HomeMy WebLinkAbout20042888.tiff CHANGE ORDER NO. 1 Potholing Services for WCR 47, Between WCR 50 and 54 Date: Project: Potholing Services for WCR 47,Between WCR 50 and 54 as described in the Request for Bids,Dated: June 22,2004 Owner: Weld County, Colorado Contractor: Colorado Boring Company The following change is hereby made to the Contract Documents: 26 Additional Potholes @$125 per pothole. CHANGE TO CONTRACT PRICE: Original Contract Price: $ 4,250.00 Current Contract Price adjusted by previous Change Order: $ 4,250.00 The Contract Price due to this Change Order will be increased by: $ 3,250.00 The new Contract Price,including this Change Order,will be$ 7,500.00 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 calendar days. The date for completion of all Work will be August 20,2004 . RECOMMENDED: Owner Representative: Date: Engineer: C 1 ir— Date: 9/7.4/0`f APPROVALS: / Contractor: _ — Date: 1/4//:"b� Owner: Date: 81/04 Owner: N Date: SEP 2 9 2004 Robert D.Masden,Chair eld County Cle,k to the Board (SEAL) F 186! r ,jg"A O • Deputy Clerk to j Al fES TO 9' P.0 GruP1TY M:\-Active Projects WCR 47,WCR 5 A 54\Construcfion\Contracts\POTHOLING CHANGE ORDER doc /O—a(o-01/ cCI . PA))/t, Q5e.. COQ `C6 • . a i MEMORANDUM CTO: Clerk to the Board DATE: September 23, 2004 • COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Agenda Item Change Order No. 1 for WCR 47 Potholing Contract with Colorado Boring Company. Enclosures pc: Dean Dreher Cameron Parrott M:\Franc ie\Agend-I.doc h.5 I � 4 LJ1 2004-2888 MEMORANDUM Date: September 23, 2004 1"1! To: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer VIDe From: Cameron Parrott, P.E., Engineer II ( COLORADO RE: Change Order No. 1 for WCR 47 Potholing Contract The potholing/utility-locating has been completed for the contract for potholing services on WCR 47, between WCR 50 & 54. The contract was set up based upon a cost per pothole. There were 34 potholes initially estimated. The cost from Colorado Boring Company was $125/pothole for a total contract amount of$4,250.00. After utility locates were performed, it was determined that more potholes would be needed to avoid conflicts with utilities during road construction. Colorado Boring Company finished 60 potholes total. This is an increase of 26 potholes at $125/pothole for a total change order increase of $3,250.00. The final contract amount with the change order would be $7,500.00. Hello