Loading...
HomeMy WebLinkAbout20030800.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Duke Energy Case Number 2ndAmUSR-274 Submitted or Prepared Prior to At Hearing Hearing 1 Staff Comments X Department of Planning Services Field Check Form Planning Commissioner Fitxgerald Field Check Form Letter to Applicant Affadavit of sign posting Legal Notifications 2 Application X Maps Surrounding Property/Mineral Owners Utilities 3 Referral List X Referrals without comment 4 State of Colorado, Division of Wildlife, referral dated 11-16-2002 Referrals with comments X 5 Weld County Code Compliance, referral dated 11-12-2002 X 6 Weld County Sheriffs Office, referral dated 11-8-2002 X 7 Weld County Department of Public Works, referral dated 11-27-2002 & 12-13- X 2002 8 Weld County Department of Building Inspection, referral dated 12-03-2002 X 9 Weld County Department of Public Health and Environment, referral dated 12-10- X 2002 10 Surrounding Property Owners X PC Exhibits 11 Continuance as requested by the applicant, dated 12-30-2002 X I hereby certify that the 11 items identified herein were submitted to e Department of Planning Services at or prior to the .cheduled Board of County Commissioners hearing. Kim Ogle ❖ -ann- III 1 E7IBIT 2003-0800 osAqr• lUReLAND SUMMARY SHEET COLORADO Case Hearing Date: January 7, 2003, continued Number: 2ndAmUSR-274 February 18, 2003 Applicant: Duke Energy Address: Duke Energy Field Services, c/o Tim Clancy; Witwer, Oldenburg, Barry& Bedingfield LLP 822 7th Street Suite 760; Greeley, CO 80631 Request: Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility(oil and gas processing), in the A(Agricultural)Zone District Legal Description: S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M.,Weld County, Colorado. Location: North of and adjacent to WCR 18 and 1/2 mile west of WCR 73 Size of Parcel: 20+/-acres POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services'staff has received responses from the following agencies: • Weld County Sheriffs Office, referral dated 11-8-2002 • Weld County Code Compliance, referral dated 11-12-2002 • State of Colorado, Division of Wildlife, referral dated 11-16-2002 • Weld County Department of Building Inspection, referral dated 12-03-2002 • Weld County Department of Public Health and Environment, referral dated 12-10-2002 • Weld County Department of Public Works, referral dated 11-27-2002 & 12-13-2002 The Department of Planning Services' staff has not received responses from the following agencies: • State of Colorado, Oil &Gas Conservation Commission • Roggen Fire Protection District • Southeast Weld Fire Protection District • Southeast Weld County Soil Conservation District • Adams County Planning 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 1 EXHI) BIT SPECIAL REVIEW PERMIT j a ADMINISTRATIVE REVIEW COLORADO Planner: Kim Ogle Case Hearing Date: January 7, 2003, continued Number: 2ndAmUSR-274 January 21, 2003 Applicant: Duke Energy Address: Duke Energy Field Services, c/o Tim Clancy;Witwer, Oldenburg, Barry& Bedingfield LLP 822 7th Street Suite 760; Greeley, CO 80631 Request: Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility(oil and gas processing), in the A(Agricultural)Zone District Legal Description: S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M., Weld County, Colorado. Location: North of and adjacent to WCR 18 and /2 mile west of WCR 73 Size of Parcel: 20+/-acres Parcel Number: 1303 24 000022 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-5-100.A(OG.Goal 1. )states "Oil and gas exploration and production should occur in a manner which minimizes the impact to agricultural uses and the environment and reduces the conflicts between mineral development and current and future surface uses." Further,Section 22-5-100.B(OG.Goal.2) states"The extraction of oil and gas resources should conserve the land and minimize the impact on surrounding land." The Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility(oil and gas processing),in theA(Agricultural)Zone District is a second amendment to an existing permitted facility. The original SUP was applied for by Charter Gas Resources, in 1975. The application was for a natural gas processing plant and support facilities. The amended USR was applied for by Snyder oil Corporation, in 1993. The application was for upgrades to the existing SUP to include new compressors, a new processing plant and a heater unit. The second amended USR application addresses all construction that has occurred on site since 1993.This application addresses the current on-site conditions,and serves as a baseline for future improvements to the site. Further,the amendment was required b y the Department of Planning Services due to a change in ownership of the facility. 2AmUSR-274,DUKE ENERGY, ROGGEN SITE, page 2 B. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District.Section 23-3-40.A.2 of the Weld County Code provides for Oil and Gas Support and Service as a Use by Special Review in the A(Agricultural)Zone District. C. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses. The property is surrounded by agricultural fields in crop production and related uses. There is a single family dwelling approximately 1/4 mile to the east with cattle in corrals; and a second house to the west approximately 1/4 mile. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The existing site does not lie within the three mile referral area of a ny incorporated community. E. Section 23-2-220.A.5--The application complies with Section 23-5 of the Weld County Code. The existing site is not within a recognized overlay district, including the Geologic Hazard, Flood Hazard or Airport Overlay District. The existing site is within the County-wide Road Impact Fee Area. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of Area 4. F. Section 23-2-220.A.6--The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. This facility was acquired by the Duke Energy Field Services Division in 1996. Previous to this acquisition the facility was permitted and operated by Snyder Oil Corporation for more than twenty years. G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based,in part,upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services'staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) B. The plat shall be labeled 2ndAmUSR-274 (Department of Planning Services) C. The plat shall be amended to delineate the following: 1) The attached Development Standards. (Department of Planning Services) 2) The approved Screening Plan,to address the outdoor storage of materials,including the fifty-five gallon barrels associated with this facility shall be screened from adjacent properties, including the public rights-of-way. (Department of Planning Services) D. If applicable, the applicant shall apply for an Underground Injection Control (U IC) Class V Injection Well permit for the shop, through the Environmental Protection Agency (EPA) or provide evidence that the applicant is not subject to the EPA Class V requirements.Evidence of such shall be submitted in writing to the Weld County Department of Planning Services.(Department of Public Health and Environment) 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 3 E. Submit an Air Pollution Emission Notice(A.P.E.N.)and Emissions Permit application to the Air Pollution Control Division,Colorado Department of Health and Environment for emissions of criteria,hazardous or odorous air pollutants. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) F. Submit a dust abatement plan to the Environmental Health Services, Weld County Department of Public Health&Environment,for approval prior to operation.Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) G. All septic systems located on the property shall have appropriate permits from the Weld County Department of Public Health & Environment. The Environmental Health Division of the Weld County Department of Public Health & Environment was unable to locate septic permits for many of the existing structures on site. Any existing septic system(s)which is not currently permitted through the Weld County Department of Public Health&Environment will require an I.S.D.S. Evaluation prior to the issuance of the required septic permit(s). In the event the system(s) is found to be inadequate, the system(s) must be brought into compliance with current I.S.D.S.regulations. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) H. The applicant shall submit evidence to the Department of Planning Services, from the Colorado Division of Water Resources,demonstrating that the well is appropriately permitted for the use. (Department of Public Health and Environment) The applicant shall submit a waste handling plan,for approval,to the Environmental Health Services Division of the Weld County Department of Public Health& Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed(including the facility name, address,and phone number). Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) J. The applicant shall address the concerns of the Department of Public Works specific to the existing concrete access and parking pad adjacent to the Roggen plant office and weigh scale. The circulation throughout the site appears to be adequate. There are secondary emergency access gates through the front and the rear of the facility. These gates are closed and chained. Truck parking and loading facilities should be adequately graveled and should be graded to prevent drainage problems. Evidence of approval by the Department of Public Works shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Works) K. The applicant shall provide evidence of approval by the Department of Public Works concerning the on-site access, circulation and storm water drainage as addressed in their memorandum dated November 27,2002. Evidence of approval by the Department of Public Works shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Works) r 2AmUSR-274, DUKE ENERGY,ROGGEN SITE, page 4 L. The applicant shall provide evidence of compliance with building permits issued by the Department of Building Inspection as outlined in their referral dated December 3,2002 and i-. briefly described as follows The following permits have been issued for various structures on this site and need to have required inspections and final approval granted: 1. BC-0000800 for a Waukesha 7042 compressor 2. BC-0101015 for 3, 80 square foot storage sheds, includes electric 3. BCS-020331 for a self supporting radio tower 4. BCS-020405 to replace pumps and pipes on 100 square foot slab, amended to include additional pipe stanchions to support new electrical cable tray 5. BCS-020664 to install a ground flare The following two permits were issued but have been expired by BOCC resolution because no inspections were conducted. If the work for which these permits was issued was done, new permits will need to be applied for, new fees paid, and required inspections performed: 1. BP 39983 to install a used process skid, 3 NG compressors totaling 200 HP with a 3000 square foot compressor building, valves, pipe, fittings and miscellaneous equipment but no electric 2. BP 43458 for a 8 by 12 building on a gravel bed to house telemetering equipment for natural gas flow The following permit was applied for but was not issued. A Zone hold was placed on the permit. We must verify that the Manufactured structure was not installed on the site: 1. PR-9500008 for a 28 by 70 grey Manufactured Home to be used as an office Permits will be required for the installation of all new equipment and all electrical work, but not for the replacement of equipment on existing foundations, including the piping and electrical connections to that equipment, nor for the addition of minor equipment such as filters and coolers, however electrical permits are required for any new electrical circuits provided to added equipment. Permits are not required for process piping for liquids or gas. Evidence of compliance with all of the requirements of the Department of Building Inspection shall be submitted in writing to the Weld County Department of Planning Services. (Department of Building Inspection, Department of Planning Services) M. The applicant shall provide evidence of compliance with the Department of Code Compliance, Zoning Division and Building Inspection Division. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services,Code Compliance,Department of Building Inspection,Code Compliance) N. The applicant to submit a Screening Plan to the Department of Planning Services for review and approval. With approval the Screening Plan information shall be graphically delineating on the USR Plat. (Department of Planning Services) O. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. Upon completion of 1.above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval.The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty(30)days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 5 3. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Recorded Exemption/Subdivision Exemption/Use by Special Review/. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is.tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to mapsl,co.weld.co.us. (Department of Planning Services) 4 Prior to Operation: The applicant shall contact the office of the Weld County Sheriff to schedule a walk-through of the site for the purposes of implementing the program"Crime Prevention through Environmental Design". This program reduces the likelihood of criminal activity at a specific location by"hardening"it to crime. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Sheriffs Office) 5. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 6 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS DUKE ENERGY-ROGGEN PLANT 2ND AMUSR-274 1. The Site Specific Development Plan and Special Use Permit is for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility (oil and gas processing), in the A (Agricultural) Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5,C.R.S.)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a"solid waste"in the Solid Wastes Disposal Sites and Facilities Act,30-20-100.5,C.R.S.,as amended. (Department of Public Health and Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) 6. Fugitive dust shall be controlled on this site. (Department of Public Health and Environment) .-� 7. The facility shall adhere to the maximum permissible noise levels allowed in the (Industrial)Zone District as delineated in 25-12-103, C.R.S. (Department of Public Health and Environment) 8. Any existing septic system(s)which is not currently permitted through the Weld County Department of Public Health & Environment, Environmental Health Services will require an I.S.D.S. evaluation prior to the issuance of the required septic permit(s). The review shall consist of observation of the system and an evaluation of the systems ability to handle the proposed hydraulic load. In the event the system(s)is found to be inadequate,the system(s)must be brought into compliance with current I.S.D.S. Regulations. (Department of Public Health and Environment) 9. Adequate handwashing and toilet facilities shall be provided for employees. (Department of Public Health and Environment) 10. In accordance with the Above Ground Storage Tank Regulations (7 CCR 1101-14) a spillage retention berm shall be constructed around the tank battery. The volume retained by the spillage berm should be greater than the volume of the largest tank inside the berm. Alternative protective measures may be allowed provided they comply with the Above Ground Storage Tank Regulations. (Department of Public Health and Environment) 11. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling. (Department of Public Health and Environment) 12. The applicant shall operate in accordance with the approved"waste handling plan". (Department of Public Health and Environment) 13. Any septic systems located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 7 14. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department of Public Health and Environment) 15. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County wide Road Impact Fee Program, Area 4. (Department of Planning Services) 16. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) 17. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 18. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 19. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 20. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) r r 2AmUSR-274,DUKE ENERGY,ROGGEN SITE, page 8 ' DEPARTMENT OF PLANNING SERVICES PHONE (970) 353-6100, EXT.3540 FAX X (9(970) 304-6498 1555 N. 17TH AVENUE COLORADO GREELEY, COLORADO 80631 November 5, 2002 Duke Energy Field Services do Tim Clancy Witwer, Oldenburg, Barry& Bedingfield LLP 822 7th Street Suite 760 Greeley, CO 80631 Subject: 2n°AmUSR-274- Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including a Natural Gas Processing Facility in the A(Agricultural)Zone District on a parcel of land described as S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for January 7, 2003, at 1:30 p.m. This meeting will take place in Room 210, Weld County Planning Department, 1555 N. 17th Avenue, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway(access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services'staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, { ---� Kim Ogle Planner DEPARTMENT OF PLANNING SERVICES PHONE (970) 35 3-6100, EXT.3540 FAX X (97(970)304-04-6498 1555 N. 17TH AVENUE COLORADO GREELEY, COLORADO 80631 December 6, 2002 Duke Energy Field Services c/o Tim Clancy Witwer, Oldenburg, Barry& Bedingfield LLP 822 7th Street Suite 760 Greeley, CO 80631 Subject: 2n° AmUSR-274- Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including a Natural Gas Processing Facility in the A(Agricultural)Zone District on a parcel of land described as S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for January 21,2003,at 1:30 p.m. This meeting will take place at the Southwest Weld County Complex, 4209 WCR 24 1/2, Longmont, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway(access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, '1 Kim O Planner PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS DECEMBER 27, 2002. THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT- OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FOR 2NDAMUSR-274, A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR A MINERAL RESOURCE DEVELOPMENT FACILITY INCLUDING A NATURAL GAS PROCESSING FACILITY. KIM OGLE Name of Person Posting Sign SignaAof Person Posting Sign STATE OF COLORADO ) ss. COUNTY OF WELD ) ! � The foregoing instrument was subscribed and sworn to me thid {ay of ( i-er , 2002. WITNESS my hand and official seal. ota My Commission Expires: LI/ J/ hent NOV 2 s 2002 .� FIELD CHECK CASE NUMBER: 2n°AmUSR-274 DATE OF INSPECTION: APPLICANT'S NAME: Duke Energy PLANNER: Kim Ogle REQUEST: Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including a Natural Gas Processing Facility in the A (Agricultural)Zone District. LEGAL DESCRIPTION: S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M.,Weld County, Colorado. LOCATION: North of and adjacent to WCR 18 and 1/2 mile west of WCR 73. LAND USE: N 7 l (4 2 E C���,r `Fr i 5- e r r 1"c 4J 3 7- 1-h -ti d w`le w c� nCJour r ��o ...e-- 4 ZONING: N A (Agricultural) E A(Agricultural) S A (Agricultural) W A(Agricultural) COMMENTS iO Itti/ C o r,"e�i`-t e fA P.C. Member r FIELD CHECK inspection date: 12-19-2002 CASE NUMBER: 2nd AmUSR-274 APPLICANT: Duke Energy LEGAL DESCRIPTION: S2 SE4 SW4 of Section 24, T2N, R63W of the 6th P.M., Weld County LOCATION: North of and adjacent to WCR 18 and 1/2 mile west of WCR 73. Zoning Land Use N A (Agricultural) N Agricultural / Corn fields E A (Agricultural) E Agricultural / Corn fields S A (Agricultural) S Agricultural / Corn fields, Residential @ 1/4 mile W A (Agricultural) W Agricultural / Sunflowers, Residential @ 1/4 mile COMMENTS: Rural location south of Roggen. Surrounded by agricultural lands with few residential dwellings. Power, telephone overhead, north side of WCR 18. WCR 18 is a two lane gravel road WCR 73 is a two lane paved road Facility is existing and in operation. Facility is surrounded by six foot tall cyclone fence with numerous man gates and vehicle gates, all locked or padlocked closed. One point of ingress and egress to facility, off of WCR 18. Security lighting is present and the facility is manned 24/7. Remediation is occurring on site to address hydrocarbons and contaminated soils. This activity is not part of this application and is being handled by previous owner and outside consultant. The flare and associated equipment is located adjacent to site to the east. Kim Ogle Planner III Hello