Loading...
HomeMy WebLinkAbout20031461.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Stephen Mokray, that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: AmUSR-1282 APPLICANT: John Johnson PLANNER: Chris Gathman LEGAL DESCRIPTION: Lot B AmRE-499; part S2 NE4 S2 NW4 Section 1, T6N, R65W of the 6th P.M., Weld County, Colorado. REQUEST: Site Specific Development Plan and Special Review Permit for a Dairy in the A(Agricultural)Zone District. LOCATION: East of and adjacent to WCR 47; South of and adjacent to WCR 74. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Planning Commission that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. A.Goal 1 states,"Conserve agricultural land for agricultural purposes which foster the economic health and continuance of agriculture." The property is currently being used as an animal feedlot and the applicants are proposing to include a dairy operation which will have a maximum of 2000 head of dairy cows and add a milking parlor to the existing feedlot. Dairies are considered agricultural related operations. B. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District. Section 23-3-40.6.16 of the Weld County Code provides for Agricultural Service Establishments primarily engaged in performing agricultural,animal husbandry,or horticultural services on a fee or contract basis,including livestock confinement operations as a Use by Special Review in the A(Agricultural)Zone District. C. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses. An existing dairy facility(SUP-138 for 100 Dairy cows) is located to the east of this site.There is also a confined animal feeding operation(SUP-395 for 2000 head feedlot) located to the north of this site. The adjacent properties are all zoned A (Agricultural)and there are three residential homes within 500 feet of the USR boundary. The proposed dairy facility will not increase the total number of cattle allowed on the facility under the original USR-1282 special use permit(a total of 11,240 head). The Development Standards,Conditions of Approval,and Operations Standards will effectively mitigate any adverse impacts to surrounding areas. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected byChapter22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is not located within any IGA's, UGB's or 3-mile referral areas of any incorporated towns. E. Section 23-2-220.A.5 -- The application complies with Section 23-5 of the Weld County Code. ~ g d N Effective January 1,2003, Building Permits issued on the proposed lots will be required to = adhere to the fee structure of the County Wide Road Impact Program. (Ordinance 2002-11) 2003-1461 Resolution AmUSR-1282 John Johnson Page 2 F. Section 23-2-220.A.6--The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The majority of the property is designated as prime farm ground according to the U.S.D.A. Soil Conservation Map, dated 1979. A portion of the of the property is designated as irrigated non prime farmground. The dairy addition to the USR is located within the existing feedlot pens with the exception of the proposed improvements for the dairy. Improvements for the proposed new dairy including the milking parlor and solid waste separator will be located on the portion of the site designated non-prime. G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards(Section 23-2-250,Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Planning Commission's recommendation for approval is conditional upon the following: 1. Prior to scheduling a Board of County Commissioners hearing: A. The applicant shall either submit to the Weld County Department of Planning Services a copy of an agreement with the properties mineral owners/operators stipulating that the oil and gas activities have adequately been incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owners. (Department of Planning Services) B. The applicant shall submit a detailed signage plan to the Weld County Department of Planning Services. (Department of Planning Services) 2. Prior to recording the plat: A. The plat shall be labeled AMUSR-1282. (Department of Planning Services) B. The plat shall be amended to delineate the following: 1. The attached Development Standards. (Department of Planning Services) 2. The existing and future right-of-way for County Roads 74 and 47. (Department of Public Works) 3. The USR boundary shall be a solid heavy line. (Department of Planning Services) 4. A parking area large enough to accommodate eight(8)parking spaces and two(2) loading spaces shall be indicated. (Department of Planning Services) 5. Any exterior lighting shall be indicated (if proposed). (Department of Planning Services) C. The applicant shall address the requirements (concerns) of Kim Ogle, Planner III, as outlined in his referral dated March 6, 2003.Written evidence of such shall be provided to the Department of Planning Services. (Department of Planning Services) r D. The facility shall demonstrate compliance with the Confined Animal Feeding Operations Control (CAFO)Regulations and the additional requirements outlined below.This shall be demonstrated by submitting a comprehensive manure and waste water management plan, for a 2,000 head dairy, to the Weld County Department of Public Health and Environment Resolution AmUSR-1282 John Johnson Page 3 for review and approval. Evidence of Health Department approval shall be provided to the Department of Planning Services.This plan shall include,but not be limited to the following: (1) Demonstration that all manure stockpile areas and waste water collection, conveyance,and retention facilities are adequately sized and constructed to handle and retain the storm water run-off generated from a twenty-five year, twenty-four hour storm event.This shall be conducted by a Registered Professional Engineer. (2) Demonstration that any proposed waste water retention structure will be constructed in accordance with the CAFO Regulations and to have a seepage rate not to exceed 1/32"/day. The demonstration shall be conducted by a Colorado Registered Professional engineer. (3) A site map delineating the layout of the site. This should include the locations of all pens, structures, feed storage areas, any water courses through the property, manure storage areas, lagoons, etc. (4) A contour map which demonstrates all surface water control feature on the site. This should include surveyed surface elevations, indicate flow direction, run-on and run-off control features, etc. (5) Demonstration that the facility has the ability to manage, dispose, and/or land apply manure and waste water at agronomic rates in accordance with the CAFO regulations. (6) Demonstration that adequate measures are in place to prevent any discharges except those which are allowed by the CAFO Regulations. (7) Other necessary measures which are required in order to comply with the CAFO Regulations. (8) A description of the types of records that will be maintained on the facility, as required by the CAFO Regulations. (9) Evidence that the site is graded to convey stormwater or other waste waters to retention facilities in order to prevent stagnant or pooling water. (Department of Public Health & Environment) E. In accordance with CAFO, the applicant shall submit the facility's manure and waste water management plan to the Colorado Department of Public Health and Environment for review and comment. Evidence of such shall be submitted to the Department of Planning Services. (Department of Public Health & Environment) F. The applicant shall address the concerns of the North side Lateral Extension Ditch Company outlined in referral received 4/21/03. Evidence of such shall be submitted to the Department of Planning Services. G. Dust abatement, fly control, odor control, and pest control plans shall be submitted to the Weld County Department of Public Health and Environment for review and approval.Evidence of Health Department approval shall be provided to the Department of Planning Services. (Department of Public Health & Environment) H. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 3. Upon completion of 1. and 2. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval.The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be Resolution AmUSR-1282 John Johnson Page 4 prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty(30) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 4. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Recorded Exemption/Subdivision Exemption/Use by Special Review/. Acceptable CAD formats are.dwg,.dxf,and.dgn(Microstation); acceptable GIS formats are ArcView shapefiles, ArcInfo Coverages and ArcInfo Export files format type is.e00. The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to mapsco.weld.co.us. (Department of Planning Services) 5. Prior to release of building permits: A. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building Inspection) 6. Prior to Construction: A. A building permit shall be obtained prior to the construction of the milking parlor. Buildings that meet the definition of an Ag Exempt building as specified in Section 29-3-206.13 of the Weld County Code do not need building permits, however those buildings shall obtain a Certificate of Compliance in accordance with Section 29-3-20B.13. An electrical permit and/or plumbing permit shall be required for any electrical work or plumbing allowed in an Ag Exempt building. Pens or corrals do not require building permits. (Department of Building Inspection) 7. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Johnson Dairy AMUSR-1282 1. The Site Specific Development Plan and Special Use Permit is for a an Agricultural Service Establishment primarily engaged in performing agricultural, animal husbandry, or horticultural services on a fee or contract basis including Livestock Confinement Operations including a dairy for up to 2,000 head of cattle(total of 11,240 head of cattle and 20 horses)in the A(Agricultural) Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The applicant shall remove, handle, and stockpile manure from the livestock area in a manner that will prevent nuisance conditions. The manure piles shall not be allowed to exist or deteriorate to a condition that facilitates excessive odors,flies, insect pests,or pollutant runoff. The surface beneath the manure storage areas shall be of materials which are protective of State waters. These areas shall be constructed to minimize seepage or percolation of manure contaminated water. In no event shall the facility impact or degrade waters of the State in violation of the Confined Animal Feeding Operations Control Regulation (5 CCR 1002-19). (Department of Public Health & Environment) 4. The facility shall be in compliance with the Confined Animal Feeding Operation Regulations prior to final approval of the proposed use. (Department of Public Health and Environment) 5. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 6. There shall be no permanent disposal of solid wastes,as defined in the Regulations Pertaining to Solid Waste Disposal Sites and Facilities(6 CCR 1007-2),at this site. (Department of Public Health & Environment) 7. Fugitive dust shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. (Department of Public Health & Environment) 8. The facility shall adhere to the maximum permissible noise levels allowed in the Light Industrial Zone District as delineated in 25-12-103,C.R.S.(Department of Public Health and Environment) 9. The facility shall be operated in accordance with the approved odor abatement plan. Odors detected off site shall not equal or exceed the level of fifteen-to-one dilution threshold, as measured pursuant to Regulation 2 of the Colorado Air Pollution control Regulations. Additional controls shall be implemented at the request of the Weld County Department of Public Health and Environment in the event the odor levels detected off-site meet or exceed the level of fifteen-to-one dilution threshold, or in the judgement of the Weld County Health Officer, there exists an odor condition requiring abatement. (Department of Public Health and Environment) 10. The facility shall maintain compliance with Confined Animal Feeding Operations Control Regulations(5 CCR 1002-19)and the Weld County Code,as amended.(Department of Public Health & Environment) 11. A spillage retention berm shall be required around any fuel container with a volume greater than 50 gallons. The volume retained by the spillage berm should be greater than the volume of the largest tank inside the berm. (Department of Public Health & Environment) 12. A septic system shall be installed to dispose of any domestic wastes generated within the milking parlor. The system shall comply with all provisions of the Weld County Individual Sewage Disposal System Regulations. (Department of Public Health and Environment) Resolution AmUSR-1282 John Johnson Page 2 13. The facility shall not discharge run-off or other waste waters to surface or groundwater with exception to what is allowed by the Confined Animal Feeding Operations Control Regulations. (Department of Public Health & Environment) 14. The facility shall be operated in a manner to control flies. The facility shall be operated in accordance,at all times,with the approved fly control plan. Additional fly control measures shall be implemented at the request of the Weld County Department of Public Health and Environment in the event that flies(which can be determined to be associated with the facility) are in such a number to be considered a nuisance condition. The plan shall also be implemented in the event the Weld County Department of Public Health and Environment receives a significant number of fly(associated with facility)complaints, and in the judgement of the Weld County Health Officer,there exists a fly condition requiring abatement.(Department of Public Health & Environment) 15. Wastes materials,not specifically addressed by other development standards,shall be handled, stored, and disposed of in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health & Environment) 16. There shall be no burning conducted at the site, with exception to burning defined as "agricultural open burning" as defined by Regulation No 17. The facility shall be operated and maintained in a manner to prevent nuisance conditions. (Department of Public Health & Environment) 18. The facility shall be operated in a manner to control pests. The facility shall be operated in accordance,at all times,with the approved pest control plan. Additional control measures shall be implemented at the request of the Weld County Department of Public Health and Environment in the event that rodents (which can be determined to be associated with the facility) are in such a number to be considered a nuisance condition. (Department of Public Health & Environment) 19. Any deceased animals found on the lot shall be removed within 24 hours of discovery and disposed of properly. 20. Off street parking and loading areas shall be surfaced with gravel or the equivalent and shall be graded to prevent drainage problems. (Department of Public Works) 21. The storm water drains into the existing ponds. One new pond will be constructed,maintained, and operated in accordance with the Colorado Confined Animal Feeding Control Regulation. Water from these ponds will be used for irrigation of farm ground. (Department of Public Works) 22. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building Inspection) 23. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 1997 Uniform Building Code, 1998 International Mechanical Code, 1997 International Plumbing Code,2002 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 24. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. (Department of Building Inspection) Resolution AmUSR-1282 John Johnson Page 3 25. Building height shall be limited to the maximum height allowed per UBC Table 5-B. Wall and opening protection and limitations shall be in accordance with UBC Table 5-A. Separation of buildings of mixed occupancy classifications shall be in accordance with UBC Table 3-B and Chapter 3. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. (Department of Building Inspection) 26. Building height shall be measured in accordance with the 1997 Uniform Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 27 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) 27. A building permit shall be obtained prior to the construction of the milking parlor and/or any other buildings. Buildings that meet the definition of an Ag Exempt building as specified in Section 29-3-206.13 of the Weld County Code do not need building permits, however those buildings shall obtain a Certificate of Compliance in accordance with Section 29-3-20B.13.b. An electrical permit and/or plumbing permit shall be required for any electrical work or plumbing allowed in an Ag Exempt building. Pens, corrals or concrete pads do not require building permits. (Department of Building Inspection) 28. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the Weld County Road Impact Program. (Ordinance 2002-11) (Department of Planning Services) 29. The property owner or operator shall be responsible for complying with the Livestock Confinement Operation standards of Section 23-4-350, Weld County Code. 30. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 31. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. 32. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 33. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners Motion seconded by Bernie Ruesgen r Resolution AmUSR-1282 John Johnson Page 4 VOTE: For Passage Against Passage Absent Fred Walker Michael Miller John Folsom John Hutson Bryant Gimlin Stephen Mokray Bruce Fitzgerald James Rohn Bernard Ruesgen The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I,Voneen Macklin, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution,is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on May 6, 2003. Dated the 6'" of May, 2003. mud) c Voneen Macklin Secretary Hello