Loading...
HomeMy WebLinkAbout20031361.tiff ai- eccc-St5>n Pcs-hnv PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS I THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, VONEEN MACKLIN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FOR USR-1416, A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS, PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS (EXCAVATION EQUIPMENT REPAIR SHOP AND CONTRACTOR'S SHOP) IN THE A (AGRICULTURAL) ZONE DISTRICT. VONEEN MACKLIN Name of Person Posting Sign Signature of Person Posting Sign STATE OF COLORADO ) ) ss. COUNTY OF WELD ) I• ' The foregoing instrument was subscribed and sworn to me this day of Ma\I , 2003. WITNESS my hand and official seal. Note Public My Commission Expires: qi- )/Oci 4 EXHIBIT E dcb3-136/ r-� SLATERPAULL ARCHITECTS May 22, 2003 Monica Daniels-Mika Weld County Planning and Zoning 1555 North 171"Avenue Greeley, Colorado 80634 RE: Vista Ridge Academy 10303.000 Dear Monica: This letter is generated in response to Department of Planning Services' staff recommendations for a site specific Development Plan and a Special Review Permit for a recreational facility. Attached are a Fencing and Screening Plan, a Landscape Plan, and a site specific Traffic Report. All documents match those that have been submitted to the Town of Erie in the form of a Site Improvement Plan for their review and approval. The site that is shown in the plat documents will not contain any signage of any kind, so a Signage Plan was not created for submittal at this time. The landscape plan shows ballfields encircled by a crusher fines track, that will be private and fenced along Ridgeview Drive. Additional fencing along Sheridan will be added in Phase II. Fencing is vinyl coated chain-link and is intended to act as a deterrent to parking in the Ridgeview Drive ROW and as a measure for safety for children using the fields. Adequate parking for use of these fields is provided at the school site to the west, and is beyond the boundaries of this plat. Parking will not be permitted within any public ROW. The use complies with all setback and offset requirements for the zone district. Landscaping, sidewalks and roads that are shown within the ROW on Ridgeview Drive will be constructed and designed by Vista Ridge Metropolitan District, and location is for general intent only. Landscaping and sidewalks that are shown along Sheridan will also be constructed and designed by the Vista Ridge Metropolitan District and location is also for general intent only. Sincerely, SLATERPAULL ARCHITECTS, INC. Kara Aylesworth, AIA H:UOBF/LESS 103 0 3 0 0 01/IC weld 001.wM/ EXHIBIT F Use*ILO° ONE PARK CENTRAL/SUITE 4001 ISIS ARAPAHOE ST/ DENVER CO 80202/TELEPHONE 303.407.0977/FACSIMILE 303.607.0767/ W W W.SLATE NPA U 1.1..COM LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303)333-1105 FAX (303)333-1107 E-mail: Isc@Iscdenver.com Web Site: http://www.lsedenver.com TRANSPORTATION CONSULTANTS, INC. 9e March 7, 2003 Mr. Russ Korcuska Vista Ridge Academy c/o Boulder Junior Academy t' 2641 Fourth Street Boulder, CO 80304 Re: Vista Ridge Academy Erie, CO y (LSC #030260) Dear Mr. Korcuska: We are pleased to submit this site specific Traffic Impact Analysis of the proposed Vista Ridge Academy to be located north of Ridgeview Drive and west of Sheridan Boulevard in Erie, Colorado. The Vista Ridge Traffic Impact Analysis(TIA) dated December 19, 2000 evaluates the overall impacts of the Vista Ridge development. The proposed site was assumed to be office/ commercial in the December, 2000 TIA and is now proposed for a private school serving grades K-12 with a capacity of 250 students. Access to the site is proposed from Ridgeview Drive with • two full movement access intersections. This analysis evaluates traffic impacts at the site's access points. Recommendations are also made for drop-off/pick-up traffic control. The remainder of this letter summarizes our findings. Site Location and Proposed Land Uses The location of the proposed Vista Ridge Academy is shown in Figure 1. It is located north of Ridgeview Drive and west of Sheridan Boulevard. The proposed site will contain a private school with a capacity of 250 students. Surrounding Roadway Network and Background Traffic Conditions As shown in Figure 1, the Vista Ridge Academy will access Ridgeview Drive which connects to the surrounding road network at Sheridan Boulevard and Mountain View Drive. Proposed r'; lane geometry and traffic controls are illustrated in Figure 2 and a description of the surrounding roadway network is as follows: • Sheridan Boulevard is proposed as a four-lane arterial connecting I-25 on the north with 120"' Avenue on the south. The Ridgeview Drive intersection will be signalized li when MUTCD traffic signal warrants are met. Mr. Russ Korcuska Page 2 March 7, 2003 • Mountain View Drive is proposed as a collector roadway with a signalized inter- section with SH 7. It will loop north and west to Vista Ridge Parkway. • Ridgeview Drive is proposed as a two-lane collector roadway connecting Sheridan Boulevard on the east with Mountain View Drive on the west. 2020 Background peak-hour traffic volumes on Ridgeview Drive are illustrated in Figure 3 and are based on buildout of the Vista Ridge development as contained in our December, 2000 TIA. Trip Generation Vista Ridge Academy is planned to ultimately accommodate 250 students. The amount of traffic that will be generated by the private K-10 school with potential future 1 and 12`h grades was determined using trip generation rates published by the Institute of Transportation Engineers in its report Trip Generation, 6th edition, 1997, and is shown in Table 1. As shown, on a typical weekday the school can be expected to generate about 820 vehicle-trips per day, with 410 vehicles entering and 410 vehicles exiting the site in a 24-hour period. During the morning peak-hour, approximately 138 vehicles will enter and 93 vehicles will exit the site. During the afternoon peak-hour, about 73 vehicles will enter and 88 vehicles will exit. During the evening peak-hour, there will be about 20 entering and 30 exiting vehicles. r Estimated Traffic Distribution and Assignment The directional distribution of project-generated traffic on the roadways providing access to and from the Vista Ridge Academy is one of the most important elements in determining its related traffic impacts. Major factors which influence the traffic distribution include: • The location of the site related to population and activity areas; • The roadway system providing access to and from the site; • The specific access plan designed to serve the site. Figure 4 illustrates the percent distribution of the project-generated traffic. It is expected that about 60 percent of the traffic would be oriented to the east on Ridgeview Drive and 40 percent oriented to the west. The assignment of project-generated peak-hour traffic is also shown in Figure 4 and was calculated by applying the trip distribution percentages in Figure 4 to the trip generation estimates given above. 2020 Total Traffic Year 2020 projected peak-hour traffic volumes are illustrated in Figure 5 and reflect the combination of 2000 background traffic from Figure 3 and project-generated traffic from Figure 4. Mr. Russ Korcuska Page 3 March 7, 2003 Capacity Analysis Based upon the peak-hour traffic volumes shown in Figure 5, "Unsignalized Intersection Capacity" analyses have been performed, using procedures set forth in the 2000 Highway Capacity Manual. The concept of Level of Service (LOS) is used as a basis for computing combinations of roadway operating conditions which accommodate various levels of traffic activity. By definition, six different Levels of Service are used (A, B, C, D, E, and F) with "A" being virtually a free-flow traffic condition and"F" being a total congested condition. Analyses have been performed for both the morning and evening peak-hour periods for 2020 back- ground plus site-generated traffic. The results of these capacity analyses are enclosed and are summarized in Table 2. The results of the capacity analyses indicate that all movements on the Ridgeview Drive/site access intersections will operate at acceptable Levels of Service (LOS "D" or better on all movements) with the addition of project-generated traffic. Drop-Off/Pick-Up Recommendations In the design of any school site plan,it is important to provide adequate on-site areas for drop- off/pick-up of students. In order to properly size such an area for Vista Ridge Academy, queuing analyses were performed as summarized in Tables 3 and 4 for the drop-off and pick- r up periods, respectively. For the drop-off period, it was assumed that about 70 percent of the morning peak-hour arriving vehicles (or 100 vehicles) would use the drop-off area with the remaining vehicles using the parking lot. It was assumed that these 100 vehicles would randomly arrive over a 20-minute period or an arrival rate of five vehicles per minute. It was further assumed that two vehicles could unload simultaneously and that each vehicle could stop and unload in 15 seconds. Using these parameters and standard queuing formulae it was calculated as shown in Table 3 that the 95' percentile queue would be six vehicles. In a similar manner, pick-up queues were estimated as shown in Table 4. Due to more car- pooling and students staying for after-school activities, fewer vehicles are expected to arrive during the peak pick-up period, but they will be concentrated in a shorter period. It was assumed that 60 vehicles would use the pick-up area and would randomly arrive over a 15- minute period or an arrival rate of four vehicles per minute. The loading time would be some- what longer at 20 seconds per vehicle,with two vehicles picking-up simultaneously. As shown in Table 4, the 95th percentile queue would be seven vehicles. Based on these calculations, it is recommended that 200 feet be provided for the drop-off/pick-up area which would be adequate for eight to ten vehicles. In addition, two traffic monitors should be stationed on the site as shown in Figure 6. One monitor should be stationed at the head of the queue to direct pick-up activities. The other should be stationed at the cross-walk crossing the drive loop to safely cross students and parents to and from the parking lot. Finally the loop drive should signed and striped for one- " way operation as shown in Figure 6. Mr. Russ Korcuska Page 4 March 7, 2003 Conclusions Based on the foregoing analysis,the following conclusions can be made regarding the proposed Vista Ridge Academy: 1. The Vista Ridge Academy will contain a private K-10 school with potential future 11 th and 12th grades with an ultimate capacity of 250 students. It will be located north of Ridgeview Drive and west of Sheridan Boulevard. 2. The distribution of trips to and from the site will be such that 60 percent of project- generated traffic would be oriented east on Ridgeview Drive and 40 percent will be oriented west. 3. All movements on the Ridgeview Drive/site access intersections will operate at a acceptable Levels of Service (LOS "D" or better on all movements) with the addition of site-generated traffic. Due to the low volume of traffic expected at the site access turn lanes will not be required. 4. The drop-off/pick-up area should be at least 200 feet in length and be appropriately signed. 5. Traffic monitors should be stationed at the head of the drop-off/pick-up area and at the crosswalk. 6. The traffic impacts of the Vista Ridge Academy are relatively minor and can be adequately served by the surrounding road network. We trust that the above information will further the planning for the Vista Ridge Academy. Please let me know if we can be of additional assistance. Respectfully submitted, LSC Transportation Consultants, In nn c Ory By: a 14` 32 p o Alex J. Arin llo, P.E. \� s't)�AJA/wc CS' ,....... `� / Enclosures: Tables 1 - 4 S/nNAt E Figures 1 through 6 Capacity Analysis Reports p .. \\Server\d\LSC\Projects\2003\030260\Report\F-VRA.wpd Table 1 ESTIMATED TRAFFIC GENERATION Vista Ridge Academy, Erie, Colorado (LSC No. 030260, March 2003) Assumed Generation Rates(1) Trips Generated Trip Average PM Peak-Hour Average PM Peak-Hour Generation Weekday Peak-Hour of Generator Weekday Peak-Hour of Generator Peak-Hour Land Use Description Acres Units Traffic AM In AM Out In Out PM In PM Out Traffic AM In AM Out In Out PM In PM Out School 5 250 Students (2) 3.28 0.55 0.37 0.29 0.35 0.08 0.12 820 138 93 73 88 20 30 Notes: (1) Rates as cited in'Trip Generation", Institute of Transportation Engineers,6th Edition, 1997. (2) ITE Land Use No. 521,Private School,with extrapolated daily rate. Table 2 Intersection Level of Service (1) Vista Ridge Academy Erie, Colorado (LSC # 030260, March, 2003) Year 2020 Year 2020 Background plus Background plus Site-Generated Traffic Site-Generated Traffic Level of Level of Level of Service Traffic Service Service PM Peak-Hour Control Intersection Location AM PM of Generator i, Unsignalized Ridge View Drive/West School Access Road Eastbound Left A A A Southbound Approach A A A Critical Movement Delay(sec/veh) 9.3 9.4 9.7 Unsignalized Ridge View Drive/East School Access Road Eastbound Left A A A Westbound Left A A A Northbound Approach A B B Southbound Approach B D C Critical Movement Delay(sec/veh) 11.9 25.5 22.8 Note: (1) Using 2000 Highway Capacity Manual(HCM) methodology and Level of Service (LOS) definitions. Table 3 Drop-off Queuing Analysis Single-Channel Queue Vista Ridge Academy School drop-off area Assumed Service Rate = 8 (veh./min.) 2 vehicles at once unload in 15 seconds Arrival Rate = 300 (veh./hr.) = 5 (veh./min.) Traffic Intensity = arrival rate (vpm)/service rate (vpm) Traffic Intensity = 0.625 Average Queue Length = 1.0 (veh.) Probability Calculations Intensity Avg. queue Enter» 0.625 1.04 P(N) P(x=N) P(x<=N) 0 0.375 0.375 1 0.234 0.609 2 0.146 0.756 3 0.092 0.847 4 0.057 0.905 5 0.036 0.940 6 0.022 0.963 7 0.014 0.977 8 0.009 0.985 9 0.005 0.991 10 0.003 0.994 11 0.002 0.996 12 0.001 0.998 13 0.001 0.999 14 0.001 0.999 15 0.000 0.999 16 0.000 1.000 Provide parking postions for 6 Vehicles at a level of confidence of 95 percent. Source: Traffic & Transportation Engineering Handbook, Second Edition, Page 461 Table 4 Pick-up Queuing Analysis Single-Channel Queue Vista Ridge Academy School drop-off area Assumed Service Rate = 6 (veh./min.) 2 vehicles at once load in 20 seconds Arrival Rate = 240 (veh./hr.) = 4 (veh./min.) Traffic Intensity = arrival rate (vpm)/service rate (vpm) Traffic Intensity = 0.666667 Average Queue Length = 1.3 (veh.) Probability Calculations Intensity Avg. queue Enter» 0.666667 1.33 P(N) P(x=N) P(x'=N) 0 0.333 0.333 1 0.222 0.556 2 0.148 0.704 3 0.099 0.802 4 0.066 0.868 5 0.044 0.912 6 0.029 0.941 7 0.020 0.961 8 0.013 0.974 9 0.009 0.983 10 0.006 0.988 11 0.004 0.992 12 0.003 0.995 13 0.002 0.997 14 0.001 0.998 15 0.001 0.998 16 0.001 0.999 17 0.000 0.999 18 0.000 1.000 Provide parking postions for 7 Vehicles at a level of confidence of 95 percent. Source: Traffic&Transportation Engineering Handbook, Second Edition, Page 461 cu Ls Si Q8 $ ell; v z ≥ En :1 a e dx S -8 tea. . 0 on � • • Yt 7, '.'--,'4":.`- 4 > .1"4 e H,it - m•L a�M 44 f( l V asti,6THM�k- .� 'At Ky lif 1 y.E i F d { ^ M1 :,ix t;:,..,,,,, 1y 4 � y 1 tee d yy� ! j ` .j ; ::44::':L3� F S •� Y as s fi� 4 c i 34 j . � 3 j y. �� H'�"TsV Y k "9N. �p M Y Z ,��vFl � a !� - . max x5y ,�a1 I w A ,'s`I. m€' : -,:,3 ' :e,.-R z+ £x q..gb'�iae '1 { /1K5� w rte+ w N: 0.'"'",,-.--w' °A x,.. e-rb ..'44r i'c� a `'i�' fi _ Y I avc rfr t App,xini.IC Seek Seek. I.=100 .--------- --0 I I SITE . Ridgeview Dr. iii CO C 31 21 25 18 Ct 127 -+ 70 113 53 102 56 90 6 n69 42 .` 14 - 158 C 11 31 (-67 126 'c 17 352 1n 14 280 Figure 3 Year 2020 LEGEND: Background Traffic 25 AM Peak—Hour Traffic March,2003 113 = PM Peak—Hour Traffic Academy Ridge Vista (LSC#O3O26O) 90 PM Peak—Hour Traffic of Generator y :, A" 4) x I Approximate Scale Scale:l'../p7 � 0SITE 40% . Ridgeview Dr. 60% 33 51 2 7 "> 2 11 16 26 46 8 48 -7--.) 2 75 m 1JL JL , C 46 12 J L4 2 51 17_1 k___40 8 n3 7 —•- -.-- I 16 f 1 'V 17 7 48 4 't CD L v) Figure 4 LEGEND: 25 AM Peak-Hour Traffic Directional Distribution and 0of G= PM Peak-Hour Traffic Assignment of Site-Generated Traffic 90 PM Peak—Hour Traffic ofGenerator - __ Percent Directional March,2003 65% Distribution Vista Ridge Academy(LSC#030260) A Approximate Scale Scale 1'-W Vista Ridge Academy A Do Not Enter Sign Ridgeview Dr. Figure 6 Drop Off/Pick Up LEGEND: Traffic Control Plan = Attendant March,2003 Vista Ridge Academy(LSC#030260) HCM Unsignalized Intersection Capacity Analysis 2020 AM Total 63: Ridge View Road & West School Access 3/7/2003 Movement . EBC' EBT- WBT'.``WBR' SAL ,`SBR Lane Configurations ►) At• + ?r M Sign Control : Free Free ` Stop Grade 0% 0% 0% Volume(veh/h) 9 77 23 8 51 33 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(veh/h) 10 ' 84 25 9 55 36 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type . None Median storage veh) Upstream signal(ft) pX, platoon unblocked vC, conflicting volume 34 128 25 vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 34 128 25 tC, single(s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 99 94 97 cM capacity(veh/h) 1578 861 1051 Direction`.tina*r '.X "EB fi'"'Eg2;.WB'-1 1NB'2 '7613`177 ' h vFf w , Volume Total 10 84 25 9 91 Volume Left 10 0 0 0 55 Volume Right 0 0 0 9 36 cSH 1578 1700 1700 1700 927 Volume to Capacity 0.01 0.05 0.01 0.01 0.10 Queue Length (ft) 0 0 0 0 7 Control Delay (s) 7.3 0.0 0.0 0.0 ' 9.3 Lane LOS A A Approach Delay (s) 0.8 0.0 . 9.3 Approach LOS A fntersectioft'Sumrrary : 'r" Average Delay 4.2 Intersection Capacity Utilization 16.3% ICU Level of Service A Vista Ridge-Ridge View Dr(LSC#011391) 2020 AM Total Analyst, Alam SM Page 3 LSCINCCS2-ST51 9 HCM Unsignalized Intersection Capacity Analysis 2020 AM Total • 64: Ridge View Road & East School Access 3/7/2003 f t 4\ t r' `► 1 d Moveinent t t , 6L R'EBT EBR ` WBC' .`U36t =W f NFL?' `PT67 `k N$Ft SBL" .SBT i2 Lane Configurations ►) T4 r 4* 4, Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume(veh/h) 46 76 6 69 _'26 75 3 : 0 61 7 0 : '2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(veh/h) 50 83 ' 7 75 28 82 3 0 66 8 0 2 Pedestrians Lane Width(ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None. None Median storage veh) Upstream signal (ft) 675 , ' pX, platoon unblocked vC, conflicting volume 110 89 366 " 446 ' 86 ' 427 . 367 28 vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 110 89 366 446 86 427 367 28 tC, single(s) 4.1 4.1 7.1 6.5 ,`. 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF(s) 2.2 2.2 3.5 : 4.0 3:3 3.5 ' 4:0 3.3 p0 queue free % 97 95 99 100 93 98 100 100 cM capacity(veh/h) 1480 1506 552 466 973 470 515 1047 f]iS oh» e7ie 7.? x :fig-1'. EBB2.'WB 1"'Wt3 2 • , .M ,-n 7 Volume Total 50 89 103 82 70 10 Volume Left 50 0 75 0 3 8 Volume Right 0 7 0 82 66 2 cSH 1480 1700 1506 1700 939 535 Volume to Capacity 0.03 0.05_ 0.05 0.05 0.07 ` 0.02 Queue Length (ft) 2 0 3 0 5 1 Control Delay(s) 7.5 0.0 5.6 0.0 9.1 11.9 Lane LOS A A A B Approach Delay (s) 2.7 .` 3.1 9.1 1.1.9 Approach LOS A B int@ISeC�IOn (lllllllafy r S of 7 tis.a -ra Average Delay 4.2 'y ' Intersection Capacity Utilization 24.1% ICU Level of Service A Vista Ridge-Ridge View Dr(LSC#011391) 2020 AM Total Analyst, Alam SM Page 4 LSCINCCS2-ST51 HCM Unsignalized Intersection Capacity Analysis 2020 PM Total 63: Ridge View Road & West School Access 3/7/2003 t b d Movement ',` EBLr s BT 1NBT_:.WBR'.- .:SBL ` SBR ' Lane Configurations vi + try Sign Control. Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 134 71 1 16 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(veh/h) 1 146 77 1 17 12 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal(ft) pX, platoon unblocked vC, conflicting volume 78 225 77 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 78 225 77 tC, single(s) 4.1 6.4 " 6:2 tC, 2 stage (s) tF (s) ; 2.2 3.5 3.3 p0 queue free % 100 98 99 cM capacity(veh/h) 1520 763 984 Dired)iolT"LBne#' EB 1; EB 2 WB 1 WB 2 SB 1" Volume Total 1 146 77 1 29 Volume Left 1 0 0 0 17 Volume Right 0 0 0 1 12 cSH 1520 1700 1700 1700 839 Volume to Capacity 0.00 0.09 0.05 0.00 0.03 Queue Length (ft) 0 0 0 0 2 Control Delay (s) 7.4 0.0 0.0 0.0 9.4 Lane LOS A A Approach Delay (s) 0.1 0.0 9:4 Approach LOS A Infersection Summary .r rr Average Delay 1.1 Intersection Capacity Utilization 17.7% -ICU Level of Service A • Vista Ridge-Ridge View Dr(LSC#011391) 2020 PM Total Analyst, Alam SM Page 3 LSC I NCC S2-ST51 9 • HCM Unsignalized Intersection Capacity Analysis 2020 PM Total 64: Ridge View Road & East School Access 3/7/2003 dvement , 88C..7@8T EBR" WBL WBT 'WBR NBL'- NBT 'NBR SBC 'SST .'S)3ik Lane Configurations ►) b 4 i 4> 4 Sign Control Free • Free Grade 0% 0% Stop Stop Volume(veh/h) 7 129 14 158 54 11 17 ' 0% 0% 0 352 2 0 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(veh/h) 8 140 15. 172 59 12 18 0 383 2 0 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type ' "None . None Median storage veh) Upstream signal (ft) 675 pX, platoon unblocked vC, conflicting volume 71 155 566 577 148 940 573 59 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 71 155 566 577 148 940 573 59 tC,single(s) : 4.1 4.1 tC, 2 stage (s) 7.1 ' ' 6.5 . :6.2 7.1 6.5.. 6.2 tF(s) • 2.2 2.2 . 3.5 40 3.3 3.5 40 3.3 p0 queue free % 100 88 95 100 57 98 100 100 cM capacity(veh/h) 1530 1425 393 374 899 ,127. 378' 1007 DRifk X`afi ii',717".77c-EB TM.r`WB 1 ''WB`2... "'St3 3 e+ 7;7- * .-�.ra- ;ems` to -74'"x' !i Volume Total 8 155 230 12 401 3 Volume Left 8 0 172 0 18 2 Volume Right 0 15 0 12 , 383 1 cSH 1530 1700 1425 1700 849 179 Volume to Capacity 0.00 0.09 0.12 0.01 - 0.47' 0.02 Queue Length (ft) 0 0 8 0 51 1 Control Delay (s) 7.4 0.0 6.1 0.0 13.0 25.5 Lane LOS A A B D Approach Delay (s) 0.3 5.8 13.0 25.5 Approach LOS B D Tiers ction'Sumil�ary' Average Delay 8.3 Intersection Capacity Utilization 62.3% ICU Level of Service B Vista Ridge-Ridge View Dr(LSC#011391) 2020 PM Total Analyst, Alam SM LSCINCCS2-ST51 Page 4 HCM Unsignalized Intersection Capacity Analysis 2020 AM Total • 63: Ridge View Road & West School Access 3/6/2003 k. M6vement . "^ 1 'EBL 'EB7 ,WBT":WSR `sat:,:86R• ' '_', ". ..... Lane Configurations ) T + It y Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 9 77 23 8 51 33' Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 10 ` ` 84 25 9 55 36 Pedestrians Lane Width (ft)' Walking Speed (ft/s) Percent Blockage Right turn flare(veh) Median type • None Median storage veh) Upstream signal(ft) pX, platoon unblocked vC, conflicting volume 34 128 25 vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 34 128 25 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3:3 p0 queue free % 99 94 97 cM capacity(veh/h) 1578 861 1051 oriw pn,.Larle#?. "i tB 1':r' g7'2 we 1 `wa 2; BB 1 Volume Total 10 84 25 9 91 Volume Left 10 0 0 0 55 Volume Right 0 0 0 9 36 cSH 1578 1700 1700 1700 927 Volume to Capacity 0.01 0.05 0.01 0.01 0.10 Queue Length (ft) 0 0 0 0 7 Control Delay (s) 7.3 0.0 0.0 0.0 9.3 Lane LOS A A Approach Delay (s) 0.8 0.0 9.3 Approach LOS A Intersealion`Sur mary r ` 75.77-7,7x, Average Delay 4.2 Intersection Capacity Utilization 16.3% ICU Level of Service A Vista Ridge Academy (LSC#030260) 2020 AM Total Analyst, Alam SM Page 3 LSCINCCS2-ST51 HCM Unsignalized Intersection Capacity Analysis 2020 AM Total 64: Ridge View Road & East School Access 3/6/2003 .r- l -' 1 '- t `\ t P �► 1 d Moveipent ,.58L "°EB7 " EBR WBL `WBT`"V116R7 NBC" ,$18T ."N l SEC` Stir` SBR Lane Configurations Sign Control Free Free r op op Grade 0% 0% Stop Stop 0% 0% Volume (veh/h) 46 76 6 69 26 75 3 0 61 7 0` 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 50 83 7` 75 28 82 3 0 66 8 0 2 Pedestrians Lane Width (ft) Walking Speed (f/s) Percent Blockage Right turn flare (veh) Median type • None None Median storage veh) Upstream signal (ft) 675 pX, platoon unblocked vC, conflicting volume 110 89 - 366 " 446 86 427 367 28 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 110- 89 366 446 86 427 367 28 tC, single(s) 4.1 4.1 7.1 6.5 ,6.2 7.1 • 6.5 : 6.2 tC, 2 stage (s) tF(s) 2.2 2.2 3.5 `' 4.0 3.3 3.5 4.0 3.3 p0 queue free % 97 95 99 100 93 98 100 100 cM capacity(veh/h) 1480 1506 552 466 973 470 515 1047 `EB 1't"EB.2" WB"1 WB 2'7-Th '1't",'Sg"ieT'cr -' , 7 71". e 7^7 :, 7, ,7•*y,jj; Volume Total 50 89 .103 82 70 10 Volume Left 50 0 75 0 3 8 Volume Right 0 7 0 82 66 2 cSH 1480 1700 1506 1700 939 535 Volume to Capacity 0.03 0.05 0.05 0.05 0.07 0.02 Queue Length (ft) 2 0 3 0 5 1 Control Delay(s) 7.5 0.0 5.6 0.0 9.1 11.9 Lane LOS A A A B Approach Delay (s) 2.7 3.1 9.1 > 11.9 Approach LOS A B ntetsectibn Summary .+- :, � .:• ,- . �.,. _, Average Delay 4.2 Intersection Capacity Utilization 24.1% ICU Level of Service A Vista Ridge Academy (LSC#030260) 2020 AM Total Analyst, Alam SM LSCINCCS2-ST51 Page 4 HCM Unsignalized Intersection Capacity Analysis 2020 PM Total 63: Ridge View Dr & West School Access 3/7/2003 i1 GVel ienTigEn i'itgl"4tigr70)14117Vit f ;4: :5141; ,5 Et` " i`74-r 3 .7 a ,,..1 .14 Y{ Lane Configurations ? ? 1' ve Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) r' 1 134 71 1 16 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) '; 1 146 77 1 ° 17 12 Pedestrians Lane Width,(ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None, "_,�> . . Median storage veh) Upstream signal(ft) x pX, platoon unblocked vC,'conflicting volume` 78 225 vC1, stage 1 conf vol vC2 stage 2 conf vol vCu, unblocked vol 78 225 77 tC, 2 stage (s) tF s 2.2 3.5 3:3 O p0 queue free% 100 98 99 cM capacity(veh/h) 1520 763 984" D(rettiotfiatae'YX, a,77E€51 B TT"VVB''1 2-_`SS 1 eT17 Volume Total 1 . 146 77 . 1 29 • Volume Left 1 0 0 0 17 Volume Right 0 0 0 1 • 12 cSH 1520 1700 1700 1700 839 Volume to Capacity 0.00 0.09 0.05 .0.00 0:03 Queue Length (ft) 0 0 0 0 2 Control Delay.(s) 7.4 0.0 0.0 0.0 • `9.4 Lane LOS A A Approach Delay(s) 0.1 0.0 9.4 Approach Los A Average Delay 1.1 Intersection Capacity Utilization 17.7% ICU Level of Service A Vista Ridge Academy (LSC#030260) 2020 PM Total Analyst, Alam SM Page 1 LSCINCCS2-ST51 • HCM Unsignalized Intersection Capacity Analysis 2020 PM Total Peak Hour of Generator 63: Ridge View Road & West School Access 3/6/2003 .! ~ \► d ty1"oiiem�t "•_�BL�- 'D61"`°"WBT'>VYBR" '56LC", ` - Lane Configurations + r M Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 5 126 58 4 48 31 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 5 137 63 4 52 34 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Medan type None Median storage veh) Upstream signal(ft) pX, platoon unblocked vC, conflicting volume 67 211 . 63 vC1, stage 1 conf vol vC2;,stage 2 conf vol vCu, unblocked vol 67 211 63 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) p0 queue free % 100 93 97 ccMM cappacit (veh/h) 1534 775 1002 r"'` 1N61 "VVB 2',`"'6a? Sz `" Volume Total 5 137 63 4 86 Volume Left 5 0 0 0 52 Volume Right 0 0 0 4 34 cSH 1534 1700 1700 1700 850 Volume to Capacity 0:00 '0.08 0.04 0.00 0.10 ' Queue Length (ft) 0 0 0 0 7 Control Delay (s) 7.4 0.0 0.0 - 0.0 9.7 Lane LOS A A Approach Delay(s) 0.3 0.0 9.7 Approach LOS A C 1(3r1 sbfnmair .x`' `r: 771:772'71'; Average Delay 3.0 Intersection Capacity Utilization 18.8% ICU Level of Service A r Vista Ridge Academy (LSC#030260) 2020 PM Total Peak Hour of Generator Analyst, Alam SM Page 1 LSCINCCS2-ST51 HCM Unsignalized Intersection Capacity Analysis 2020 PM Total 64: Ridge View Dr & East School Access 3/7/2003 f l .-- k• 4\ t P ► 4 N13vp enc , EBL.' -5BT? EBa -WBL ,�56T itVBR` NBL `NB " '" Nl3R" . 6BE.7 SB1-1-'88g Lane Configurations ►) b 4r 4, 4. Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume(veh/h) 7 129 14 158 54 11 17 0 352 . ' 2 0 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly;flow, rate (veh/h) 8 140 15 172 59 12 18 ` 0 383 2 0 1 Pedestrians Lape Width(ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type . -; None None Median storage veh) Upstream signal (ft) 675 pry platoon unblocked vC, conflicting volume 71 155 566 577 148 940 573 59 vC1, stage 1 conf vol vC2, stage 2 col vol vCu, unblocked vol 71 155 566 577 148 940 573 59 );C,single(s) 4.1 4.1 7.1 6.5 '- 6.2. 7.1 ' 6.5 ' 6.2 tC, 2 stage (s) tF(s).'-3: 2.2 2.2 3.5 4.0 3.3 3.5 4.0 '`3.3 p0 queue free % 100 88 95 100 57 98 100 100 cM,capacity(veh/h) 1530 1425 393 374 899 127 376 ; 1007 RREJ 7°" "EB1*. 8E11- FWB 1.5 WI3 2.7..,NB:.'I";." St317: ..,, 7, .,.,, : K Volume Total 8 155 230 12 401 3 Volume Left 8 0 172 0 18 2 Volume Right 0 15 0 12 383 1 cSH 1530 1700 1425 1700 849 179 Volume to Capacity 0.00 0.09 0.12 0.01 O.47' 0.02 Queue Length (ft) 0 0 8 0 51 1 Control Delay (s) ' 7.4 0.0' 6.1 ,' 0.0 13.0 . 25.5 Lane LOS A A B D Approach Delay(s) 0.3 5.8 13.0 25.5' Approach LOS g D i uth i ? Average Delay 8.3 Intersection Capacity Utilization 62.3% ICU Level of Service B Vista Ridge Academy (LSC#030260) 2020 PM Total Analyst, Alam SM Page 1 LSCINCCS2-ST51 HCM Unsignalized Intersection Capacity Analysis 2020 PM Total Peak Hour of Generator 64: Ridge View Road & East School Access 3/6/2003 C k- 4\ t t ti 1 1 Movement @BL"' `5BT EBR`"WaLT WEJT'"WEIR IR NBC °'`NB7 - 'NBR "'SBA "SBA' 'SBR Lane Configurations ►) 1. r4. Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume(veh/h). 24 138 11 126 48 40 14 0 280 7 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(veh/h) 26 150 12 137 52 43 15` 0` 304 8 0 2 Pedestrians Lane Width (ft) Walking Speed (f/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal(ft) 675 pX, platoon unblocked vC, conflicting volume 96 162 536 578 156 833 540 52 vC1, stage 1 conf vol vC2,'stage 2 conf vol vCu, unblocked vol 96 162 536 578 156 833 540 52 tC, single(s) . 4.1 4.1 7,1 6.5 ' 6.2 7.1 , 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 " 3.3 p0 queue free % 98 90 96 100 66 96 100 100 cM capacity(veh/h) 1498 1417 415 379 890 173 '398 1015 breer(ron,'Geitie# 1 w``i B'1",7.€Bl $GVB f ..° B27-Ng"1 ^SBi' i Td 7f e rv . : ::: Volume Total 26 162 189 43 320 10 Volume Left 26 0 137 0 15 8 Volume Right 0 "` 12 0 43 304 2 cSH 1498 1700 1417 1700 844 212 Volume to Capacity 0.02 0.10 0.10 0.03 0.38 0.05 Queue Length (ft) 1 0 6 0 36 3 Control Delay (s) 7.4 0.0 5.9 0.0 11.8 : 22.8" Lane LOS A A B C Approach Delay (s) 1.0 4.8 11.8 22.8 Approach LOS B C InteriectlbhSumfier X xs> 4'X? tR .7"iijR "' _=1 ify.'s i Average Delay 7.1 Intersection Capacity Utilization 54.2% ICU Level of Service A ess' Vista Ridge Academy (LSC#030260) 2020 PM Total Peak Hour of Generator Analyst, Alam SM Page 1 LSCINCCS2-ST51 r. Exhibit F contains oversized Site Plan , Landscape Plan , and .. Fencing Plan maps Please see original file Weld County Planning Department GREELEY OFFICE MAY ] 3 2003 • MEMORANDUM MAY C TO: Monica Mika DATE: May 9, 2003 WI I DO FROM: Donald Carroll, Engineering Administrator t!'‘ COLORADO SUBJECT: USR-1426, Vista Ridge Development Master Drainage Report Addendum Release of Collateral This is a follow-up of my previous memo requesting the master drainage report for review of the proposed Vista Ridge Academy Baseball and Soccer fields. The applicant's engineer, Hurst and Associates, consulting engineering from Boulder, has provided a master drainage report. This report has been prepared by a professional engineer, stamped, signed, and licensed in the State of Colorado. This meets our requirement for Section 24-7-120, Storm Drainage Requirements. I have reviewed this report and find that it is acceptable. pc: USR-1426 M:\PLANNING\USR-6.doc i EXHIBIT U-92..*114214 11421s Hello