Loading...
HomeMy WebLinkAbout800863.tiff es, THE AMERICAN INSTITUTE OF ARCHITECTS MA Document A701 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM TI OOtI'AUNT 1715 1MPORIANT IL CAL COiNSIOC 4NCFS; CONSULTATION WITH AN ATIOR,'s}1 I. I NCOURACII) Lt"IFFI RISPFC7 TO 115 ( 1),11PIIIION OR MODIFICATION Use only with the latest Edition of AMA Document A201, General Conditions of the Contract for Construction. -this dot ement has been ,ygxoaed and endorsed by The Associated General Contractors of America. AGREEMENT made this Twenty second day of February in the year of Nineteen Hundred and Eighty BETWEEN the Owner: County of Weld and the Contractor: Western Construction, Inc. the Project: Renovation of the existing elevator shaft in the Weld County Court House. the Architect: Zoyiopoulos and Associates The Owner and the Contractor agree as set lurth below. MA DOCUMENT 4101 • OWNIK-C C IN I RA(-II)K -C RE ^YENI • IANl1ARY 1971 FDIIION • AIA) • ©1974 THL AMERICAN INSiHCIL C)I ARC HITI(Is, C1S NEW YORK AVE., NW., WASHINGTON, D.C. 20006 1succp : elid, `/rc, 800863 +' ",t)G • ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda issued prior to execution of this Agreement and all Modifications issued subsequent thereto. These form the Contract, and .III are as fully a part of the Contract as if attached to this Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 7. ARTICLE 2 THE WORK The Contractor shall perform a II the Work required by the Contract Documents for )lore non the t.ymmnt desctlptoo tit the Work as used on other Contract Docuniontc Renovation of the existing elevator shaft in the Weld County Court House. ARTICLE 3 TIME OF COMMENCEMENT AND COMPLETION The Work to be performer) under this Contract shall be commenced March 3, 1980 and completed on or before June 3 , 1980 Wore insert any 'portal prm irinns for liquidated damages relating to (allure M1'<omplete on lime) AIA DOCUMENT A101 • OWNER (t)N \( IOR A(,Rti'sIE N I • IAALIARY 19?{ 11)11ION • AIAO0 • O1974 lilt AMERICAN INSTIIUIE UI AR( Itilti tS, 1231 NFM. 1(ORR ;ME NW., )AASIIINGTON, D.C 20006 2 ems e•N ARTICLE 4 CONTRACT SUM The Owner shall pay the Contractor for the performance of the Work, subject to additions and deductions by Change Order as provided in the Conditions of the Contract, in current funds, the Contract Sum of gate herr the;amp sum amount unit(meet. or both.as dewed; Eleven thousand five hundred ($11 ,500 . 00) ARTICLE 5 PROGRESS PAYMENTS Based upon Applications fin I'a%ment suhnlitted to the Architet t by the Contra(for and Certificates for Payment issued h% the Archi(et t, the ()wile' shall make progress payments on at t onnt ni 11w Contract Sum to the Contractor as pro- \iced in the Conditions of the( ontract a, follows: On or about the Fifteenth day of each month . . .Eighty per cent of the proportion ut the ( untlact tiunl I)! 1}11`d% .1i1O(Alt' to labor, material', and equipment irurnporated in the Work and . .Ninety per cent of the portion of the Contra( SUM properly allocable to materials and equipment suitably stored at the site in at some other location . :;reed upon in writing by the parties, up to . .Five days prior to the slate on whit h the Applical�on for Payment is submitted, less the aggregate . . . .Five p+tetiotrs pa%ments in each c,l.e; and upon Substantial Completion 01 the entire 1Vork, a sum sufficient to increase the total paln►ents to One Hundred per cent of the•( mutatt Sum. less such retainages as the Architect shall determine for all incomplete Work and unsettled claims. r^.•t u+en•.r rt•.•,sin•ta en 'h.•, r.un;. here in.;•rt am pros mu!,her the anrr.un' rrr.tin •i after the Work reaches a certain ,:a}!e rut irvesuietr,n Any moneys not paid %%hen due to either party under this Cootract .hall bear interest at the legal rate in force at the place of the Project. AM DOCUMENT A101 • ()1\•\I1Z etPN11O(.1 )R ACM IM1.\I • I\5aIAR\ I't'4 t.t)itlo•.N • AIA* • trit974 bit A\It RICAN IN5T11UT( 111 AN( pitta 1.. 171: Nt\\• NOR'. •11eI., N \b•AStlINCTON, D.C. 20006 3 .r-\ ARTICLE 6 FINAL PAYMENT final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor Thirty days after Substantial Completion of the Work unless otherwise stipulated in the Certificate of Substantial Completion, provided the Work has then been completed, the Contract fully performed, and a final Certificate for Payment has been issued by the Architect. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those Conditions. 7.2 The Contract Documents,which constitute the entire agreement between the Owner and the Contractor,are listed in Article 1 and, except for Modifications issued after execution of this Agreement,are enumerated as follows: 1 ht bet„w the Agreement, Condition, of the Contract (General, Supplementary, and other (renditions), Drawings, Specifications, Addenda and accepted Alternates,shrrwing page or sheet numbers in all eases and dates where applicable) A. Bid Form, Dated: February 21 , 1980 B. Bid Bond, Dated: February 21 , 1980 C. Conditions of Contract, Page 0-10 thru 0-11 D. Summary of Work , Page 1-1 thru 1-3 E. Project Closeout, Page 1-4 thru 1-6 F. Cleaning, Page 1-7 G. Project Record Documents , Page 1-8 thru 1-9 H. Demolition and Salvage, Page 2-1 I . Concrete, Page 3-1 thru 3-2 J. Masonry, Page 4-1 K. Drawing, 1 Sheet, Dated: January, 1980 This Agreement executed the day and year first written above. OWNER e124.76.* CONTRACTOR CHAIRMAN, BOARD OF COUNTY COMMISSIONERS D_COUNTY,_COIDRAL70-____ __ 1,414‘ z rt,t -fry 9,7arr+%- d 044,1-da. AIA DOCUMENT 4101 • OWNER-CONIRACIOR AGREEMENT • JANUARY 1771 EDITION • AIA® • C1974 THE AMERICAN INSTIL UTE O1 ARt Fill EC Ts, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 4 Hello