Loading...
HomeMy WebLinkAbout20032389.tiff it) MEMORANDUM CTO: Clerk to the Board DATE : August 12, 2003 • COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engine SUBJECT: Item for Chair's Signature Please submit the enclosed item for the Chair's signature. CHANGE ORDER NO. 1, Chambers Tracts Subdivision, with Zak Dirt, Inc. The appropriate documentation is enclosed. Would you please return the original to the Public Works Department Enclosures pc: Wayne Howard, Engineering • . M:\FRAN C I E\C HA I R-S I G N A T U RE.D O C 2003-2389 CHANGE ORDER NO. 1 Chambers Tracts Subdivision Date: 471D3. Project: The work consists of the construction of approximately 1366 feet of roadway which includes approximately 140 sq. yds. of concrete sidewalk, 807 lin. ft. of curb and gutter type 2, and 650 ton of H.B.P. The project also includes unclassified excavation, riprap, and other incidental work. Owner: Weld County,Colorado Contractor: Zak Dirt,Inc., 14290 Hilltop Road, Longmont,CO 80504 The following change is hereby made to the Contract Documents: Include an additional 363'of Curb and Gutter Type 2(Section MS) @$18/Lin. Ft. for a total of$6,534. Delete Item 210, Reset Chain Link Fence @$30.00/Lin.Ft. x 40 Lin.Ft._$1,200.00. CHANGE TO CONTRACT PRICE: Original Contract Price: $ 105,193.50 Current Contract Price adjusted by previous Change Order: $ 105,193.50 The Contract Price due to this Change Order will be increased by: $ 5,334.00 The new Contract Price, including this Change Order,will be$ 110,527.50 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 calendar days. The date for completion of all Work will be unchanged . RECOMMENDED: AUG 1 8 2003 Owner Representative: eivi �,`(�( ' Date: ({/ David E. Long,Chair / Engineer: f .. j��� Gu.� i Date: 7/4/0.3 APPROVALS: (n� Contractor: U P ZaK b„gf l .i(. . Date: L•urry D Owner: Date: Hello