Loading...
HomeMy WebLinkAbout20033554.tiff MEMORANDUM TO: Chris Gathman Planner II DATE: 10 /14/2003 FROM: Donald Carroll, Engineering Administrator Ii DC SUBJECT: USR-1402, Amheim, LLC COLORADO On October 10, 2003, I visited the site to verify if any site grading or construction was completed prior to submitting the Improvements Agreement. In referring to the Exhibit A portion of the Improvements Agreement, the applicant indicated that site grading is complete and the only outstanding item would be the fencing requirement. There is some steel fabrication stockpiled on site with no other improvements visible. In reviewing the Improvements Agreement for the transportation portion, I recommend that an item be placed for site grading and street base for the parking lot area and the approach road in addition to the fencing requirement. There is an existing retention pond on site, which is also being utilized by the storage unit facility located directly west of the proposed USR. Rework the Exhibit A portion including site grading and street base along with the fencing requirement, then resubmit for review and approval prior to scheduling with the BOCC. pc: USR-1402 M:\PLANNING\USR-2.DOC • c71OD3 35-6 27 CA Hello