HomeMy WebLinkAbout20032617.tiff RESOLUTION
RE: APPROVE AGREEMENT FOR ROADWAY IMPROVEMENTS FOR WELD COUNTY
ROADS 26 AND 15 AND AUTHORIZE CHAIR TO SIGN - ASPHALT SPECIALTIES
COMPANY, INC.
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS,the Board has been presented with an Agreement for Roadway Improvements
for Weld County Roads 26 and 15 between Owens Brothers Concrete, Inc., L.G. Everist, Inc.,and
the County of Weld,State of Colorado, by and through the Board of County Commissioners of Weld
County,on behalf of the Department of Public Works,and Asphalt Specialties Company, Inc.,with
terms and conditions being as stated in said agreement, and
WHEREAS,after review,the Board deems it advisable to approve said agreement,a copy
of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County,Colorado,that the Agreement for Roadway Improvements for Weld County Roads 26 and
15 between Owens Brothers Concrete, Inc., L.G. Everist, Inc., and the County of Weld, State of
Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the
Department of Public Works,and Asphalt Specialties Company, Inc.,be,and hereby is,approved.
BE IT FURTHER RESOLVED by the Board that the Chair be,and hereby is,authorized to
sign said agreement.
The above and foregoing Resolution was,on motion duly made and seconded,adopted by
the following vote on the 10th day of September, A.D., 2003.
BOARD OF COUNTY COMMISSIONERS
� ��
Wfk1Q CO�U,NJ�TY, �LO„(�ADO
ATTEST: dateg l,/idAh ,`
Davi L ng, Chair
Clerk to the :lard
• Robert D. sden, Pro-Tem
1861 :�.i, 13lq y�►„/�i�/Ir._ -, l ��/�-.�
Vii• to the Board
!� a M. J. Geile
O . t1 ' /„y
rWilliam . Jerke
)&tey) .111
Glenn Vaad
Date of signature: --,a6
— 5'
2003-2617
EG0047
66 '. AN
AGREEMENT
Roadway Improvements for WCR 26/15
THIS AGREEMENT,made this 5 day of $ r f ,20 j,by and between Owens Bros. Concrete
Co./L.G. Everist, Inc./Weld County,hereinafter called"Owner"and
Asphalt Specialties Co. , Inc. doing business as(anindividual,)or(a
partnership,)or(a corporation,)hereinafter called"Contractor."
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The Contractor will commence and complete the following: The roadway improvements of Weld County Road
(WCR)26 between WCR 13 and WCR 15 and WCR 15 from WCR 26 to about 1,112 feet north.
2. The Contractor will furnish all of the material, supplies,tools, equipment,labor and other services necessary for the
construction and completion of the Project described herein.
3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after
the date of the Notice to Proceed and will complete the WCR 26/15 Project within 21 calendar days unless the
period for completion is extended otherwise by the Contract Documents.
4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms
therein for the sum of$ 423,549.00 , or as shown in the Bid Schedule.
5. The term"Contract Documents"means and includes the following:
(A) Invitation for Bids
(B) Instructions to Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Agreement
(F) General Conditions
(G) Project Special Conditions
(H) Labor and Materials Payment Bond
(I) Performance Bond
(J) Notice of Award
(K) Notice to Proceed
(L) Change Order
(M) Certificate of Substantial Completion
(N) Lien Waiver
(O) Notice of Acceptance
(P) Drawings prepared by the Owner,titled"Plan-Profile,Detail and Construction cross Sections for WCR 26
From WCR 13 To WCR 15 and WCR 13 from WCR 26 To 1,112 Feet North."
(Q) Specifications prepared or issued by the Weld County Public Works Department.
(R) Colorado Department of Transportation"Standard Specifications for Road and Bridge Construction"
(S) Colorado Department of Transportation Standard Plans"M& S Standards"
(T) Addenda:
No. ,dated 20
No. , dated 20
6. The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions such
amounts as required by the Contract Documents.
Page 15
°GC3- de/7
AGREEMENT
Roadway Improvements for WCR 26/15
(Page 2 of 2)
6. The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions
such amounts as required by the Contract Documents.
7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors,and assigns.
8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for
this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring
additional compensable work to be performed, which work causes the aggregate amount payable under the
Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the
Owner assures the Contractor, in writing, that lawful appropriations to cover the costs of the additional work
has been made or unless such work is covered under a remedy-granting provision contained in the Contract.
IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly
authorized officials,this Agreement in three(3)copies each of which shall be deemed an original on the date
first above written.
ORDERED BY: ACCEPTED BY:
R CONTRACTOR
CR
D.znr1,S r,r ids VP LG Edo ),S+‘
A
ilJrl; Arh U,�J.05 cr-o JU�OvtS t t.ne. (tc tre
(SEAL) (SEAL)
ATTEST: ATTEST:
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: ,th#4,72
44
David E. Long, Chair SEP 10 2003
Wel = Clerk t• the Board
o the Board
1 1861 r� �y*
qms TO FORM•
qty orney
WCR 26 and WCR 15 Improvement
Cost Distribution
Total Bid (Asphalt Specialties Co.,Inc.) $423,549.00
Total Ancillary Costs $22,532.00
Owens Contribition $8,581.68
Owens Ancillary Costs @26% $5,858.32
Everest pays to 15+00
HBP 1500 ft x 32 ft x 5"depth =1500 tons $46,500.00
ABC 1500 ft x 33 ft x 12" depth =3403 tons $20,630.00
Tack Coat (CSS-1 H) 554.54 Gallons $544.54
Pipe Work $6,118.44
Everest Total to 15+00 $83,249.04
Everest Ancillary Costs @ 23.8% $5,362.62
Total Contributions (Owens) $14,440.00
Total Contributions (Everest) $88,611.66
Total Contributions $103,051.66
County Contribution $320,497.34
County Contribution (Available Funds) $250,000.00
Needed Revenue $70,497.34
.0F44P7- ye
cow
t \om' o
•
•
STATE 18 }AJRADO
DEPARTMENT OF
STATE
CERTIFICATE
I, DONETTA DAVIDSON, Secretary of State of the State of Colorado,
hereby certify that, according to the records of this office,
ASPHALT SPECIALTIES CO., INC.
(Colorado CORPORATION )
File# 19921020323
was filed in this office on February 27, 1992 and has complied with the applicable provisions
of the laws of the State of Colorado and on this date is in good standing and authorized and
competent to transact business or to conduct its affairs within this state.
Dated: August 26, 2003
For Validation:
Certificate ID: 701258
To validate this certificate,visit the following
web site,enter this certificate ID,then follow the
instructions displayed.
www.sos.state.co.usNalidateCertificate
SECRETA Y OF STATE
, a
47.11 MEMORANDUM
WI I DC TO: Carol Harding, Clerk to the Board DATE : September 5, 2003
•
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Agenda Item
Please submit the enclosed item for the Board's next agenda.
Agreement for Roadway Improvements on WCR 26/15 between Owens Brothers
Concrete Co.,L. G.Everist,Inc.,and Weld County(owners) and Asphalt Specialist Co.
Inc. (contractor)
Enclosed are four original Agreements. Please send three originals to Public Works
upon execution of this Agreement.
The appropriate documentation is enclosed.
Enclosures
pc: Dean Dreher, Engineering Tech III
M:\Franc ie\S ignatureltem.DOC