HomeMy WebLinkAbout20033554.tiff MEMORANDUM
TO: Chris Gathman Planner II DATE: 10
/14/2003
FROM: Donald Carroll, Engineering Administrator Ii
DC SUBJECT: USR-1402, Amheim, LLC
COLORADO
On October 10, 2003, I visited the site to verify if any site grading or construction was completed prior to
submitting the Improvements Agreement. In referring to the Exhibit A portion of the Improvements Agreement,
the applicant indicated that site grading is complete and the only outstanding item would be the fencing
requirement.
There is some steel fabrication stockpiled on site with no other improvements visible. In reviewing the
Improvements Agreement for the transportation portion, I recommend that an item be placed for site grading
and street base for the parking lot area and the approach road in addition to the fencing requirement.
There is an existing retention pond on site, which is also being utilized by the storage unit facility located
directly west of the proposed USR.
Rework the Exhibit A portion including site grading and street base along with the fencing requirement, then
resubmit for review and approval prior to scheduling with the BOCC.
pc: USR-1402 M:\PLANNING\USR-2.DOC
•
c71OD3 35-6 27
CA
Hello