Loading...
HomeMy WebLinkAbout20040795.tiff 03/25/2004 15:28 FAX 970 350 9800 CITY OF GREELEY C0M DEV O001 • (3uifi \\ Weld County Referral ' February 25, 2004 WI p e COLORADO The Weld County Department of Planning Services has received the following item for review: _ - - Applicant Prima Oil and Gas Case Number USR-1467 Please Reply By March 25, 2004 Planner Sheri Lockman Project A Site Specific Development Plan and Special Review Permit for an oil and gas production facility(nine oil and gas wells) In the I-1 (Industrial) Zone District. Legal Part of Section 34, T6N,R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to Hwy 257; south of and adjacent to CR 64. • Parcel Number 0807 34 000012 & 0807 26 000039 . • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. if you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) April 6, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests, See attached letter. Comments: • Signature Date OS-•,..2 S--oR Co V Agency / :Weld County Planning Dept. 1555 N. 17th Ave. Greeley, CO.80631 t(970)353-6100 ext.3540 ?•(970)304-6498 EXHIBIT O795 03/25/2004 15:28 FAX 970 350 9800 CITY OF GREELEY C0M DEV 2002 OFFICE OF COMMUNITY DEVELOPMENT City of Planning Division Greeley 1100 10'"Street,Suite 202, Greeley, Colorado 80631 • (970)350-9780 • Fax(970)350-9800 • www.greeleygov.com March 25,2004 Sheri Lockman Weld County Department of Planning Services 1555 N. 17th Avenue Greeley, CO 80631 Subject: USR-1467 Dear Ms. Lockman: Thank you for the opportunity to review this Site Specific Development Plan and Special Review Permit of an oil and gas production facility. The City of Greeley Planning staff has reviewed the application for this USR from Prima Oil and Gas located east of and adjacent to HWY 257 and adjacent to WCR 64 and wish to forward the following comments. This proposal is outside the City of Greeley 2020 Growth Area. It is suggested that landscaping be provided along both Highway 257 and WCR 63 to screen the facility. The Greeley Public Works Department noted a reservation of a minimum of 75' of right-of-way from the centerline of Highway 257 and 60' of right-of-way from the centerline of WCR 64 would be appropriate to facilitate future development of this area if the proposal is approved by the County. Also, with the proximity of this property to Windsor it is advised that Windsor be notified of this request. Sincerely, Kay Eyl Planning Technician SERVING OUR COMMUNITY • I T ' S A TRADITION We promise to/reserve anJfmproue fEie yual y of 119G for 9reeley/Firousu Timely, courteous and.cosi e/ec/iue service. MEMORANDUM TO: SHERI LOCKMAN, PLANNING SERVICES T I FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH SUC. B E MARCH 22. 2200 CT: PRIMA OIL AND GAS D. COLORADO CC: Environmental Health Services has reviewed this proposal for an oil and gas production facility (nine oil and gas wells). We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division (APCD), Colorado Department of Health and Environment. Alternately, the applicant can provide evidence from the APCD that they are not subject to these requirements. 2. According to the application materials submitted the site will temporarily store oil and water in aboveground storage tanks. Therefore, the applicant shall submit evidence of an Aboveground Storage Tank permit from the Colorado Department of Labor and Employment (CDL&E), Oil Inspection Section for any aboveground storage tanks located on the site. Alternately, the applicant can provide evidence from the (CDL&E), Oil Inspection Section that they are not subject to these requirements. 3. In the event that 1 or more acres are disturbed during the construction and development of this site, the applicant shall inquire with the Water Quality Control Division (WQCD) of the Colorado Department of Public Health and Environment if they are required to obtain a stormwater discharge permit. Alternately, the applicant can provide evidence from WQCD that they are not subject to these requirements. 4. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. The applicant shall operate in accordance with the approved "waste handling plan". 5. The operation shall comply with all applicable rules and regulations of the Colorado Oil and Gas Conservation Commission. 6. If applicable, the applicant shall comply with all provisions of the Underground and Above Ground Storage Tank Regulations (7 CCR 1101-14). 7. Fugitive dust and fugitive particulate emissions shall be controlled on this site. 8. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in 25-12-103 C.R.S., as amended. 9. Adequate toilet facilities (port-a-potty) shall be provided during the construction of the facility. 10.Bottled water shall be utilized for drinking and hand washing. 11 .All potentially hazardous chemicals must be stored and handled in a safe manner 2 in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). 12.If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 3 Weld County Referral 1 Februar 25 2114 oKFrFivFi COLORADO I I MAR U The Weld County Department of Planning Services has received the following item f rIfittrCOUNTY PUBLIC WORKS DEPT Applicant Prima Oil and Gas Case Number USR-1467 Please Reply By March 25, 2004 Planner Sheri Lockman Project A Site Specific Development Plan and Special Review Permit for an oil and gas production facility(nine oil and gas wells) in the I-1 (Industrial)Zone District. Legal Part of Section 34, T6N,R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to Hwy 257; south of and adjacent to CR 64. Parcel Number 0807 34 000012 & 0807 26 000039 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) April 6, 2004 0 We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. kSee attached letter. Comments: Signature / // �f Fill L` ta /Ax Date 3 _ -L; y•Agency 1111 /I24L L +Weld County Planning Dept. +1555 N. 17th Ave. Greeley, CO. 80631 +(970)353-6100 ext.3540 4•(970)3046498 fax • .iu County Planning Department GREELEY OFFICE 7-70 se.3/4--. 1 MAR 1 6 2004 • MEMORANDUM RECEIVED I "0 1, TO: Sheri Lockman, Planner II DATE: March 15, 2004 C� FROM: Donald Carroll, Engineering Administrator LL;4 COLORADO SUBJECT: USR-1467, Prima Oil and Gas The Weld County Public Works has reviewed this proposal; this project falls primarily under the purview of the Use by Special Review Standards, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Our comments and requirements are as follows: COMMENTS: Access: From the Weld County Access Information Sheet and the plat drawing provided with the application, it appears that the access points are from State Highway 257 or from the internal Kodak road system. REQUIREMENTS: .ccess: The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the state highways. Please contact Gloria Hice-Idler or Tess Jones at the Greeley office to verify the access permit or for any additional requirements that may be needed to obtain or upgrade the permit. Notification to Eastman Kodak should be verified by Planning Services or the Public Works Department. The Town of Windsor annexed the part of Section 34 which appears to be in the proposal. Verification is needed from the Town of Windsor indicating that they are aware of the proposed USR and had an opportunity to comment. pc: USR-1467 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1467, Prima.DOC WELD COUNTY ROAD ACCESS INFORMATION SHEET Road File#: Date: Februry 18, 2004 RE#: Other Case#: Weld County Department of Public Works 111 H Street, P.O. Box 758, Greeley, Colorado 80632 Phone: (970 )356-4000, Ext. 3750 Fax: (970) 304-6497 1. Applicant Name Prima Oil & Gas Company Phone (303) 297-2300 Address 1099 18th Street, Suite 400 City Denver State CO Zip 80202 2. Address or Location of Access from Colorado 257 to the existing dirt road at the SW corner of the NW/4SW/4 of Section 34 which is owned by the Town of Windsor which crosses the SW/4 from West to East. Section 34 Township 6 North Range 67 West , Subdivision _ Block_Lot_ Weld County Road#: Side of Road Distance from nearest intersection 3 Is there an existing access(es) to the property? Yes X No_ #of Accesses One . 4. Proposed Use: X Permanent Residential/Agricultural Industrial Temporary Subdivision Commercial Other 5. Site Sketch uwv 257 Legend for Access Description: AG =Agricultural RES = Residential Kodak Road I O&G = Oil&Gas Entrance a R. = Hoch Road � = House =Shed NT OFFICIAL USE ONLY: Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement Culvert Size Length Special Conditions 9 Installation Authorized Information Insufficient Reviewed By: Title: -8- { - iii r ,11; ... Kodak 34 22 '" r+ _ _ (N190 from i ��F - - 1<. � - 1. — Center) ,.« ,,,. ,�, •Kodak 34-12 i( •••`, Kodak 34-21{�Q{ i it t ly r 4 r -n, . i`' ,a f� M r# , (S 190 from Center) Kodak 34-23 T \--$.41,1: 4T' (W 75'from i Kodak 34-13 Kodak 34-14 ' t� Center) R_ ti(, . , p^�, j n : (S 190'from (S 190'W 190 _, .,, rwK a f f" r�a Center) g1 from Center) _JJ 5 '« „�" "rISS."it K3` Kodak 34241® y if } tc, ,y h p pu Y. },. 5< � h G '� 'Ism > 'hfl ;� u i ;•+AV F` > w. ret, ' 4A s �� 1;\ any 4:, 01,114 •1 • nib. �` h ' t5,p trrkas_.. w Kotlak 34-4>2 _ r �, 4 Y f h _ _ _ �+Y�� S 3•u ix. w � 1 If ,ri' S le N , ¢n.. IF 01-1.1 you nt4 Cpprado • _2 / a „, .„80! i Hwy 257 i Mini • 17 ritrlis;„), Weld County Referral 1 February 25, 2004 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Prima Oil and Gas Case Number USR-1467 Please Reply By March 25, 2004 - Planner Sheri Lockman Project A Site Specific Development Plan and Special Review Permit for an oil and gas production facility (nine oil and gas wells) in the I-1 (Industrial)Zone District. Legal Part of Section 34, T6N,R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to Hwy 257; south of and adjacent to CR 64. Parcel Number 0807 34 000012 & 0807 26 000039 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) April 6, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑/We have reviewed the request and find no conflicts with our interests. E See attached letter. Comments: Signaturejec (J Date C� Agency 6Ciadt 4 //J�PGT7svt :•Weld County Planning Dept. •.1555 N. 17th Ave. Greeley, CO. 80631 •.(970)353-6100 ext.3540 •.(970)304-6498 fax . Q DEPARTMENT OF BUILDING INSPECTION - ‘ti, st:: Weld County Administrative Offices 1555 N. 17th Avenue, Greeley, CO WEBSITE: www.co.weld.co.us Phone (970) 353-6100, Ext. 3540 Fax (970) 304-6498 WilC. COLORADO March 9, 2004 Prima Oil and Gas Site Specific Development Plan and Special Review Permit for an oil and gas production facility (9 oil and gas wells) in the I-1 (Industrial) Zone District. USR-1467 Permits will be required for the installation of all new equipment and all electrical work, but not for the replacement of equipment on existing foundations, including the piping and electrical connections to that equipment, norfor the addition of minor equipment such as filters and coolers, however electrical permits are required for any new electrical circuits provided to added equipment. Permits are not required for process piping for liquids or gas. Please contact me for any further information regarding this project.ági1P y, Plans Examiner Service,Teamwork, Integrity,Quality �, ail tE Weld County Referral 111k. February 26, 2004 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Prima Oil and Gas Case Number USR-1467 Please Reply By March 25, 2004 Planner Sheri Lockman Project A Site Specific Development Plan and Special Review Permit for an oil and gas production facility(nine oil and gas wells) in the I-1 (Industrial)Zone District. Legal Part of Section 34, T6N,R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to Hwy 257; south of and adjacent to CR 64. Parcel Number 0807 34 000012 & 0807 26 000039 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) April 6, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan 14 We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Co ments: lAcrn \ ( \lr ;.C Et ic\ C ctIl.c! r', ( N.'1/4 ( ( , nr• \CIGk\-icy tC< 1 Signature Riy-Ok AimDate Z • Z7 -C(. t Agency [t) ), t�< ( F\1k AkrKk ❖Weld County Planning Dept. +1555 N. 17th Ave. Greeley, CO. 80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax • £}iT Of. ms`s • \v� DEPARTMENT OF THE ARMY r// Z CORPS OF ENGINEERS,OMAHA DISTRICT 4 �I '' E 1\I'^ DENVER REGULATORY OFFICE,9307 SOUTH WADSWORTH BOULEVARD a ;!IL,�M LITTLETON,COLORADO 80128-6901 p �lt March 3, 2004 Ms. Sheri Lockman Weld County Planning Department 1555 N. 17th Ave. Greeley, CO 80631 RE: Prima Oil and Gas Production Facility, Case No. USR-1467 Corps File No. 200480106 Dear Ms. Lockman: Reference is made to the above-mentioned project located in Section 34, Township 6 North, Range 67 West, Weld County, Colorado. If any work associated with this project requires the placement of dredged or fill material, and any excavation associated with a dredged or fill project, either temporary or permanent,in waters of the United States at this site, this office should be notified by a proponent of the project for proper Department of the Army permits or changes in permit requirements pursuant to Section 404 of the Clean Water Act. Waters of the U.S. includes ephemeral, intermittent and perennial streams, their surface connected wetlands and adjacent wetlands and certain lakes, ponds, drainage ditches and irrigation ditches that have a nexus to interstate commerce. Work in waters of the U.S. should be shown on a map identifying the Quarter Section, Township, Range and County of the work and the dimensions of work in each area of waters of the U.S. If there are any questions concerning this matter please call Mr. Terry McKee of this office at 303-979-4120 and reference Corps File No. 200480106. Sincerely, Tim.thyT. Carey Chief, I •-r Reg. .to Office 200480106 Weld County Referral . ` WilkFebruary 25, 2004 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Prima Oil and Gas Case Number USR-1467 Please Reply By March 25, 2004 Planner Sheri Lockman Project A Site Specific Development Plan and Special Review Permit for an oil and gas production facility (nine oil and gas wells) in the I-1 (Industrial) Zone District. Legal Part of Section 34, T6N,R67W of the 6th P.M., Weld County, Colorado. t Location East of and adjacent to Hwy 257; south of and adjacent to CR 64. Parcel Number 0807 34 000012 & 0807 26 000039 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) April 6, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Signature Date 1:..OtA Agency C L.:0 +Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax Applicant: Prima Jil and Gas Planner: Sheri Lockman Case#: RE- 1467 . ., I I i xV z , r,,,,,..!. .r, {� rnlV. P fha ,-.,,,,,, ,,,r,,,,,,,,,,,, ,- ! ' .'T fi r $ � K '��."'z rfT-4"'9rW ^l. r 3u+ rt. �", c- 3 „t Ys Trk l ''q � '�}*." 2 u. i It. 3 i > " . T ` h Yf i ,N, h / IA 3#*i /4 fi� r,+m +r11 itr r••• • t 4' Etkd t r{'3-sar� I ���'�r�i R Lltt I I -1,..'i4'."'- C ;�Y x' 4 &. r 4 Sri s 7,____ ... _ , _ , ,_ , 0.4 0 0.4 0.8 Miles m Weld County Referral Map Highways Major Roads i r' A/ Local Roads N Railroads 2. Streams&Ditches \ / PLSS Soils W p\ E 41. Lakes Floodplains S t I • West Greeley Conservation District (970) 356-8097 ' Case Number: RE-1467 Applicant: Prima Oil and Gas Planner: Sheri Lockman s -Below is a list of the soils and their limitations according to the USDA, Weld County Soil Survey. Map Shallow Dwellings Dwellings with Small Septic Tank'Prime Farm Symbol Soil Name Soil Texture Excavations without basements Commercial Absorption Land (if Additional Comments basements Buildings Fields irrigated) 3 Aquolls Gravelly Substratum Severe Severe Severe Severe Severe �No West Greeley 10 Bankard Sandy Loam Severe Severe Severe ,Severe ISevere No Conservation District ) , always discourages l building within a floodplain. The West Greeley Conservation District recommends that the applicant does an on site soils testprior to any- construction. For soils amore complete soils description consult the Weld County Soil Survey or contact our office at (970) 356-8097. If you or the applicant have any questions please feel free to call our office. ONSERVATI0N Produced by the West Greeley Conservation District Hello