HomeMy WebLinkAbout20043653 itocife4\97.-
DEPARTMENT OF PLANNING SERVICES
1555 N. 17`"AVENUE
GREELEY, COLORADO 80631
WEBSITE: www.co.weld.co.us E-MAathman @co.weld.co.us
C. PHONIE (9g0) 353-6100, EXT. 3540
FAX (970)
3 -6498
COLORADO
July 2, 2004
Joyce Allely
17 Dos Rios
Greeley, CO 80634
Dear Ms. Allely,
The Department of Planning Services has reviewed your letter dated June 30, 2004 in which you request
to allow secondary structures/buildings outside of the designated building envelopes for Lots 1-4, Block 1,
Dos Rios Estates Filing II and has determined that a resubdivision application for redesign, addition,
vacation of the final plat is required. A copy of this application is attached. Feel free to contact me if you
have any questions regarding this matter.
Sincerely,
AEIL( o -r
Chris Gathman
Planner II -AICP
(e7n/it atCt )2ALi 0?ao -3 S
-,27,2-,_4C/C? /)/ if j/5
June 30, 2004
Chris Gathman
Weld County Planner
1555 North 17th Avenue
Greeley, Colorado 80631
Dear Chris,
This letter refers to a meeting we had yesterday regarding permits allowing secondary
structures, such as a horse barn or a small workshop, on the portion of land West of the
Colorado Interstate Pipeline, on Lots 1,2,3,4, of Block 1, Dos Rios Estates, Filing 2.
We have had an offer to purchase Lot 3, contingent upon the ability to acquire a permit to
build such a structure on the portion of the lot West of the pipeline. Permission has been
obtained from Colorado Interstate Pipeline, and they state their restriction ends with their
easement.
We are requesting affirmation that such permits will be allowed. The purchase offer
requires notification of this ability on or before July 10, 2004.
Thank you for this consideration.
Sincerely,
Joyce Allely
17 Dos Rios
Greeley, Colorado 80634
970-330-7429
Weld County Planning Department
GREELEY OFFICE
K
PUBLIC WORKS DEPARTMENT
1111H STREET, P.O. BOX 758
\ lilt AUG 1 2 2003 Aar; , ' ,; GREELEY, COLORADO 80632
WEBSITE: WWW.CO.WELD.CO.US
PHONE (970) 356-4000, EXT. 3750
C. FAX: (970) 304-6497
COLORADO O__. 7'Y.--
August 12, 2003
Joy Wathers
West Lake Wells Fargo
2164 35th Ave.
Greeley, CO 80634
Dear Joy:
I have reviewed both invoices for June and July submitted by the contractors working on the
Dos Rios Project. The items listed in the June invoice are in the amount of $109,942.76 and the
July invoice totals $35,538.99. All items identified in both invoices are identified as construction
costs utilized at the Dos Rios site.
If you have any additional questions, please call me.
Sincerely,
A
414047
Donald Carroll
Engineering Administrator
pc: Lee Morrison, County Attorney
Kim Ogle, Planner III
Dos Rios file
M:\PLANNING\Joy Wathers-let
„ti&
an PUBLIC WORKS DEPARTMENT
Weld Colm ; t - "f''' ' 1111 H STREET, P.O. BOX 758
GR.3��LF� r1�
GREELEY, COLORADO 80632
1 MAY 14 ?1 i WEBSITE: www.co.weld.co.us
C. R C ' � � PHONE (970) 356-4000, EXT. 3750
FAX: (970) 304-6497
COLORADO
May 13, 2003
Joy Waters
West Lake Wells Fargo Bank
2164 35th Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2°d Filing,Phase 3
Dear Joy:
This letter is to authorize payment for the enclosed invoices,Nos. 200304032,26287,4361,46202,
and interest for the total amount of$117,701.36, Rios Project, 2nd Filing, Phase 3'partial release.
The invoices are payment for construction administration, earth work, public service installation,
engineering, and seeding. All items appear to be adequate for this pay period.
If you have any questions, please call me.
Sincerely,
Donald Carroll
Engineering Administrator
Enclosures
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2❑d Filing, Phase 3
S-385
MdWPF[LES\DON-C DRAW-D0SRI0S-1.D0C
PUBLIC WORKS DEPARTMENT
1111 H STREET, P.O. BOX 758
GREELEY, COLORADO 80632
Q WEBSITE: www.co.weld.co.us
PHONE (970) 356-4000,( )EXT.
3750
FAX: (970) 304-6497
Weld County Planning Department
O GREELEY OFFICE
• April 8, 2003 APR 1 0 2003
COLORADO
RECEIVED
Joy Waters
West Lake Wells Fargo Bank
2164 35th Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2"d Filing, Phase 3
Dear Joy:
This letter is to authorize payment for Invoice Nos. 200303060, 26139, and CO13096, Dos Rios
Project,2nd Filing,Phase 3,partial release. The invoice reflects construction administration, Qwest
and Earth Work.
Your interest amount should be handled by Wells Fargo, as it is not a part of our Improvements
Agreement with Joyce Allely.
If you have any questions,please call me.
Sincerely,
t �*le c
Donald Carroll
Engineering Administrator
Enclosures
pc: Lee Morrison, Assistant County Attorney
Kim Ogle,Planner III
Dos Rios Estates, 2"d Filing, Phase 3
S-385
\W PFILES\DON-C\Draw-DosRios-12.wpd
n '
t5C
tr.,
y 2164 35th Avenue Wells Fargo bank West,N.A.
Greeley,CO 80634
April 3,2003
Weld County Colorado
Don Carroll
Greeley, CO 80634
Re: Dos Rios Filing 2
, Dear Don:
kr In accordance with the terms of the Improvement Agreement dated June I I,2002,the applicant
hereby requests an advance in the amount of$61,1.56.78(Administration$3,574.48,()west
$5,517.00,Earthwork$50,415.30 and interest of$1,650.00), 1 certify that the following
represents the funds available on the Development Loan after the $61,156.78 advance.
Paving $86,865.17
Dirt Work 22,482.79
Telephone/Trenching 4,144.00
Gas/Installation 18,195.00
Water Extension 0.00
Signs 0.00
Electric 85,000.00
Engineering end Supervision 17.464.72
a, Total Remaining Est Costs $234.151.68
Contingency 65,895.91
WC Improvements Guarantee 64,100.00
Interest/Other 50.679.89
,. Total Loan Availability $414,827.48
• Total Remaining Estimated Costs $234,151.68
• Total Loan Availability $414,827.48
• $234,151.68/414,827.48 56%
Should you have any questions please call me at(970) 336-6245.
S., . y,
: i, e
Business Banker
m
k
dfc
tr-
4i` Z0 'd 9£Z99££0L6 'ON X8d 0981i9S113M Wd 017:Z0 (1H,1 £OOZ-60-8dd
I ,
a
PUBLIC WORKS DEPARTMENT
1111 H STREET, P.O. BOX 758
GREELEY, COLORADO 80632
WEBSITE: www.co.weld.co.us
CPHONE (970) 356-4000, 3 !50
O FAX: (97(970)) 30 304-6497
COLORADO�
1'9arch 25, 2003
y Waters
Vest Lake Wells Fargo Bank
164 35`h Avenue
I j:eeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2"d Filing, Phase 3
Dear Joy:
This letter is to authorize payment for Invoice No. 25965, Dos Rios Project, 2"d Filing, Phase 3,
partial release. The invoice reflects construction administration.
tour interest amount should be handled by Wells Fargo, as it is not a part of our Improvem mts
Agreement with Joyce Allely.
If you have any questions, please call me.
Sincerely,
Donald Carroll
Engineering Administrator
Enclosures
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2nd Filing, Phase 3
S-385
M i\W PFILES\DON-C\Draw-DosRios-12.wpd
MAR-24-2003 MON 10:45 AM WELLSFARGO� FAX NO. 9703366235 P. 03
> j Landmark
, ENGINEERING LTC.
3531 WEST EISENHOWER SLVD.
LOVELAND, COLORADO E10537
(970) 647-6206
SUMMARY BILLING
FEBRUARY 26,2003 INVOICE#25965
Client Information: JOYCE ALLELY
17 Dos Rios
Greeley, CO 80634
Fax#: (970)330-7429
PROJECT: ALLJ 3G2D01 -A9
DESCRIPTION: DOS RIOS EST. BLOCK 3 BILLING TO FEBRUARY 8,2003
, •'l;., , J— ; u r.' [7:).12 IIiL�� I (I1 'I ',ill � [��i: 2It�)k 11 r i.. . ) I i. i 1 iy ryi , � s r
I 'I 1 11 I 1 : [11.' 1[1\00,t
� 1 111 1 l I 1 I . f ' ] l 1� 1 li �4t: l {:�:
I� n f. , i 'J II 1 it h� i l0,1 II , 1 l id1 i 111' 1it)
u ifL1-1,4.i� 1 4 1l P .� { I V
I
i IZ7 IIH u' " li' 1 'qY ��t i I�I� 4 y, h y4 , y; �l q$ Ii i1''� 1 ' .) i ,hlw y
IL ,.,.._ li• al • '.. �� 1u,1.J li{4���� h 1_1.11 i�i<...,L,L��1413�J ��, 1��4 iL� � I���� Ih i d, hi, i ��, �'�
108A6 CONSULTATION $1500.00+/_ $1,500.00 $1,500.00 $0.00
304A6 DESIGN $10800.00+1- $10,887.50 $10,887.50 $0.00
600A7 TOPO SURVEY $1250.00+/- $1,135.00 $1,135.00 $0.00
300A7 PRELIMINARY DESIGN $1250.00+/- $560.00 $560.00 $0.00
404A8 CONSTRUCTION ADMIN.-BIDS $3,000.00 $3,182.50 $3,182.50 $0.00
404A9 $15,000.00. $18,900.75 $16,980.75 $1,920.00
616A9 CONSTRUCTION SURVEY $25,000.00 $6,997.50 $6,997.50 $0.00
702A9 - $5,000.00 $3 593.50 $3,593.50 $0.00
REIA6 REIMBURSABLE EXPENSE In $132.10 $132.10 $0.00
REIA7 'REIMBURSABLE EXPENSE nil $100.45 $100.45 $0.00
REI/A8 REIMBURSABLE EXPENSE N/A $165.40 _ $165.40 $0.00
REI/A9 REIMBURSABLE EXPENSE WA $740.25 $686.20 $54.05
TOTAL AMOUNT111
$47,694.95 $45,920.90 $1,974.05
PLUS: INTEREST $0.00
LESS:PREVIOUSLY PAID ($45,920.90)
TOTAL NOW DUE $1.974,0,
RE1A9 REIMBURSABLES:
MILEAGE $ 54.05
POSTAGEJFAX $ $ 54.05
5/y_
PUBLIC WORKS DEPARTMENT
1111 H STREET, P.O. BOX 758
riart\C japil4C
GREELEY, COLORADO 80632
wigglWEBSITE: www.co.weld.co.us
C. PHONE (970) 356-4000, EXT. 3750
FAX: (970) 304-6497
COLORADO
Weld County Planning Department
GREELEY OFFICE
FEB 1 4 2003
February 13, 2003 RECEIVED
Joy Waters
West Lake Wells Fargo Bank
2164 35`h Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2nd Filing, Phase 3
Dear Joy:
This letter is to authorize payment for Invoice No. 25693 and 10067, Dos Rios Project, 2' Filing,
Phase 3,partial release. Both invoices reflect engineering/administration, drainage and excavation.
Your interest amount should be handled by Wells Fargo, as it is not a part of our Improvements
Agreement with Joyce Allely.
If you have any questions, please call me.
Sincerely,
/
f!
(.�'C;.,X1N UAL ,b ',.:L V
Donald Carroll
Engineering Administrator
Enclosures
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2°d Filing, Phase 3
S-385
M AW PFILES\DON-C\Draw-DosRios-I2.wpd
0
PUBLIC WORKS DEPARTMENT
to
1111 H STREET, P.O. BOX 758
GREELEY, COLORADO 80632
WEBSITE: WWW.CO.WELD.CO.US
C PHONE (970) 356-4000 EXT. 3750
F : (970) 304-6497
Weld Coe* i5,-
COLORADO
JAN 1 4 2003
r
January 10, 2003
Joy Waters
Wells Fargo Bank West,N.A.
2164 35th Avenue
Greeley, CO 80634
RE: Draft Request; S-385, Dos Rios, Filing 2, Phase III
Dear Joy:
This letter is to authorize payment on Invoice No. 25534 in the amount of$3,337.95 and statement
No. 339555 in the amount of $850.00. These items are associated with the construction,
administration, engineering, and dirt work items.
In your January 8, 2003, letter you referred to interest in the amount of$1,631.00 associated with
the project. In our Improvements Agreement,there is no line item identified for interest. This line
item is associated with the Wells Fargo Agreement.
If you have any questions, please call me.
Sincerely,
LW d
Donald Carroll
Engineering Administrator
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Lead Planner
Dos Rios,2n° filing, Phase III file
V1:,W PPILESIDON-C'Dositios-advance-let wpd
� 0
PUBLIC WORKS DEPARTMENT
1111 H STREET, P.O. BOX 758
GREELEY, COLORADO 80632
VIEDDWEBSITE: www.co.weld.co.us
PHONE (970) 356-4000, EXT. 3750
O FAX: (970) 304-6497
COLORADO
October 16, 2002
Weld County Planning Department
GREELEY OFFICE
Lisa Hopkin OCT 1 7 2002
West Lake Wells Fargo Bank ��������
2164 35`h Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2°d Filing, Phase 3
Dear Lisa:
On October 10,2002, I performed a site investigation to verify that the site grading(earth work)and
the emergency access road to 47"' Avenue have been completed.
We recommend release of funds in the amount of$69,494.00 for the site grading (earth work) and
$8,080.00 for engineering.
The attached invoice from Landmark, indicates a change order for Item No. 1 in the amount of
520.500.00 for construction water. Usually this item is combined with the site grading or in the site
base bid, not bid separately. In the Improvements Agreement, there is no line item identified for
construction water. Therefore, I cannot approve this line item.
Sincerely,
t
u dc's
Donald Carroll
Engineering Administrator
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2°d Filing, Phase 3
S-385 M:\WPFILESNDON-C\Lisallopkin-l.wpd
Weld County Planning Department PUBLIC WORKS DEPARTMENT
GREELEY OFFICE 1111 H STREET, P.O. BOX 758
OCT 1 6 2002 GREELEY, COLORADO 80632
WEBSITE: www.co.weld.co.us
RECEIVED PHONE (970)FAX4 000, EXt-6497
3750
C.
COLORADO
October 14, 2002
Lisa Hopkin
West Lake Wells Fargo Bank
2164 35t11 Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2" Filing,Phase 3
Dear Lisa:
On October 10,2002,I performed a site investigation to verify that the site grading(earth work)and
the emergency access road to 4111 Avenue have been completed.
We recommend release of funds in the amount of 569,494.00 for the site grading (earth work) line
item.
The attached invoice from Landmark, indicates a change order for Item No. 1 in the amount of
520,500.00 for construction water. Usually this item is combined with the site grading or in the site
base bid, not bid separately. In the Improvements Agreement, there is no line item identified for
construction water. Therefore, I cannot approve this line item.
Sincerely,
s
Donald Carroll
Engineering Administrator
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2" Filing, Phase 3
S-385 Mi',WPr'ILEShDON-CLisahopkin-Lwpd
PUBLIC WORKS DEPARTMENT
Weld County Planning Department 1111 H STREET, P.O. BOX 758
GREELEY OFFICE GREELEY, COLORADO 80632
I DEC 1 6 2002 WEBSITE: www.co.weld.co.us
PHONE (970) 356-4000, EXT. 3750
O RECEIVED FAX: (970) 304-6497
COLORADO
December 12, 2002
Joy Waters
West Lake Wells Fargo Bank
2164 35th Avenue
Greeley, CO 80634
RE: Draw Request; 8-385, Dos Rios, 2"d Filing, Phase 3
Dear Joy:
This letter is to authorize payment in the amount of 513,619.20 for the enclosed invoices, Nos.
25286 and 25487, Dos Rios Project, 2"d Filing, 3`d Phase partial release. The invoices are either
construction administration or engineering oriented.
The draft shall be drawn from the engineering line item identified in the Exhibit "A" of the
Improvements Agreement with Weld County on the Dos Rios Estates Account.
If you have any questions, please call me.
Sincerely,
l / / -ilititi144
Donald Carroll
Engineering Administrator
Enclosures
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2"d Filing, Phase 3
S-385
VL`.WPPILES`-DON-O.Draw-DosRius.wF d
DEC-10-2002 TUE 03:39 PM WELLSFARGO FAX NO. 9703366235 P. 03
- 5Landmark
ENGINEERING LTD.
8521 WENT EIHENHOWER BLVD,
LOVELAND, COLORADO B0537 Invoice number. 25286
(9701 667-B9S6 10/30/02
Page number 1
JOYCE J.ALLELY
17 DOS RIOS
GREELEY, CO 80634
Contract:3O2O01-A9
DOS RIOS SUBDIVISION L.1,2,3
CONSTRUCTION SERVICES
Current
PROFESSIONAL SERVICES Labor
Billing
404 CONSTRUCTION ADMINIS 6,842.00
616 CONSTRUCTION SURVEY 3,172.50
702 MATERIAL TESTING 0.00
Labor Fee Subtotal $10,014.50
REIMBURSABLE
Activity Amount
MILEAGE 165.15
POSTAGE/FAX 26.00
PRINTS 56.00
Reimbursable subtotal $247.15
INVOICE TOTAL $10,261.65
Total Balance Due
Contract Aged Receivables
Current 31-60 61-go Kat Total
10,261.65 0.00 0.00 0.00 10,261.65
Contract Billing Summary
Contract Prior Current Project
Amount Billed Billed Total
Labor 45,000.00 10,396.00 10,014.50 20,410.50
Reimbursable 0.00 327.30 247.15 574.45
Consultant 0.00 0.00 0.00 0.00
Total 45,000.00 10,723.30 10,261.65 20,984.95
DEC-06-2002 FRI 04:37 PD WELLSFARGO FAX NO. 9703366235 P. 04
Landmark
ENGINEERING LTG.
3521 WEST EISENHOWER BLVD. Invoice number 25487 S
LOVELAND, COLORADO 80537
(970) 567A62S8 12/4/02
Page number 1
JOYCE J.ALLELY
17 DOS RIOS
GREELEY, CO 80634
ALLJ
Contract: 3G2D01-A9
DOS RIOS SUBDIVISION L.1,2,3
CONSTRUCTION SERVICES
Current
Labor
PROFESSIONAL SERVICES
Billing
404 CONSTRUCTION ADMINIS 1,962.50
616 CONSTRUCTION SURVEY 1,310.00
702 MATERIAL TESTING 0:00
Labor Fee Subtotal $3,272.50
REIMBURSABLE
Activity Amount
MILEAGE 67.05
POSTAGE/FAX 18.00
Reimbursable subtotal 586 65'
INVOICE TOTAL $3,357.65
Outstanding Invoices
Transactions Number Date Amount
Invoice 25286 a 10/30/02 10,261.65
Total unpaid invoices $10,261.65
Total Balance Duo $13,619,20 e
Contract Aged Receivables
Current 31-60 61-90 90-over Total
3,357.55 10,261.65 0.00 0.00 13,619.20
2�
1
PUBLIC WORKS DEPARTMENT
1 111 H STREET, P.O. BOX 758
GREELEY, COLORADO 80632
www.co.weld.co.us
PHONE (970) 356-4000, EXT. 3750
DcWEBSITE:
FAX: (970) 304-6497
COLORADO
October 2, 2002
Lisa Hopkin
West Lake Wells Fargo Bank
2164 35th Avenue
Greeley, CO 80634
RE: Draw Request; S-385, Dos Rios, 2°d Filing, Phase 3
Dear Lisa:
In referring to our Exhibit "A" of the Improvements Agreement According Policies Regarding
Collateral for Improvements(public road maintenance),I recommend dispersal of two of the three
items covered in Exhibit"A," the water extension and the engineering item.
The waterline extension is a total of $30,365.50, and the portion of the engineering item is
$1,704.30.
The water tap item is not identified in the Exhibit "A" nor in the Agreement with Joyce Allely.
Wells Fargo has increased the development loan for the additional funds, and provided verification
that the development loan shall be in the amount that is not less than 115% for a total value of the
improvements following the payment of the water taps.
I will be coordinating with the Department of Planning Services to involve them in the disbursement
of any item that is non-transportation oriented associated with the Dos Rios filing.
Sincerely,
jGGtiL1-6 ` C G 1
Donald Carroll
Engineering Administrator
pc: Lee Morrison, Assistant County Attorney
Kim Ogle, Planner III
Dos Rios Estates, 2 ° Filing, Phase 3
0-385 M:\WPFILES\DON-C\Lisahopkin-let.wpd
tcciaz;, •
T
PUBLIC WORKS DEPARTMENT
I
1111 H STREET
C P.O. BOX 758
WI O GREELEY, COLORADO 80632
WEBSITE: www.co.weld.co.us
COLORADO� PHONE (970) 356-4000, EXT. 3750
1nn FAX: (970) 304-6497
November 29, 2000
weld County Planning Dept.
Joyce Allely ` 04 2.000
17 Dos Rios
Greeley, CO 80634 RECEIVED
Dear Ms. Allely:
This is a follow-up of our conversation of November 27, 2000, concerning the installation of the culvert under the
Evans Ditch. The culvert was identified as the extended 42" storm drainage approximately 240' in length with a
flared end section and rip rap. This item is identified in the Improvements Agreement for Filing 2, Phase 2, Lots
1 through 4, Block 3. The installation of this pipe is required in this phase.
During my field investigation, it is obvious that you are working in Phase 3 without an Improvements Agreement
in place. Please complete this Agreement and submit it as soon as possible.
In the Final Plat Subdivision Application of Dos Rios, 2"d Filing, under Comment No. 4, Item 10, it states that the
City of Evans has approved the crossing and signed off on the construction drawings for the 42" storm drain. The
Drainage Agreement was signed January 2, 1996, with the City of Evans on this item. Item No. 3 of the Drainage
Agreement with the City of Evans indicates the developer agrees that the east ditch crossing shall be completed no
later than the time of commencement of the construction of roads in Phase 2 of the development. The Phase 2 roads
are complete. There is no water in the Evans ditch in late fall, winter, or early spring. You shall complete the
installation of the 42" drain pipe prior to moving into Phase 3 as per the Agreement.
Sincerely,
Donald Carroll
Engineering Administrator
pc: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer
Drew Scheltinga, P.E., Engineering Division Manager
Julie Chester, Lead Planner, Planning Services
Dos Rios Estates, Phase 2 nr\wptiiles\don-c\allely.let.wpd
Hello