HomeMy WebLinkAbout20040372.tiff AGREEMENT
Concrete Lined Ditch
THIS AGREEMENT,made this 26th day of January , 20 04 , by and
between Weld County, Colorado, hereinafter called "County" and
Can-Do Concrete Construction, Inc. doing business as
(an individual, ) or (a partnership,) or (a corporation) hereinafter called "Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The Contractor will commence and complete the following: Concrete Lined Ditch
described in the Invitation for Bids dated Nov. 18, 2003.
2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other
services necessary for the construction and completion of the Project described herein.
3. The Contractor will commence the work required by the Contract Documents within ten
(10) calendar days after the date of the Notice to Proceed and will complete the work
required within thirty (30) calendar days after the date of the Notice to Proceed, unless the
period for completion is extended otherwise by the Contract Documents.
4. The Contractor agrees to perform all of the Work described in the Contract Documents and
comply with the terms therein for the sum of$ 14,170.00 , or as shown in the
Bid Schedule.
5. The term "Contract Documents" means and includes the following:
(A) Invitation for Bids
(B) Instructions to Bidders
(C) Bid Proposal
(D) Required Project Forms
(E) Agreement
(F) Notice of Award
(G) Notice to Proceed
(H) Notice of Acceptance
(I) Specifications prepared or issued by the Weld County Pub. Works Dept.
(J) Colorado Department of Transportation "Standard Specifications for Road
and Bridge Construction"
(K) Colorado Department of Transportation Standard Plans"M & S Standards"
(L) Addenda:
No. , dated , 20
No. , dated , 20
6. The Owner will pay to the Contractor in the manner and at such times as set forth by the
Contract Documents, or otherwise agreed upon in writing.
q 2004-0372
0 ����J-O'I (•(+ i
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
8. Contract Appropriations: The Owner hereby states and affirms that the amount of money
appropriated for this Contract is equal to or in excess of the Contract amount. No change
order to this Contract requiring additional compensable work to be performed, which work
causes the aggregate amount payable under the Contract to exceed the amount appropriated
for the original Contract shall be issued by the Owner unless the Owner assures the
Contractor, in writing, that lawful appropriations to cover the costs of the additional work
has been made or unless such work is covered under a remedy-granting provision
contained in the Contract.
IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly
authorized officials, this Agreement in three (3) copies each of which shall be deemed an original on the
date first above written.
ORDERED BY: ACCEPTED BY:
THE BOARD OF WELD
COUNTY COMMISSIONERS CONTRACTOR
BY OA ` BY ��2O)e_.--- /1/-Xf- --5
NAME Robert D. Masden NAME Pedro R. Gutierrez
(Please Type)
TITLE Chair TITLE President
Date 01/26/2004 ADDRESS 401 N. 21st. Ave.
Greeley, CO. 80631
(SEAL) A (SEAL)
ATTEST: sty
ATTEST:
w� !! 1 l3-J/p
/�-v v-.r
4 )�
Weld Count Clerk to` e' ���?� � -/�,)( 6
BY i A BY Inez Gutierrez
Deputy Clerk to the:B'c 4 ' 1 (Please Type)
TITLE Secretary
MEMORANDUM
CTO: Esther Geisick, Clerk to the Board DATE : January 21, 2004
•
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Chair's Signature - Consent Agenda
Please submit the enclosed item for the Board's next Consent Agenda.
Agreement for Concrete Lined Ditch with Can-Do Concrete Construction, Inc.
Enclosed are three original agreements. Please send two original agreements to Public
Works as soon as they have been signed by the Chair.
The appropriate documentation is enclosed.
Enclosures
pc: Cameron Parrott, Engineering
C:\Documents and Settings\fcollins.COWELDCO\Desktop\AGENDA-I.DOC
Hello