HomeMy WebLinkAbout800655.tiff THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A1OI
Standard Form of Agreement Between
Owner and Contractor
where the basis of payment is a
STIPULATED SUM
Jill' I>O)((AIENT N 1v IVI°ORTANT f(. ((INNfQf 11V( !;; CONSU!TATION WITH
•Vc.AI71)RNCY Is 1N'C(i RACE I) lcilll RI VI(II() 11ti ( Os1Nt I I ION ORMOOIr/CATION
l•' c urIlr With the Litr>l edition al AIA Doc unnun! 12/I? ( ,-nrrdl ( cn(1t(ons of the Contract for Construction.
Ihr. rr ( nirnr h;. been ,ind e n.uccerl General Cunha(Mrs of America.
AGREEMENT
made this ;.l\ 1)1 in the year of Nineteen
tundred and
BETWEEN the Owner: County of Weld
and the Contractor: Growling Bear Company, Inc .
the Project: Renovation of Alcohol Rehabilitation Center at Island
Grove Park.
the Architect: Zoyiopoulos and Associates
the Owner and the Contractor agree a, set forth below. 8 00 65 5
AIA DOCUMENT AIOI • rvSNIR-(ON I KArl1)0; AGRI!NO NI • I NIINRY '1':4 II)IIION • AIA ) • 2,0)74
WI 5V0RICAN INtilil C rIi AR( ili!It Is 1232 NOV Yt IRl- AAi N.W., WANT HNC,ION, I).C 20006
ARTICLE 1
THE CONTRACT DOCUMENTS
the ( onlrart I),,, ulr rr <:vr of nl tl -; Aglormen, ( ,1,-; ,1 S upplernentary and other
onditionrl, l)r,ns inLy. Spin lb( oon, nl Vddcn(I 4is<reri poor tr: exrrunIM of Ihl A;Ill romect and all Modifications
is,ucd suhsequent theleto iIre e loon the Cmono(' and .ill ,I! r hilts ,; p,trl of ;hi} l ontract ac It attar bed to this
\;regiment or ;r pe.'led herein. An enur.lrrdliu 1 a the t oitun El( umoni,. appears in Article 7.
ARTICLE 2
THE WORK
the Contra(to, ,hall perform all the \York required by the Cont,ac t Hot uments for
The removal of existing roof, repair, and replacement of a new roof;
removal of exterior paint and repainting; remodeling restrooms ; con-
structing a ramp at main entrance, constructing an exterior stairway
on west end of building , and other work as required per specifications.
ARTICLE 3
TIME OF COMMENCEMENT AND COMPLETION
the AMork IL, I , peitorrhAd undo) this l id) I I ,hall he (CHM`, need July 15 , 1980
arida.rmpteted November 12 , 1980
LIQUIDATED DAMAGES: If the work embraced by this contract is not com-
pleted on or before the date set for completion or any extension there-
of, the actual damages for delay will be impossible to determine and in
lieu thereof, the Contractor shall pay to the Owner as fixed, agreed and
liquidated damage, the sum of fifty dollars ($50) per day for each calen-
dar day of delay until the work is satisfactorily completed. Whatever
sums may be due the Owner as liquidated damages for delay may be deducted
from payments due the Contractor or may be collected from the Contractor
or Contractor' s surety.
ALA D(1(IJMINr A101 • (1AAN14:-iONrRAC t(1R AU triAttNI • tSNtmSri't 11)71 lhIi(1;; • MAO') • ?`I974
lIll A`t 5t( \.N INSlrlllll t,I AR(Hill( Is m15 NI AV lint. AAl. , N •A.. w'Asl UN( 1N, D. C. 20006 2
ARTICLE 4
CONTRACT SUM
The Owner shall pay the Contractor for the performance of the Ab'ork, subject to additions and deductions by Change
Oder as ibis i led in the ( nndlti ins of the ( ontr.,rl. in r lireel nook, Ira" CuntrtcI ,Burn of
Forty eight thousand five hundred twenty one dollars (48 ,521. 00)
ARTICLE S
PROGRESS PAYMENTS
Ir,nr•rl upon Apphr„lions trip Pasnwni submitted to the Arc lute,I by IIe C (ultra( for and terrificales for Payment issued
bs the :Arc Inter I the On rim shall nt,Ike plogress payments OO an r oust of the Contra:I Sum to the Contractor as pro-
v riled in tire Cnndrlrons of the Contra(l as foliov::
(hl nrr about the fifteenth (15th) day or ea( month ninety (90) per rent of
the ea Ipertinn nt the Ilaltract Sum peepedV wile(able In lab„r. main (,a1. and cywpment incorporated in the Work
.rod ninety (90) per rent of the portion or the ( antra t Arm properly allocable to materials and
enlurpmenl sure -hly ,cored at the sire or at some other tot al:on aprrr d upon in writing by the parties, up to
five (5) days prior t„ the (late on o,hn h the Apnlrralum ton Payment is submitted, less the aggregate
ui elev iou+ pat nx 1's in ear Er aso: an i upon Subslanlial i. or,plr t: n of the entire Work, a sort sufiir ie_nt to al(tease
the totar pasnlenb 'lone hundred (100) per ,( tit Mt. ( 'nvrart bunt, less sw-h relaine+,es as the Architect
rh.+ll tlr rer,nine ter aii mrunlplete Abur'k and ere( Itleri ( Lem,
The Owner shall retain ten percent (10%) of the amount of each payment
until final completion and acceptance of all work covered by the Con-
tract Documents. The Owner may reduce the retainage to five percent
(5%) on the current and remaining estimates after fifty percent (50%)
of the work has been completed, if he finds that satisfactory progress
is being made.
Payment requested on the basis of materials and equipment not yet in-
corporated in the Work, but delivered and suitably stored at or near
the job site , shall be accompanied by supporting data (e. i. invoice,
etc. ) satisfactory to the Owner. Otherwise payment for such materials
on site will not be made.
\nt mono), not paid when due to either par under this I nntIact shall hear interest at the legal rate in force at the
plate is the I'utject.
AIA I)O(Un1FN1 A101 • UlA'NIR r O\11: ,Arl'Rft AtrA1 • ts'a aus i'r'-t IDi11 ,N • )11/Vet • C,1974
no Asurttlr lA rNslltl!It rH \KrLllrr i. CIs tilAti srrck A.Ar "1VA . A.% AIUN0ruN, R(. ).6006 3
ARTICLE 6
FINAL PAYMENT
- l final pas nu-nt, (onstiluting the entire unpaid halanc e of the Connie t Sum, shall he paid by the Owner to the
Cunlrartrn (lays alter Subst.le,tial ((trephine,' of the Work unless otherwise stipulated in the
t.c-crtiiicate of tellecantial Completion, provided the Work has dein been completed, the Contract fully performed,
and a final Certilieue for Pat,rent has been issued by the Architect.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.7 leans used in this Agreement which are defined in the Conditions of the Contract shall have the meanings
des,goated in those Conditions.
7.2 The Contract Documents,which constitute the entire agreement between the Owner and the Contractor, are listed
or Article 1 and, except for Modifications issued after execution of this Agreement,are enumerated as follows:
Jsr betvn tiff. Atireer err (onddmn, of the Contract (ceneral, Supplementary, and ntl¢v (onhoons), Drawings, Specifications, Addenda and accepted
Alrvmatns, -10,Virig pge or ,sheet numbers in all rases and dares where applicable)
A. Bid Form, Dated: /M 7 /Sto
B. Bid Bond, Dated: (v .rze ej Cited'de/ T4 ?y,• to
C. Conditions of Contract , Page 0-10 thru 0-11
D. Summary of Work, Page 1-1 thru 1-3
E. Project Closeout, Page 1-4 thru 1-6
F. Cleaning, Page 1-7
G. Project Record Documents , Page 1-8 thru 1-9
H. Demolition and Salvage, Page 2-1
I. Concrete, Page 3-1 thru 3-2
J. Drawings , 3 Sheets , Dated: April , 1980
This Agreement executed the clay and year first written above.
ti'NCh /J C< T ACT( %k�
,r, '.- o,10
Chairman, Board of County Commissioners • c-it- - __
NIA DUCUMI-NI '.1U1 • UbbNIK-(-UAIRAt InO A(INII'.P • Iv. s ,} if ffff ,.Ille I • AIAi
flit- AMERICAN INSulun (,I AR( tllltf Is. I'h NIX rrkK .. dS\SI II .(IIr,N, C1 ( _:S14 , 4