will convey water to an existing concrete lined irrigation channel that is located along the west edge of the proposed residential lots. The new pipeline will bypass the concrete control structure located at the downstream end of the proposed new pipeline. The raw water supplied to the concrete lined channel along the west edge of the residential lots will be utilized to flood irrigate the residential properties and open space areas. It is emphasized however, that an independent sprinkler system using potable water sources will be utilized to irrigate any turf grass immediately surrounding the residential structures. It is recommended that the residential lots be graded such that adequate drainage is provided away from all structures including homes, garages,barns, and septic systems. For lots 5 through 8, the raw water will be delivered directly from the existing concrete irrigation channel to the property. For lots 1 through 4, the water will likely be conveyed from the concrete channel through the open space area,between lots 5 and 6, and into a new irrigation lateral traversing the west side of lots 1 through 4. It is important that adequately sized culverts are installed at each driveway and under the access road to ensure proper drainage and conveyance of irrigation and storm water. TETRA TECH RMC /`, Mr. George DuBard May 12, 2003 Page 4 SUMMARY The Cattail Creek Group, LLC owns 180 shares of Wood Lake Mutual Water& Irrigation and 3.75 shares of Larimer&Weld Irrigation Company. Shepardson Farm previously owned these water rights. The water yielded from these water rights has historically irrigated the lands within the subject Cattail Creek P.U.D. It is proposed to utilize 20 shares of WLMWIC and a raw water irrigation system to irrigate the proposed residential lots within Cattail Creek. Approximately 700 feet of newly constructed pipeline will be installed in order to deliver the water directly from the East Lateral of the Wood Lake Mutual Water& Irrigation system to the proposed residential lots. The water rights and proposed delivery system will provide an adequate irrigation system to maintain the growth of native grasses at the proposed residential lots. The remaining 160 shares of WLMWIC will be utilized to irrigate 103 acres under the center pivot sprinkler on the Cattail Creek property. The water delivered to the center pivot will made through the South Lateral and it is expected that these water rights will provide an adequate irrigation water supply for the growth of agricultural crops. The water rights will be used only on lands historically irrigated with these same shares and therefore,no expansion of use of these water rights will occur as the result of the Cattail Creek development. If you have questions or require additional input,please contact me. Sincerely, Tetra Tech RMC Douglas C. Seely, P.E. Water Resources Engineer Attachments cc: Anne Best Johnson(6 originals, 24 copies) G:\4542_00 I.dcs\Report\Letter_Rep3.doc Hello