Loading...
HomeMy WebLinkAbout20031559.tiff Usiirm.\\ 1 j 'tct ion-el vt It t , f * r Ali i• ►i4,y . a gnr r 4 EXHIBIT 2003-1559 I Pe 4106-4 Kim Ogle- Follow-up Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/11/03 9:13AM Subject: Follow-up It is my understanding that there has been discussion as to what structures, including massing are proposed for the first filing of the LifeBridge PUD project. Please submit this information to this office for review as soon as possible. Of not is the article in the Greeley Tribune for Tuesday February 11, 2003, entitled "Mega-Church". Bruce is quoted extnsively. Thank you in advance for a timely response. Kim Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile koole@co.weld.co.us Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle - Follow-up: Electronic Copy of drawings Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/11/03 10:24AM Subject: Follow-up: Electronic Copy of drawings Barb If at all possible please provide an electronic copy in .jpeg format of all drawings submitted with the application. Thank you. Kim Ogle - Question - Bulk Standards Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/13/03 10:02AM Subject: Question - Bulk Standards Heading Single Family Residential and Attached Residential Table in text body. Item G states Lot coverage is 65% of land area for this type of development. Code states 60 %. Is this accurate or does does 60%work with your application.? Pleae advise. Thank you Kim Ogle- RE: Question - Bulk Standards Page 1 From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 2/13/03 5:01 PM Subject: RE: Question - Bulk Standards 60% will be great, thus the applicant will conform to the lot coverage requirements. Final Plat will be heard by both PC and BCC. site Plan Review is administratively approved. Have a great day. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> Barb Brunk <barb.brunk@ttrmc.com>02/13/03 03:16PM >>> Kim, We used 65% because of the small lots in the senior community, but 60% will be ok. I also want to confirm the the Final Plan only goes to County Commissioners and the Site Plan Review is a staff review so that we can tell the neighbors when they will have additional input as the project develops. Thanks, Barb Original Message From: Kim Ogle [mailto:KOGLE oeco.weld.co.usl Sent: Thursday, February 13, 2003 10:03 AM To: barb.brunk@ttrmc.com Subject: Question - Bulk Standards Heading Single Family Residential and Attached Residential Table in text body. Item G states Lot coverage is 65% of land area for this type of development. Code states 60 %. Is this accurate or does does 60%work with your application.? Pleae advise. Thank you Kim Ogle - Lifebridge &off subject information Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 4/6/03 1:12PM Subject: Lifebridge & off subject information Good morning Barb I am attempting to finalize staff comments. Has there been a change to the application as of today, Monday April 7, 2003? If yes, could you email/fax me the changes in the text? Second, Drew has not had the opportunity to review the traffic turn lane diagram that was prepared by your consultant team and was to be submitted to DPW for review. Any idea as to where we are on this one? Third, I am hopeful that you could provide a ball park estimate for the costs associated with the preparation of a CLOMR and LOMA. This is for internal purposes only for a project under review by the County attorney's office. Ball park implies 20K to 25K, minimum depending on site conditions, research and investigation, modeling, etcetera. Thank you for any assistance that you are able to provide. kim r Kim Ogle - RE: Question - Sign Posting Page 1 .I From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 4/2/03 1:29PM Subject: RE: Question - Sign Posting neither, the continuance was set to a date specific. no sign posting required. kim >>> Barb Brunk <barb.brunk@ttrmc.com> 04/02/03 01:19PM >>> Kim, Does the Department of Planning Services post the sign two weeks before the hearing or do we? Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk(odttrmc.com .sue Kim Ogle- RE: Follow-up Page 1 From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 3/13/03 11:24AM Subject: RE: Follow-up April 22nd 2003 has been reserved for the PC hearing. We are proposing a 9:00 am starting time, with breaks throughout the day including lunch. Staff is proposing no dinner break with a decision rendered at 8:00 pm May 7, 2003 is the scheduled BCC hearing. Hearing begins at 10:00 am. I have taken the case file to BCC for set up and processing. Make it a great day. kim >>> Barb Brunk <barb.brunk@ttrmc.com> 03/13/03 08:57AM >>> Kim, Todd will be out of town on April 30. Is it possible to pre-advertise for the May 7 County Commissioners hearing? Let me know and I will send you the request this morning. Thanks Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com Kim Ogle- Re: Overall Map Page 1 From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 4/19/03 3:52PM Subject: Re: Overall Map Thank you. I will get someone to make it work Any idea on Phase One total square feet by break down of use, and the same for phase two of filing 1? Fax in system of modifications to text and other comments. have not sent out to PC yet, will do on Monday mid day. Hopefully you are home and not in the office now. kim >>> Barb Brunk <barb.brunk@ttrmc.com>04/19/03 02:43PM >>> Kim, The attached file is a PDF - I enlarged it to 400% at the table and the info is clear. I can't get the JPEG to be clear. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com <<OVERALL_MAP Model (1).pdf>> r Kim Ogle- Re: FW: Drawing Page 1 From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 4/27/03 7:49AM Subject: Re: FW: Drawing unable to read. Very pretty green image, no clarity >>> Barb Brunk <barb.brunk@ttrmc.com>04/25/03 02:21 PM >>> Kim, Here is a diagram of the Main Street concept- buildings in the front, parking in the rear. If we can get the setback down to 15'or 20'. Let me know if additional info will help explain the concept-This goes with the street cross section we submitted with the PUD. Barb Original Message From: Chris Geddes [mailto:cgeddes@insitedgn.coml Sent: Thursday, April 24, 2003 12:06 PM To: Todd Borger; Alexa Taylor(E-mail); Barb Brunk Subject: RE: Drawing Todd, et al... Attached is a quick rendering of the LBCC Mainstreet scheme, indicating the buildings, walks, street and parking as described in the street sections. Let me know if you need me to take this diagram any further... Chris Geddes INSITEDESIGN 2401 15th Street, Suite 10 Denver, Colorado 80202 tel 303.433.7100 fax 303.433.4301 www.insitedgn.com Original Message From: Todd Borger [mailto:todd.borger@ttrmc.coml Sent: Thursday, April 24, 2003 9:56 AM To: Alexa Taylor(E-mail); Dennis Rubba (E-mail); Chris Geddes (E-mail); Barb Brunk Subject: FW: Drawing To All, Recd this from Kim. Sounds like we need to put something together with a more detail than the"Section B - Local Mixed-Use District Street"section on sheet 5/6 of the Change of Zone submittal. In a packet date Feb 27, I found a nice color schematic for the senior village showing on-street parking, two residences, alley, garages, etc. What do you think about putting something like that together for Kim? Kim Ogle - Re: FW: Drawing Page 2 j Todd Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.usl Sent: Wednesday, April 23, 2003 4:43 PM To: todd.boraer(a)ttrmc.com Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner Ill Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile koole@co.weld.co.us >>> Todd Borger<todd.borger(a)ttrmc.com> 04/23/03 04:20PM >>> >From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.comj Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn Kim Ogle- RE: FW: Drawing Page 1 j From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 4/28/03 12:44PM Subject: RE: FW: Drawing thank you >>> Barb Brunk <barb.brunk@ttrmc.com> 04/28/03 08:38AM >>> Kim, I will send you a fax- and put a color copy in the over night mail. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.usl Sent: Sunday, April 27, 2003 7:50 AM To: barb.brunk@ttrmc.com Subject: Re: FW: Drawing unable to read. Very pretty green image, no clarity >>> Barb Brunk <barb.brunk@ttrmc.com> 04/25/03 02:21 PM >>> Kim, Here is a diagram of the Main Street concept- buildings in the front, parking in the rear. If we can get the setback down to 15'or 20'. Let me know if additional info will help explain the concept-This goes with the street cross section we submitted with the PUD. Barb Original Message From: Chris Geddes [mailto:caeddes(a insitedan.coml Sent: Thursday, April 24, 2003 12:06 PM To: Todd Borger; Alexa Taylor(E-mail); Barb Brunk Subject: RE: Drawing Todd, et al... Attached is a quick rendering of the LBCC Mainstreet scheme, indicating the buildings, walks, street and parking as described in the street sections. Let me know if you need me to take this diagram any further... Chris Geddes INSITEDESIGN 2401 15th Street, Suite 10 Denver, Colorado 80202 tel 303.433.7100 fax 303.433.4301 www.insitedgn.com 1 Kim Ogle- RE: FW: Drawing Page 2 I Original Message From: Todd Borger rmailto:todd.boraerOttrmc.coml Sent: Thursday,April 24, 2003 9:56 AM To: Alexa Taylor(E-mail); Dennis Rubba (E-mail); Chris Geddes (E-mail); Barb Brunk Subject: FW: Drawing To All, Rec'd this from Kim. Sounds like we need to put something together with a more detail than the "Section B- Local Mixed-Use District Street"section on sheet 5/6 of the Change of Zone submittal. In a packet date Feb 27, I found a nice color schematic for the senior village showing on-street parking, two residences, alley, garages, etc. What do you think about putting something like that together for Kim? Todd Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.usl Sent: Wednesday, April 23, 2003 4:43 PM To: todd.boruer@ttrmc.com Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile koole@co.weld.co.us >>>Todd Borger<todd.borger@ttrmc.com>04/23/03 04:20PM >>> >From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:loenfold(Thfirehousemail.coml Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn Kim Ogle- Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 4/30/03 10:17AM Kim Ogle- Information requested by Duane Braunagel from Building Department Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 5/4/03 2:08PM Subject: Information requested by Duane Braunagel from Building Department Information provided by Roger Vigil: Bulk/ Massing of Known County Structures: Faith Tabernacle Church: 27 feet without steeple, UBC Table 5-A allow up to 55 feet LandMark Builders fabrication of precast concrete products: 32 feet Macrum Builders Batch Plant: 55 feet Gerald Bakery silo: 31 feet Pier Building, addition to Batch Plant: 52 feet Central Weld County Water District Storage Tank: 48 feet\ LaFarge Batch Plant: 74 feet to top of Silo Norfolk Iron and Metal manufacturing and warehouse facility: 43 feet Bruce Meyer- Radio Tower: 1164 feet Height numbers are based on building standpoint only, Table 5-A Uniform Building Code. This Table sets allowable area and height. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle- LifeBridge hearing Page Ti From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 5/5/03 8:05AM Subject: LifeBridge hearing r r Lim Ogle- RE: Meeting with neighbors Page 1 From: Kim Ogle To: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN Date: 5/6/03 6:52AM Subject: RE: Meeting with neighbors Sent Facsimile this morning. Mountain View and Left Hand Letters, not attending BCC on Wednesday. Kim >>> Barb Brunk <barb.brunk@ttrmc.com>05/06/03 06:52AM >>> Kim, Bruce met with some of the neighbors last night-don't know how it went. We still have about 20 on the team -grouped together in two rows (back to back)works well for us if it's ok with you. See you tomorrow morning- call if you need anything. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r Kim Ogle-Follow-up Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/11/03 9:13AM Subject: Follow-up It is my understanding that there has been discussion as to what structures, including massing are proposed for the first filing of the LifeBridge PUD project. Please submit this information to this office for review as soon as possible. Of not is the article in the Greeley Tribune for Tuesday February 11, 2003, entitled "Mega-Church". Bruce is quoted extnsively. Thank you in advance for a timely response. Kim Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kopleco.weld.co.us Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us r Kim Ogle-Question - Bulk Standards Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/13/03 10:02AM Subject: Question - Bulk Standards Heading Single Family Residential and Attached Residential Table in text body. Item G states Lot coverage is 65% of land area for this type of development. Code states 60 %. Is this accurate or does does 60% work with your application.? Pleae advise. Thank you r Kim Ogle- Lifebridge & off subject information Page 1j From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 4/6/03 1:12PM Subject: Lifebridge & off subject information Good morning Barb I am attempting to finalize staff comments. Has there been a change to the application as of today, Monday April 7, 2003? If yes, could you email/fax me the changes in the text? Second, Drew has not had the opportunity to review the traffic turn lane diagram that was prepared by your consultant team and was to be submitted to DPW for review. Any idea as to where we are on this one? Third, I am hopeful that you could provide a ball park estimate for the costs associated with the preparation of a CLOMR and LOMA. This is for internal purposes only for a project under review by the County attorney's office. Ball park implies 20K to 25K, minimum depending on site conditions, research and investigation, modeling, etcetera. Thank you for any assistance that you are able to provide. kim r Kim Ogle- Follow-up: Electronic Copy of drawings Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 2/11/03 10:24AM Subject: Follow-up: Electronic Copy of drawings Barb If at all possible please provide an electronic copy in .jpeg format of all drawings submitted with the application. Thank you. Kim Ogle- LifeBridge hearing Page 1 i From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 5/5/03 8:05AM Subject: LifeBridge hearing Kim Ogle- Information requested by Duane Braunagel from Building Department Page 1 From: Kim Ogle To: I: barb.brunk@ttrmc.com Date: 5/4/03 2:08PM Subject: Information requested by Duane Braunagel from Building Department Information provided by Roger Vigil: Bulk/Massing of Known County Structures: Faith Tabernacle Church: 27 feet without steeple, UBC Table 5-A allow up to 55 feet LandMark Builders fabrication of precast concrete products: 32 feet Macrum Builders Batch Plant: 55 feet Gerald Bakery silo: 31 feet Pier Building, addition to Batch Plant: 52 feet Central Weld County Water District Storage Tank: 48 feet\ LaFarge Batch Plant: 74 feet to top of Silo Norfolk Iron and Metal manufacturing and warehouse facility: 43 feet Bruce Meyer- Radio Tower: 1164 feet Height numbers are based on building standpoint only, Table 5-A Uniform Building Code. This Table sets allowable area and height. Kim Ogle Planner Ill Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle- Re: FW: Drawing Page 1_ From: Kim Ogle To: "todd.borger@ttrmc.com".GWIA.CENTDOMAIN Date: 4/23/03 4:43PM Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>Todd Borger<todd.borger@ttrmc.com> 04/23/03 04:20PM >>> From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold fmailto:Ipenfold(a,firehousemail.comj Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn Kim Ogle - Re: LifeBridge, Drainage and CDOT Page 1 From: Kim Ogle To: "todd.borger@ttrmc.com".GWIA.CENTDOMAIN Date: 2/26/03 4:05PM Subject: Re: LifeBridge, Drainage and CDOT Thank you Todd, I will pass this along to DPW, Drew Scheltinga. Have a great day. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>Todd Borger<todd.borger@ttrmc.com> 02/26/03 04:04PM >>> Kim, I've been pursuing the request from Weld County Public Works asking for confirmation from CDOT regarding proposed drainage patterns. I've been directed to a gentleman by the name of Samer Alhaj (with CDOT), who wasn't aware of the request until I shared it with him on Monday. Because Samer's schedule is quite full, he would prefer to speak with you on the telephone and answer your questions and not write a letter. He may try to call you, or you may call him on his mobile phone at 970-302-4022. Please let me know if I can be of further assistance. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com> todd.borger@ttrmc.com website: <http://www.ttrmc.com/> http://www.ttrmc.com CC: Drew Scheltinga Kim Ogle - Follow-up Page 1 f,. From: "Paige Jacques" <pjacques@Ibcc.org> • To: "Kim Ogle" <kogle@co.weld.co.us> Date: 2/4/03 11:43AM Subject: Follow-up Kim: It was a pleasure to talk with you this morning. I have enclosed the web site we discussed below. As mentioned, I delivered a complete Application for Change of Zone Package to Danielle DiDonna, (303.772.5677) <mailto:303.772.5677)%20%20(ddidonna@hotmail.com> (ddidonna@hotmail.com), about two weeks ago. As per your request, you have asked us to clarify the component of our proposed Phase 1 as relates to the northern portion of the proposed site plan. I will speak with Bruce Grinnell and try to have something to you as soon as possible. I enjoyed our talk. If there is anything additional you might need, please do not hesitate to give me call at the number listed below. I look forward to meeting with you personally one of these days. Best regards, /— Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@Ibcc.org> pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 CC: "Barb Brunk" <barb.brunk@ttrmc.com>, "Alexa Taylor" <taylor@fentressbradburn.com>, "Bruce Grinnell" <bgrinnell@Ibcc.org>, "Dale Bruns" <dalebruns@earthlink.net>, "Mike Palumbo" <mikep@projectoneis.com>, "Reggie V. Golden" <reggieg@diamondglllp.com>, "Tristin Gleason" <tristing@projectoneis.com> Kim Ogle - RE: Follow-up Page 1 From: Kim Ogle To: "pjacques@Ibcc.org".GWIA.CENTDOMAIN Date: 2/9/03 1:22PM Subject: RE: Follow-up Thank you for the information. Please acknowledge that Todd Hodges, of Todd Hodges Design, LLC has joined your consultant team. Please note information will be provided to Todd on your behalf. Questions, please contact me. thank you. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>"Paige Jacques" <pjacques@lbcc.org>02/04/03 11:44AM >>> Ops, I forgot the web page. http://www.eastlongmontcsd.org/contact_us.htm Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@Ibcc.org>pjacques@Ibcc.orq Office: 303.678.0311 Facsimile: 303.702.0585 Original Message From: Paige Jacques [mailto:pjacques@Ibcc.orgj Sent: Tuesday, February 04, 2003 11:42 AM To: Kim Ogle (kogle@co.weld.co.us) Cc: Barb Brunk (barb.brunk@ttrmc.com); Alexa Taylor (tavlor@fentressbradburn.com); Bruce Grinnell (bgrinnell@lbcc.org); Dale Bruns (dalebruns@earthlink.net); Mike Palumbo (mikep@projectoneis.com); Reggie V. Golden (reooieo@diamondolllo.com); Tristin Gleason (tristing@projectoneis.com) Subject: Follow-up Kim: It was a pleasure to talk with you this morning. I have enclosed the web site we discussed below. As mentioned, I delivered a complete Application for Change of Zone Package to Danielle DiDonna, (303.772.5677) <mailto:303.772.5677)%20%20(ddidonna@hotmail.com> (ddidonna@hotmail.com), about two weeks ago. As per your request, you have asked us to clarify the component of our Kim Ogle - RE: Follow-up Page i proposed Phase 1 as relates to the northern portion of the proposed site plan. I will speak with Bruce Grinnell and try to have something to you as soon as possible. I enjoyed our talk. If there is anything additional you might need, please do not hesitate to give me call at the number listed below. I look forward to meeting with you personally one of these days. Best regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:oiacoues@Ibcc.orq>pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 CC: "barb.brunk@ttrmc.com".GWIA.CENTDOMAIN; "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN; "dalebruns@earthlink.net".GWIA.CENTDOMAIN; "mikep@projectoneis.com".GWIA.CENTDOMAIN; "reggieg@diamondgIllp.com".GWIA.CENTDOMAIN; "taylor@fentressbradburn.com".GWIA.CENTDOMAIN; "tristing@projectoneis.com".GWIA.CENTDOMAIN Kim Ogle - Re: FW: Drawing Page 1 From: Kim Ogle To: "todd.borger@ttrmc.com".GWIA.CENTDOMAIN Date: 4/23/03 4:43PM Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner Ill Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> Todd Borger<todd.borger@ttrmc.com> 04/23/03 04:20PM >>> From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.coml Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn r Kim Ogle- Re: FW: Drawing Page 1 From: Kim Ogle To: "todd.borger@ttrmc.com".GWIA.CENTDOMAIN Date: 4/23/03 4:43PM Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> Todd Borger<todd.borger@ttrmc.com> 04/23/03 04:20PM >>> From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.coml Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn r Kim Ogle- Re: LifeBridge, Drainage and CDOT Page 1 From: Kim Ogle To: "todd.borger@ttrmc.com".GWIA.CENTDOMAIN Date: 2/26/03 4:05PM Subject: Re: LifeBridge, Drainage and CDOT Thank you Todd, I will pass this along to DPW, Drew Scheltinga. Have a great day. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>Todd Borger <todd.borger@ttrmc.com>02/26/03 04:04PM >>> Kim, I've been pursuing the request from Weld County Public Works asking for confirmation from CDOT regarding proposed drainage patterns. I've been directed to a gentleman by the name of Samer Alhaj (with CDOT), who wasn't aware of the request until I shared it with him on Monday. Because Samer's schedule is quite full, he would prefer to speak with you on the telephone and answer your questions and not write a letter. He may try to call you, or you may call him on his mobile phone at 970-302-4022. Please let me know if I can be of further assistance. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com>todd.borger(o)ttrmc.com website: <htto://www.ttrmc.com/> htto://www.ttrmc.com CC: Drew Scheltinga Kim Ogle- Re: FW: LifeBridge update and to-do list Page 1 From: Kim Ogle To: "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN Date: 4/29/03 7:24AM Subject: Re: FW: LifeBridge update and to-do list Thank you for the information. kim >>> "Bruce Grinnell" <bgrinnell@lbcc.org>04/29/03 07:14AM >>> fyi Punchin' holes in the darkness, Bruce Original Message From: Bill Norris [mailto:BillNorris15@msn.coml Sent: Monday, April 28, 2003 8:21 PM To: bgrinnell@Ibcc.orq Subject: Fw: LifeBridge update and to-do list Bruce, Thought you might be interested! Bill Norris--- Life is Good Original Message From: Peter.Gries@colorado.edu <mailto:Peter.Gries@colorado.edu> To: gries@colorado.edu <mailto:gries@colorado.edu> Sent: Monday, April 28, 2003 4:23 PM Subject: LifeBridge update and to-do list My fellow homeowners, NEWS: 1. Our new website, www.weldhomeowners.org <htto://www.weldhomeowners.orq> , is now up and running. Please check it out and sign up. 2. Our first AD was in today's Greeley Tribune and will run most of the week. We may have a new AD over the weekend. 32c598.jpg The purpose of the AD campaign is to apply pressure to our County Commissioners this week prior to next week's rezoning hearing. Our Commissioners must understand that there will be consequences if they ignore their constituents in favor of their colleague Glen Vaad and his special interest. TO-DO List: 1. Call the four commissioners. If you cannot speak to them, talk to their wives or leave messages. They need to know that we are organized and upset: * David Long (970/437-5383) * Rob Masden (303/536-4250) * Bill Jerke (970/284-6061) Mike Geile (970/352-6290) 2. Write a short(200 word) letter to the editor of the Greeley Tribune. T Kim Ogle- Re: FW: LifeBridge update and to-do list Page 2 E-mail it to: letters(a)greelevtrib.com. Be sure to include your name and phone number, as they will want to confirm your consent prior to publication. I've pasted below the letter I submitted this morning. Please e-mail me to let me know if/when you accomplish one or both of these tasks. Thks! Pete Weld County's New State Religion Next Wednesday, Weld County Commissioners David Long, Rob Masden, Bill Jerke, and Mike Geile will decide whether to make fellow Commissioner Gleen Vaad's LifeBridge Church Weld County's state religion. So says the Establishment Clause of the U.S. Constitution. Specifically, the County Commissioners will decide whether to grant Vaad's church the right to build multiple Pepsi Center-sized structures in the middle of a residential neighborhood. And LifeBridge is asking Weld County to rezone more land than it can use, planning to lease or sell the unused acres at a hefty profit after rezoning. This will help pay for the construction of their church campus. The County will thus be subsidizing the construction of Vaad's church to the tune of several million dollars. This is unfair to our current Weld County churches, which will be at a competitive disadvantage up against a state-subsidized newcomer. It will also be unconstitutional, as it amounts to state sponsorship of one church to the detriment of others. But this rezoning does not just threaten to our Weld County churches, it also endangers our rights as homeowners. If LifeBridge is allowed to build a 90 foot tall, 3,200 seat auditorium in the middle of a residential neighborhood, any individual or group that claims to be religious (like the KKK)will have the right to build equally massive structures in any Weld County neighborhood. And the Establishment Clause of the U.S. Constitution will allow such religious groups to sue anyone (including the County)that gets in their way. This rezoning thus sets a precedent for what can be built next to every house in the County. To protect our churches and our property rights, the County Commissioners must reject this reckless rezoning request. Peter Gries, www.weldhomeowners.org <http://www.weldhomeowners.ora/> (Weld District 2, 720/494-1794; 303/492-8601) Assistant Professor Department of Political Science University of Colorado Boulder, CO 80309-0333 tel. (303)492-8601; fax (303)492-0978 htto://socsci.colorado.edu/--aries/ Co-Director Sino-American Security Dialogue htto://socsci.colorado.edu/--gries/SASD/index.htm CHINA'S NEW NATIONALISM: Pride, Politics, and Diplomacy Kim Ogle- Re: Kim you received a card emailed by Bruce. Page 1 From: Kim Ogle To: "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN Date: 11/25/02 3:46PM Subject: Re: Kim you received a card emailed by Bruce. Thank you for the card. Have a great holiday, drive safely if you are traveling and enjoy the time spent with family and friends. kim >>> "Bruce Grinnell" <bgrinnell@Ibcc.org> 11/25/02 03:20PM >>> Kim, Bruce today created you a postcard. Read your e-card by clicking here: http://www.FriendGreeting.comThickup.aspx?code=Kim&id=2511023 <http://65.240.226.241/505320/pickup.html?code=Kim&id=2511023> Message- Kim, Retrieve the greeting I just e-mailed. Bruce r Kim Ogle- Re: Meeting at Weld County Page 1 �., From: Kim Ogle To: "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN Date: 1/29/02 3:24PM Subject: Re: Meeting at Weld County Tuesday February 5, 2002 is Planning Commission at 1:30 pm. Monica is busy at this time. Should you want to have her input at this meeting, we will need to reschedule to Monday or Thursday. Second, after consulting with Monica, it has been determined that the Review Fee will be imposed. The fee is based on an hourly rate of 150.00 for Monica and Kim, or 100.00 for Kim and a second Planner. The fee is payable via check or cash immediately after the meeting. Billing is in 15 minute increments, no exceptions. Please confirm the date and time. Thank you. Kim Ogle Planner III Weld County Department of Planning 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>"Bruce Grinnell" <bgrinnell@Ibcc.org> 01/29/02 03:02PM >>> Hi Kim, This is to confirm our appointment on Tuesday afternoon, Feb 5th, at 1:30pm, at your office. Thank you, Bruce Grinnell Kim Ogle- Re: FW: LifeBridge update and to-do list Page 1 From: Kim Ogle To: "bgrinnell@lbcc.org".GWIA.CENTDOMAIN Date: 4/29/03 7:24AM Subject: Re: FW: LifeBridge update and to-do list Thank you for the information. kim >>> "Bruce Grinnell" <bgrinnell@Ibcc.org> 04/29/03 07:14AM >>> fyi Punchin' holes in the darkness, Bruce Original Message From: Bill Norris [mailto:BillNorris15@msn.coml Sent: Monday, April 28, 2003 8:21 PM To: bgrinnell@Ibcc.org Subject: Fw: LifeBridge update and to-do list Bruce, Thought you might be interested! Bill Norris--- Life is Good Original Message From: Peter.Gries@colorado.edu <mailto:Peter.Gries@colorado.edu> To: gries@colorado.edu <mailto:gries@colorado.edu> Sent: Monday, April 28, 2003 4:23 PM Subject: LifeBridge update and to-do list My fellow homeowners, NEWS: 1. Our new website, www.weldhomeowners.org <http://www.weldhomeowners.org> , is now up and running. Please check it out and sign up. 2. Our first AD was in today's Greeley Tribune and will run most of the week. We may have a new AD over the weekend. 32c598.jpg The purpose of the AD campaign is to apply pressure to our County Commissioners this week prior to next week's rezoning hearing. Our Commissioners must understand that there will be consequences if they ignore their constituents in favor of their colleague Glen Vaad and his special interest. TO-DO List: 1. Call the four commissioners. If you cannot speak to them, talk to their wives or leave messages. They need to know that we are organized and upset: David Long (970/437-5383) ` Rob Masden (303/536-4250) Bill Jerke (970/284-6061) Mike Geile (970/352-6290) 2. Write a short(200 word) letter to the editor of the Greeley Tribune. Kim Ogle - Re: FW: LifeBridge update and to-do list Page 2 E-mail it to: letters@greeleytrib.com. Be sure to include your name and phone number, as they will want to confirm your consent prior to publication. I've pasted below the letter I submitted this morning. Please e-mail me to let me know if/when you accomplish one or both of these tasks. Thks! Pete Weld County's New State Religion Next Wednesday, Weld County Commissioners David Long, Rob Masden, Bill Jerke, and Mike Geile will decide whether to make fellow Commissioner Gleen Vaad's LifeBridge Church Weld County's state religion. So says the Establishment Clause of the U.S. Constitution. Specifically, the County Commissioners will decide whether to grant Vaad's church the right to build multiple Pepsi Center-sized structures in the middle of a residential neighborhood. And LifeBridge is asking Weld County to rezone more land than it can use, planning to lease or sell the unused acres at a hefty profit after rezoning. This will help pay for the construction of their church campus. The County will thus be subsidizing the construction of Vaad's church to the tune of several million dollars. This is unfair to our current Weld County churches, which will be at a competitive disadvantage up against a state-subsidized newcomer. It will also be unconstitutional, as it amounts to state sponsorship of one church to the detriment of others. But this rezoning does not just threaten to our Weld County churches, it also endangers our rights as homeowners. If LifeBridge is allowed to build a 90 foot tall, 3,200 seat auditorium in the middle of a residential neighborhood, any individual or group that claims to be religious (like the KKK)will have the right to build equally massive structures in any Weld County neighborhood. And the Establishment Clause of the U.S. Constitution will allow such religious groups to sue anyone (including the County)that gets in their way. This rezoning thus sets a precedent for what can be built next to every house in the County. To protect our churches and our property rights, the County Commissioners must reject this reckless rezoning request. Peter Gries,www.weldhomeowners.orq <http://www.weldhomeowners.org/> (Weld District 2, 720/494-1794; 303/492-8601) Assistant Professor Department of Political Science University of Colorado Boulder, CO 80309-0333 tel. (303)492-8601; fax (303)492-0978 http://socsci.colorado.edu/—gries/ Co-Director Sino-American Security Dialogue http://socsci.colorado.edu/—gries/SASD/index.htm CHINA'S NEW NATIONALISM: Pride, Politics, and Diplomacy Kim Ogle - Re: Meeting at Weld County Page 1 ,.� From: Kim Ogle To: "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN Date: 1/29/02 3:24PM Subject: Re: Meeting at Weld County Tuesday February 5, 2002 is Planning Commission at 1:30 pm. Monica is busy at this time. Should you want to have her input at this meeting, we will need to reschedule to Monday or Thursday. Second, after consulting with Monica, it has been determined that the Review Fee will be imposed. The fee is based on an hourly rate of 150.00 for Monica and Kim, or 100.00 for Kim and a second Planner. The fee is payable via check or cash immediately after the meeting. Billing is in 15 minute increments, no exceptions. Please confirm the date and time. Thank you. Kim Ogle Planner III Weld County Department of Planning 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> "Bruce Grinnell" <bgrinnell@lbcc.org> 01/29/02 03:02PM >>> Hi Kim, This is to confirm our appointment on Tuesday afternoon, Feb 5th, at 1:30pm, at your office. Thank you, Bruce Grinnell Kim Ogle- Re: Kim you received a card emailed by Bruce. Page 1 �, From: Kim Ogle To: "bgrinnell@Ibcc.org".GWIA.CENTDOMAIN Date: 11/25/02 3:46PM Subject: Re: Kim you received a card emailed by Bruce. Thank you for the card. Have a great holiday, drive safely if you are traveling and enjoy the time spent with family and friends. kim >>> "Bruce Grinnell" <bgrinnell@Ibcc.org> 11/25/02 03:20PM >>> Kim, Bruce today created you a postcard. Read your e-card by clicking here: http://www.FriendGreetind.com/Dickup.aspx?code=Kim&id=2511023 <http://65.240.226.241/505320/pickup.htm I?code=Kim&id=2511023> Message- Kim, Retrieve the greeting I just e-mailed. Bruce ) ) ) Phone Log, Messages from Voice Mail Returned DATE TIME CALLER TELEPHONE# INQUIRY INFO GIVEN DATE 2-19 1330 DEB KALISH 303 575 7525 LIFEBRIDGE MESSG 2-20 2-20 340 BARB BRUNK x 108 303 772 5282 RMC-LIFEBRIDGE ADDITIONAL INFORMATION NEEDED 2-21 2-21 500 BARB BRUNK 303 651 0033 BRUCE OPEN HOUSE MONDAY 2-21 2-23 410 BRUCE GRINNELL 303 717 2647 LIFEBRIDGE PRESENTATION PM Tuesday 11:00 AM 2-24 2-27 950 BRUCE GRINNELL 8738 970 772 5282 2-27 303 717 2647 2-27 1200 BARB BRUCE 10 MINUTES OUT DROPPED PACKAGE OFF 2-27 3-5 100 BARB BRUNK 303 772 5282 CDOT AND WATER QUALITY, ERROR IN PHOTO GRAPHIC TO COME MONDAY PM 3-5 GRAPHIC A 3-12 510 BARB BRUNK 303 772 1240 x 108 BACK DOOR PHONE 3-12 3-13 830 BARB BRUNK 303 772 1240 x 108 MAY 7, PRE-AD 3-13 3-21 1120 BRUCE GRINNELL 303 776 5377 TODD, BARB, BRUCE- NEXT WEEK CALLED TO CONFIRM 2:00 PM 3-21 FRIDAY MORNING 28TH? FRIDAY PM? 3-21 230 BARB FRIDAY @ 2:00 3-21 4-4 400 KIM GROE GRINNELL MEETING NO INFO, READY MONDAY 4-4 4-8 900 BRUCE GRINNELL 303 776 5558 LIFEBRIDGE, NO NEW PACKAGE SUPPORT PRIOR TO END OF WEEK, 4-8 303 717 2647 RESTRICTIONS ON HEIGHT NOT IN WELD COUNTY'S INTEREST. 12-20 FAMILIES OF SUPPORT AGREE TO NOT AGREE,WORSHIP 150, 000 SF AT 90 FEET BLDG FOR TEN YEARS, CONNECTIVITY? 4-17 310 BARB BRUNK 303 772 5282 NORTH ROAD MOVED 4-18 5-6 230 BARB 303 772 5282 LEE BIG BOARDS 5-6 5-6 330 BARB 303 7725282 PETER AND DUANE 5-6 125 FEET OF PROPERTY LINE ADD THIRTY FOOT TALL BUILDING ENVELOPE ti EXHIBIT ea & pp - =1F]Mt4 Kim Ogle - Update Page 1 From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 2/26/03 12:27PM Subject: Update Hi Kim, Thanks for yesterday. I really appreciate your comments and the large amount of effort and time that you, Monica, Drew, and Peter allowed for our conversation. I will have everything together tonight. I will be providing you with a letter of clarification and drawings. I will deliver the information to your office tomorrow(Thursday) morning. I believe that there could be value for both of us, if you and I meet and quickly to review the information. This could speed up your interpretation of the materials and hopefully any miscommunication could be resolved. Please let me know if you have time. Thanks, Bruce Grinnell Administrator LifeBridge Christian Church 10345 Ute Highway Longmont, CO 80501 303.776.2927- office 303.717.2647 - cell r3/4- bgrinnell@lbcc.org Kim Ogle - FW: LifeBridge in today's TimesCall Page 1 From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 3/5/03 11:50AM Subject: FW: LifeBridge in today's TimesCall Kim, FYI. Punchin' holes in the darkness, Bruce Original Message From: Rod Schmidt [mailto:rschmidt@Acosta.com] Sent: Wednesday, March 05, 2003 9:48 AM To: 'LBCC - Bruce Grinnell'; 'LBCC - Reg Golden' Subject: FW: LifeBridge in today's TimesCall Guys, Don't take too much offense to this letter- it was submitted before we ever began discussing the issues as a group - I hate the timing of this- hope it doesn't derail anything we are trying to accomplish. Rod Original Message From: Peter.Gries@colorado.edu [mailto:Peter.Gries@colorado.edu] Sent: Wednesday, March 05, 2003 9:42 AM To: Duane J Leise; Rod Schmidt; 'Darla J Gabbitas '; 'Rich Salm '; Peter.Gries@colorado.edu; Kmaglia20@aol.com; v-dbraun@ecentral.com; archers4@att.net; billnorris15@msn.com; ddidonna@hotmail.com; mark.j.schroeder@seagate.com Subject: LifeBridge in today's TimesCall I submitted this and it was approved about two weeks, ago, but heree it is today! Pete 202bd3.jpg Kim Ogle- FW: LifeBridge update and to-do list Page 2 Please e-mail me to let me know if/when you accomplish one or both of these tasks. Thks! Pete Weld County's New State Religion Next Wednesday, Weld County Commissioners David Long, Rob Masden, Bill Jerke, and Mike Geile will decide whether to make fellow Commissioner Gleen Vaad's LifeBridge Church Weld County's state religion. So says the Establishment Clause of the U.S. Constitution. Specifically, the County Commissioners will decide whether to grant Vaad's church the right to build multiple Pepsi Center-sized structures in the middle of a residential neighborhood. And LifeBridge is asking Weld County to rezone more land than it can use, planning to lease or sell the unused acres at a hefty profit after rezoning. This will help pay for the construction of their church campus. The County will thus be subsidizing the construction of Vaad's church to the tune of several million dollars. This is unfair to our current Weld County churches, which will be at a competitive disadvantage up against a state-subsidized newcomer. It will also be unconstitutional, as it amounts to state sponsorship of one church to the detriment of others. But this rezoning does not just threaten to our Weld County churches, it also endangers our rights as homeowners. If LifeBridge is allowed to build a 90 foot tall, 3,200 seat auditorium in the middle of a residential neighborhood, any individual or group that claims to be religious (like the KKK)will have the right to build equally massive structures in any Weld County neighborhood. And the Establishment Clause of the U.S. Constitution will allow such religious groups to sue anyone (including the County)that gets in their way. This rezoning thus sets a precedent for what can be built next to every house in the County. To protect our churches and our property rights, the County Commissioners must reject this reckless rezoning request. Peter Gries,www.weldhomeowners.org <http://www.weldhomeowners.org/> (Weld District 2, 720/494-1794; 303/492-8601) Assistant Professor Department of Political Science University of Colorado Boulder, CO 80309-0333 tel. (303)492-8601; fax (303)492-0978 http://socsci.colorado.edu/-gries/ Co-Director Sino-American Security Dialogue http://socsci.colorado.edu/—gries/SASD/index.htm CHINA'S NEW NATIONALISM: Pride, Politics, and Diplomacy http://www.ucpress.edu/books/pages/9662.html#bio Kim Ogle- FW: LifeBridge Page 1 t. From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 3/6/03 12:01 PM Subject: FW: LifeBridge FYI -great news Punchin' holes in the darkness, Bruce Original Message From: Barb Brunk [mailto:barb.brunk@ttrmc.com] Sent: Thursday, March 06, 2003 10:40 AM To: B.Grinnell; Barb Brunk; C.Geddes; D.Bruns; D.Rubba; K.Weykamp; Mary Brown; Matt Delich; Outman; P.Jacques; ReggieG; Taylor; Todd Borger; Todd Hodges; Tristin Gleason Subject: FW: LifeBridge Original Message From: Matt Delich [mailto:mdelich@frii.com] Sent: Thursday, March 06, 2003 10:14 AM To: Barb Brunk Subject: Fw: LifeBridge Barb, Check out the attached. I think that the meeting should still occur on Monday. To get everybody comfortable. Matt Original Message From: "Nice-Idler, Gloria" <Gloria.Nice-Idler@dot.state.co.us> To: <kogle@co.weld.co.us> Sent: Thursday, March 06, 2003 9:16 AM Subject: LifeBridge Kim, I've been asked to reconsider my memo about the LifeBridge Church. It would appear that my reference to an interchange raised more than a few eyebrows. I would like to explain that it is CDOT's position that we would prefer to NOT have an interchange. It would be the worst case and we would welcome alternatives. I'm hoping that's what Monday will be about; discussions regarding options. Attached please find a revised memo. I would ask that you remove the previous memo, and instead, include this one in your packet. «LifeBridge2.doc» CC: "Barb Brunk (E-mail)" <barb.brunk@ttrmc.com> r Kim Ogle- ELCSD Page 1 From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com>, "Barb Brunk (E-mail)" <barb.brunk@ttrmc.com>, "Chris Geddes (E-mail)" <cgeddes@insitedgn.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Dennis Rubba (E-mail)" <drubba@insitedgn.com>, "Mark Outman (E-mail)" <outman@fentressbradburn.com>, "Mary Brown (E-mail)" <mbrown@intermountainca.com>, "Mike Palumbo (E-mail)" <mikep@projectoneis.com>, "Paige Jaques (E-mail 2)" <pjacques@lbcc.org>, "Reggie Golden (Diamond) (E-mail)" <reggieg@diamondglllp.com>, "Todd Hodges (E-mail)" <toddhodgesdesign@earthlink.net>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Date: 3/4/03 4:10PM Subject: ELCSD FYI - making progress... Hoo-rah Punchin' holes in the darkness, Bruce Original Message From: Rod Schmidt [mailto:rschmidt@Acosta.com] Sent: Tuesday, March 04, 2003 10:24 AM To: 'LBCC - Bruce Grinnell' Cc: 'LBCC - Reg Golden' Subject: FW: ELCSD: Today's Headlines Bruce and Reg, Thanks for the time last night. I think Vicki has concurred with Rick and myself that we are definately making positive progress. Even Rich Salm is beginning to feel like we are advancing at a pace that could bring both sides into some type of agreement prior to the meeting on the 18th. I wanted both of you to see that we do take our commitment seriously as well. Rich has posted information to the web site relative to the changes (ignor the kudos he sends out as well)that have occurred the past few weeks. He also addresses the traffic issues that have been missrepresnted in the past. There's still a little rhetoric, but it is toning down. Have a great day. Rod Original Message From: Rich Salm [mailto:rich.salm@eastlongmontcsd.com] Sent: Tuesday, March 04, 2003 8:02 AM To: Elms at Meadowvale Subject: ELCSD: Today's Headlines East Longmont Citizen's for Sensible Development Log on to eastlongmontcsd.org for the latest news <http://www.eastlongmontcsd.org/l ifebridge.agrees.to.changes.htm> Lifebridge Agrees to Changes ELCSD <http://www.eastlongmontcsd.org/elcsd.efforts.yield.results.htm> Efforts Yield Results Kim Ogle- RE: revised memo Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/27/03 1:58PM Subject: RE: revised memo Kim, This is the revised file with the correct setback table -east/west corrected. Barb Kim Ogle- RE: LifeBridge Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/20/03 6:17PM Subject: RE: LifeBridge Kim, Call me in the morning - I have 4 additional perspective drawings. They are not rendered but I can forward the black and white line drawings from the Architect. They show the view from the neighbors to the west, view from the neighbors to the east and view up WCR 31/2 looking north. Fentress has also prepared an electronic 3D Model of the PUD -without architecture -just block/bulk to show massing, based on the model and existing grade on the site. The 3D model and photos from the different view points were the basis for the perspectives. I can share the model and photos with you if you think it will help you understand the site. We do not have detailed architecture at this time. Thanks for all your help. Let me know how you want to proceed. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r CC: "B.Grinnell" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@lbcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor<taylor@fentressbradburn.com>, Todd Borger<todd.borger@ttrmc.com> Kim Ogle - Fwd: JPEGS Page 1 From: Kim Ogle To: Voneen Macklin Date: 4/19/03 12:33PM Subject: Fwd: JPEGS Add Filing 2, to lifebridge file, see attached. thanks r Kim Ogle- Information you need Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/14/03 3:33PM Subject: Information you need Kim, Bruce is still working with the neighbors, If we have a letter with neighborhood signatures and a summary of the info we discussed with neighbors, can we send it tomorrow and still get it in the packets, or will it be better to bring it to the PC meeting? Have you received any new fan mail? Todd sent the traffic info to Drew and Gloria and will follow up today. He will forward any info received to you. We will need about 20 seats for LBCC staff and consultants at the PC meeting and can set up the evening before or early in the AM - Let me know what you think is best. I have compiled a sampling of house plans and the plat for Belle Creek. This project is an award winning mixed use, new urbanism project. I got the plat from the Sales office and sample house plans off of the web site. I am putting together a file toe mail and I will send you a hard copy in the over night mail. The lots range in size from 3,000 to 6,400 s.f and include a wide range of styles and sizes of homes. Homes are under construction and fit on the lots as designed. Maybe we could have enough flexibility to vary lot sizes at the time of final plat with sample house plans for the lots. We should have better information with the final PUD plan. We also feel that the setback in the senior portion of the PUD and the Neighborhood Center, Mixed Use office retail, and Commercial Center should be 20' max - the intention is to have a "Main Street"and additional setback will make it difficult to reinforce the public spaces with a built edge. How does the Code treat units in an assisted living facility or a nursing home? Does the minimum lot area per unit apply to this type of facility? We did not understand that you needed the massing cross section prior to the PC meeting, Alexa is working on the map and we will send it tomorrow. Is there any additional info that you need from us before tomorrow? Thanks for all your help. Barb CC: "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org> Kim Ogle- FW: church building uses in phase one Page 1 From: Barb Brunk<barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/21/03 12:56PM Subject: FW: church building uses in phase one Kim, Here are the numbers that go with Phase One (both filings)of the Church campus. (The Church campus does not change with the second filing.) Barb Original Message From: Bruce Grinnell [mailto:bgrinnell@Ibcc.org] Sent: Monday, April 21, 2003 12:45 PM To: Barb Brunk (E-mail) Subject: church building uses in phase one Fellowship Hall to included, lobby, 2500-seat worship auditorium/multi use room, bookstore, library, kitchen, and 500-seat worship auditorium/theatre - 158,000 sq. ft. Learning Center to include, lobby, classroom, youth worship, church offices, and meeting rooms -60,000 sqft Children's to include, lobby, classrooms, children's worship, cafeteria, multi use room, and gym - 50,000 sqft Total -268,000 sqft Punchin' holes in the darkness, Bruce • Kim Ogle- RE: Meeting with neighbors Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 5/6/03 6:50AM Subject: RE: Meeting with neighbors Kim, Bruce met with some of the neighbors last night- don't know how it went. We still have about 20 on the team - grouped together in two rows (back to back)works well for us if it's ok with you. See you tomorrow morning-call if you need anything. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com Kim Ogle- RE: Proposed Weld County Storm Water Management Plan Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/20/03 4:01 PM Subject: RE: Proposed Weld County Storm Water Management Plan Kim, Is it possible to get a copy of the proposed storm water management plan? Accessible on line? Hope you are having a wonderful day! Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r"� Kim Ogle- FW: bulk plane section for Kim Ogle Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/15/03 9:14AM Subject: FW: bulk plane section for Kim Ogle Kim, Here is the north/south section of the campus height boxes. Do you also need the east/west section? Barb Original Message From: Alexa Taylor [mailto:taylor@fentressbradburn.com] Sent: Monday, April 14, 2003 5:02 PM To: Barb Brunk (E-mail) Cc: Bruce Grinnell (E-mail); Mark Outman; 200115 Lifebridge Christian Church Subject: bulk plane section for Kim Ogle Barb, here is our understanding of the section Kim wanted. You didn't specify if we should put the bldg outline on, and the bulk plan is so large, that we thought it would be good to show exactly how much of the allowable space we are using. Please let us know if you or Kim require any changes. <<200115 012 bulk plane section 3_7_03.jpg>> Alexa Taylor, AIA Fentress Bradburn Architects Kim Ogle- RE: Follow-up Page 1 I From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/13/03 8:56AM Subject: RE: Follow-up Kim, Todd will be out of town on April 30. Is it possible to pre-advertise for the May 7 County Commissioners hearing? Let me know and I will send you the request this morning. Thanks Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r Kim Ogle-JPEGS Page 1 I From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/17/03 5:14PM Subject: JPEGS Kim, I keep getting the JPEGS back from the other address in weld county- could you forward them to him or send me another address? Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com «filingl_0226_pp.jpg» «filing2_0226pp.jpg» «OVERALL_MAP 8X11 (1).jpg>> «SHEET_6_landscape Layoutl 8x11 (1).jpg» «SHEET1 8X11copy.jpg>> «SHEET2 04-11-0311X8copy.jpg>> <<SHEET3_04-11-03 11X8copy.jpg>> «SHEET4_04-11-0311X8copy.jpg>> Kim Ogle - Overall Map Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/19/03 2:41 PM Subject: Overall Map Kim, The attached file is a PDF - I enlarged it to 400% at the table and the info is clear. I can't get the JPEG to be clear. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com «OVERALL_MAP Model (1).pdf>> r LKim Ogle- RE: 2/27/03 Documents Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/27/03 1:06PM Subject: RE: 2/27/03 Documents Kim, The letter and memo from today's submittal are attached. PC packets and the additional color maps will be in the overnight mail. I will also drop a complete packed off at the City of Longmont. Thanks for all your help. Barb r Kim Ogle- LifeBridge, Lane Layout at 119, 3,5 and 3.5 and Long View Blvd Page 1 i �-. From: Todd Borger<todd.borger@ttrmc.com> To: "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us>, "Gloria Hice-Idler(E-mail)" <Gloria.Hice-Idler@dot.state.co.us> Date: 4/10/03 2:57PM Subject: LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Gloria, Drew, Kim, Peter, Attached is a figure showing a lane layout that would accommodate the traffic predicted for the full build out scenario. Please call Matt Delich or myself if you have questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> CC: "Matt Delich (E-mail)" <mdelich@frii.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com> r r [Kim Ogle- Building height Page 1 ' From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/8/03 12:16PM Subject: Building height «Doc3.doc» Kim, The Church is continuing to meet with the neighbors. The file above outlines the building height restrictions we discussed for the Church Campus and supercedes all previous requests. Todd Borger is coordinating with Drew and Gloria re the turn lanes and ROW for 119 and WCR 31/2. I will have him update you when he has information. I also followed up with a Flood Plain Engineer re CLOMR and LOMR. I have heard 25K offered up as an order of magnitude more than once, but each site is different and it could be more or less depending on what information is available. In order to give a ball park on the cost he needs to know: How much area ( acres and length of reach)? What king of mapping is available - has the base flood elevation been established? Has the flood way been defined for the property? Will the changes impact adjacent properties? Any base mapping available? Call with questions. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com CC: "B.Grinnell" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Mary Brown <mbrown@intermountainca.com>, Matt Delich <mdelich@frii.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@lbcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor<taylor@fentressbradburn.com>, Todd Borger <todd.borger@ttrmc.com>, Todd Hodges <toddhodgesdesign@earthlink.net>, Tristin Gleason <tristi ng @p roj ectone is.com> Kim Ogle- RE: Question - Sign Posting Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/2/03 1:17PM Subject: RE: Question - Sign Posting Kim, Does the Department of Planning Services post the sign two weeks before the hearing or do we? Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com I Kim Ogle- RE:Proposed Weld County Storm Water Management Plan Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/20/03 4:01 PM Subject: RE: Proposed Weld County Storm Water Management Plan Kim, Is it possible to get a copy of the proposed storm water management plan? Accessible on line? Hope you are having a wonderful day! Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r Kim Ogle- RE: Follow-up Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/13/03 12:22PM Subject: RE: Follow-up Kim, Thank you for your help-we appreciate all of your effort. I will send the schedule and follow up with the pre-notification request. We will also contact the keeper of the neighborhood web page to try to get the word out to the neighborhood re Tuesday. Bruce will be there on Tuesday to represent the Church. Have a wonderful day. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Thursday, March 13, 2003 11:24 AM To: barb.brunk@ttrmc.com Subject: RE: Follow-up April 22nd 2003 has been reserved for the PC hearing. We are proposing a 9:00 am starting time, with breaks throughout the day including lunch. Staff is proposing no dinner break with a decision rendered at 8:00 pm May 7, 2003 is the scheduled BCC hearing. Hearing begins at 10:00 am. I have taken the case file to BCC for set up and processing. Make it a great day. kim >>> Barb Brunk <barb.brunk@ttrmc.com> 03/13/03 08:57AM >>> Kim, Todd will be out of town on April 30. Is it possible to pre-advertise for the May 7 County Commissioners hearing? Let me know and I will send you the request this morning. Thanks Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com CC: "B.Grinnell" <bgrinnell@lbcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kwe kam insited n.com>, Mary Brown <mbrown@ intermountainca.com>,p" y p@' g Matt Delich <mdelich@frii.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@lbcc.org>, [kim Ogle - RE: Follow-up Page 1 From: Barb Brunk<barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/13/03 8:56AM Subject: RE: Follow-up Kim, Todd will be out of town on April 30. Is it possible to pre-advertise for the May 7 County Commissioners hearing? Let me know and I will send you the request this morning. Thanks Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com Kim Ogle-Staff Recommendation Page 1 From: Kim Grow <kim.grow@ttrmc.com> To: <KOGLE@co.weld.co.us> Date: 3/12/03 11:19AM Subject: Staff Recommendation Kim: Barb is down at Fentress Bradburn Architect's in Denver today and they are anxiously awaiting the Staff Recommendation. Is there any chance that you could email it to me and I can forward it to them? Thank you Kim. Sincerely, Kim Grow Kim Grow TETRA TECH RMC 1900 S. Sunset Street, Suite 1-F Longmont, CO 80501 303.772.5282 Ext. 163 FAX 303.665.6959 kim.grow@ttrmc.com <mailto:kim.grow@ttrmc.com> r Kim Ogle -Oligarchy ditch agreement is OK for Lifebridge Page 1 From: LEE Morrison To: Kim Ogle Date: 3/10/03 2:10PM Subject: Oligarchy ditch agreement is OK for Lifebridge Lee D. Morrison Assistant Weld County Attorney 915 10th St., PO Box 758 Greeley, CO 80632 (970)356-4000 x 4395 FAX 352 0242 This e-mail contains confidential and/or privileged information. If the reader is not the intended recipient, please reply and delete your copy of this message." r Kim Ogle FW: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Page 1 !i From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 3/7/03 2:09PM Subject: FW: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Am forwarding as confirmation. Original Message From: AlHaj, Samer[mailto:Samer.AlHaj@DOT.STATE.CO.US] Sent: Friday, March 07, 2003 1:56 PM To: Todd Borger Subject: RE: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Thanks Todd, this summarized everything we discussed this morning good luck Original Message From: Todd Borger[mailto:todd.borger@ttrmc.com] Sent: Friday, March 07, 2003 1:43 PM To: Kim Ogle (E-mail); Drew Scheltinga (E-mail); Peter Schei (E-mail) Cc:AlHaj, Samer; Barb Brunk; Alexa Taylor (E-mail); Bruce Grinnell (E-mail); Dale Bruns (E-mail); Paige Jacques (E-mail); Reggie M. Golden (E-mail); Tristin Gleason (E-mail) Subject: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Kim, Drew, Peter, With permission from Samer Alhaj (CDOT), I am forwarding his response via the attachment. Samer and I met on-site this morning to discuss the drainage issues. The attached memo summarizes our meeting. Please feel free to call me if you have any questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: http://www.ttrmc.com <http://www.ttrmc.com/> CC: Barb Brunk <barb.brunk@ttrmc.com>, "Alexa Taylor(E-mail)" Kim Ogle - Lifebridge, CDOT, Drainage in SH 119 Right-of-way Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 3/7/03 1:42PM Subject: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Kim, Drew, Peter, With permission from Samer Alhaj (CDOT), I am forwarding his response via the attachment. Samer and I met on-site this morning to discuss the drainage issues. The attached memo summarizes our meeting. Please feel free to call me if you have any questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: http://www.ttrmc.com <http://www.ttrmc.com/> CC: "Samer Alhaj (E-mail)" <samer.alhaj@dot.state.co.us>, Barb Brunk <barb.brunk@ttrmc.com>, "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@lbcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> r^ Kim Ogle - FW: LifeBridge Page 1 From: "Bruce Grinnell" <bgrinnell@lbcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 3/6/03 12:01 PM Subject: FW: LifeBridge FYI - great news Punchin' holes in the darkness, Bruce Original Message From: Barb Brunk [mailto:barb.brunk@ttrmc.com] Sent: Thursday, March 06, 2003 10:40 AM To: B.Grinnell; Barb Brunk; C.Geddes; D.Bruns; D.Rubba; K.Weykamp; Mary Brown; Matt Delich; Outman; P.Jacques; ReggieG; Taylor; Todd Borger; Todd Hodges; Tristin Gleason Subject: FW: LifeBridge Original Message From: Matt Delich [mailto:mdelich@frii.comj Sent: Thursday, March 06, 2003 10:14 AM To: Barb Brunk Subject: Fw: LifeBridge Barb, Check out the attached. I think that the meeting should still occur on Monday. To get everybody comfortable. Matt Original Message From: "Nice-Idler, Gloria" <Gloria.Nice-Idler@dot.state.co.us> To: <kogle@co.weld.co.us> Sent: Thursday, March 06, 2003 9:16 AM Subject: LifeBridge Kim, I've been asked to reconsider my memo about the LifeBridge Church. It would appear that my reference to an interchange raised more than a few eyebrows. I would like to explain that it is CDOT's position that we would prefer to NOT have an interchange. It would be the worst case and we would welcome alternatives. I'm hoping that's what Monday will be about; discussions regarding options. Attached please find a revised memo. I would ask that you remove the previous memo, and instead, include this one in your packet. «LifeBridge2.doc» CC: "Barb Brunk (E-mail)" <barb.brunk@ttrmc.com> Kim Ogle - FW: LifeBridge in today's TimesCall Page 1 1 From: "Bruce Grinnell" <bgrinnell@lbcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 3/5/03 11:50AM Subject: FW: LifeBridge in today's TimesCall Kim, FYI. Punchin' holes in the darkness, Bruce Original Message From: Rod Schmidt[mailto:rschmidt@Acosta.com] Sent: Wednesday, March 05, 2003 9:48 AM To: 'LBCC - Bruce Grinnell'; 'LBCC - Reg Golden' Subject: FW: LifeBridge in today's TimesCall Guys, Don't take too much offense to this letter- it was submitted before we ever began discussing the issues as a group - I hate the timing of this- hope it doesn't derail anything we are trying to accomplish. Rod Original Message From: Peter.Gries@colorado.edu [mailto:Peter.Gries@colorado.edu] Sent: Wednesday, March 05, 2003 9:42 AM To: Duane J Leise; Rod Schmidt; 'Darla J Gabbitas '; 'Rich Salm '; Peter.Gries@colorado.edu; Kmaglia20@aol.com; v-dbraun@ecentral.com; archers4@att.net; billnorris15@msn.com; ddidonna@hotmail.com; mark.j.schroeder@seagate.com Subject: LifeBridge in today's TimesCall I submitted this and it was approved about two weeks, ago, but heree it is today! Pete 202bd3.jpg Kim Ogle - ELCSD Page 1 From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Alexa Taylor (E-mail)" <taylor@fentressbradburn.com>, "Barb Brunk (E-mail)" <barb.brunk@ttrmc.com>, "Chris Geddes (E-mail)" <cgeddes@insitedgn.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Dennis Rubba (E-mail)" <drubba@insitedgn.com>, "Mark Outman (E-mail)" <outman@fentressbradburn.com>, "Mary Brown (E-mail)" <mbrown@intermountainca.com>, "Mike Palumbo (E-mail)" <mikep@projectoneis.com>, "Paige Jaques (E-mail 2)" <pjacques@Ibcc.org>, "Reggie Golden (Diamond) (E-mail)" <reggieg@diamondglllp.com>, "Todd Hodges (E-mail)" <toddhodgesdesign@earthlink.net>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Date: 3/4/03 4:10PM Subject: ELCSD FYI - making progress... Hoo-rah Punchin' holes in the darkness, Bruce Original Message From: Rod Schmidt [mailto:rschmidt@Acosta.com] Sent: Tuesday, March 04, 2003 10:24 AM To: 'LBCC - Bruce Grinnell' Cc: 'LBCC - Reg Golden' Subject: FW: ELCSD: Today's Headlines Bruce and Reg, Thanks for the time last night. I think Vicki has concurred with Rick and myself that we are definately making positive progress. Even Rich Salm is beginning to feel like we are advancing at a pace that could bring both sides into some type of agreement prior to the meeting on the 18th. I wanted both of you to see that we do take our commitment seriously as well. Rich has posted information to the web site relative to the changes (ignor the kudos he sends out as well)that have occurred the past few weeks. He also addresses the traffic issues that have been missrepresnted in the past. There's still a little rhetoric, but it is toning down. Have a great day. Rod Original Message From: Rich Salm [mailto:rich.salm@eastlongmontcsd.com] Sent: Tuesday, March 04, 2003 8:02 AM To: Elms at Meadowvale Subject: ELCSD: Today's Headlines East Longmont Citizen's for Sensible Development Log on to eastlongmontcsd.org for the latest news <http://www.eastlongmontcsd.org/lifebridge.agrees.to.changes.htm> Lifebridge Agrees to Changes ELCSD <http://www.eastlongmontcsd.org/elcsd.efforts.yield.results.htm> Efforts Yield Results Kim Ogle- CDOT drainage confirmation Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: Barb Brunk <barb.brunk@ttrmc.com>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us>, "Alexa Taylor (E-mail)" <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondgIllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Date: 2/28/03 1:02PM Subject: CDOT drainage confirmation Greetings: I've been working with CDOT, a gentleman by the name of Samer Alhaj. He requested to meet on site to look at how the drainage will leave the property and affect the CDOT r.o.w. as the drainage heads toward the St. Vrain River. This meeting is set for next Thursday, 10 am, at the LifeBridge site. All are invited to attend, particularly Drew and Peter. Please call if you have questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com> todd.borger@ttrmc.com website: <http://www.ttrmc.com/> http://www.ttrmc.com Kim Ogle - RE: revised memo Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/27/03 1:58PM Subject: RE: revised memo Kim, This is the revised file with the correct setback table-east/west corrected. Barb r Kim Ogle- RE: 2/27/03 Documents Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/27/03 1:06PM Subject: RE: 2/27/03 Documents Kim, The letter and memo from today's submittal are attached. PC packets and the additional color maps will be in the overnight mail. I will also drop a complete packed off at the City of Longmont. Thanks for all your help. Barb r Kim Ogle - LifeBridge, Drainage and CDOT Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 2/26/03 4:03PM Subject: LifeBridge, Drainage and CDOT Kim, I've been pursuing the request from Weld County Public Works asking for confirmation from CDOT regarding proposed drainage patterns. I've been directed to a gentleman by the name of Samer Alhaj (with CDOT), who wasn't aware of the request until I shared it with him on Monday. Because Samer's schedule is quite full, he would prefer to speak with you on the telephone and answer your questions and not write a letter. He may try to call you, or you may call him on his mobile phone at 970-302-4022. Please let me know if I can be of further assistance. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com>todd.borger@ttrmc.com website: <http://www.ttrmc.com/> http://www.ttrmc.com Kim Ogle- Update Page 11 "„� From: "Bruce Grinnell" <bgrinnell@Ibcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 2/26/03 12:27PM Subject: Update Hi Kim, Thanks for yesterday. I really appreciate your comments and the large amount of effort and time that you, Monica, Drew, and Peter allowed for our conversation. I will have everything together tonight. I will be providing you with a letter of clarification and drawings. I will deliver the information to your office tomorrow(Thursday) morning. I believe that there could be value for both of us, if you and I meet and quickly to review the information. This could speed up your interpretation of the materials and hopefully any miscommunication could be resolved. Please let me know if you have time. Thanks, Bruce Grinnell Administrator LifeBridge Christian Church 10345 Ute Highway Longmont, CO 80501 303.776.2927- office 303.717.2647- cell bgrinnell@Ibcc.org r Kim Ogle- RE: LifeBridge Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/20/03 6:17PM Subject: RE: LifeBridge Kim, Call me in the morning - I have 4 additional perspective drawings. They are not rendered but I can forward the black and white line drawings from the Architect. They show the view from the neighbors to the west, view from the neighbors to the east and view up WCR 31/2 looking north. Fentress has also prepared an electronic 3D Model of the PUD -without architecture-just block/bulk to show massing, based on the model and existing grade on the site. The 3D model and photos from the different view points were the basis for the perspectives. I can share the model and photos with you if you think it will help you understand the site. We do not have detailed architecture at this time. Thanks for all your help. Let me know how you want to proceed. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com CC: "B.Grinnell" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@Ibcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor <taylor@fentressbradburn.com>, Todd Borger<todd.borger@ttrmc.com> Kim Ogle- RE: Question - Bulk Standards Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/13/03 3:16PM Subject: RE: Question - Bulk Standards Kim, We used 65% because of the small lots in the senior community, but 60%will be ok. I also want to confirm the the Final Plan only goes to County Commissioners and the Site Plan Review is a staff review so that we can tell the neighbors when they will have additional input as the project develops. Thanks, Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Thursday, February 13, 2003 10:03 AM To: barb.brunk@ttrmc.com Subject: Question - Bulk Standards Heading Single Family Residential and Attached Residential Table in text body. Item G states Lot coverage is 65% of land area for this type of development. Code states 60 °A°. Is this accurate or does does 60%work with your application.? Pleae advise. Thank you CC: "B.Grinnell" <bgrinnell@lbcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@Ibcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor<taylor@fentressbradburn.com>, Todd Borger<todd.borger@ttrmc.com> Kim Ogle- RE: Follow-up Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> re- To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/11/03 4:27PM Subject: RE: Follow-up Kim, Here is the electronic file (MS Word) of the development guide and the cover letter that we submitted with the application. I will have the phasing plan and other info for you on Tuesday. Copies for the Planning Comission packets will also be ready on Tuesday. I will send you the jpeg's of the maps next week. Thanks for all of your help. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Tuesday, February 11, 2003 9:14 AM To: barb.brunk@ttrmc.com Subject: Follow-up It is my understanding that there has been discussion as to what structures, including massing are proposed for the first filing of the LifeBridge PUD project. Please submit this information to this office for review as soon as possible. Of not is the article in the Greeley Tribune for Tuesday February 11, 2003, entitled "Mega-Church". Bruce is quoted extnsively. Thank you in advance for a timely response. Kim Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle - Phasing for Project LifeBridge/Hwy 119 Page 1 From: "Paige Jacques" <pjacques@Ibcc.org> To: "Kim Ogle" <kogle@co.weld.co.us> Date: 2/11/03 10:43AM Subject: Phasing for Project LifeBridge/Hwy 119 Kim: The phasing and diagrammatic renderings for the project at Highway 119 are in process. We expect to have this finalized by the first of next week. I will have them forwarded to you as soon as I receive them. Hopefully, this will be satisfactory to you needs. Please let me know if you have any questions or other needs. Regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@Ibcc.org> pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 CC: "Alexa Taylor" <taylor@fentressbradburn.com>, "Barb Brunk" <barb.brunk@ttrmc.com>, "Bruce Grinnell" <bgrinnell@Ibcc.org>, "Dale Bruns" <dalebruns@earthlink.net>, "Dennis Rubba" <drubba@insitedgn.com>, "Mark Outman" <outman@fentressbradburn.com>, "Mike Palumbo" <mikep@projectoneis.com>, "Reggie V. Golden" <reggieg@diamondglllp.com>, "Todd A. Hodges" <toddhodgesdesign@earthlink.net>, "Tristin Gleason" <tristing@projectoneis.com>, <cgeddes@insitedgn.com> Kim Ogle - RE: Follow-up Page 2 Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@lbcc.org> pjacques@lbcc.org Office: 303.678.0311 Facsimile: 303.702.0585 Original Message From: Paige Jacques [mailto:pjacques@lbcc.org] Sent: Tuesday, February 04, 2003 11:42 AM To: Kim Ogle (kogle@co.weld.co.us) Cc: Barb Brunk (barb.brunk@ttrmc.com); Alexa Taylor (taylor@fentressbradburn.com); Bruce Grinnell (bgrinnell@lbcc.org); Dale Bruns (dalebruns@earthlink.net); Mike Palumbo (mikep@projectoneis.com); Reggie V. Golden (reggieg@diamondglllp.com); Tristin Gleason (tristing@projectoneis.com) Subject: Follow-up Kim: It was a pleasure to talk with you this morning. I have enclosed the web site we discussed below. As mentioned, I delivered a complete Application for Change of Zone Package to Danielle DiDonna, (303.772.5677) <mailto:303.772.5677)%20%20(ddidonna@hotmail.com> (ddidonna@hotmail.com), about two weeks ago. As per your request, you have asked us to clarify the component of our proposed Phase 1 as relates to the northern portion of the proposed site plan. I will speak with Bruce Grinnell and try to have something to you as soon as possible. I enjoyed our talk. If there is anything additional you might need, please do not hesitate to give me call at the number listed below. I look forward to meeting with you personally one of these days. Best regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@lbcc.org> pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 CC: <reggieg@diamondglllp.com>, <dalebruns@earthlink.net>, <taylor@fentressbradburn.com>, <bgrinnell@lbcc.org>, <mikep@projectoneis.com>, I Kim Ogle - RE: Follow-up Page 1 From: "Paige Jacques" <pjacques@Ibcc.org> To: "'Kim Ogle"' <KOGLE@co.weld.co.us> Date: 2/10/03 9:14AM Subject: RE: Follow-up Kim: You are correct that Todd has been engaged by our team to assist us in the application process. I have no problem in your use of him as the point of contact for further dissemination of information related to our application. Please let me know how I can be of further assistance. Regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Sunday, February 09, 2003 1:22 PM To: pjacques@Ibcc.org Cc: reggieg@diamondglllp.com; dalebruns@earthlink.net; taylor@fentressbradburn.com; bgrinnell@lbcc.org; mikep@projectoneis.com; tristing@projectoneis.com; barb.brunk@ttrmc.com Subject: RE: Follow-up Thank you for the information. Please acknowledge that Todd Hodges, of Todd Hodges Design, LLC has joined your consultant team. Please note information will be provided to Todd on your behalf. Questions, please contact me. thank you. Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> "Paige Jacques" <pjacques@Ibcc.org>02/04/03 11:44AM >>> Ops, I forgot the web page. http://www.eastIongmontcsd.org/contact_us.htm I Kim Ogle - FW LifeBridge update and to-do list Page 1 From: "Bruce Grinnell" <bgrinnell@lbcc.org> To: "Kim Ogle (E-mail)" <kogle@co.weld.co.us> Date: 4/29/03 7:18AM Subject: FW: LifeBridge update and to-do list fyi Punchin' holes in the darkness, Bruce Original Message From: Bill Norris [mailto:BillNorris15@msn.com] Sent: Monday, April 28, 2003 8:21 PM To: bgrinnell@lbcc.org Subject: Fw: LifeBridge update and to-do list Bruce, Thought you might be interested! Bill Norris--- Life is Good Original Message From: Peter.Gries@colorado.edu <mailto:Peter.Gries@colorado.edu> To: gries@colorado.edu <mailto:gries@colorado.edu> Sent: Monday, April 28, 2003 4:23 PM Subject: LifeBridge update and to-do list My fellow homeowners, NEWS: 1. Our new website, www.weldhomeowners.org <http://www.weldhomeowners.org> , is now up and running. Please check it out and sign up. 2. Our first AD was in today's Greeley Tribune and will run most of the week. We may have a new AD over the weekend. 32c598.jpg The purpose of the AD campaign is to apply pressure to our County Commissioners this week prior to next week's rezoning hearing. Our Commissioners must understand that there will be consequences if they ignore their constituents in favor of their colleague Glen Vaad and his special interest. TO-DO List: 1. Call the four commissioners. If you cannot speak to them, talk to their wives or leave messages. They need to know that we are organized and upset: David Long (970/437-5383) * Rob Masden (303/536-4250) ` Bill Jerke (970/284-6061) * Mike Geile (970/352-6290) 2. Write a short (200 word) letter to the editor of the Greeley Tribune. E-mail it to: letters@greeleytrib.com. Be sure to include your name and phone number, as they will want to confirm your consent prior to publication. I've pasted below the letter I submitted this morning. IF Kim Ogle- RE: Follow-up Page I From: "Paige Jacques" <pjacques@Ibcc.org> To: "'Paige Jacques"' <pjacques@Ibcc.org>, "Kim Ogle" <kogle@co.weld.co.us> Date: 2/4/03 11:46AM Subject: RE: Follow-up Ops, I forgot the web page. http://www.eastIongmontcsd.org/contact_us.htm Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@Ibcc.org> pjacques@lbcc.org Office: 303.678.0311 Facsimile: 303.702.0585 Original Message From: Paige Jacques [mailto:pjacques@Ibcc.org] Sent: Tuesday, February 04, 2003 11:42 AM To: Kim Ogle (kogle@co.weld.co.us) Cc: Barb Brunk (barb.brunk@ttrmc.com); Alexa Taylor (taylor@fentressbradburn.com); Bruce Grinnell (bgrinnell@lbcc.org); Dale Bruns (dalebruns@earthlink.net); Mike Palumbo (mikep@projectoneis.com); Reggie V. Golden (reggieg@diamondglllp.com); Tristin Gleason (tristing@projectoneis.com) Subject: Follow-up Kim: It was a pleasure to talk with you this morning. I have enclosed the web site we discussed below. As mentioned, I delivered a complete Application for Change of Zone Package to Danielle DiDonna, (303.772.5677) <mailto:303.772.5677)°/020%20(ddidonna@hotmail.com> (ddidonna@hotmail.com), about two weeks ago. As per your request, you have asked us to clarify the component of our proposed Phase 1 as relates to the northern portion of the proposed site plan. I will speak with Bruce Grinnell and try to have something to you as soon as possible. I enjoyed our talk. If there is anything additional you might need, please do not hesitate to give me call at the number listed below. I look forward to meeting with you personally one of these days. Best regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 Kim Ogle - Follow-up Page 1 From: "Paige Jacques" <pjacques@Ibcc.org> To: "Kim Ogle" <kogle@co.weld.co.us> Date: 2/4/03 11:43AM Subject: Follow-up Kim: It was a pleasure to talk with you this morning. I have enclosed the web site we discussed below. As mentioned, I delivered a complete Application for Change of Zone Package to Danielle DiDonna, (303.772.5677) <mailto:303.772.5677)%20%20(ddidonna@hotmail.com> (ddidonna@hotmail.com), about two weeks ago. As per your request, you have asked us to clarify the component of our proposed Phase 1 as relates to the northern portion of the proposed site plan. I will speak with Bruce Grinnell and try to have something to you as soon as possible. I enjoyed our talk. If there is anything additional you might need, please do not hesitate to give me call at the number listed below. I look forward to meeting with you personally one of these days. Best regards, Paige R. Jacques Managing Director 4C Corporation 2020 Terry Street, Suite 54 Longmont, CO 80501 E-mail: <mailto:pjacques@Ibcc.org> pjacques@Ibcc.org Office: 303.678.0311 Facsimile: 303.702.0585 CC: "Barb Brunk" <barb.brunk@ttrmc.com>, "Alexa Taylor" <taylor@fentressbradburn.com>, "Bruce Grinnell" <bgrinnell@lbcc.org>, "Dale Bruns" <dalebruns@earthlink.net>, "Mike Palumbo" <mikep@projectoneis.com>, "Reggie V. Golden" <reggieg@diamondglllp.com>, "Tristin Gleason" <tristing@projectoneis.com> Kim Ogle- PUC Application Page 1 From: Sarah Smith <sarah.smith@ttrmc.com> To: "'KOGLE@co.weld.co.us"' <KOGLE@co.weld.co.us> Date: 1/15/03 3:42PM Subject: PUC Application Hi Kim, Here is a copy of the PUD application for the Great Western Railroad Crossing in a pdf format. If you have any questions or any problems opening the file, please give me a call. Thank you. Sarah Smith, E.I.T. TETRA TECH RMC 1900 S. Sunset Street, Suite 1-F Longmont, CO 80501 (303) 772-5282 - FAX (303)665-6959 Sarah.Smith@ttrmc.com < mailto:ssmith@long.rmcco.com <mailto:ssmith@long.rmcco.com> > <?xml:namespace prefix= o ns = "urn:schemas-microsoft-com:office:office"/> CC: Barb Brunk <barb.brunk@ttrmc.com> Documents requested for review All other documents associated with this case are at the Clerk to the Boards Office Centennial Building, Third Floor 915 10' Street, Greeley Each photocopy is available for 1.25 dollars per page Please mark each page with the post-it provided should you want a photocopy of that page. Thank you. r Kim Ogle - RE: Follow-up Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/11/03 4:27PM Subject: RE: Follow-up Kim, Here is the electronic file (MS Word) of the development guide and the cover letter that we submitted with the application. I will have the phasing plan and other info for you on Tuesday. Copies for the Planning Comission packets will also be ready on Tuesday. I will send you the jpeg's of the maps next week. Thanks for all of your help. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Tuesday, February 11, 2003 9:14 AM To: barb.brunk@ttrmc.com Subject: Follow-up It is my understanding that there has been discussion as to what structures, including massing are proposed for the first filing of the LifeBridge PUD project. Please submit this information to this office for review as soon as possible. Of not is the article in the Greeley Tribune for Tuesday February 11, 2003, entitled "Mega-Church". Bruce is quoted extnsively. Thank you in advance for a timely response. Kim Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle - FW: Drawing Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/25/03 2:20PM Subject: FW: Drawing Kim, Here is a diagram of the Main Street concept- buildings in the front, parking in the rear. If we can get the setback down to 15'or 20'. Let me know if additional info will help explain the concept-This goes with the street cross section we submitted with the PUD. Barb Original Message From: Chris Geddes [mailto:cgeddes@insitedgn.com] Sent: Thursday, April 24, 2003 12:06 PM To: Todd Borger; Alexa Taylor(E-mail); Barb Brunk Subject: RE: Drawing Todd, et al... Attached is a quick rendering of the LBCC Mainstreet scheme, indicating the buildings, walks, street and parking as described in the street sections. Let me know if you need me to take this diagram any further... Chris Geddes INSITEDESIGN 2401 15th Street, Suite 10 Denver, Colorado 80202 tel 303.433.7100 fax 303.433.4301 www.insitedgn.com Original Message From: Todd Borger[mailto:todd.borger@ttrmc.com] Sent: Thursday, April 24, 2003 9:56 AM To: Alexa Taylor(E-mail); Dennis Rubba (E-mail); Chris Geddes (E-mail); Barb Brunk Subject: FW: Drawing To All, Rec'd this from Kim. Sounds like we need to put something together with a more detail than the"Section B- Local Mixed-Use District Street" section on sheet 5/6 of the Change of Zone submittal. In a packet date Feb 27, I found a nice color schematic for the senior village showing on-street parking, two residences, alley, garages, etc. What do you think about putting something like that together for Kim? /es Todd Kim Ogle- FW: Drawing Page 2 ! Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Wednesday, April 23, 2003 4:43 PM To: todd.borger@ttrmc.com Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner Ill Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>> Todd Borger<todd.borger@ttrmc.com> 04/23/03 04:20PM >>> >From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.com] Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger i. Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn CC: "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org> Kim Ogle- RE: FW: Drawing Page 2 To: Alexa Taylor(E-mail); Dennis Rubba (E-mail); Chris Geddes (E-mail); Barb Brunk Subject: FW: Drawing To All, Rec'd this from Kim. Sounds like we need to put something together with a more detail than the"Section B - Local Mixed-Use District Street" section on sheet 5/6 of the Change of Zone submittal. In a packet date Feb 27, I found a nice color schematic for the senior village showing on-street parking, two residences, alley, garages, etc. What do you think about putting something like that together for Kim? Todd Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Wednesday, April 23, 2003 4:43 PM To: todd.borger@ttrmc.com Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle i-. Planner Ill Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us >>>Todd Borger<todd.borger@ttrmc.com> 04/23/03 04:20PM >>> >From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.com] Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn Kim Ogle - RE: FW: Drawing Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/28/03 8:36AM Subject: RE: FW: Drawing Kim, I will send you a fax-and put a color copy in the over night mail. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Sunday, April 27, 2003 7:50 AM To: barb.brunk@ttrmc.com Subject: Re: FW: Drawing unable to read. Very pretty green image, no clarity >>> Barb Brunk <barb.brunk@ttrmc.com> 04/25/03 02:21 PM >>> Kim, Here is a diagram of the Main Street concept- buildings in the front, parking in the rear. If we can get the setback down to 15'or 20'. Let me know if additional info will help explain the concept-This goes with the street cross section we submitted with the PUD. Barb Original Message From: Chris Geddes [mailto:cgeddes@insitedgn.com] Sent: Thursday, April 24, 2003 12:06 PM To: Todd Borger; Alexa Taylor(E-mail); Barb Brunk Subject: RE: Drawing Todd, et al... Attached is a quick rendering of the LBCC Mainstreet scheme, indicating the buildings, walks, street and parking as described in the street sections. Let me know if you need me to take this diagram any further... Chris Geddes IN SITEDESIGN 2401 15th Street, Suite 10 Denver, Colorado 80202 tel 303.433.7100 fax 303.433.4301 www.insitedgn.com Original Message From: Todd Borger [mailto:todd.borger@ttrmc.com] Sent: Thursday, April 24, 2003 9:56 AM Kim Ogle - RE: Follow-up Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> es- To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 3/13/03 12:22PM Subject: RE: Follow-up Kim, Thank you for your help-we appreciate all of your effort. I will send the schedule and follow up with the pre-notification request. We will also contact the keeper of the neighborhood web page to try to get the word out to the neighborhood re Tuesday. Bruce will be there on Tuesday to represent the Church. Have a wonderful day. Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Thursday, March 13, 2003 11:24 AM To: barb.brunk@ttrmc.com Subject: RE: Follow-up April 22nd 2003 has been reserved for the PC hearing. We are proposing a 9:00 am starting time, with breaks throughout the day including lunch. Staff is proposing no dinner break with a decision rendered at 8:00 pm r May 7, 2003 is the scheduled BCC hearing. Hearing begins at 10:00 am. I have taken the case file to BCC for set up and processing. Make it a great day. kim >>> Barb Brunk <barb.brunk@ttrmc.com> 03/13/03 08:57AM >>> Kim, Todd will be out of town on April 30. Is it possible to pre-advertise for the May 7 County Commissioners hearing? Let me know and I will send you the request this morning. Thanks Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com CC: "B.Grinnell" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Mary Brown <mbrown@intermountainca.com>, Matt Delich <mdelich@frii.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@Ibcc.org>, Km Ogle- RE: LifeBridge hearing Page 1 i . From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 5/5/03 8:17AM Subject: RE: LifeBridge hearing Kim, We have new email addresses - barb.brunk@ttrmc.com See you first thing Wed. for set-up Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Monday, May 05, 2003 7:06 AM To: bbrunk@ttrmc.com Subject: LifeBridge hearing Room will be set late afternoon on Tuesday. Presentation set up on Wednesday at 8:00 am. there will be a short business meeting at 9:00 by the BCC. questions? please email me, thanks. PS, I have heard the Sunday Greeley paper was filled with Lifebridge commentary. will get copy and fax off to you later today. Kim Ogle - RE: Question - Bulk Standards Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 2/13/03 3:16PM Subject: RE: Question - Bulk Standards Kim, We used 65% because of the small lots in the senior community, but 60%will be ok. I also want to confirm the the Final Plan only goes to County Commissioners and the Site Plan Review is a staff review so that we can tell the neighbors when they will have additional input as the project develops. Thanks, Barb Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Thursday, February 13, 2003 10:03 AM To: barb.brunk@ttrmc.com Subject: Question - Bulk Standards Heading Single Family Residential and Attached Residential Table in text body. Item G states Lot coverage is 65% of land area for this type of development. Code states 60 %. Is this accurate or does does 60%work with your application.? Pleae advise. Thank you r CC: "B.Grinnell" <bgrinnell@lbcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@lbcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor<taylor@fentressbradburn.com>, Todd Borger<todd.borger@ttrmc.com> Kim Ogle-jpegs of requested files Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us>, "VMACKLINE@co.weld.co.us- <VMACKLINE@co.weld.co.us> Date: 4/17/03 4:09PM Subject: jpegs of requested files Kim, Here are the jpegs - 81/2 X11 of sheet 1-4, sheet 6 and filing one and filing two. I also included the colored overall map. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com <<filingl_0226_pp.jpg>> «filing2_0226pp.jpg>> <<OVERALL_MAP 8X11 (1).jpg>> <<SHEET_6_landscape Layout18x11 (1).jpg» <<SHEET1 8X11copy.jpg» «SHEET2_04-11-0311X8copy.jpg>> <<SHEET3_04-11-03 11X8copy.jpg» <<SHEET4_04-11-0311X8copy.jpg» CC: "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org> I Kim Ogle- Building height Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/8/03 12:16PM Subject: Building height «Doc3.doc» Kim, The Church is continuing to meet with the neighbors. The file above outlines the building height restrictions we discussed for the Church Campus and supercedes all previous requests. Todd Borger is coordinating with Drew and Gloria re the turn lanes and ROW for 119 and WCR 31/2. I will have him update you when he has information. I also followed up with a Flood Plain Engineer re CLOMR and LOMR. I have heard 25K offered up as an order of magnitude more than once, but each site is different and it could be more or less depending on what information is available. In order to give a ball park on the cost he needs to know: How much area ( acres and length of reach) ? What king of mapping is available- has the base flood elevation been established? Has the flood way been defined for the property? Will the changes impact adjacent properties? Any base mapping available? Call with questions. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com CC: "B.Grinnell" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "C.Geddes" <cgeddes@insitedgn.com>, "D.Bruns" <dbruns@oneimage.com>, "D.Rubba" <drubba@insitedgn.com>, "K.Weykamp" <kweykamp@insitedgn.com>, Mary Brown <mbrown@intermountainca.com>, Matt Delich <mdelich@frii.com>, Outman <outman@fentressbradburn.com>, "P.Jacques" <pjacques@Ibcc.org>, ReggieG <reggieg@diamondglllp.com>, Taylor<taylor@fentressbradburn.com>, Todd Borger <todd.borger@ttrmc.com>, Todd Hodges <toddhodgesdesign@earthlink.net>, Tristin Gleason <t r i s t i n g@ p roj a cto n e i s.co m> Kim Ogle- RE: Question - Sign Posting Page 1 From: Barb Brunk <barb.brunk@ttrmc.com> To: 'Kim Ogle' <KOGLE@co.weld.co.us> Date: 4/2/03 1:17PM Subject: RE: Question - Sign Posting Kim, Does the Department of Planning Services post the sign two weeks before the hearing or do we? Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303)772-5282, ext. 108 (303)665-6959 (fax) barb.brunk@ttrmc.com r Kim Ogle- FW: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 3/7/03 2:09PM Subject: FW: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Am forwarding as confirmation. Original Message From: AIHaj, Samer [mailto:Samer.AlHaj@DOT.STATE.CO.US] Sent: Friday, March 07, 2003 1:56 PM To: Todd Borger Subject: RE: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Thanks Todd, this summarized everything we discussed this morning good luck Original Message From: Todd Borger[mailto:todd.borger@ttrmc.com] Sent: Friday, March 07, 2003 1:43 PM To: Kim Ogle (E-mail); Drew Scheltinga (E-mail); Peter Schei (E-mail) Cc: AlHaj, Samer; Barb Brunk; Alexa Taylor(E-mail); Bruce Grinnell (E-mail); Dale Bruns (E-mail); Paige Jacques (E-mail); Reggie M. Golden r 1 (E-mail); Tristin Gleason (E-mail) Subject: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Kim, Drew, Peter, With permission from Samer Alhaj (CDOT), I am forwarding his response via the attachment. Samer and I met on-site this morning to discuss the drainage issues. The attached memo summarizes our meeting. Please feel free to call me if you have any questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: http://www.ttrmc.com <http://www.ttrmc.com/> CC: Barb Brunk <barb.brunk@ttrmc.com>, "Alexa Taylor(E-mail)" Kim Ogle - FW: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Page 2 <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@lbcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> 1 Kim Ogle- FW: Drawing Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: Barb Brunk <barb.brunk@ttrmc.com>, "Alexa Taylor (E-mail)" <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Date: 4/23/03 4:18PM Subject: FW: Drawing From LuAnn Penfold with Mtn View Fire District: Original Message From: LuAnn Penfold [mailto:lpenfold@firehousemail.com] Sent: Wednesday, April 23, 2003 4:12 PM To: T Borger Subject: Drawing Got the drawing. The set backs I believe Kim is referring to is a building code thing. I don't have anything in the fire code that says this is not ok. I think it does have something to do with separation distances, but when separation is not provided it does drive how big a building can be. There maybe other issues, but not related to the fire code that I know of. LuAnn CC: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> r Kim Ogle- LifeBridge, Street sections &setbacks on neighborhood Page 1 From: Todd Borger <todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 4/23/03 12:26PM Subject: LifeBridge, Street sections & setbacks on neighborhood Kim, I'm contacting Mtn View Fire, LuAnn Penfold, regarding fire safety issues and separation distances for buildings as this related to right-of-way width and setbacks. Let me know of any specifics you need addressed that I might not be aware of. --Thanks. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> Kim Ogle - FW: LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 4/15/03 11:08AM Subject: FW: LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Good Morning, I just spoke with Gloria at CDOT regarding the intersection sketch. Essentially, there are no major issues at this time, with some issues likely needing to be resolved at the time of final plat. Gloria said she will do her best to write her response on Thursday. Todd Original Message From: Todd Borger Sent: Thursday, April 10, 2003 2:58 PM To: Drew Scheltinga (E-mail); Kim Ogle (E-mail); Peter Schei (E-mail); Gloria Hice-Idler(E-mail) Cc: Matt Delich (E-mail); Bruce Grinnell (E-mail); Barb Brunk Subject: LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Gloria, Drew, Kim, Peter, Attached is a figure showing a lane layout that would accommodate the traffic predicted for the full build out scenario. Please call Matt Delich or myself if you have questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> CC: "Matt Delich (E-mail)" <mdelich@frii.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, Barb Brunk <barb.brunk@ttrmc.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com>, "Mike Palumbo (E-mail)" <mikep@projectoneis.com> Kim Ogle - Meeting Minutes of County Road 26 Meeting with Weld County, City Longmont, LifeBridge Page 1 11 From: Todd Borger <TBorger@long.rmcco.com> To: "Nick Wolfrm (E-mail)" <nick.wolfrum@ci.longmont.co.us>, "Joe Olson (E-mail)" <joe.olson@ci.longmont.co.us>, "Ken Huson (E-mail)" <ken.huson@ci.longmont.co.us>, "Brien Schumacher (E-mail)" <[No email address found]>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Bruce Grinnell (E-mail)" <bgrinnell@lbcc.org>, "Paige Jacques (E-mail)" <pjacques@lbcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Barb Brunk (E-mail)" <bbrunk@long.rmcco.com>, "Cathy Leslie (E-mail)" <cleslie@long.rmcco.com>, "Curtis Ansel (E-mail)" <curtis.ansel@ci.longmont.co.us> Date: 12/5/02 11:40AM Subject: Meeting Minutes of County Road 26 Meeting with Weld County, City Longmont, LifeBridge Greetings to all, Attached are the minutes from our meeting back in November. Please accept my apologies for getting these out so late. If you have any corrections, please send them to me and I'll have revised minutes prepared. Sincerely, Todd Borger, P.E. Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 RMC website: <http://www.ttrmc.com/> http://www.ttrmc.com Tetra Tech website: <http://www.tetratech.com/> http://www.tetratech.com PLEASE NOTEI We are pleased to announce as of January 1st, 2003, RMC will be changing it's name to Tetra Tech RMC. Everything else about our business will remain the same, i.e., staff, phone &fax numbers, etc. I would be happy to answer any questions you may have. CC: "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com> r li Kim Ogle - County Road 26 Meeting with Weld County, City Longmont, LifeBridge Page 1 From: Todd Borger<TBorger@long.rmcco.com> To: "Nick Wolfrm (E-mail)" <nick.wolfrum@ci.longmont.co.us>, "Joe Olson (E-mail)" <joe.olson@ci.longmont.co.us>, "Ken Huson (E-mail)" <ken.huson@ci.longmont.co.us>, "Brien Schumacher(E-mail)" <[No email address found]>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Barb Brunk (E-mail)" <bbrunk@long.rmcco.com>, "Cathy Leslie (E-mail)" <cleslie@long.rmcco.com> Date: 10/22/02 1:37PM Subject: County Road 26 Meeting with Weld County, City Longmont, LifeBridge Greetings to all: This meeting has been set up to coordinate the use of County Road 26 between the City of Longmont and Weld County. LifeBridge Christian Church will be participating in this meeting as their planned project will be significantly impacted by future plans for this road. It is schedule for Friday, November 1 at 3 pm at the South Weld Service Center. I've attached a map of the meeting location. Below, Drew Scheltinga has described the meeting room. Presently, attending this meeting will be: City of Longmont: Nick Wolfrum, Joe Olson, Ken Huson, Brien Schumacher Weld County: Drew Scheltinga, Peter Shae, Kim Ogle LifeBridge: Bruce Grinnel, Paige Jacques, Reggie Golden, Dale Bruns RMC (Consultant for LifeBridge): Todd Borger, plus possibly 1 or 2 others Please call me if you have any questions. Todd Borger, P.E. Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Voice: 303.772.5282 Fax: 303.665.6959 RMC website: http://www.rmcco.com Tetra Tech website: http://www.tetratech.com Original Message From: DREW Scheltinga [mailto:DSCHELTINGA@co.weld.co.us] Sent: Monday, October 21, 2002 4:48 PM To: tborger@long.rmcco.com Subject: Re: New Time: CR 26 Meeting Todd The location will be in the Large Conference Room at the South Weld Service Center located on Weld County Road 24 %east of the 1-25 Frontage Road (Y mile north and 1/4 mile east of 1-25 and SH 119 interchange). /� Drew Kim Ogle - CDOT drainage confirmation Page From: Todd Borger<todd.borger@ttrmc.com> To: Barb Brunk <barb.brunk@ttrmc.com>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us>, "Alexa Taylor (E-mail)" <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@lbcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Date: 2/28/03 1:02PM Subject: CDOT drainage confirmation Greetings: I've been working with CDOT, a gentleman by the name of Samer Alhaj. He requested to meet on site to look at how the drainage will leave the property and affect the CDOT r.o.w. as the drainage heads toward the St. Vrain River. This meeting is set for next Thursday, 10 am, at the LifeBridge site. All are invited to attend, particularly Drew and Peter. Please call if you have questions. Sincerely, Todd Borger, P.E. Project Manager /^ TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com> todd.borger@ttrmc.com website: <http://www.ttrmc.com/> http://www.ttrmc.com r Kim Ogle - FW:Draft Service Agreements regarding the Project LifeBridge PUD Page 1 From: "Todd Borger" <tborger@long.rmcco.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us> Date: 10/1/02 3:42PM Subject: FW: Draft Service Agreements regarding the Project LifeBridge PUD Kim, Drew: We are forwarding you copies of our correspondence in order to keep you informed. If you have any question, please call myself or Barb Brunk. Todd Original Message From: Todd Borger [mailto:tborger@long.rmcco.com] Sent: Tuesday, October 01, 2002 2:38 PM To: Lee Morrison (E-mail) Subject: Draft Service Agreements regarding the Project LifeBridge PUD Lee, We are sending you these attached documents for your review in order to approve the "format"of the draft agreements. So far, we have received positive input from the service providers; St. Vrain Sanitation is ready to sign their agreement in the form as we are sending you today; I understand the other service providers to be not far behind. r Once you have determined that the general form of these agreements is acceptable, please contact Barb Brunk (RMC) or myself. We would be happy to answer any questions or comments you might have. Sincerely, Todd Borger, P.E. Project Manager RMC Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Voice: 303.772.5282 Fax: 303.665.6959 email: tborger@Iong.rmcco.com RMC web site: www.rmcco.com Tetra Tech web site: www.tetratech.com It is our professional opinion that this electronic information provides information current as of the date of its release. Any use of this information is at the sole risk and liability of the user. All provided electronic information is subject to change without notice and is furnished at the request and sole convenience of the recipient. This electronic information is the property of Rocky Mountain Consultants, Inc. and shall not be used by the recipient on any other project or released to any other party without the consent of Rocky Mountain Consultants, Inc. The use of said electronic information constitutes the recipient*s acceptance of these terms. Kim Ogle - Fwd: FW: Draft Service Agreements regarding the Project LifeBridge PUD Page 1 From: DREW Scheltinga To: Ogle, Kim Date: 10/1/02 4:21 PM Subject: Fwd: FW: Draft Service Agreements regarding the Project LifeBridge PUD The format of improvements agreements look OK to me. They are our standard form. CC: Morrison, LEE r Kim Ogle- FW: Draft Service Agreements regarding the Project LifeBridge PUD Page 1 From: "Todd Borger" <tborger@long.rmcco.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us> Date: 10/1/02 3:42PM Subject: FW: Draft Service Agreements regarding the Project LifeBridge PUD Kim, Drew: We are forwarding you copies of our correspondence in order to keep you informed. If you have any questions, please call myself or Barb Brunk. Todd Original Message From: LEE Morrison [mailto:LMORRISON@co.weld.co.us] Sent: Tuesday, October 01, 2002 3:05 PM To: tborger@long.rmcco.com Subject: Re: Draft Service Agreements regarding the Project LifeBridge PUD Todd Received and will review and provide comments to you and Planning by Friday. Lee >>> "Todd Borger" <tborger@long.rmcco.com> 10/1/02 2:37 PM >>> Lee, We are sending you these attached documents for your review in order to approve the"format" of the draft agreements. So far, we have received positive input from the service providers; St. Vrain Sanitation is ready to sign their agreement in the form as we are sending you today; I understand the other service providers to be not far behind. Once you have determined that the general form of these agreements is acceptable, please contact Barb Brunk (RMC)or myself. We would be happy to answer any questions or comments you might have. Sincerely, Todd Borger, P.E. Project Manager RMC Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Voice: 303.772.5282 Fax: 303.665.6959 email: tborger@long.rmcco.com RMC web site: www.rmcco.com Tetra Tech web site: www.tetratech.com It is our professional opinion that this electronic information provides information current as of the date of its release. Any use of this information is at the sole risk and liability of the user. All provided Kim Ogle- FW: Draft Service Agreements regarding the Project LifeBridge PUD Page 2 electronic information is subject to change without notice and is furnished at the request and sole convenience of the recipient. This electronic information is the property of Rocky Mountain Consultants, Inc. and shall not be used by the recipient on any other project or released to any other party without the consent of Rocky Mountain Consultants, Inc. The use of said electronic information constitutes the recipient*s acceptance of these terms. r Kim Ogle - Project LifeBridge, County Agreements Page From: Todd Borger<TBorger@long.rmcco.com> To: "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Lee Morrison (E-mail)" <Imorrison@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 11/19/02 4:26PM Subject: Project LifeBridge, County Agreements Lee, Kim, Drew, Attached are revised public and private agreements regarding this project. The revisions consists of referring to attached Exhibits "D" and "E", which provide a phase map and narrative description of phase 1. Please let me know if these documents meet your requirements for processing the Change of Zone application. If so, we will immediately proceed with submitting the Change of Zone application. Please call me if you have any questions. Thank you, Sincerely, Todd Borger, P.E. Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Voice: 303.772.5282 Fax: 303.665.6959 RMC website: http://www.rmcco.com <http://www.rmcco.com/> Tetra Tech website: http://www.tetratech.com <http://www.tetratech.com/> Kim Ogle- New Time: CR 26 Meeting Page 1 From: "Todd Borger" <tborger@long.rmcco.com> To: "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Bruce Grinnell (E-mail)" <bgrinnell@lbcc.org>, "Paige Jacques (E-mail)" <pjacques@lbcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net> Date: 10/21/02 3:52PM Subject: New Time: CR 26 Meeting Greeting to all: Tomorrow afternoon did not work out for everyone. The new time for this meeting will be Friday, November 1 at 3 pm. I'll provide specifics on the meeting location separately. Todd Borger, P.E. Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Voice: 303.772.5282 Fax: 303.665.6959 RMC website: http://www.rmcco.com Tetra Tech website: http://www.tetratech.com CC: "Barb Brunk (E-mail)" <bbrunk@long.rmcco.com> Kim Ogle - LifeBridge Transportation Impact Fee Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 4/21/03 11:21 AM Subject: LifeBridge Transportation Impact Fee Kim, I understand from Peter(below)that you may have the answer to my question (below Peter's response). Todd Original Message From: Peter Schei [mailto:PSchei@co.weld.co.us] Sent: Monday, April 21, 2003 11:18 AM To: todd.borger@ttrmc.com Cc: Peter Schei Subject: Re: LifeBridge Transportation Impact Fee Good Morning, Todd. Public Works is not administering this impact fee.... The Director of Planning has this administration responsibility. So, please check with Planning. Have a nice day! Peter Schei, Public Works. >>> Todd Borger<todd.borger@ttrmc.com> 04/21/2003 9:33:44 AM >>> Drew, Peter, Not related to the hearing tomorrow, I need to find out specific dollar amounts to be assessed to the project for Weld County's Transportation Impact fee. We're trying to generate an overall cost estimate for the church in order to see how much the whole thing is going to cost. Thanks, Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> Kim Ogle- LifeBridge, Drainage and CDOT Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 2/26/03 4:03PM Subject: LifeBridge, Drainage and CDOT Kim, I've been pursuing the request from Weld County Public Works asking for confirmation from CDOT regarding proposed drainage patterns. I've been directed to a gentleman by the name of Samer Alhaj (with CDOT), who wasn't aware of the request until I shared it with him on Monday. Because Samer's schedule is quite full, he would prefer to speak with you on the telephone and answer your questions and not write a letter. He may try to call you, or you may call him on his mobile phone at 970-302-4022. Please let me know if I can be of further assistance. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: <mailto:todd.borger@ttrmc.com> todd.borger@ttrmc.com website: <http://www.ttrmc.com/> http://www.ttrmc.com Kim Ogle- RE: FW: Drawing Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: Kim Ogle <KOGLE@co.weld.co.us> Date: 4/24/03 9:12AM Subject: RE: FW: Drawing I'll follow up and get back with you. Thanks you. Todd Original Message From: Kim Ogle [mailto:KOGLE@co.weld.co.us] Sent: Wednesday, April 23, 2003 4:43 PM To: todd.borger@ttrmc.com Subject: Re: FW: Drawing Has a schematic sketch been developed for this design scenario? If yes is this a document that could be sent via facsimile to this office? Thank you Kim Ogle Planner III Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 970 353 6100 x 3540 970 304 6498 facsimile kogle@co.weld.co.us Kim Ogle Lifebridge, CDOT Drainage in SH 119 Right-of-way Page 1 From: Todd Borger <todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 3/7/03 1:42PM Subject: Lifebridge, CDOT, Drainage in SH 119 Right-of-way Kim, Drew, Peter, With permission from Samer Alhaj (CDOT), I am forwarding his response via the attachment. Samer and I met on-site this morning to discuss the drainage issues. The attached memo summarizes our meeting. Please feel free to call me if you have any questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: http://www.ttrmc.com <http://www.ttrmc.com/> CC: "Samer Alhaj (E-mail)" <samer.alhaj@dot.state.co.us>, Barb Brunk <barb.brunk@ttrmc.com>, "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Paige Jacques (E-mail)" <pjacques@lbcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Tristin Gleason (E-mail)" <tristing@projectoneis.com> Kim Ogle-Weld County- Longmont IGA Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us> Date: 4/30/03 3:01 PM Subject: Weld County- Longmont IGA Kim, Is there an email-able copy of the Weld County- Longmont IGA, with maps, I could get sent to me? If not, what's the best way I can get a full copy of the agreement? --Thanks! Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> Kim Ogle - LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Page 1 From: Todd Borger<todd.borger@ttrmc.com> To: "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us>, "Gloria Hice-Idler(E-mail)" <Gloria.Hice-Idler@dot.state.co.us> Date: 4/10/03 2:57PM Subject: LifeBridge, Lane Layout at 119, 3.5 and 3.5 and Long View Blvd Gloria, Drew, Kim, Peter, Attached is a figure showing a lane layout that would accommodate the traffic predicted for the full build out scenario. Please call Matt Delich or myself if you have questions. Sincerely, Todd Borger, P.E. Project Manager TETRA TECH RMC 1900 S. Sunset St., Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 email: todd.borger@ttrmc.com <mailto:todd.borger@ttrmc.com> website: www.ttrmc.com <http://www.ttrmc.com/> CC: "Matt Delich (E-mail)" <mdelich@frii.com>, "Bruce Grinnell (E-mail)" <bgrinnell@lbcc.org>, Barb Brunk <barb.brunk@ttrmc.com> r Kim Ogle- REVISED Meeting Minutes of County Road 26 Meeting with Weld County, City Longmont, LifeBridge Page 1 From: Todd Borger<TBorger@long.rmcco.com> ✓'` To: "Nick Wolfrm (E-mail)" <nick.wolfrum@ci.longmont.co.us>, "Joe Olson (E-mail)" <joe.olson@ci.longmont.co.us>, "Ken Huson (E-mail)" <ken.huson@ci.longmont.co.us>, "Brien Schumacher (E-mail)" <[No email address found]>, "Drew Scheltinga (E-mail)" <dscheltinga@co.weld.co.us>, "Kim Ogle (E-mail)" <KOGLE@co.weld.co.us>, "Bruce Grinnell (E-mail)" <bgrinnell@Ibcc.org>, "Paige Jacques (E-mail)" <pjacques@Ibcc.org>, "Reggie M. Golden (E-mail)" <reggieg@diamondglllp.com>, "Dale Bruns (E-mail)" <dalebruns@earthlink.net>, "Barb Brunk (E-mail)" <bbrunk@long.rmcco.com>, "Cathy Leslie (E-mail)" <cleslie@long.rmcco.com>, "Curtis Ansel (E-mail)" <curtis.ansel@ci.longmont.co.us>, "Peter Schei (E-mail)" <PSchei@co.weld.co.us> Date: 12/6/02 9:30AM Subject: REVISED Meeting Minutes of County Road 26 Meeting with Weld County, City Longmont, LifeBridge Greetings to all, Attached are the revised minutes per Drew Scheltigna's corrections. If you have any additional corrections, please send them to me and I'll have revised minutes prepared. Sincerely, Todd Borger, P.E. Rocky Mountain Consultants, Inc. A Tetra Tech Company 1900 South Sunset Street, Suite 1-F Longmont, CO 80501 Tel: 303.772.5282 Fax: 303.665.6959 RMC website: http://www.ttrmc.com Tetra Tech website: http://www.tetratech.com PLEASE NOTE! We are pleased to announce as of January 1st, 2003, RMC will be changing it's name to Tetra Tech RMC. Everything else about our business will remain the same, i.e., staff, phone &fax numbers, etc. I would be happy to answer any questions you may have. CC: "Alexa Taylor(E-mail)" <taylor@fentressbradburn.com> r^ 9703502258 CDOT TRAFFIC 579 P02 MAR 03 '03 08:07 Colorado Oepartrlierlt U Trar':SPUriiu14r1 ).111) ! Slit , (a,t (AI nth. 1 , (9 It)) 37O 2 I Jo Memo KrnOgle Fives Gloria Hite-Idler (�v CC: flie U DS 313/2903 Net UfeBridge Church—USR 1422 Kim, I've reviewed the traffic impact study dated June, 2002, and the memorandum dated February, 2003 for the Llfe8rldge Project Code and based upon the traffic volumes projected. It is Rings 1 and 2 will require that the developer make improvements to SH 119 necessary to bring ft possib into le that with the State Highway Access The storage requirement for the possible that the lanes have already been constricted adequately. eastbound to northbound left turn lane may have to be improved. What concerns COOT is the proposed2020 numbers for the development his unlikely that provid the ing_ additional turn lanes on SH 119 will have much impact on the turning(possible Interchange?)CDOT OO at lie a that ation. I would and therag state must meet to discussether on a future plan possible scenarios. It would be advantageous to look at possible encourage footprints for the site to enable the developer to better plan his property. If you should have any questions,please do not hesitate to contact me 1 MAR-03-2003 MON 02 : 32 PM FROM:DALE BRUNS FAX: 3036513486 PAGE 1 THENCE SOUTH 38°40'00"EAST 57.32 FEET;THENCE SOUTH 63°35'24"EAST 111.77 FEET;THENCE SOUTH 88°41'43"EAST 134.80 FEET;THENCE NORTH 79°06'16"EAST 173.06 FEET;THENCE NORTH 71°27'35"EAST 93.45 FEET;THENCE NORTH 52°23'30" EAST 180.19 FEET TO A POINT ON THE EAST LINE OF THE NORTHWEST QUARTER OF SECTION 5;THENCE ALONG SAID EAST LINE,NORTH 00°43'36"EAST 110.75 FEET TO THE NORTH ONE-QUARTER CORNER OF SECTION 5 AND THE POINT OF BEGINNING,EXCEPTING THEREFROM THAT PORTION OF THE NORTHEAST QUARTER OF SAID SECTION 5 DESCRIBED BY DEED RECORDED JUNE 12, 1906 IN BOOK 241 AT PAGES 392 AND 393 OF WELD COUNTY RECORDS BEING DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTH ONE-QUARTER CORNER OF SECTION 5;THENCE ALONG-THE WEST LINE OF.THE.NORTHEAST QUARTER OF SECTION 5, SOUTH 00°43'36"WEST 1,159.38 FEET TO THE POINT OF BEGINNING;THENCE NORTH 71°35'57"EAST 1,736.54 FEET;THENCE ALONG THE ARC OF A CURVE TO THE LEFT (SAID CURVE HAVING A RADIUS OF 1,398.11 FEET,A CENTRAL ANGLE OF 41°45'31", CHORD OF SAID ARC BEARS NORTH 50°43'12" EAST 995.57 FEET)A DISTANCE OF 1,01-8.98 FEET TO A POINT ON THE NORTH LINE-OF-THE NORTHEAST QUARTER OF SECTION 5;THENCE ALONG SAID NORTH LINE,NORTH 89°31'40" EAST 91.83 FEET;THENCE ALONG THE ARC OF A CURVE TO THE RIGHT(SAID CURVE HAVING A RADIUS OF 1,478.11 FEET,A CENTRAL ANGLE OF 43°33'20", CHORD OF SAID ARC BEARS SOUTH 49°49'17" WEST 1,096.78 FEET)A DISTANCE OF 1,123.64 FEET;-THENCE SOUTH 71°35'57"-WEST 1,764.29 FEET-TO A POINT ON THE WEST LINE OF THE NORTHEAST QUARTER OF SECTION 5;THENCE NORTH 00°43'36"EAST 84.67 FEET TO THE POINT OF BEGINNING. THE NET AREA OF THE ABOVE DESCRIBED TRACT OF LAND IS 313.490 ACRES MORE OR LESS, MAR-03-2003 MON 02: 32 PM FROM:DALE BRUNS FAX:3036513486 PAGE 2 • EXHIBIT"A"-LEGAL DESCRIPTION A TRACT OF LAND SITUATED IN SECTION 5,TOWNSHIP 2 NORTH, RANGE 68 WEST OF THE 6"'PRINCIPAL MERIDIAN,COUNTY OF WELD, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTH ONE-QUARTER CORNER OF SECTION 5;THENCE NORTH 89°31'40"EAST 2,696.60 FEET TO THE NORTHEAST.CORNER OF SECTION 5; • THENCE SOUTH 01'05'48" WEST 2,613.02 FEET TO THE EAST ONE-QUARTER CORNER OF SECTION 5;THENCE ALONG THE NORTH LINE OF THE SOUTHEAST QUARTER OF SECTION 5,NORTH 89°08'41"WEST 856.97 FEET; THENCE SOUTH 00°43'11"WEST 2,400.49 FEET TO A POINT ON THE NORTHERLY RIGHT-OF-WAY LINE OF STATE HIGHWAY 119; THENCE ALONG SAID NORTH RIGHT-OF-WAY LINE THE FOLLOWING 6 COURSES: THENCE ALONG THE ARC OF A NON-TANGENT CURVE TO THE LEFT(SAID CURVE HAVING A RADIUS OF 5,830.00 FEET,A CENTRAL ANGLE OF 09°42'41", CHORD OF SAID ARC BEARS NORTH 87°38'07"WEST 986.99 FEET)A DISTANCE OF 987.17 FEET; THENCE SOUTH 83°36'18" WEST 193.86 FEET;THENCE SOUTH 87°5326" WEST 190.57 FEET; THENCE SOUTH 86°14'18"WEST 361.50 FEET;THENCE NORTH 70°19'49" WEST 66.65 FEET TO A POINT ON THE EASTERLY RIGHT-OF-WAY LINE OF WELD COUNTY ROAD NO. 3 1/2; THENCE SOUTH 87°37'58" WEST 30.01 FEET TO A POINT ON THE WEST LINE OF THE SOUTHEAST QUARTER OF SECTION 5;THENCE NORTH 00°43'55"EAST 2,418.11 FEET TO THE «a' ER ONE-QUARTER CORNER OF SAID SECTION 5;THENCE ALONG THE EAST LINE OF THE NORTHWEST QUARTER OF. SECTION 5,NORTH 00°43'36"EAST 1,391.14 FEET TO THE SOUTHEAST,CORNER OF LOT B OF RECORDED EXEMPTION NO. 1313-O5-2-RE 1389 OF WELD COUNTY RECORDS;THENCE ALONG THE BOUNDARY OF SAID LOT B THE FOLLOWING 16 COURSES: THENCE SOUTH 71°34'28" WEST 546.56 FEET;THENCE ALONG THE ARC OF A CURVE TO THE LEFT(SAID CURVE HAVING A RADIUS OF 2,904.90 FEET,A CENTRAL ANGLE OF 08°20'09",CHORD OF SAID ARC BEARS SOUTH 67°24'52" WEST 422.13 FEET)A DISTANCE OF 422.50 FEET;THENCE SOUTH 63°14'52"WEST 1,843.45 FEET; THENCE ALONG THE ARC OF'A CURVE TO THE RIGHT(SAID CURVE HAVING A RADIUS OF 1,310.00 FEET,A CENTRAL ANGLE OF 05°18'41", CHORD OF SAID ARC BEARS SOUTH 65°54'13"WEST 121.40 FEET)A DISTANCE OF 121.44 FEET TO A POINT ON THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 5;THENCE ALONG SAID'WEST LINE;NORTH 01°04'27" EAST 831,70 FEET; THENCE NORTH 68°57'51" EAST 1,252.40 FEET; THENCE NORTH 27°20'44"EAST 1,224.16 FEET TO A POINT ON THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 5; THENCE ALONG SAID NORTH LINE,NORTH 89°41'22" EAST 295.05 FEET; THENCE SOUTH 16°04'00" WEST 145.38 FEET; THENCE SOUTH 06°35'40"EAST 42.71 FEET; MAR-03-2003 M0N 02 :33 PM FROM:DALE BRUNS FAX:3036513486 PAGE 3 DATED: S-O 5 2Oo? OLIGARCHY IRRIGATION DITCH COMPANY, a Mutual ditch company By: 4Gy - 1L.. �tP cc President LIFEBRIDGE CHRISTIAN CHURCH By: (e....t.onV STATE OF COLORADO ) ) ss, COUNTY OF BOULDER ) • The foregoing was acknowledged before me thispa�c�dayy of 'RC* , 2003 by � N f' 11 htt4 as , of the Oligarchy Irrigation Ditch Compan Mycomu„issio, ��.' ,�. E* 740416 Witness my . an. • i, s� , • • tG ataxy P• lic STATE OF COLO. i j ) /1 ) ss, COUNTY OF,4ncl6.j The foregoing w acknowledged before n ethis te of L 2003 by of LiftBti Christian arch. Chris Ann Bass, N Public My commission expires: gt - • My Commission Expires 6l111 .fr� Witness my band and officio/lest •seal. l( '' Notary Public MAR-03-2003 M0N 02:33 PM FR0M:DALE BRUNS FAX:3036513486 PAGE 4 r 13. NOTICES. Any notice required or permitted by this Agreement shall be in writing and shall be deemed to have been sufficiently given for all purposes if sent by certified or registered mail, postage and fees prepaid, addressed to the Party to whom such notice is intended to be given at the address set forth below, or at such other address as has been previously furnished in writing to the other Party or Parties. Such notice shall be deemed to have been given when deposited in the U.S.Mall. All notices given pursuant to Section 8 shall also be submitted to the Superintendent of the Ditch at the time of such notice. DITCH COMPANY: COPY TO: Oligarchy Ditch Company Phillip S. Wong c/o Dan Grant, Secretary Schey,P71er, Alspaugh&Wong,P.C P.O. Box 1826 825 Delaware Avenue, Suite P-300 Longmont, CO 80502 P.O. Box 267 303-776-5800 Longmont, CO 80501 LICENSEE: COPY TO: LifeBridge.Christian Church LifeBridge Christian Church 10345 Tjte Highway c/o Administrator Longmont, CO 80504 10345 Ute Highway Longmont, CO 80504 14. WAIVER OF BREACH. The waiver by any Party to.this Agreement or a breach of any term or provision of this Agreement shall not operate or be construed as a waiver of any subsequent breach by any Party. 15. EXHIBITS. All exhibits refeued to in this Agreement are, by reference, incorporated into this Agreement for all purposes. 16. ATTORNEYS' FEES. If any Party breaches this Agreement, the non- prevailing Party shall pay all of the prevailing Party's reasonable attorneys' fees and costs in enforcing this Agreement through litigation, arbitration or mediation. 17. BINDING EFFECT. This Agreement shall inure to the benefit of, and be binding upon, the Parties, and their respective legal representatives, successors, and assigns. 18. ASSIGNMENT. This Agreement is assignable, provided written notice is given to the other party of the assignment. The Ditch Company must approve any assignments from Licensee to a third party that does not have an ownership interest in the property described in BXBIBIT A. r MAR-03-2003 MON 02 :33 PM FROM:DALE BRUNS FAX:3036513486 PAGE 5 �-. shareholders are third party beneficiaries of this Agreement. S.4 In the event of an emergency, the Licensee may conduct maintenance or repair immediately, giving notice at the time the en. gency repairs are made by telephone and in writing to the contacts identified in Section 13. If Ditch Company conducts said emergency work, it shall be reimbursed for the cost of said work from the party with responsibility for the affected portion of the Ditch, Under no circumstances shall the Ditch Company be responsible or held liable for damages to the Installations resulting from maintenance or repair to the Ditch. 9. TERM. This Agreement shall be perpetual unless modified by mutual written consent of the parties. 10. LIABILITY AND INDEMNIFICATION. 10.1 By virtue of entering into this Agreement, the Ditch Company (1) assumes no liability for use, operation or existence of the Installations; and (2) assumes no additional responsibilities or obligations related to the Licensee's future or additional activities which are required by this Agreement. 10.2 The Licensee agrees to indemnify and hold harmless the Ditch Company from all claims and liability for damage or injury to property or persons arising or caused directly or indirectly by the Licensee's construction of the Installations and the Licensee's occupancy and use of the Ditch. 10.3 The Licensee shall be responsible for calling the Utility Notifications Center of Colorado (UNCC) for locates before construction and repair work is done and shall hold the Ditch Company harmless for any damages and/or penalties for failing to do so, 10.4 The Licensee warrants it will do nothing to adversely affect the current water quality which is being carried in the Ditch. In the event the Licensee breaches this warranty, Licensee shall take all actions necessary to meet all water quality laws and regulations. Licensee shall indemnify and hold the Ditch Company harmless for all costs, damages, fines and fees, including reasonable attorney's fees, which are incurred by the Ditch Company as a result of any adverse changes to water quality which result in the water failing to meet water quality laws, regulations or historic usage. 11. DEFAULT. Time is of the essence, and if any payment or any other condition, obligation or duty is not timely made, tendered or performed by either Party, the non-defaulting Party shall have the right to an action for specific performance or damages or both. 12. RECORDATION. This Agreement shall be recorded at the cost of the Licensee and shall be binding on any successors of the Parties. The obligations and benefits of this Agreement shall specifically run with the land described in EXHIBIT A. The plans and specifications for the installation may not be recorded because of their size, MAR-03-2003 MON 02 :34 PM FROM:DALE BRUNS FAX: 3036513486 PAGE 6 the costs associated with billing and collecting these amounts for the Ditch Company and the costs of inspection as described in Section 4. 6.2 Statement for the costs chargeable to Licensee hereunder will be forwarded to Licensee and the same shall be paid to the Ditch Company within 30 days after the billing date. If payment has not been received by Ditch Company within 30 days, Licensee shall have breached this Agreement and Ditch Company may institute legal proceedings to collect the amount due and owing. In such • proceeding, Ditch Company shall be entitled to its costs and reasonable attorneys' fees from Licensee. 7. LICENSE FEE. As consideration for the Ditch Company to enter into this Agreement, Licensee shall pay to the Ditch Company $2500 (or other reasonable amount approved by the Ditch board) upon approval of the plans and specifications of the Installations. Licensee shall pay to the Ditch Company an additional fee of$1000 (or other reasonable amount approved by the Ditch board) for each additional use or crossing of the Ditch at the time any additional use or crossing is approved. However, nothing herein shall obligate the Ditch Company to approve any additional uses of the Ditch by the Licensee. 8. MAINTENANCE. 8.1 Licensee specifically agrees and pledges to maintain, repair and replace the Installations and the entire portion of the Ditch located on the property described in EXHIBIT A so as not to require the Ditch Company to maintain, repair or replace the Installations or the Ditch in that area. If Licensee fails to properly maintain, repair or replace any portion of the Insts,llmions or the portions of the Ditch for which it is responsible alter ten days notice of the need for same and such maintenance and/or repairs are feasible due to weather conditions during that period,the Ditch Company may, at its own option, conduct its own maintenance, repair or replacement, and Licensee shall reimburse Ditch Company for the cost of such work, together with interest at the rate of 12% and reasonable administrative fees, within 30 days. In the event Licensee fails to maintain, repair or replace the Installations or the portions of the Ditch for which it is responsible, it shall be held liable for any loss, damage or injury to the Ditch Company. If the Ditch Company conducts its own maintenance, repair or replacement, it does not waive the right to hold Licensee liable for damages caused by Licensee's failure to maintain, repair or replace. 8.2 The Licensee's maintenance responsibilities hereunder include, but are not limited to, the daily obligations of removing trash and debris from the Ditch, cleaning grates and trash racks, and keeping all culverts and pipelines open and free of debris on the property affected by the Installations. 8.3 The Licensee must notify and receive authorization from the Ditch Company before replacing any portion of the Ditch. If the Licensee interrupts the Ditch Company's water supply for any reason, it shall be responsible for all damages incurred by the Ditch Company and its shareholders. The Ditch Company's MAR-03-2003 M0N 02: 34 PM FROM:DALE BRUNS FAX:3036513486 PAGE 7 3.8 Licensee shall be responsible, at its own expense, for obtaining any local, state or Federal permits or approvals. It is the Licensee's obligation to investigate and determine the need for any such permits or approvals. The Licensee is responsible, at its own expense, for obtaining all local, state and federal permits or approvals and for compliance with all local, state and federal laws and regulations including but not limited to land use and environmental laws and regulations, and specifically including the Endangered Species Act, prior to beginning construction. The Licensee shall indemnify the Ditch Company for any and all costs, damages, fines, and fees, including reasonable attorneys' fees incurred by the Ditch Company as a result of the Licensee's failure to obtain such permits or approvals or failure to comply with all applicable laws and regulations, 4. INSPECTION. 4.1 The Licensee shall notify the Ditch Company at least three (3) business days prior to construction of the Installations, or replacement or repair of the Installations permitted by.this Agreement. The Ditch Company is permitted to inspect the Installations or replacement and repairs of the Installations during construction. Upon completion of the construction, the Ditch Company may inspect the Installations. • 4.2 Licensee shall reconstruct the Ditch by relocating and piping a portion of the open Ditch, and installing the installations pursuant to the plans and specifications approved by the Ditch Company according to the provisions of Section 3 of this Agreement. The obligations and benefits of this Agreement shall run with the land described in EXHIBIT A. The Ditch Company's right to inspect the installations or replacement of the installations in no way relieves the Licensee of its liability for improper design, construction or maintenance, The Ditch Company's inspection is solely for the benefit of the Ditch Company and creates no obligation to the Ditch Company. Upon completion of the construction of the Installation, the Licensee shall provide the Ditch Company with a complete set of "As Built" plans together with a certification from the Licensee's licensed engineer certifying that the Installation was constructed in accordance with the Approved Plans. S. SURVEY. After completion of the Installations, Licensee shall obtain an "as built" survey signed by a registered engineer of the Installations and provide a copy of the survey to the Ditch Company, As part of this survey, a legal description shall be developed for the easement to be granted to the Ditch Company. The legal description of the easement shall be incorporated into this Agreement upon approval of the Ditch Company of the Installations. 6. REIMBURSEMENT OF EXPENSES. 6,1 The Licensee agrees to reimburse the Ditch Company (or pay directly) for all reasonable engineering, legal costs and administrative fees incurred by the Ditch Company in preparing, approving and enforcing all aspects of this Agreement, MAR-03-2003 MON 02:35 PM FROM:DALE BRUNS FAX:3036513486 PAGE 8 Company and shall not be deemed to be a waiver of' the Ditch Company to enforce the obligation of the Licensee to construct the Installation in accordance with the plans and nor shall it be deemed to estop the Ditch Company for the Licensee's failure to install or properly design its installation. 3.4 The Licensee agrees that the construction permitted hereunder shall proceed with reasonable diligence from the initiation of such construction to its completion. The Installations shall be constructed in such a manner so as not to interfere with • the flow of water through the ditch to water recipients. Licensee shall be responsible for the carriage of water across Licensee's land, including drainage water, while the Installations are being constructed. Stormwater released into the ditch from Licensee's land will not be in excess of the historic average runoff and will comply with all relevant Weld County drainage criteria, rules, and regulations. 3.5 Licensee agrees that construction on Installations shall proceed expeditiously and with reasonable diligence from the commencement of construction to its completion. Upon completion of the Installations, Licensee shall notify the Ditch Company. The Ditch Company shall accept or reject the Installations except that the Ditch Company shall not be required to accept or reject until and unless all fees billed have been paid pursuant to Section 7 below. The Ditch Company shall not unreasonably withhold acceptance. The Ditch Company shall be entitled to test the Installations by running water through them. Acceptance or rejection shall be in writing. If the Ditch Company accepts, the survey and grant of easement described in Sections 5 and 6 shall occur. If the Installations are rejected, the Ditch Company shall specify the reasons for rejection, and the Licensee shall correct same, and the above process shall be repeated. All portions of the Ditch bottom, sides, banks and all affected portions of the Ditch and lateral easements which are disturbed by the Installation shall be restored to the condition of the property at the time prior to construction. Any and all fencing and other facilities appurtenant to the Ditch shall be replaced in a condition at least equal to the condition of such facilities and appurtenances prior to construction. 3,6 The Ditch Company's review and approval of the plans and specifications of the Installations is solely for its benefit and creates no benefit or right in any other Party. The Ditch Company's review and approval of the plans and specifications shall not relieve the Licensee, or its agents, employees, from its duty to properly design and construct the Installations. 3.7 The Licensee shall install permanent markers or indicators showing the location of the piped ditch for the purpose of locating the piped ditch as required by the Utility Notifications Center of Colorado. These markers shall be installed at the entrance of the piped ditch and located at every manhole showing the location of the new pipeline. The distance between the markers shall not exceed 500 feet. Additionally, a trace wire shall be installed along the entire length of the ditch pipeline. MAR-03-2003 M0N 02 :35 PM FR0M:DALE BRUNS FAX: 3036513486 PAGE 9 • OLIGARCHY IRRIGATION DITCH COMPANY AGREEMENT TO MODIFY DITCH AND EASEMENT ASSOCIATED WITH PROJECT LIFEBRIDGE 1. PARTIES. The Parties to this Agreement are Oligarchy Irrigation Ditch Company ("Ditch Company"), and LifeBridge Christian Church ("Licensee"). The Ditch Company and Licensee are hereinafter referred to as the Parties. 2. RECITALS. Licensee desires to obtain the permission of the Ditch Company to modify the Oligarchy Ditch ("Ditch") on property described in EXHIBIT A by relocating a portion of the ditch and placing it in a pipeline. Additionally, the Licensee will install utility crossings which plans and specifications shall be completed at a later date and incorporated into this Agreement upon the approval by the Ditch Company (the "Installations"). Licensee owns the property described in EXE MIT A. The ditch company has agreed to the change in the easement and the ditch subject to the terms, conditions and covenants set forth in this Agreement,. NOW, It[EREFORE, rift PARTIES AGREE: 3. CONSTRUCTION. 3.1 Licensee shall reconstruct the Ditch by relocating and piping a portion of the open Ditch, and installing the Installations pursuant to the plans and specifications approved by the Ditch Company as stated in Section 3.2 of this Agreement. The obligations and benefits to this Agreement shall run with the land described in EXHIBIT A. 3.2 The Licensee shall submit plans and specifications as to the Installations to the ditch company for approval Upon receipt of the plans and specifications for the installations, the ditch company shall have a reasonable time (approximately 30 Days) days to review the plans and specifications for approval or rejection. If written notice of approval is not given to the Licensee within such time period, the plans and specifications shall be deemed to be rejected. Licensee shall have the right to resubmit amended plans to Ditch Company for review. The Ditch Company may impose reasonable standards for protection of the Ditch Company. This review process shall continue until the plans and specifications are approved by the Ditch Company or until terminated by the Licensee. Upon this approval the plans and specifications shall be attached and incorporated into this Agreement. Licensee shall make no modifications to the approved plans and specifications without the prior written approval of the Ditch Company. 3.3 The Licensee shall notify the Ditch Company at least three (3) business days preceding the date of commencing work involved on the Installations, or replacement of the Installations, permitted hereunder. The Ditch Company may inspect the Installation or replacements during the construction thereof, as it deems necessary to protect its interests. The right of the Ditch Company to inspect the Installation or replacements shall be solely for the benefit of the Ditch N TETRA TECH RMC 1900 S.Sunset Street,Suite 1-F Longmont,CO 80501 Tel:303.772.5282 Fax:303.665.6959 MEMORANDUM Weld County Planning p- ;t GREELEY 0 'w!-- TO: Kim Ogle MAR 1 0 2003 FROM: Barb Brunk RE: View Studies RECE # 'k J DATE: March 10, 2003 I have enclosed view study information to clarify the sketches submitted on Feb. 24, 2003. Conversations with the neighbors at the open house led us to believe that the sketches from views A, B and C as submitted are not accurate. The sketches submitted on Feb. 24, 2003 were prepared based on available information, before the complete view shed analysis was finished and contain some inaccurate information. The attached information includes wire frames of the proposed Phase I improvements overlaid on photographs taken from specific points on the map. We positioned people holding survey poles at specific points within the PUD. The survey poles were raised to 20' with a 24"X36" orange board attached to the pole. The top of the board was 20' above the existing grade. The location of the camera, the survey flag and Phase I improvements are shown on the drawings. We are confident that the attached drawings and photographs accurately represent views of the Phase I improvements from the adjacent properties. Doeumena 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC 4 970 304 6498 NO.886 P01 TETRA TECH RMC 1900 S.Sunset Street,Suite 1-F Longmont CO 80501 Tel:303.7715282 fax 103.665.6959 TRANSMITTAL, TO: Weld County Planning Dept. FROM: Kim Grow for Barb Brunk 1555 North 17t Avenue DATE: 5-14-03 Greeley,CO 80631 ATTN: Kim Ogle PROJECT: Project LifeBridge PHONE: 970-353-6100 Ext. 3540 JOB NO: 804270.001.00 x Fax Number:97O-3O4.5495 If you do not receive all pages,or if Number of pages sent(Including this cover): pages. transmission is not clear please call Tetra Tech MSC at(303)772-5282. Messenger - Delivery _ Pickup _ Other _ Standard Mall FedEx Overnight WE ARE SENDING YOU: Copies Description 8 Copies of transmittals re:LifeBridge Change of Zone If enclosures are not se noted,please notify us promptly. THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: r noeuronus CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING•SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC -, 970 304 6498 N0.886 P02 ..---"e"-. AXE wrib . TETRA TECH RMC _ , 1900 s.sunset street,Suite 1-F Longmont,C0 80501 Tel;303.7715292 Fatc 3D3_t:65.6959 TRANSMITTAL TO: AAA atorkt1{a lannttpQ FROM: ICM apse) -Pr .I arlflA CAr-fi Z 1SSS N. (-le. Ave. . DATE: I -4.l_o3 Geed.' t C'� Shca$1 PROJECT: Llfe8:6c4t Ckris an Ctartj1 ATTN: IctreY1 o�J J le— JOB NO.: a_ II-21D. WI .OO J.+n; - . x I (cn &citt - G Li.tie /. FAX: Number of pages sent(including this cover): I I pages If you do not receive all pages, 1 or if transmission is not clear Messenger - Delivery Pickup Other please call Tetra Ted,RMC at 772-5282 or 665-6283. Mail Other WE ARE SENDING YOtr: /^ Copies / Description I 1 Via rrardi .a of irceciosings au not as nosed.please notify sea promptly, THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: • COPY TO: r. CIVIL AND ENVIRONMENTAL ENGINEERING• PLANNING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INCtJ 99770 304 6498 NO.886 P03 TETRA TECH RMC Ira bra 1900S.Sunset soregLSuit.1-F LongnonLCOgp501 Tel;303.7725162 Ea303.aes.as9 r TRANSMITTAL TO: 6u4lot Cntlf Ptomain" SW 0-Wat FROM: tC r& Gaul 4?.r 9,arb R-runk 41 Oct (' 2 244 J `lz. DATE: Z — 19--OS oiett1eN CU Satet1 - ATTN: kivIA �q 1-e PROJECT: Prey ft L;4103,1 ;Ay PHONE en-a) rnS2 ^ 4 210 JOS NO: 80- m2-TD. p O 1 . O Fax Number. I!! if you do not receive all pages, or it Number of pages sent(including this cover): pages. transmission Is not clear please call Tetra Tech RMC at(303)7724282. lC Messenger - Delivery F Pickup _ Other _ Standard Mail Feat(Overnight WE ARE SENDING YOU: Copies r� Description l Qr;a)trvt � 0 e e*' 7,?"a Alap1i•eciAvon 14/ Sup lor+r&rn�of Pcckt 61 1 �1 d 1 LAn�ouw>al rot r1 1 c a 0v oitel 'Z7 dP S1.('pp12MB [off encoauree are not as noted,plena notify us pernpey. ` �S THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: Mamma AND ENVIRONMENTAL ENGINEERING•PLANNING •SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC 4 970 304 6498 NO.886 D04 TETRA TECH RMC 0 1900 5.Sunset Street Suite 1-F Longmont CO easo1 Tel:303-772.5282 F»c30;,565.6959 nn •TRANSMITTAL TO: 11)461. (mirth.' ?\anr ns7 IIA5r FROM: 4 in geDiA.) 1"waf6 IJY1LA Z I Sss Ns1orc h 11x:1, IAN P DATE: 0-Xl-Di r;rt/A Ial I Co (5olpgi A7TN: `�;m Dq\e, t LISP-It-1,17e r PROJECT: Prb eC PHONE: ( wa> ?�S3 - ( IDO K 3541) JOB NO: 60'• ztal0. bOl. DO Fax Number If you do not receive all pages,or if Number of pages sent(including this cover): Paget transmission is not clear please call Tetra Tech AMC at(303)772.5282. Messenger - Delivery _ Pickup _ Other _ Standard Mall $[ FodEx Overnight WE ARE SENDING YOU: Copies Description el I_i-Peezrldrie- Pl &Th C.tar iPcajianc tocketieS (O addI rs kr- rericIPrin q I johncc oum Min;Ica., PT-0 is RP P rnap • aIu efea are no as noted.pease nolay us promptly. THESE ARE TRANSMITTED For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: ,--- Danonrno CIVIL AND ENVIRONMENTAL ENGINEERING •PLANNING• SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC + 970 304 6498 NO.886 D05 tilti TETRA TECH RMC 1900£Sunset Street Suite 1-F Longmont CO 80501 Tel:303.7725182 Fax:3034654959 1". I /1 1 Miff. � l/ /� /7 TRANSMITTAL TO: [Aisle' aural f P lone tI1 J i . FROM: Kim C�rDw Ter- &rlo 2gft1C 1SSS Nlov4h rtKI 4vt=. DATE: $- '1 art-all . CO opC0S1 ATTN: g 00 14 Elk. PROJECT: ?roj tt U�.e fay 9_ r PHONE: (qio� 353- ea too El k.2,544 JOB NO: 50- J 4210. 001• OO Fax Number. if you do not receive all pages,9� or if Number of pages sent(including this cover): pages. transmission is not clear please call Tetra Tech RMC at(303)772-5282. Messenger • Delivery _ Pickup _ Other _ S Standard Mail FedE*Overnight WE ARE SENDING YOU: Copies A Description ( it igr:trrl'a� -111 Ajree.enant- ( S1gne4 oDp'y) Ir endoaveo ere not as noted,please rwWy us prwapay, THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: r Duoeeevr2 CIVIL ANO ENVIRONMENTAL ENGINEERING •PLANNING•SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC -, 970 304 6498 NO.886 P06 SIM TETRA TECH RMC 1900 S.Sunset Sveet.5uhe 7-F[an o23.080501 Tel:303-7725282 Fwc 6959 �1 {-� 'rte y� TRANSMTITAL TO: WsId Coon--.( PLwnn Ln"1I LIZ, FROM: garb ISIS •.inrin I—Pcin "e t ve. DATE: 2,— o-- 02> ( ree1sti I'D SC (Q3l ATTN: rn /^)Qln PROJECT: 1 r ai er+ L R PHONE: (°1C) J7y (o LQO f'{4- 2;c110 JOB NO: ESC— 4) 7O C C 1 ea Fax Number. It you do not receive all pages, or if Number of pages sent(including this cover): pages. transmission is not clear please call Tetra Tech RMC at(303)172-5282. x Messenger - Delivery ✓ Pickup _ Other , Standard Mail FedEx Overnight WE ARE SENDING YOU: Copies r Description 3arne u endow=ate not as rabid.please nody us promptly. THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: na„mma CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING•SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC 4 970 304 6498 NO.886 D07 Erb TETRA TECH RMC 1900 5 Sunset Sven Suite 1-r Longmont CO S0501 Tet 303772.5282 Fax 303,6656959 j� f TRANSMITTAL TO: !"�L . O �r FROM: Fab ,yl —• P�(LV Pbnn)r DATE: "^I ATTN: PROJECT: b8l.G CA45 tit tilt. PHONE: JOB NO: 4176' NM or) Fax Number:_ If you do not receive ail pages,or if Number of pages sent(including this cover): erpages. transmission Is not clear please call Tetra Tech RMC at(303)772-5282 Messenger - Delivery _ Pickup _ Other _ - (q-70) & Standard Mall FedEx Overnight WE ARE SENDING YOU: Copies Description 4w pte vtok4a4sys tt enclosures are not as noted,please notify us promptly, THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: • COPY TO: k..I k I when Pxard hear 4ke rte Demand CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING•SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC 3 970 304 6498 NO.886 P08 TETRA TECH RMC 1900 S.Sunsat Stte itgite 1-F Lo rnor tco a0501 Tc1:303.7T25182 F•yc 303.665.6959 TRANSMITTAL TO: tat la f hi.Deft cfP Qlann�Gq S.r,,,e.es FROM: t�i'm Amu —cc- [aatL ortAdo iss5 N. nth lase. DATE:DATE: A - 2B-- P�fe�ie.1 . Ca Born%l n ATTN: Kam MitePROJECT: LI-��ri�O.e PHONE: (gib) 263--G%O JOB NO: fo- 4a,0. cot- on Fax Number. If you do not receive all pages, or if Number of pages sent(including this cover): pages. transmission is not clear please call Tetra Tech RMC at(303)772.5282. r Messenger - Delivery y Pickup _ Other _ Standard Mali Fedex Overnight WE ARE SENDING YOU: Copies Description 2 "get ana Appli CAitave L,'Ft�riO�e 2 tlarrteradIuM p.luS a+ ack1 er:R. J7ta3� 2 Lt-ion- pttoS att krrtoats &"9 's.) 2 1 II regameS (c. (41S Pc VI If 04100BUreel are not us noes,please natty ue Promptly. THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: Document CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING•SURVEYING 05/14/2003 09:44 ROCKY MOUNTAIN CONSULTANTS INC 9 970 304 6498 NO.886 D09 TETRATECH RMC 1900 S.Sunset Street.Suite 1-F Longmont.CO 80501 Te1:303J723202 Far 303.665.6959 TRANSMITTAL TO: al Id ('.a,4Ban.,n7 .► 1 pt • FROM: 1&�.stca . IscS 14. 1-1ttf+ /4vrz. DATE: 4-2-1- OS &fee1t� CD SOGa1 ATTN: ,'yt.1 lJ {t^ PROJECT: `We. 'EtrI•„tn Ckr slVa/t Q ug, PHONE: Cr)Vl oD 1 o D JOB NO: AO- 4-2. 0 • co) . co Fax Number In — `la8 If you do not receive aHpages,orif Ic Number of pages sent(including this Cover); 11- pages, transmission is not clear please call Tetra Tech RMC at(303)772-5282. Messenger • Delivery _ Pickup Other_ Standard Mail FedEx Overnight WE ARE SENDING YOU: Copies Description Le-1-Fu -$o Mr• 4tA Dale re : ()rale. & 70.19 A{tot.(,arno\ I .44 er -o Monieti.—LartielS re ' Mifigarh'on /greeinen't If enrbsures are not as noted,please many us pn acsIY. - THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO; Duounne2 CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING• SURVEYING Et TETRATECH RMC 1900 S.Sunset Street,Suite 1-F Longmont,Co 80501 Tel:303.772.5282 Fax:303.665.6959 TRANSMITTAL TO: wed C1i11 Planni,n9 cW ( rf e FROM: KrPri afoul 'rorQ rb Rrunk- ti7Oct P rZ ay j tit DATE: Z ^ IS-0'S breelel1 Co [jo (ptI I p ATTN: Ki,(y� ©91-e PROJECT: Pra�2Cl L1 "tip< ;o,q,¢ el2 PHONE: O') r„s2. . 4 2. t JOB NO: [j0- 'i�-117. 0 0 1 . 0 0 Fax Number: If you do not receive all pages, or if Number of pages sent(including this cover): pages. transmission is not clear please call Tetra Tech RMC at(303)772-5282. IC Messenger - Delivery It Pickup _ Other _ Standard Mail FedEx Overnight .. WE ARE SENDING YOU: Copies f �I !7 Description 1 Cl p /1 I or;gt'wet_t Oka, & et' Zane_ pii'Ca." on 1WI JU � -tb. p . Site omens 1Y\ac�" e 8 t f� t{ �c6,co( r$1 s;2PpdL map's n L_ Ant of C'O tj (kc- f o�@.�tar-6,) OP SA„Tple.men 2._ s If enclosures are not as noted,please notify us promptly. THESE ARE TRANSMITTED: For Approval As Requested For Your Use For Review and Comment REMARKS: COPY TO: Docurnent3 CIVIL AND ENVIRONMENTAL ENGINEERING• PLANNING•SURVEYING U4/1C/GU J 11:5.5 t1ULKY FIJUN I A I N CONSULTANTS INC 4 970 304 6498 NO.815 D01 it TETRA TECH RMC 1900 5.Sunset Street Suite 1-F Lnngtnant,CC 80507 n Tab 303.7725282 fatc 303.665.6959 f T12ANSMTTTAL TO: kVA, 6 FROM: at-b DATE: 14/S/os- ATTN: PROJECT: tJ 1914O- PHONE: JOB NO; Fax Number. H you do not receive all pages,on if Number of pages sant(Including this cover): pages. transmission is not clear please call Tetra Tech AMC at(303)7724282. Messenger - Delivery _ Pickup _ Other _ Standard Mail FedEx Overnight WE ARE SENDING YOU: Copies Description If enclosures are not as noted,pease notify us prpmpyy, THESE ARE TRANSMITTED: For Approval / As Requested For Your Use (/ For Review and Comment REMARKS: COPY TO: 1 Z Ul1l 1 a-evid CS I e r ► Li 6u,`� ^-- 14- WDu.(d let be-Ser O7rtr s - 'kts n-h) asi P, L- tbf vrt 4clu CIVIL AND ENVIRONMENTAL ENGINEERING•PLANNING•SURVEYING 04/18/2003 11:53 ROCKY MOUNTAIN CONSULTANTS INC i 970 304 6498 NO.615 P02 l k,n _ Za 6-ea,-t5 Ktari o� . - Y- do u.�r-+n bi,�,((d I r (6They, ee.. C 4"-)) pas- -r• 4 cisnstt -avvf5 • .. Kim, �p We have reviewed Preliminary draft 6 and have a few 136“ — questions/clarifications 1. page 8 bulk standards - the building height on the church campus is not consistent with your condition of approval - (0) - I think the table needs to be modified to match the condition? 2. The summary at the bottom of page 9 also needs to match the condition (o) 3. Should we talk with the PC regarding minimum lot sizes or could you allow some flexibility with a condition that the applicant must demonstrate that the homes proposed will fit on the lots as designed at the time of final plat? 4. We would also like to discuss setbacks in the mixed use office, neighborhood center and commercial area - to allow for a "Main Street" - is it possible to reduce the setback to 20' ? S. Does the Code recognize units in an assisted living facility as residential units or beds in a nursing home/hospital? If the code considers them residential units - the requirement for 3000 s.f per unit seems high (R-4 requires 1500 sf per unit) . 6. It is my understanding that lot coverage includes everything except the landscaping (buildings, drives, walks, parking) . If you decrease the lot coverage in the Assisted Living Village from 75% to 60% you have essentially raised the landscaping requirement from 258 to 40%. Maybe we could compromise on 706? 7. Page 31 - the discussion regarding building height on the campus in ie bottom of the 4th paragraph and the 5th paragraph does not match.the _condition of approval. The end of the 4th paragraph still references 10% of the building footprint and the flyspace. The 5th paragraph appears to limit the church building envelope to an area 125' south of the RR - the condition limits height to 45' north of the RR - we assume that it will be ok to build in that area subject to final plan and site plan review and other bulk standards. The last paragraph matched the condition. We may want to clarify that the 20% at 90 ' is within the rectangle in the central area of the campus. Condition 1- A - street names - more appropriate at final plat? Condition 2 - 0 - references bulk diagram on the Change of zone plat - we just need to make sure they all match and add the diagram to the map. I sent the JPEG earlier, call if you need any additional graphics. Thank you for all of your hard work. Barb Tetra Tech RMC 1900 South Sunset, Suite 1-F Longmont, CO 80501 (303) 772-5282, ext. 108 (303) 665-6959 (fax) barb.brunkattrmc.com 4-r" aNt ) BULK STANDARDS SUMMARY: LI' )RIDGE PUD v.WELD COUNTY CODE ) 6 A N LIFEBRIDGE PUD CHURCH SINGLE FAMILY SINGLE FAMILY/3 ASSISTED MIXED USE COMMERCIAL NEIGHBORHOOD m • WELD COUNTY CAMPUS RESIDENTIAL ATTACHED LIVING OFFICE/RETAIL CENTER CENTER NJ RESIDENTIAL VILLAGE M Minimum LOT Size N/A 7500 3500 423,20? WA N/A NIA N/A (SF) 6000 6000 a 600D Minimum LOT area N/A 7500 2500 N/A NIA NIA WA `r' per Residential 6000' 4500 4500 W Structure(SF) I — I Minimum LOT area WA 7500 1500 WA (.(5ab) N/A WA NIA per Unil(SF) 6000 . 3000 3000 - zt 0 Minimum 25 FEET 20 FEET 20 FEET 15 FEET 0 FEET ^^.2 15 FEET ,.7,9 15 FEET X '' 9 SETBACK(feel) 25 FEET 20 FEET 20 FEET 20 FEET 25 FEET LU . 25 FEET 0 W• 25 FEET r -c Minimum OFFSET 25 FEET MIN 5 FEET Side Yards, 5 FEET OR 0 FEET '15 FEET ( 0 FEET MIN 15 FEET MIN 15 FEET MINIMUM 8 (feel)Fences am Setback From 15 Feet Corner With Minimum 10 Feet Minimum Setback From Setback From Setback From not required to Property Line Setback;20 Feet For Between Structures,15 Setback From Property Line Property Line Property line D comply with the Rear Yards;3 Feet Feet Comer Setback Property Line z minimum OFFSET 25 FEET 11IN For Accessory 20 Feet For Accessory and may be Setback Structures(it, • Structures(i.e., 5 FEET on 10 FEET MIN 19 FEET MW - 10 FEET MIN o located on the From Garages or Sheds at Garages or Sheds at IfsEET Setback From Setback From Setback From Z Properly Line Property Rear Lot Line) Rear Lot Line) um every Property Line Property Line Property line C Line 5 FEET or 1 FEET 5 FEET or 1 FEET 3 FEET Bldg -I for every for every Height - D z 3 FEET Bldg Height 3 FEET Bldg Height H co - — — 1 Maximum FEET 30 FEET 45 FEET 45 FEET 45-55 FEET 45-55 FEET 55 FEET Z BUILDING F Main Portions of the Portions of the y HEIGHT(feet) cture Structures Such Structures such Ad o as parapet walls, as parapet walls. W -J 60 clock towers or dock towers or m S (AJO Flys ce other architectural other architectural (A T (30% features up to 55 features up to 55 A f prl l) FEET FEET ern-1)4U""1' MAIN ITH 35 FEET 35 FEET 35 FEET 45 FEET 45 FEET 45 FEET tp0 10%F Aim FLYSPA E 0R 12000 SF Ji - Makdmum LOT 85% 50% 60% 75% Ir0 ,t 85% 85% 85% Coverage(%) 85% 50% 60% 60% 85% 85% • .85% Maximum number NOT NOT PERMITTED NOT PERMITTED NOT NOT PERMITTED NOT PERMITTED NOT PERMITTED of ANIMAL UNITS PERMITTED R-1: TWO(2)PER PERMITTED I permitted per LOT wlo Special LOT NOT 'NOT PERMITTED z Permit on TWO(2)PER LOT R,2: NOT PERMITTED PERMITTED NOT PERMITTED NOT PERMITTED _ p Church Campus - y� hh r /�Aye/��k `,,,,�. c,f1- /(� �� c n lI �� ,,..i/- N u , p Iit� LN + 'U r r,4� "hf `(.44 af ppi( [.a6--f m J I L."ernon l yl�+,g -r \[.L:t liable I.Bulk Standards,page l6 11 bullrtlnss (�- rn4he lc�t5 art *nL-1 P1ccn • u4/1b/em3 11:b3 ROCKY MOUNTAIN CONSULTANTS INC 9 970 304 6498 NO.815 PO4 • Bulk Standards Massing Diagram for Church Campus - _ Church Campus Only Off-Set from Perimeter of Maximum Building Height 160 Acre Church Campus West Property Line 125400 feet 45 feet [ • Quarter Section Line on Section 5 400-500 feet 136feet ( 55) �. /11 Approximately County Road 3 1/2 _500 feet+ up to 90-feet ; 11 �� North Property Line 125.400 feet 45 feet Section Line on Section 5 400-700 feet 55 feet ` Approximately County Road 26 700-1300 feet 60 feet 1300 feet+ 60 feet/up to 90 feet East Property Line 125-400 feet 45 feet Section Line on Section 5 400-500 feet 55 feet • Approximately Elms Property Line 500-700 feet 60 feet • 700 feet+ 60 feet/up to 90 feet South Property Line 125-300 feet 45 feet Quarter Section Line on Section 5 300-400 feet 55 feet 400-800 feet 60 feet 800 feet+ 60 feet/up to 90 feet — Al Lands North of the Great Western 45 feet Railroad Track 7. The overall height within the center of the church campus will be restricted to sixty (60) feet with up to.56,060itrtahsquare feet of 81& building foatpiinrwitsi`u, ths—area-lhet ,J� may extend u to ninety (90) feet, yCt�`•ID D vT -HI-6 & L^Pi/d (V3 ` .he- caftta'" f o-r- 'its`() lilt Carvlpu.s i"1 LIFESRIDGE CHRISTIAN CHURCH PUD. PZ-1004.page 9 - �..r`n., � nrv..•, i.i. vrn•....vr''II',.+ •i�..• • /IV .aVY UYJO IY4J.O1J VYJJ er . . a4 1 E, f,i, VI e .� °' tfo at pp -fro ' d Asp '56 ' -_ 46 ' - - _..... - __ ►25 M.,,: x• ,- .z: x K,:�, ter. �._. (* 5 e-kbp-a- .ern, t 6k p t go o m ) (_i-in (5 aLap*V, v c --1-cdotii' P ii • Kim Ogle- Revised CR 26 Mtg 01 Nov2002.pdf Page 1 r1 MEMORANDUM TO: All Meeting Attendees FROM: Rocky Mountain Consultants DATE: December 5,2002;Revised: December 6,2002 RE: Meeting Minutes from November 1,2002 Regarding Future Transportation improvements in the Vicinity of the Proposed LifeBridge P.U.D. Prepared by: Todd Borger,RMC Meeting Attendees: Peter Schei Weld County Public Works Drew Scheltinga Weld County Public Works Nick Wolfrum City of Longmont Public Works Joe Olson City of Longmont Public Works Curtis Ansel City of Longmont Public Works Ken Huson City of Longmont Water Department Brien Schumacher City of Longmont Planning Barb Brunk Rocky Mountain Consultants res.` Cathy Leslie Rocky Mountain Consultants Todd Borger Rocky Mountain Consultants Dale Bruns LifeBridge Christian Church Dennis Thompson LifeBridge Christian Church Paige Jacques LifeBridge Christian Church Bruce Grinnell LifeBridge Christian Church On Friday,November I,2002,we meet at the South Weld Service Center to discuss several transportation issues in the vicinity of the proposed LifeBridge P.U.D. The following is a summary of this meeting: Nick Wolfram: As Weld County Road#1 (County Line Road)is classified as an arterial street by the City of Longmont,the signal spacing along County Line should be at 1 mile intervals. Presently,County Road 26(CR 26)turns into CR 24-3/4 as it winds around Union Reservoir,and is at a'''A mile spacing along County Line. The City would like to see CR 24-3/4 realigned to intersect with County Line at 96' Avenue. While the existing location of CR 24-3/4 on County Line lines up with an access to a development(Fox Meadows),the City does anticipate the need for a signal at this intersection. Drew Scheltinga: The County has had discussions with the three property owners impacted by the suggested realignment,and they are all willing to adjust this intersection to the North.lining the road up with 9'"Avenue. The County needs to maintain this road connection around Union Reservoir. Addition: Drew's discussions regarding transportation issues in the area have been with Don I.e0ler a planning consultant,who is representing the property owners in their application to Weld County. ra..\ Kim Ogle- Revised CR 26 Mtg 01 Nov2002.pdf Page 2 Ken Boson: The new embankment associated with the enlargement of Union Reservoir will be where the existing road is,so it will need to be moved about ICR feet to the South. As the water department owns the ground adjacent to the road around Union,they are willing grant an easement,or possibly dedicate right-of-way,for the relocation of the road at the time of construction. Drew Scheltinga: Chris Adrian is one of the three property owners with whom the County has had discussions. Chris Adrian is going through the County process. The County has told Chris to move CR 24-3/4 and Chris has appeared agreeable. Other than the relocated CR 24-3/4 intersection,the County has told Chris that all additional intersections along County Line for his development will be right-in/right- out only. Addition: Drew's discussions regarddingtrartsportation issues in the area have been with Don Leffler,apl:pminy consultanywho is representing theareccrty owners in their application to Weld County_. Nick Wolfram: The City has several general concerns. What if the LifeBridge P.U.D.needs to have CR 24-3/4 relocated prior to Chris Adrian develops? The City also wants to avoid the situation where the existing intersection of CR 24-3/4 warrants signalization prior to being realigned. LifeBridge committed to updating the traffic study with each additional phase in order to determine the point when improvements to CR 24-3/4 are triggered. If a particular future traffic study indicates that CR 24-3/4 needs to be relocated,then that need will be addressed at the time of that phase of development to determine all construction related issues,i.e.,cost sharing,etc. Drew Scheltinga: The County':tmnrportation fund is changing to a county wide approach from the existing spot by spot approach to improvements. This sentence is heingstruck out. While some mention fees' transportation made during the meeting regarding possible changes to the manner of handling Weld County transportation impact fees,those details are not significant at this stage of the LifeBridge application. Regarding upgrading railroad crossings and the PUC,the County has not been approaching the PUC for upgrade:to existing erorsing:and ha,:been constructing them without PUC review. The County would :uppor the pursuit of reduced or no requirement%for signals and gates at these low u::e crossings. Correction: Union Pacific has been upgrading unsignalized crossings(new signing,replankine,paving, etc.)and Weld County had not made any applications to the PUC for that work. Upgrading an existing crossing,without adding lights and gates,may not require a PUC application or hearing. The County will support the additional crossing at Fairview, The Concepts developer(Dale Bruns)will prepare the application with the County as the applicant. Regarding COOT,all of today's issues need to be followed up with CDOT. Nick Wolfram: The City will support the County regarding the addition of the railroad crossing at Fairview. Corrections If anyone has any corrections to these meeting minutes,please send them to Todd Borger with Rocky Mountain Consultants. Revised minutes will then be issued. H:4270 001VelaungMimut&Uleeting minutes CR26 necting.doc Hello