Loading...
HomeMy WebLinkAbout20043464.tiff AGREEMENT Weld County Bridge 27/58A over Sheep Draw THIS AGREEMENT,made this day of ,20 ,by and between Weld County, Colorado,hereinafter called"Owner"and Hamon Contractors, Inc., 5670 Franklin St.,Denver CO 80216 doing business as(an individual,) or (a partnership,) or (a corporation)hereinafter called"Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following: The roadway improvements of WCR 27 over Sheep Draw described in the Invitation for Bids,Bid No.B0400232. 2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor will commence the work required by the Contract Documents within ten (10) calendar days after the date of the Notice to Proceed and will complete the WCB 27/58A within 180 calendar days unless the period for completion is extended otherwise by the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the sum of$ 937,991.51 ,or as shown in the Bid Schedule. 5. The term"Contract Documents"means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders (C) Bid Proposal (D) Bid Bond (E) Statement of Qualifications and Subcontractors (F) Required Project Forms (G) Agreement (H) Labor and Materials Payment Bond (I) Performance Bond (3) Notice of Award (K) Notice to Proceed (L) Change Order (M) Certificate of Substantial Completion (N) Lien Waiver (O) Notice of Acceptance (P) Drawings prepared by Stantec,titled"WCR 27(83`d Ave.)over Sheep Draw". (Q) Specifications prepared or issued by the Weld County Public Works Department. (R) Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" (S) Colorado Department of Transportation Standard Plans"M&S Standards" (T) Addenda: No. ,dated ,20 No. ,dated , 20 6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents, or otherwise agreed upon in writing. E LLGC E_C l -C45?-O(/ 0�' . 1-1(;), 1)1\ 'ci4 2004-3464 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors,and assigns. 8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor, in writing, that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy-granting provision contained in the Contract. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials,this Agreement in two(2)copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: / THE BOARD OF WELD COUNTY COMMISSIONERS CONT r , BY S.s?..(b BY � G NAME Robert D.Masden NAME l -JCt= CO. FAl rh c•l (Please Print) TITLE Chair TITLE fC-L--e i)osi- DATE DEC 0.8 2004 ADDRESS SOP FCA4kL' Psi S-1- 4% 1ELam\ 1851 '�` (SEAL) � ik ' J1 '/� tip ' ; :, tf"` AT EST � /LIh Weld County Clerk to the Board (Arra,, ,/ BY -' 7`71/Ga �- BY F4ICAgr L_ a , (i)4119tr (Please Type) TITLE Deputy Clerk to the Board TITLE ;it,tE AL/If(C UVL L_ rit ,•3/4 MEMORANDUM CTO: Clerk to the Board DATE : December 2, 2004 • COLORADO FROM: Keith Meyer, Engineering Manager Li \ SUBJECT: Request for Chair's Signature Agreement for Bridge 27/58A Sheep Draw with Hamon Contractors Attached are two duplicate original Agreements. Once executed, please send one original agreement to Public Works at your earliest convenience. Thank you. The appropriate documentation is enclosed. Enclosures pc: Wayne Howard M:AFrancle'AgendaSignature.DOC Hello