Loading...
HomeMy WebLinkAbout20042862.tiff CHANGE ORDER NO. I 2004 Hot In Place Recycling Project Date: September 13,2004 Project: 2004 Hot In Place Recycling Project described in the Invitation for Bids, ' 9tB0400059 Owner: Weld County, Colorado Contractor: Cutler Repaving,Inc The following change is hereby made to the Contract Documents: Added work to include Main Street,and shared jurisdiction areas in and adjacent to the City of Kersey. CHANGE TO CONTRACT PRICE: Original Contract Price: $ 252,004.00 Current Contract Price adjusted by previous Change Order: $ 252,004.00 The Contract Price due to this Change Order will be increased by: $ 37,730.61 The new Contract Price,including this Change Order,will be$ 289,734.61 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 5 calendar days. The date for completion of all Work will be September 8,2004 RECOMMENDED: Owner Representative: /' _ca.? //� ..� Date: '/ — / G — O (/ Engineer: Date: APPROVALS:Contractor: f'^,/ Date: ?"5-/ Owner: Date: 71 - A Owner: U{_ ° , Robert D. Masden Date: SEP 2 7 ZOOM TITLE Chairman,Board of County Commissioners 'u4 (SEAL) G l���� �/1 , ATTEST: JbG ug li ' 4 Weld Coun Clerk to the Boar. , d•a.# BY Dep ty &erk to the Board Hays 30 2004-2862 C n , (' ; PGt,I Pct_, '_ �Y yc_v. ,ll��.'.>e v jC -e"( HIR IMPROVEMENTS AT KERSEY 9/13/2004 HIR Services and 1.5" Overlay Item EtimatedQ Actual Unit Cost Total Cost Number Item Unit uantity Quantity ($) ($) 403 HOT BITUMINOUS PAVEMENT(GRADING S) TON 1,241 1,230 $21.00 $25,830.00 (ASPHALT) (75) (PG-64-22) Main Street 403 HOT BITUMINOUS PAVEMENT(GRADING S) TON 510 506 $21.00 $10,626.00 (ASPHALT) (75) (PG-64-22)RD 53 S. of RR Tracks 411 HIR AND 1.5"OVERLAY (Main Street) - S.Y. 15208 15208 $1.63 $24,789.04 411 HIR AND 1.5"OVERLAY (RD 53 S. of RR Tracks) S.Y. 6242 6242 $1.63 $10,174.46 614 TRAFFIC CONTROL(Main Street) L.S. 1 1 $2,250.00 $2,250.00 614 TRAFFIC CONTROL (RD 53 S. of RR Tracks) L.S. 1 1 $1,100.00 $1,100.00 614 STRIPING L.S. 1 1 $300.00 $300.00 ADMIN L.S. 1 1 $500.00 $500.00 Total $75,569.50 NOTE: Weld County's 2004 asphalt purchase price is at$18.90 per ton. The haul from the asphalt plant is approximately 14 miles to Kersey.A cost 15 cents per ton mile adds$2.10 per ton to the price of the asphalt. M:\IGA\Kersey\Kersey HIR 04 cost Arc INTERGOVERNMENTAL AGREEMENT FOR COOPERATIVE HIR PROGRAM THIS INTERGOVERNMENTAL AGREEMENT is made and entered into effective as of the 93 day of ,,12004,A.D.between the COUNTY OF WELD,a political subdivision of the STATE OF COLORADO, whose address is 915 10th Street, P. O. Box 758, Greeley, CO 80632, hereinafter referred to as"Weld County," and the TOWN OF KERSEY,a municipal corporation of the STATE OF COLORADO, with its principal office located at 332 3RD Street, P. O. Box 657, Kersey, CO 80644, hereinafter referred to as "Municipality." WITNESSETH: WHEREAS, Weld County has advertised for contracted services to apply Hot In-place Recycling,hereinafter referred to as (HIR) to Weld County Road 53, during the year 2004, and WHEREAS, said HIR services scheduled for Weld County Road 53, are adjacent to the jurisdictional limits of Municipality and are to be performed by Cutler Repaving ("Contractor"), pursuant to Bid Request No. B0400059, and WHEREAS, for an additional price to be paid to Contractor by Municipality through Weld County, Contractor will perform similar HIR services within the boundaries of Municipality, and WHEREAS,Weld County and Municipality now desire to enter into this Intergovernmental Agreement so as to memorialize their agreement with respect to their respective responsibilities for the performance of said services by the contractor within Municipality's boundaries. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows: 1. PROVISION OF HOT IN-PLACE RECYCLING SERVICES BY CONTRACTOR WITHIN MUNICIPALITIY'S BOUNDARIES: Upon the signing of this Intergovernmental Agreement by both parties hereto and the payment of the final costs by Municipality to Weld County for HIR services the half mile section of Weld County Road 53, located between the Hwy 34 Frontage and the Section line at what would be WCR 54, which has been annexed by Municipality and is shown on the attached Exhibit Map, Weld County shall direct Company to perform the HIR services on said stretch of WCR 53 within Municipality's boundaries during the year 2004. Preparatory work such as patching, taper milling at curbs and gutter pans, and final striping are the responsibility of the Municipality and are not included as part of the work to be performed. The scope of work includes heating and scarifying 1 to 1.5 inches of existing asphalt, mixing in rejuvenating agent, relaying the recycled mix, and placing an additional one and one half inches of new asphalt, all in one operation. Page 1 of 3 Pages 2. PAYMENT OF FINAL COSTS:Municipality agrees to pay the final costs for approximately 22,248 square yards of HIR work and a proportionate share of traffic control,estimated to be $75,600, to Weld County by September 30, 2004, to pay for all of the HIR services to be performed by Contractor on said stretch of WCR 53 within Municipality=s boundaries during the year 2004. 3. MONITORING OF THE WORK OF CONTRACTOR: Staff from the Weld County Department of Public Works shall be responsible for monitoring the work of Company to ensure that the HIR services detailed in Contract are fulfilled during the year 2004 within Municipality=s boundaries. Notice and contact shall be through Mr. Dean Dreher, Weld County Department of Public Works, 1111 H. Street, Greeley, Co 80631; (970) 356-4000, ext. 3765; FAX: (970) 304-6497. 4. TERM: The term of this Intergovernmental Agreement shall be from January 1,2004,to and until December 31, 2004. 5. LIABILITY INSURANCE COVERAGE: Weld County has arranged in the contract to include Municipality as an additional named insured on Company=s general liability policy. 6. GUARANTEE BY CONTRACTOR: Municipality acknowledges that the goal of the HIR services to be performed within Municipality=s boundaries by Contractor is to provide a new wearing surface and to preserve and extend the life of the paved surface.Weld County makes no guarantee as to the effectiveness of such HIR service in achieving such goal. There is a one year warranty required of the Contractor to cover workmanship and materials, 7. ENTIRE AGREEMENT: This writing constitutes the entire Intergovernmental Agreement between the parties hereto with respect to the subject matter herein, and shall be binding upon said parties,their officers, employees,agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 8. NO WAIVER OF IMMUNITY: No portion of this Intergovernmental Agreement shall be deemed to constitute a waiver of any immunities the parties or their officers or employees may possess, nor shall any portion of this Intergovernmental Agreement be deemed to have created a duty of care which did not previously exist with respect to any person not a party to this Intergovernmental Agreement. 9. NO THIRD PARTY BENEFICIARY ENFORCEMENT: It is expressly understood and agreed that the enforcement of the terms and conditions of this Intergovernmental Agreement,and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties and nothing in this Intergovernmental Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Intergovernmental Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Intergovernmental Agreement shall be an incidental beneficiary only. Page 2 of 3 Pages Signed by the parties theag d day of , 2004. ~ �► iOnSeUti COUNTY OF WELD, a political subdivision 1-•`<'�'�.�,�,Clerk to the Board of the STATE OF COLORADO: Dui (U 1�1r� ,1 -- \� By: � �` � ►~ .,j lerk to the Board _ Robert D. Masden, Chairman JUN 2 8 2004 Ouim Board of County Commissioners of the County of Weld ATTEST: TOWN OF KERSEY, a municipal Aide/-1 /�e/ corporation of the STATE OF COLORADO By. 7��- - / By: ette Barker, Town Clerk rrold Brethauer, Mayor 0- k,t ", . .•..• ,p- ai t� i c,014Paiki, SEAT, Id M:\word\maint contracts\igakersayh .i oc Page 3 of 3 Pages -i..ina__ /O2 U EXHIBIT MAP Page 4 of 3 Pages EXHIBIT MAP • Wider Section with Curb&Gutter A *. CAF f Y ni End Pro'ect Page 4 of 3 Pages a 0/rit MEMORANDUM 1 CTO: Clerk to the Board DATE: September 16, 2004 • COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Agenda Item Change Order No. 1 for the 2004 Hot In Place Recycling Project. Enclosures pc: Dean Dreher M:V'rancie'Agend-I.doc s • MEMORANDUM CTO: Keith Meyer, P.E., pi DATE : 9/16/2004 • Engineering Divisio nager COLORADO Clerk to the Board FROM: Dean Dreher, Civil Tech III SUBJECT: Chair's Signature Item Please submit the enclosed item on the signature agenda. Change Order No. 1 for the 2004 Hot In Place Recycling Project. Change Order No. 1 is to revise the contract between Weld County and Cutler Repaving, Inc. for services performed to include the City of Kersey. The additional work done by Cutler Repaving,Inc. was completed as indicated by the Intergovernmental Agreement between Weld County and the City of Kersey dated June 28`h of 2004. The Change Order includes an increase to the project cost for completion of work requested by the Public Works Department.Additional contract time to perform the extra work will be included in the Change Order. NOTE: The appropriate documentation is included to show that Weld County will recuperate all costs for the added work done in the City of Kersey. Enclosures pc: Dean Dreher, Civil Tech III ,C1-Lf7 - V2 Hello