HomeMy WebLinkAbout20040691.tiff RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF WELD COUNTY ROAD 74 BETWEEN WELD COUNTY ROADS 35 AND
37 FOR FOUR WORKING DAYS, FOR INSTALLATION OF STORM SEWER
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance,temporarily close to
through traffic or to all vehicular traffic any highway or portion thereof
for a period not to exceed a specified number of work days for project
completion and shall, in conjunction with any such road closure
establish appropriate detours or provide for an alternative routing of
the traffic affected...", and
WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW,THEREFORE,BE IT RESOLVED that the Board of County Commissioners of Weld
County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads
and any intersections thereof,and it hereby authorizes and orders the posting of such traffic control
devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the
safety of the general public and that said traffic control devices shall conform to the Federal Manual
on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado,does declare and establish that Weld County Road 74 between Weld County Roads 35
and 37 be temporarily closed,with said closure being effective March 15,2004,for approximately
four working days for installation of storm sewer, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
2004-0691
EG0024
06 : ,17c� C'0�.,-; ,co, CSA' z'If
ROAD CLOSURE - WCR 74
PAGE 2
The above and foregoing Resolution was,on motion duly made and seconded,adopted by
the following vote on the 8th day of March, A.D., 2004.
BOARD OF COUNTY COMMISSIONERS
W�D COUNTY, COLORADO
'/1 ATTEST: eil Eta `�nU1y(\� -----_
Robert D. Masden, Chair
Weld County Clerk to th ':o .�"�._ S�
' William H. Jerke, Pro-Tem
BY:
Deputy Clerk to the Boa . � EXC SED
M. eile
APPROVED AS TO FORM:
Da;Long
County Attorney
Glenn Vaad
Date of signature: 119
2004-0691
EG0024
FEB 27 '04 12:27PM NCTC P.1/3
NORTHERN COLORADO TRAFFIC CONTROL, INC
P. O.Box 1826
Greeley, CO 80632
Phone 970-356-6881
Fax 970-356-5862
FAX COVER SHEET
DATE: FEBRUARY 27, 2004
TO:WELD COUNTY PUBLIC WORKS
ATTN: TED EYL
FAX 11: 304-6497
FROM: LUANN LEIDING
NUMBER OF PAGES INCLUDING THIS SHEET: 3
TED,
Here is plans,submitted in December, for GLH Construction,to close WCR 74 to install a storm
sewer pipe. We have also included a plan showing the positioning of Variable Message Sign
Panels,that will be placed out on March 8th,stating that WCR 74 shall be closed,March 15th
through March 19th. If you have any questions,please feel free to call us.
Thank You
Luattn Leiding
Project Manager
N a
w W—4›.- ]s a
ROAD 4 n ROAD w -
S
AHEAD CLOSED WORK z m
AHEAD AHEAD E A.
a
j U 3
2
DETOUR ROCLO® I} H
AHEAD
ROAD
13 i;: DETOUR CLOSED
®� ROAD I AHEAD AHEAD
WCR74 CLOSED
-1
I
I r
DETOUR 'J�SE�V
ROAD AHEAD v "N°le
WORK 1RRIItRgR:
AHEAD / ROAD
AHEACLOSED DETOUR 4( :-I
♦ ROAD ROAD
WORK WOE
AHEAD AHEAD
MMUS Yuen
CUBED
F DETOURir\ '1E=DETOUR "" GOVERNOR'S RANCH PROF.PARK
H / f VIER 74CLOSUREIEATOH S(2605
faMliwm
GLH CONSTRUCTION N.C.T.C
en 1
i Mow eRRQa nED
MOMmr�xn �UR - ;(970)6740440 D RIR�EV 31�
R¢wen Ulna 12 I { wmtuR wan R.o�4
t _ —>. \ ctasm I Lawn Leiding,TCS,DS
\ VIEWER??
4T•
•
N L
R
W E c
,2,, LI
z - S W
Ric USr
a
x VARIABLE z
n MESSAGE n
I-' BOARD n
VARIABLE @ SH85
• MESSAGE f
BOARD
WCR 74
•
VARIABLE vi MESSAGE
BOARD
NOTE:
MESSAGE BOARDS WILL BE PLACED ONE WEEK
IN ADVANCE OF WORK BEGINNING STATING THAT
THE ROAD WILL BE CLOSED.
INFORMATION TO BE GIVEN:
DATES OF CLOSURE
CLOSURE FORM WHER TO WHERE
ALTERNATE ROUTE SUGGESTION. ,bin._---------______..-.._._._..___.--- ---..__-_-
GOVERNOR'S RANCH PROF. PARK
WCR72 ;WCR74CLOSURE/EATON Sj2605
A1maanlator lWlWeartdC�lebiu
i GLH CONSTRUCTION N.C.T.C.
I A e.. lira @L:fe aM1
• Er
i(970)674-0440 MHT112REV ---.._ 312/04
Luann Leidmg,TCS,DS
MEMORANDUM `:; : s
„331 : '.".? II: J7
REP
TO: Board of County Commissioners DATE: March 1, 2004
•
COLORADO FROM: Frank B. Hempen, Jr.,
Director of Public Works/County Engineer
SUBJECT: Agenda Item
Road Closure: GLH Construction will close WCR 74 between WCR 35 and WCR 37 to
install a storm sewer. The road is scheduled to be closed from March 15 to March 19, 2004.
Enclosures
pc: Ted Ey]
M:\Francie\Agenda.doc
2004-0691
Hello