Loading...
HomeMy WebLinkAbout20042645.tiff FINAL PLAT APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT/AMOUNT# /$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number LI ( ≤L- 11-Q- D (,- oi c (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessors Office,or www.co.weld.co.us). (Include all lots being included n� P in the final plat area.s If additional space is required,ir attach an additional sheet) / Legal Description /v�(� 7412 JW /y' , Section2'7, Township North, Rang‘7 West Lot/Block: Zone District: f' io , Total Acreage: p /�O Overlay District: FEE OWNER(S) OF THE �/C Name: I / /Been ede d eAie2ieh h -17 Work Phone#720 S3O 513 1 Home Phone#970 537 4/3S Email Address T4(d0/) ej w Address: %.?ng Ad St/ City/State/Zip Code .ZAn3 f own (eJ 196-3 V Name: C/i‘ 4-QeAs Work Phone# Home Phone# Email Address Address: Sd/» P City/State/Zip Code APPLICANT OR AUTHORIZED AGENT (See Below:Authorization must accompany applications signed by Authorized Agent) Name: Work Phone# Home Phone# Email Address Address: City/State/Zip Code NAME OF SUBDIVISION lfe ( L_w,(.GS /' ? YICfa UTILITIES: Water: j. '(y(// w ",7761- Sewer:Sewer: a '5 Gas:c U4� JN (W7 ten 7 Electric: (/d,l(y� Phone: DISTRICTS: School: L ril Fire: I¢ S a(,n1 \-1.OPost: in I(We)hereby depose and state under penalties of perjury that all statements,proposals,and/or plans submitted with or contained within the application are true and correct to the best of my(our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included showing the signatory has to legal authority to sign for the corporation. I (we), the undersigned hereby request the Department of Planning/Services to review this final plat on the following described unincorporated area of Weld County. ..e zQGti 1----C. 2-6 -.47 Signature: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date -5- 2004-2645 Page 1 of 1 Sheri Lockman From: Tom Honn [honn@frii.com] Sent: Monday, August 16, 2004 3:30 PM To: Sheri Lockman Sheri: Here is the letter I sent to KP Kauffman for your file. Tom 08/17/2004 August 5, 2004 Jason D. Lilley, RLP Land Manager K.P. Kauffman Company, Inc. World Trade Center 1675 Broadway, Suite 2800 Denver, CO 80202 Subject: Lakota Lakes Ranch Final Plat(Ref: KPK-Challenger#1-32) Dear Mr. Lilley: I am forwarding for your review and reference the Final Plat for Lakota Lakes Ranch. This matter has been scheduled before to Weld County Board of County Commissioners for a hearing on September 8, 2004 at 10:00 AM in the County Commissioners Hearing Room, 915 10th St, Greeley Colorado. I believe the concerns related to setback conflicts, wells not within private lots, easements and access provisions are addressed on the plat. Other concerns that may better be addressed via legal council can be directed to: G. Brent Coan Otis, Coan & Stewart, LLC, Attorneys and Counselors at Law The Doyle Building 1812 56th Ave. Greeley, CO 80634. (970) 330-6700; Metro (303) 659-7576 Please forward any thoughts or considerations to me or to Mr. Coan. Thank you for your consideration. Sincerely, Thomas E. Honn, AICP Applicant's Representative Todd and Debbi Muckler G. Brent Coan Sheri Lockman as r May 5,2004 Sheri Loclanan,Planner II Department of Planning Services 1555 N. 17th Ave. Greeley,CO 80631 Subject: Final Plat Submittal for Lakota Lakes Ranch PUD Dear Sheri: Te following is a summary of the submittal for the Final Plat of Lakota Lakes Ranch PUD. The plat has been adjusted to accommodate the requests of the Oil and Gas Leases and facilities. Although slight variations of the lot lines occur,no substantial changes have been made to the layout and function. The following itemize changes or accommodations in conditions of the Change of Zone approval: Prior to scheduling the Board of County Commissioners hearing: The applicant shall submit to the Weld County Department of Planning Services assigned copy of an agreement with the properties mineral owners which stipulates that oil and gas activities have been adequately incorporated into the design of the site or submit evidence that mineral owners concerns have been mitigated. (Department of Planning Services) An agreement has been prepared and will be presented with this submittal. It has yet to be signed by the Oil and Gas entities. Prior to recording the Change of Zone plat: Lot 7 has been illegally subdivided from Lot B of Recorded Exemption 2695. The property owners signature block on the change of zone plat shall include signatures from Lot 7 property owners or a court ruling granting ownership of Lot 7 to the applicants.(Department of Planning Services) The applicants acquired the property. A final drainage report stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted to the Weld County Department of Public Works for review and approvaL Evidence of approval shall be submitted the Department of Planning Services. The Floodplain Analysis Modeling Report for Proposed Lakota Lakes Ranch Development, dated March 19, 2003, by Weiland, Inc. is acceptable. The applicant shall re-evaluate the finished floor elevation stated in the drainage report. The floodplain analysis report shows the Effective Floodplain Boundary makes no major changes to the FEMA boundary with respect to the adjacent proposed building lots. (Department of Public Works) The floodplain analysis report details water surface elevations at river stations in Table 2. The applicant shall address the different water surface elevations with respect to the various lots in the development, and the proposed finished floor elevations(or top of foundation opening). (Department of Public Works) This has been submitted. Building Permit BC-9901051 was issued for the construction of a single family residence at 7288 CR 54. The permit received final approval for all inspection items except final electrical. A new building permit must be obtained to perform the final electrical inspection. The Certificate of Occupancy for this residence will not be issued until the final plan has been recorded thereby correcting the illegal subdivision.(Department of Building Inspection) This has been completed The applicant shall attempt to address the requirements (concerns) of the City of Greeley, as stated in the referral response dated April 15,2003. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services.(Department of Planning Services) Applicant met with The City Planner and response is attached The applicant shall attempt to address the requirements (concerns) of the Hill and Brush Ditch Company, as stated in a letter dated February 26, 2003. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) See attached letter. The plat shall be amended as follows: 1) CR 15 ROW has been reserved as required. 2) CR 54 is classified by the County as a collector road and requires an 80-foot right-of-way. The right-of-way has been noted on the change of zone plat and is dedicated on the final plat. 3) County Code requires that PUD developments pave internal roadways. This development will have a paved road. 4) The internal roadway is of curvilinear design, and not oblique segments. The right-of-way shall parallel the roadway. (Department of Public Works) 5) The applicant shall show a curve table including data, especially to describe the internal roadway alignment. (Department of Public Works) 6) The internal roadway right-of-way shall be 60-feet in width including cul-de-sacs with a minimum 65-foot radius, and dedicated to the public. The typical roadway cross-section should be shown as two 12-foot paved lanes with 4-foot gravel shoulders on the change of zone plat. The cul-de-sac edge of pavement radius shall be 50-feet minimum. Stop signs and street name signs will be required at all intersections. (Department of Public Works) 7) The Hill and Brush Ditch shall be shown and labeled. (Department of Public Works) 8) Building envelops shall be indicated at the front of the lots -- (close to Lakota Lakes Road), due to the flood hazard concern. (Department of Public Works) 9) The applicant shall designate two (2) septic system envelopes per residential lot. Evidence of Department of Public Health and Environment approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) 10) The applicant has indicated that a bus/mail pull off will be at the entrance of the subdivision. The plat shall indicate location. (Department of Planning Services); and, The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: Changes made as noted and Change of Zone Plat mylars submitted Also enclosed are the comments from the School District regarding the fee agreement and the bus pull out. Mail will be delivered internally and a separate letter is submitted requesting a modification of the condition of the Change of Zone Plat. A letter is included to Peter Schei requesting revisions to the conditions related to flood plain impacts and the bus/mail delivery issues based upon more current information. We will ask the Health Department for a clarification to the issue of locating leach fields within the property based upon final building plans on each lot. Project Summary: Lakota Lakes Ranch is a Planned Unit Development,which,upon approval, will establish a cluster of seven homes(one existing)on approximately 20 acres of a parcel containing approximately 80 acres. The buildable lots average 3 acres in size to match a demand for lots that may support 4-H projects and horses and will be environmentally appropriate for on-site sewage disposal systems. Nearly 60 acres or more than 70 percent of the site will remain as open space. The open space will be the result of a reclaimed gravel mining operation(USR 672 Amended)which is currently entering the reclamation phase, and existing pasture for livestock(cattle,horses and mules)which will continue as a use of the owner and resident of Lot 7. The open space also permits the existing floodplain of the Big Thompson River to operate as it has historically and will permit area wildlife to be sustained if not flourish. The open space will be a private amenity for the residents and made a part of the Homeowner's Association responsibility. A public road meeting County standards will serve the seven lots. On street parking is allowed,however,adequate off-street parking will exist on each lot. Accessory buildings may include garages; livestock corrals,barns and sheds; and, other storage buildings. Animal units have been established with the Change of Zone. A Homeowner's Association will be established to administer the Covenants and a -- Mandatory Association for the purpose of maintaining the common open space and landscaping features. Permitted Uses Uses Allowed by Right Lots 1 — 7 - Those uses listed in Section 36.2.1, E (Estate) District of the Weld County Zoning Resolution. Outlots - Those uses listed in Section 31.2, A (Agricultural) District of the Weld county Zoning Resolution except no residential uses shall be permitted. Accessory Uses Lots 1 — 7 - Those uses listed in Section 36.2.2, E (Estate) District of the Weld County Zoning Resolution. Outlots Those uses listed in Section 31.3, A (Agricultural) District of the Weld county Zoning Resolution except no residential uses shall be permitted. Uses by Special Review Lots 1 — 7 - Those uses listed in Section 36.2.3, E (Estate) District of the Weld County Zoning Resolution. Outlots - Those uses listed in Section 31.4, A (Agricultural) District of the Weld county Zoning Resolution except no residential uses shall be permitted. Please advise me of any additional information you may need. Sin/ lY, Thomas E. Honn,AICP Applicant's Representative Cc: Todd Muckier and Debra Eberl Email copy to Sheri Lockman lit Pro 26 Pro essional Planning Consultin 1601 Quoit Hollow Drive f g Ft Collins.CO 80525 (970)223-1961 Thomas E.Henn,MCP F-Maik lsonn@fiiLcon, May, 10, 2004 Pam Smith ISDS Program Coordinator Weld County Department of Health and Environment 1555 N. 171°Ave. Greeley, CO 80631 Subject: Lakota Lakes Ranch Final Plat—Leach Field Language Dear Pam: Based upon an earlier conversation with you I am requesting that you might accept language for the final plat regarding location of leach fields as shown on the final plat. My goal is to retain the commitment and designation of the primary and secondary leach fields,however,with the size of the lots, a final location of the primary residence may require the relocation of the leach field on the lot. You had indicated that on previous developments you had used language that permitted such wording. I would like to request that you provide similar language for this subdivision to allow flexibility is siting the leach fields without adversely affecting the integrity of the Health Department regulations and policies. Thank you for your assistance. Sin.? `(CC2- Thomas E. Bonn, AICP Applicant's Representative —Bridging the Development Process— THinc, Professional Planning Consulting1601 QuaiiH wuD yr f Ft CoQinr,CO basis (970)223-1961 Thomas E.Hann,AICP E_Maik honn@fiii.rom May 10, 2004 Peter Schei. P.E. Weld County Public Works PO Box 758 Greeley, CO 80632 Subject: Lakota Lakes Ranch Final Plat Dear Peter: I have two issues to address regarding conditions on the Change of Zone approval that I would like to review with you. Both relate to Flood plain related concerns. The concerns are as follows: Commissioner Resolution Condition 2. G. requires a Flood Hazard Development Permit for all lots. With approval of the Drainage Study and Flood plain report, it seems that no additional flood plain evaluation would be required. Our request is to remove this condition for the final plat. Commissioner Resolution Condition 1. I. 8)requires that building envelopes be located to the north extremities of the lots. With approval of the Drainage Study and Flood plain report, it seems that no restriction on envelope location is needed. Our request is to remove this condition for the final plat. Commissioner Resolution Condition 1. I. 10)requires bus and mail pull outs shown on the plat at the subdivision entrance. The Post Office has sent a letter(attached), which indicates the mail service will be individual boxes on the internal street. The School District will continue to stop as they have always stopped in the County Road. Our request is to remove this condition for the final plat. Thank you for your assistance in this matter. Thomas E. Honn,AICP Applicant's Representative —Bridging the Development Process— W\r-1 /1 _Weiland. Inc Environmental E Engineering March 17,2004 Environmental support Ion • r a vpart lion Weld County Colorado Planning and Zoning Department • Land Development 1111 H Street Post Office Box 758 Greeley, CO 80632-0758 • Industry This letter is written to address the floodplain boundary issue at the proposed Lakota Lakes Ranch Development site. The proposed site is south of WCR 54 and east of WCR 15 on the former Challenger Gravel Pit site. More specifically,the proposed site is located in the northwest quarter of the northwest quarter and the southwest quarter of the northwest quarter of Section 29,Township 5 North,Range 67 West of the 6tn Prime Meridian. The Federal Emergency Management Agency(FEMA)Flood Insurance Rate Map (FIRM)pertaining to the proposed site is located in panel 615, community panel 080266 0615 C,dated September 28, 1982. It indicates minimal encroachment in Lots 5-7 of the proposed site. An updated floodplain study titled"Floodplain Analysis Modeling Report for Proposed Lakota Lakes Development" authored by Joe Wright,P.E. and dated March 19, 2003 has been approved by Weld County as the corrected base flood elevations for this development. This study shows no encroachment of the proposed site by the 100-year floodplain of the Big Thompson River. The corrected 100-year floodplain delineation has been utilized by Weiland, Inc. in our drainage analysis and design work for this site. If the Planning and Zoning Department has questions regarding this submittal,please contact Weiland, Inc. at the address and phone provided. .✓K..-,C William C.Klawitter,P.E. Weiland, Inc. 10395 Colfax Ave.. State 350. Lakewood CO 60215 ph 303-436-0 5I fax 3D3-436-0953 LANDSCAPE DESIGN FOR LAKOTA LAKES RANCH PUD: At the N/E corner, entrance and along the lane, Lakota lakes will maintain draught resistant grasses and shrubs with a combination of xeriscaping. None of these will impede the on line of sight for road purposes. Individual lots will comply with draught resistant grasses, shrubs, and trees. Homeowners will maintain their own lots. Outlot C will comply with the Reclamation Plan for mining with the state, agreed to by Coulson Excavating. This includes the planting of native grasses, shrubs, and trees with state approval. SIGNAGE FOR LAKOTA LAKES RANCH PUD: A sign will be placed at the entrance of Lakota Lakes Road to properly identify the individual lot addresses. This sign will be approximately 4'x4' in size. Attached to log poles or brick pedestals,4' — 5' high, set back, not to impede ingress and egress or easements at the entrance. 4#WO74_texas Ridnetege, e. Great Western Railroad 950 Taylor Ave. Loveland, CO 80539 Contact: Gary Earnshaw Phone: 970-667-6883 RE: Lakota Lakes Ranch PUD Located in the NW1/4 &the Nl/2, SW1/4, SEC. 29,T5N, R67W, 6th P.M. Weld County, Colorado HWY 54 & WCR 15,the southeast section The applicant has contacted The Great Western Railroad several times. David Lafferty was the first contact. He advised us that there were no concerns other than informing all land owners of the existing tracks and that there would be no intrusion on the easement along the tracks. He would not agree to give us a signed statement. Gary Earnshaw iathe most recent contact. He will agree to get a written response to us if necessary. Attached is our letter to him. Lakota Lakes Ranch,L.L.C. Debra Eberl,member 4a&ta. sided a , .de mime.W.54. ;data CO. P4534 May 29, 2004 Weld County Department of Planning Services 1555 N. 17th Ave. Greeley, CO 80631 Re: A request for variance from the Change of Zone Resolution 4)M -the mail/bus pullout. Due to the responses and information we have received from the Sheriffs dept., postmaster, and school district, we request that the mail/bus pullout be waived at this time. Attached are statements from the Johnstown Postmaster and the Johnstown/Milliken School District. The Postmaster has advised Lakota Lakes Ranch that the mail will b e delivered/picked up at individual mail boxes to be installed at each driveway on Lakota Lakes Road. The assistant superintendent, Bill Hungenberg and the transportation administrator, Judy Sobeski, both state that there is an existing roadside stop at our entrance on the bus route that has been in effect for several years. This bus stop is in a 30MPH zone, about 150 feet before the RR crossing. The children do not cross the street to get on the bus. There are three more bus stops just like this one on Rd. 54. Judy Sobeski can be reached at 970-5874202. I, Debra Eberl-Muckler, met briefly with Dave Tuttle at the Weld County Sheriffs office Dec. 5. He was to contact Sheri Lockman with any concerns. We have not had a response yet. We will cooperate if any concerns should arise in the future. Sincerely, Debra Eberl-Muckler, member Lakota Lakes Ranch,LLC Date: November 18,2003 From: Todd& Debra Eberl-Muckler and Eli Krebs Owners of Lakota Lakes Ranch, L.L.C. (former Forbes Park Ranch) 7288 W. C. RD. 54,Johnstown,Co 80534 ITo: Johnstown Postmaster We,the above,have purchased the property on the south east section of County Road 54 and j Road 15. We are writing in reference to a prior inquiry related to the mail pick up at this address. The mail is presently delivered to an existing mail box on Road 54. It was agreed that the mail carrier will pull off Road 54 into the subdivision and pick up the mail at residential boxes provided by the homeowners. Weld County Planning has requested that we provide proof of this contact with your office. Please use the space provided for any comments and/or sign below to confirm your approval. { COMMENTS: //a. "an-, 41 S-57 ifr i Signed:( 7/07- Johnstown Postmaster Thank You, Todd&Debra Eberl-Muckler Eli Krebs I , / Pitt- June 24, 2003 Weld County Planning and Zoning Greeley, Co 80631 To Whom It May Concern: Concerning the lot for Eli Krebs on WCR 54, the district will not require any special needs for the transportation department. A bus will be able to stop on the county road. If you have any questions or concerns please contact me at 587-6053. Sincerely, fiAle Bill Hungenberg Assistant Superintendent of Schools 1, Memo To: Weld County Planning Department Front Dr.Jack E. Pendar, Superin Date: 1/10/03 Q1,�, / Re S-594 i _ l (!" Please be advised that Ms. Debra Ebert did speak with me concerning a cash-in-lieu of land dedication fee for the school district. Ms. Ebert stated that all builders would pay the appropriate fee that is in effect when a building permit is Sued. This arrangement is satisfactory to the school district and we have no further objections at this time. I would like to thank you for your support in this matter. Johnstown Schools Superintendent, Jack Pendar has responded favorably to the Lakota Lakes PUD. His letter is attached regarding the cash in lieu of land dedication in the amount of $750.00 for each residence building permit. Letter attached. Transportation, Contacted Judy Sobeski, transportation administrator, regarding a bus stop at described location. There is an existing roadside stop on the bus route. -dada Idea Rasa, tee Date: May 29,2004 From: Lakota Lakes Ranch,L.L.C To: The Hill and Brush Ditch Co. Attention: Jim Croissant,President The Hill and Brush Ditch Company has outlined concerns related to the ditch that goes through Lakota Lakes Ranch,PUD. To address these concerns,the Lakotatakea,LLC agree that the Hill and Brush Ditch Company will not be liable or responsible for the following: 1. Children playing on or around the ditch easement. 2. Damage caused by seepage from the ditch that is not due to lack of maintenance. 3. Damage cause by the ditch overflowing its banks due to causes not under control of the ditch company. We,Todd and Debra Muckier-Eberl,Eli Krebs,Jennifer Landen(Lakota Lakes LLC), will inform prospective buyers of the above concerns. At the time of purchase,the Lakota Lakes homeowners will be asked to sign a waiver in agreement of the same. The above agreement adequately addresse the concerns of the Hill &Brush Ditch Co. Signed: Jim Croissant C� -a`� President of Hill & Brush_Ditch Co. Agreed, Todd&Debra Eberl-Muckler Eli Krebs , Jennifer Landen _Johnstown Fire Protection (District C \'A PO Box 979 C-(AN - ' Johnstown, CO 80534 iiii,k,\N 970-587-0339 F/AE Dtv June 9, 2004 Lakota Lakes Subdivision Debbie Ebberel Debbie, Here is a list of the items needed to be complete in order for the subdivision to be in compliance. • Placement of a fire hydrant at the entrance located off of W.C.R. 54 • Maintain a minimum 50' turning radius for all cul-de-sacs • Maintain road width and surface Thank you, Jesse Molinar Jr. Fire Prevention Jeri 07 07 ud:erp ___ __.. / 0.03 • • &io+ p05-1-ed API LE THOMPSON WATER DISTRICT HYDRANT INSPECTION HISTORY, INVENTORY INFORMATION O LOCATION: A' I 2d.- Ka`.-r-4- .1._ 12w & HYERANT Shutoff Valve • NUMBER Located: /fO 6_ 0 r F-/iii- . Inspection Data: Installation Dated. Bury Depth: Hydrant Color: Inspected By: Valve Hy.dranj Manufacturer:) Wa aro• r I I I 1 • Model:) t ota I '... . Turns to Open: ) Open Direction: ] I i i Operating Nut Size: I. Operating Nut Type:1 +1 E.\C _ sSize. Thread Hose Outiets:I I I Pumper Outlets: J FLOW TEST : 1 REQUIRED MAINTENANCE i minutes Flushed: 15-n":1:1 i ate Name Italic. Flow GPM EM DATF COMPLETED 1043-03 I Shy- /(C7 Y4 Ida . ❑ Adj. Height II 1 J ID chains ` 1 1 1 0 Drain tr________J 0 Valve Marker (I I 0 Paint 1 - I 0 OP Nut ( i 1 0 Caps 1 1 0 Break Away Fing I I 0 Leaks ( I I ❑ COMMENTS: 1 / /� l/ ,rrn eAia / ` C- CO Galaxy Systems Inc. 1993 2 •d dIbtE0 PO LO tar .4za7t.MXES RreiteW, 24e December 5, 2003 Debra Eberl-Muckler Lakota Lakes Ranch, member To: Weld County Planning Dept. Re: Follow up/Response from the City of Greeley To Whom it may concern, Phone contact with Darrell Gesick at the City of Greeley, In reference to comments submitted by The City of Greeley regarding the Lakota Lakes L.L.C., Darrell Gesick advised that comments were based on City code and requirements of the City of Greeley which do not all apply to the outlying areas. Mr. Gesick said that there are no problems or conflicts with the plans of the Lakota Lakes Ranch PUD. He acknowledged the compromises made so far in our efforts to meet some of their requirements. He gave his permission to report this discussion and stated that the City of Greeley does not have further concerns but will support County Planning's requirements and approval. Thank You, Lakota Lakes Ranch, L.L.C. Debra Eberl-Muckler, member Specific Development Guide Component One—Environmental Impacts The proposed use, a rural oriented, seven-lot residential subdivision located on a limited productive parcel of land. The adjacent minerals have been mined and the site is in the process of reclamation. The lots will be located on the small portion of the site that has been cultivated in the past and today is planted to a pasture/hay crop. The soils are considered to be less than prime agricultural soils. The following are the relevant issues that may have limited to no impact. 1. Erosion and sedimentation—The nature of a subdivision and home construction will create earth moving and grading operations. In this case,the site will require minimal over lot grading and with appropriate grading practices, erosion is maintained on the premises. The ultimate ground cover as pasture/hay replace the previously tilled operation and exposed soils. A slight reduction to runoff siltation should be the benefit. 2. Traffic Impacts—The proposal will produce approximately 70 vehicle trips per day. The existing road system is adequate in design and capacity to address this modest increase in trips. No traffic study is required. 3. Analysis of the Prebles mouse habitat and Ute Ladies-tresses Orchid have been determined to not be an issue at this site. The development's covenants will address the Division of Wildlife's concerns for roaming of domestic pets, notification of nuisance wildlife,and management of the pasture of animals. 4. Floodplain analysis has been accomplished to insure that the floodplain has not been changed in any detrimental way that would adversely affect the proposed lots. 5. The right to farm information will be incorporated into the covenants with the specific intent of disclosure to all residents of the subdivision. 6. A weed management plan will be prepared to address concerns for controlling noxious weeds. 7. The proposed subdivision is designed to be compatible with the adjacent Challenger Ranch development and wildlife sanctuary. The orientation of lots and the large open space common tracts are intended to create clustered lots away from the major sanctuary and the open space further buffers any human activity from the river. Generally hiking, fishing and wildlife observation will occur in the nearly 60 open space acres. Component Two- Service Provisions Service provisions have been studied during the sketch plan review. No unusual comments were received. I. Schools will be satisfied with agreement that fees are to be collected at the time of building permits. A bus pickup for students is currently made along County Road 54. 2. Law Enforcement requests adequate addresses posted at the entrance to the subdivision. This will be done as a part of an entry identification. Street signage, house addressing and homeowner association organization will be accomplished as suggested by the Sheriff's Office. The Oil and Gas Well and facilities will be secured for safety and visual benefits. 3. Fire Protection will be satisfied by the compliance with requirements of the Johnstown Fire Department including additional hydrants, cul-de-sac design and access standards. 4. Storm Drainage will be accomplished through appropriate grading of residential foundations to create positive drainage and the large impervious area of the site. 5. Water requirements of the Little Thompson Water District are satisfied and all needed water taps have been acquired. 6. Sewer will be addressed with individual septic systems. Each lot will be platted with two leach field locations. At the time of a building permit, detailed soil and percolation tests will be completed to determine the size and type of septic system. Standard conditions of approval should address any minimal concerns. 7. The public transportation infrastructure that serves the site is considered adequate. The internal access, as shown on the site plan is a paved public street. The access design is in large part due to the development concept for the larger rural use lots Stop signs and street signs will be installed at appropriate locations. No traffic study is required. Utility easements will be established on the final plat per the County code. 8. Mail boxes will be established on the internal road as prescribed by the postal jurisdiction. 2 Component Three—Landscaping Elements The landscaping for this development is all on private lots,on open spaces that are controlled by the reclamation plans that are part of the gravel pit, or part of a natural grass or pasture area. A small entry area will be provided by an easement from Lot 2 which will be maintained by the association to include an entry monument identification sign and an adjacent address identification sign for emergency services for identification. These signs will not exceed 32 square feet each and will be maintained in a xeriscape feature consisting of ground cover and shrubs Component Four—Site Design The following discussion addresses the intent behind the development proposal and how it achieves the spirit behind the Comprehensive Plan policies. The proposal's compatibility is also addressed below. 1. Site features and development objectives: The property contains nearly 80 acres. The majority of the site will be kept as an open space natural area and pasture as a result of the existing floodplain and nearly completed gravel extraction operation. 2. The property is not located within a growth boundary but within a three mile area of Greeley and Johnstown. The comments from Johnstown which has the most potential to annex this property is the future is concern for the lake edges being created natural and a concern that there may be a regional recreation trail in the area. The reclamation design does account for a natural edge to the water bodies and the open space designation will create the potential for a regional trail sometime in the future. Greeley commented that this plan does not fit their Comprehensive Plan in that it is not an urban development and is not a cluster and therefore sprawl. The apparent conflict presented here by The City of Greeley's comments are unfortunate because they do not permit any interpretation of the specific set of circumstances This property has unique features which make it desirable to be developed in the manner proposed: First it is utilizing non-prime soils; second it is clustering lots on an area of non-prime soils,adjacent to an significant natural feature made possible from intensive resource extraction;third, by creating opportunity for rural residential sites at a single clustered location, less pressure is placed on other sites which may have prime soils; and fourth, if this site were to be annexed into an urban setting,it would be desired and expected that setbacks to preserve the natural environs and low density to not encroach or impact the natural setting would commonly be required. Such an approach would be considered buffering a natural area from more intense urban activity. Greeley's concerns for this project have been softened during conversations with the property owner and planning staff. 3. The ability to preserve prime agricultural land may be achieved when a smaller, isolated area, such as the proposed property, can be developed thereby relieving other less appropriate area from development pressures. 3 r 4. Uses within the PUI)are residential and rural uses. Livestock will be permitted per the limits for animal units in the code. The Homeowner's Association and the Lakota Lakes, LLC will own and control the common area as equestrian use and recreation use. Parts of the open space will therefore be active and some will be passive. Should additional oil and gas development be requested, the common tract will permit such activity separated from the housing uses. 5. Hunting restrictions have been incorporated to further enhance compatibility with the adjacent Challenger sanctuary. The location of the lots are as far away from the sanctuary and are consistently placed with the lots in the adjacent Challenger Ranch. Component Five—Common Open Space Usages The common open space within the PUD, identified as Outlot C will be operated and maintained by a Homeowner's Association and Lakota Lakes, LLC. The open spaces are for the common enjoyment and use of the future residents and a mandatory program for collection of fees for any common expenses will be established through the Homeowner's Association. Grazing of livestock will continue on Outlot D. Outlot C will contain lakes and natural grass areas. Pathways and limited features such as benches and rest areas may be placed by the HOA. Out lot B is a passive area, which will be maintained as a dry land grassed parcel. Component Six- Sippage Signage for this PUD may include a single entry identification sign. In all cases signs shall meet the requirements of Section 6.3.6.3 Sign District Regulations as prescribed within the Weld County PUD Ordinance 197. An additional sign for identification for Emergency Service responders will also be located at the entry. Component Seven—MUD Impact Not applicable Component Eight—Intergovernmental Agreement Impacts Not applicable 4 •-� EXHIBIT AA@ Name of Subdivision or Planned Unit Development: Lakota Lakes Ranch.. LLC Filing: • 1 Location: NW 1/4&THE N 1/2,SW 1/4,SEC. 29,T5N, h67W,6th P.M., WELD COUNTY,COLORADO Intending to be legally bound, the undersigned Applicant hereby agrees to provide throughout this Subdivision or Planned Unit Development the following improvements. (Leave spaces blank where they do not apply.) Estimated Improvements Unit Cost Construction Cost Site grading Street grading Street base Street paving subgrade prep included (4" Asphalt/3"base) $63,859.32 Curbs, gutters, and culverts Sidewalk Storm sewer facilities Retention ponds Ditch improvements Subsurface drainage Sanitary sewers Trunk and forced lines Mains Laterals(house connected) On-site sewage facilities On-site water supply and storage Water mains(includes bore) completed Fire hydrants $3,500.00/ea -one is complete $3,500.00 Survey and street monuments and boxes Street lighting Street name signs Fencing requirements Landscaping Park improvements Road culvert Grass lined swale Telephone t hie Gas complete Electric complete Water transfer SUB-TOTAL: Engineering and Supervision Costs$ 13,000.00 (Testing, inspection, as-built plans and work in addition to preliminary and final plat;supervision of actual construction by contractors) EXHIBIT AB@ Name of Subdivision or Planned Unit Development: Lakota Lakes Ranch.LLC Filing: 1 Location: NW 1/4&THE N 1/2,SW 1/4,SEC. 29,T5N,R67W,6th P.M..WELD COUNTY,COLORADO All improvements shall be completed within 3 years from the date of approval of the final plat. Construction of the improvements listed in Exhibit AA a@ shall be completed as follows: (Leave spaces blank where they do not apply.) Improvements Time for Completion Site grading 08/05/2004 Street grading existing Street base 11/05/05 Street paving 12/05/06 Curbs,gutters,and culverts Sidewalk Storm sewer facilities Retention ponds Ditch improvements Subsurface drainage Sanitary sewers Trunk and forced lines Mains existing Laterals(house connected) On-site sewage facilities On-site water supply and storage Water mains existing Fire hydrants 0a/30/04 Survey and street monuments and boxes Street lighting Street name signs 08/30/04 Fencing requirements Landscaping Park improvements Road culvert Grass lined swale Telephone complete Gas complete Electric complete Water transfer complete Hello