Loading...
HomeMy WebLinkAbout20042735.tiff CHANGE ORDER NO. 2004 Slurry Seal Projects Date: August 26, 2004 Project: 2004 Slurry Seal Projects described in the Invitation for Bids,Bid No.B0400034 Owner: Weld County,Colorado Contractor: Quality Resurfacing CO The following change is hereby made to the Contract Documents: Additional mobilization cost to complete missed section. CHANGE TO CONTRACT PRICE: • Original Contract Price: $ $808,116.42 Current Contract Price adjusted by previous Change Order: $ $808,116.42 The Contract Price due to this Change Order will be increased by: $ $2,656.00 The new Contract Price,including this Change Order,will be$ $810,772.42 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 1 calendar days. The date for completion of all Work will be Completed RECOMMENDED: i Owner Representative: 'om. - /isujiil Date: £ 26 "- ) �/ Engineer: //Tn Date: APPROVALS: Contractor. � �w i� Date: S 12:1 ( 4 �(/j p Owner: / /i Date:04 Chairman, Bo of u y C mi -'•`� ATTEST: ;is6i °, '- '�WELD C• NTY CLERK-1O T�' B�� R� �;,,y. S. BY: DEPUTY CLE . O HE BOARD � UN 1>'� Page 29 €(rPOS l 2004-2735 0 -o8-oy (10 P(,(w/ ( f1z, K ,7 MEMORANDUM TO: Clerk to the Board DATE: August 30, 2004 COLORADO FROM: Frank B. Hempen, Jr., Director of Public Works/County Engineer SUBJECT: Agenda Item Change Order No. 1 for the 2004 Slurry Seal Project. The appropriate documentation is attached. Enclosures pc: Keith Meyer, P.E. Dean Dreher NI:AFrancfeVAgenda-2.doc KistLe".•• MEMORANDUM CTO: Keith Meyer, P.E., DATE : 8/30/2004 • Engineering Division Manager COLORADO Clerk to the Board FROM: Dean Dreher, Civil Tech III SUBJECT: Chair's Signature Item Please submit the enclosed item on the signature agenda. Change Order No. 1 for Public Works Project 2004 Slurry Seal. Change Order No. 1 is to revise the contract between Weld County and Quality Resurfacing Co. for the mobilization and seal coat work on 4000 feet of Weld County road 52. The Change Order includes an increase to the project cost for completion of work requested by the Public Works Department. Additional contract time to perfoun the extra work will be included in the Change Order. The appropriate documentation is enclosed. Enclosures pc: Dean Dreher, Civil Tech III M-A—Maintenace Contracts,Slurry Seal\2004VChange order AGENDADOC Hello