Loading...
HomeMy WebLinkAbout20042504.tiff RESOLUTION RE: GRANT CHANGE OF ZONE #629 FROM A (AGRICULTURAL) ZONE DISTRICT TO PUD(PLANNED UNIT DEVELOPMENT)ZONE DISTRICT-DALLAS AND MARJORIE SCHNEIDER WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 15th day of September, 2004, at 10:00 a.m. for the purpose of hearing the application of Dallas and Marjorie Schneider, 520 Weld County Road 18, Longmont,Colorado 80504, requesting a Change of Zone from the A(Agricultural)Zone District to a PUD (Planned Unit Development)Zone District for nine (9) lots with E (Estate)Zone uses and three(3)non-residential outlots for open space fora parcel of land located on the following described real estate, to-wit: Lot B of Recorded Exemption#2293;being part of the NE1/4 of Section 30, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS,the applicant was represented by Clayton Harrison, Pickett Engineering, Inc., 808 8th Street, Greeley, Colorado 80631, and WHEREAS, Section 27-6-120 of the Weld County Code provides standards for review of said Change of Zone, and WHEREAS,the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendations of the Weld County Planning Commission and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 27-5-30 of the Weld County Code. 2. The request is in conformance with Section 27-6-120.D as follows: a. Section 27-6-120.D.5.a - The proposal is consistent with any intergovernmental agreement in effect influencing the PUD and Chapters 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter23(Zoning),Chapter 24(Subdivision),and Chapter 26(Mixed Use Development)of the Weld County Code. The proposed site is not influenced by an Intergovernmental Agreement. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-2-60.C (A.Goal 3) states, "Provide mechanism for the division of land which is agriculturally zoned. Options for division shall be provided to ensure the continuation of agricultural production and accommodate low intensity development. Urban-scale 2004-2504 PL1741 : ���/°42 ✓1�� ;o�CC./y CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 2 residential, commercial and industrial development will be discouraged in areas where adequate services and infrastructure are not currently available or reasonably obtainable." The applicant is proposing a low-density residential development of nine(9)lots on 55 acres. The minimum lot size is 2.6 acres,with an overall density of one septic system per 6.1 acres, which does meet the current policy of the Department of Public Health and Environment. 2) Section 22-2-60.D(A.Goal 4)states,"Conversion of agricultural land to nonurban residential, commercial, and industrial uses will be accommodated when the subject site is in an area that can support such development. Such development shall attempt to be compatible with the region. This goal is intended to address conversion of agricultural land to nonurban uses." Once converted, this land is less conducive to agricultural production. The proposed PUD will be serviced by the Left Hand Water District for potable water and fire protection requirements. Individual sewer disposal systems will handle the effluent flow. The surrounding property consists of primarily single family homes to the north, south, and west, and gravel mining operations to the east. The property consists of a steep slope towards the north with a ditch corridor running east/west on the southern portion of the land. The property is currently not farmed and consists of long grass. 3) Section 22-2-210.D.2 (PUD.Policy 4.2) states, "A Planned Unit Development which includes a residential use should provide common open space free of buildings,streets,driveways or parking areas. The common open space should be designed and located to be easily accessible to all the residents of the project and usable for open space and recreation. Some Planned Unit Developments may not require common open space depending on their type,density,or other factors." The proposal includes 21 acres of open space, 19 acres consisting of a ditch corridor with crossings for pedestrians and vehicular access, and the remaining 2 acres of open space are located by an existing oil and gas operations area. 4) Section 22-2-210.D.3 (PUD.Policy 4.3) states, "Conservation of natural site features, such as topography, vegetation, and water courses, should be considered in the project design. The site plan has addressed the substantial issues surrounding the location of water courses and varying topography. 5) Section 22-2-210.F.1 (PUD.Policy 6.1) states, "The development should provide for perpetual maintenance of all commonly shared land and facilities. The County should not bear the expense or responsibility of maintenance for any commonly shared land or 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 3 facilities within the Planned Unit Development." The Conditions of Approval ensure that any future work required to maintain the open space shall be at the expense of the Homeowners' Association. 6) Section 22-3-50.B.1 (P.Goal 2)states, "Require adequate facilities and services to assure the health, safety and general welfare of the present and future residents of the County." The proposed PUD will be serviced by the Left Hand Water District for potable water and fire protection requirements. Individual Sewage Disposal Systems will handle the effluent flow. B. Section 27-6-120.D.5.b -The uses which will be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27, Article II, of the Weld County Code. Section 27-2-20,Access Standards—In a letter dated December 18,2004, the Weld County Department of Public Works has recommended that the internal roadway be paved. Weld County Road 18 is not a recognized County(public) road and does not have public right-of-way. All references to Weld County Road 18 should be removed. The applicant will provide an easement for the emergency access. Section 27-2-40, Bulk requirements — The applicant has chosen to adhere to the bulk requirements of the E (Estate)Zone District. The applicant has met the remaining Performance Standards as delineated in Section 27-2-10. The Conditions of Approval ensure compliance with Sections 27-2-20 through 27-2-220 of the Weld County Code. C. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed site is not influenced by an Intergovernmental Agreement. The Town of Frederick, City of Longmont, and City of Dacono indicated no conflicts with their interests. The Towns of Firestone and Erie and Boulder County did not respond to the referral request. D. Section 27-6-120.D.5.d - The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Chapter 27,Article II, of the Weld County Code. The proposed PUD will be serviced by the Left Hand Water District for potable water and fire protection requirements. Individual Sewage Disposal Systems will handle the effluent flow. The Weld County Attorney's Office has indicated that the agreements submitted by the applicant are adequate for the Change of Zone.The Weld County Department of Public Health and Environment has indicated in a referral response dated January 29, 2004, that the application has satisfied Chapter 27 of the Weld County Code in regard to water and sewer service. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 4 E. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. The Weld County Department of Public Works has reviewed the proposal and has determined that the internal road right-of-way shall be sixty(60)feet in width,including cul-de-sacs with a sixty-five(65)foot radius, and dedicated to the public. The typical roadway section of the interior roadway shall be shown as two 12-foot gravel lanes with 4-foot gravel shoulders on the Change of Zone plat. The cul-de-sac edge of roadway radius shall be fifty (50)feet. Stop signs and street names will be required at all intersections. F. Section 27-6-120.D.5.f-An Off-site Road Improvements Agreement and an On-site Improvements Agreement proposal is in compliance with Chapter 24 of the Weld County Code,and a road improvements agreement is complete and has been submitted, if applicable. The Weld County Public Works Department and Department of Planning Services will require an Improvements Agreement in accordance with Section 27-6-120.6.f of the Weld County Code for improvements to DalMar Estates PUD and all on-site improvements. Further, Public Works has required the applicant enter into an agreement with the County to proportionately share the cost of improving Weld County Road 16.5 between Weld County Road 3.25 and County Road 1. The cost will be based on a proportion of the traffic generated by the development to the existing traffic. Weld County Road 16.5 is classified by the County as a local road which and requires a 60-foot right-of-way which shall be delineated on the plat. The applicant shall enter into a Dust Abatement Agreement with the Department of Public Works. On December 18, 2003, the Department of Public Works reviewed the applicant's requested paving waiver, along with the County Code, the development site and surrounding area. The Director of Public Works did not consent with the granting of a paving waiver(for internal roadways)with this subdivision. G. Section 27-6-120.D.5.g - There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. The Weld County Department of Public Works stated that a Final Drainage Report and construction plans, conforming to the drainage report, shall be approved prior to recording final plat. The Final Drainage Report shall research and document FEMA maps to determine if a flood hazard exists. The applicant has a draft agreement with Kerr-McGee(the oil and gas entity)on the property. A finalized agreement should be submitted with the agreed upon areas to be delineated on the Change of Zone plat. The applicant will also provide an agreement with Kauffman and Amoco(oil and gas entities) on the site. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 5 H. Section 27-6-120.D.5.h-The submitted Specific Development Guide does accurately reflect the Performance Standards and allowed uses described in the proposed zone district, as described previously. The applicant is requesting that the Final Plan be administratively reviewed. The Department of Planning Services staff concurs with this request. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of Dallas and Marjorie Schneider for a Change of Zone from the A(Agricultural)Zone District to a PUD(Planned Unit Development)Zone District on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. The applicant shall provide evidence of an agreement with the properties mineral owners(Kauffman and Amoco)stipulating that the oil and gas activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owners. Evidence shall be submitted to the Department of Planning Services for review and approval. 2. Prior to recording the Change of Zone plat: A. In accordance with Section 29-8-20.A of the Weld County Code, a new permit shall be obtained to conduct the remaining required inspections for BP40704 and BP40707 and the full fees, less the fees for the electrical construction meter and the plan review, shall be paid. In accordance with Section 20-1-21 of the Weld County Code,a Road Impact Fee shall also be assessed for this residence. Evidence shall be provided to the Department of Planning Services. B. The applicant shall provide the Department of Public Works with written documentation verifying that the roadway layout is acceptable to appropriate referral agencies, especially the fire department of jurisdiction. C. The Longmont Soil Conservation District has provided information regarding the soils on the site. The applicant shall review the information and use it to positively manage on-site soils. D. The applicant shall address the requirements and concerns of the Division of Wildlife, as stated in the referral response dated January 26, 2004. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. E. The applicant shall contact the U.S. Fish and Wildlife Service to determine if a survey needs to be conducted for the Preble's Meadow Jumping Mouse, or any other threatened or endangered species. Written evidence shall be provided to the Department of Planning Services and the Colorado Division 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 6 of Wildlife. If required,evidence of mitigation of concerns shall be written and graphically shown. F. The applicant shall attempt to address the requirements and concerns of the Weld County Sheriffs Office, as stated in the referral response dated January 8,2004. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. G. The applicant shall attempt to address the requirements and concerns of the Mountain View Fire Protection District, as stated in the referral response dated January 12,2004. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. H. The applicant shall be required to submit a re-vegetation plan of all areas disturbed during construction. The plan shall include information regarding plant type, installation methods, and maintenance. The applicant shall provide written and graphic evidence from the school district and post office that the proposed mailbox location and bus shelter plan meets their design standards and delivery requirements. Written evidence of compliance with their standards and requirements shall be submitted to the Department of Planning Services. Further, evidence shall be provided that the facility meets the intent of the Americans with Disabilities Act (ADA) for access. J. The applicant shall provide additional detail to the relationship of the bus pull-out, mail box location, and point of ingress and egress for the development. K. The applicant shall provide the Department of Planning Services with a sign plan that conforms with Section 23-4-80.A of the Weld County Code. L. The applicant shall provide additional information pertaining to the entry sign and plant materials,including common, botanical,and species names,size at installation,and any additional information deemed necessary by a Weld County Landscape Architect. M. The applicant shall provide written and graphic evidence that the location of residential lots located immediately adjacent to the fifty (50) foot utility easement are able to meet setbacks for both structure location and location for septic systems. N. The applicant shall address the issue of the turf/native and seed grasses in all open space areas. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 7 O. The applicant shall provide evidence of the non-potable water source and delivery for irrigation for proposed plant materials, if any. P. The applicant shall provide evidence that the Army Corps of Engineers Clean Water404 Permit is not required for this development. It shall be noted that no new construction will be permitted within one hundred (100) feet of wetlands. Q. The applicant shall address the requirements and concerns of the Weld County Department of Planning Services,as stated in the referral response dated January 19,2004. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. R. The applicant shall submit to the Weld County Department of Planning Services a recorded copy of any agreement signed by all of the owners of the property crossed by the access. The access shall be for emergency use and shall be referenced on the plat by the Weld County Clerk and Recorder's reception number. S. The plat shall be amended to include the following: 1) All pages of the plat shall be labeled PZ-629. 2) The applicant shall adhere to the plat requirements in preparation of the Change of Zone plat. 3) The applicant shall provide an Open Space/Landscape Plan per Section 24-3-50.G of the Weld County Code. 4) The applicant shall delineate a Landscape legend and provide additional information regarding the proposed plant material species. At a minimum, the applicant shall identify existing on-site plant material delineated with a single dot in the center of the circle and proposed additional plant material with a "+" in the middle of each circle. 5) A drawing scale will need to be added to the Grading Plan, (Sheet C-3.1). 6) Weld County Road 16.5 is classified by the County as a local road and requires a 60-foot right-of-way and shall be delineated on the plat. 7) Weld County Road 18 is not a recognized County(public)road and does not have public right-of-way. All references to Weld County Road 18 should be removed. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 8 8) The Change of Zone plat must show the required easements extending to County Road 1 for the proposed development emergency access. 3. The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: A. Change of Zone#629 is from the A (Agricultural)Zone District to the PUD (Planned Unit Development) Zone District for nine (9) lots with E (Estate) Zone uses, along with three (3) non-residential outlots for open space, as indicated in the application materials on file and subject to,and governed by, the Conditions of Approval stated hereon and all applicable Weld County regulations. B. Water service shall be obtained from the Left Hand Water District. C. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division,and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. D. If required, the applicant shall obtain a Stormwater Discharge Permit from the Water Quality Control Division of the Colorado Department of Public Health and the Environment. Silt fences shall be maintained on the down gradient portion of the site during all parts of the construction phase of the project. E. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. F. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land must incorporate all available and practical methods which are technologically feasible and economically reasonable in order to minimize dust emissions. G. If land development creates more than a 25-acre contiguous disturbance,or exceeds six (6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan, submit an Air Pollution Emissions Notice, and apply for a permit from the Colorado Department of Public Health and Environment. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 9 H. Any disturbance of the wetlands needs to be done in accordance with the Corps of Engineers' regulations. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities, and other facilities. Open space restrictions are permanent. J. Weld County's Right to Farm as delineated on this plat shall be recognized at all times. K. Stop signs and street name signs will be required at all intersections. L. All signs, including entrance signs, shall require Building Permits. Signs shall adhere to Section 23-4-80 of the Weld County Code. These requirements shall apply to all temporary and permanent signs. M. No new construction will be permitted within one hundred (100) feet of wetlands. N. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. O. Building Permits shall be obtained prior to the construction of any building or structure. Building Permits are also required for signs and structures such as bus shelters, if provided. P. Activities such as permanent landscaping,structures,dirt mounds,or other items, are expressly prohibited in the septic absorption field site. Q. A plan review is required for each building, except for those that meet the definition of Agricultural Exempt buildings. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. R. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code,2003 International Residential Code,2003 International Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, and Chapter 29 of the Weld County Code. S. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 10 T. Building height,wall and opening protection,and separation of buildings with mixed uses,shall be in accordance with the Building and/or Residential Code in effect at the time of permit application. Setback and offset distances shall be determined by the Weld County Code. U. Building height shall be measured in accordance with the applicable Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter23 of the Weld County Code in order to determine compliance with offset and setback requirements. Off-set and setback requirements are measured to the farthest projection from the building. V. A Flood Hazard Development Plan shall be submitted for buildings constructed within the 100-year floodplain. W. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. X. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. Y. The site shall maintain compliance at all times with the requirements of the Weld County Departments of Public Works,Public Health and Environment, and Planning Services, and adopted Weld County Code and policies. Z. No development activity shall commence, nor shall any Building Permits be issued, until the final plan has been approved and recorded. AA. The applicant shall comply with Section 27-8-50 of the Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within two (2)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan,the Board of County Commissioners 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 11 may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. BB. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. 4. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp(Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 5. At the time of Final Plan submission: A. Weld County Road 16.5 is classified by the County as a local road and requires a 60-foot right-of-way. This right-of-way shall be shown on the final plat. The existing 60-foot right-of-way shall be verified by the applicant and the documents creating the right-of-way noted on the final plat. If the right-of-way cannot be verified, it will be dedicated on the final plat. B. The applicant will be required to enter into an agreement with the County to proportionately share the cost of improving Weld County Road 16.5 between Weld County Road 3.25 and County Road 1. The cost will be based on a proportion of the traffic generated by the development to the existing traffic. This agreement shall be submitted with the final plat materials. C. Roadway and grading plans,along with construction details,will be required for the final plat. D. Roadside ditches appear to be at six percent(6%)slopes,thus influencing high drainage flows and velocities. A stabilization plan will be required,along with construction details, with the final plat materials. E. Verification that a 15-inch diameter culvert will perform satisfactorily to handle flows shall be submitted to the Department of Public Works. F. The drainage report states that drainage flow will discharge into the Gooding, Dailey and Plumb Ditch. Any probable increase of drainage into an irrigation system shall be corroborated with the appropriate owner. The applicant shall provide a confirmation letterform the ditch owner addressing this issue. The applicant shall show and name all irrigation systems in the development on the final plat, including ditch easements. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 12 G. Proposed building envelopes and grading to accommodate drainage shall be provided with the final grading and drainage plans. H. Easements shall be shown in accordance with County standards and/or Utility Board recommendations, and dimensioned on the final plat. The applicant shall submit an On-site (Private) Improvements Agreement with the final plat application that addresses all improvements associated with this development, per compliance with Section 24-9-10 of the Weld County Code. J. A final drainage report stamped, signed, and dated by a Colorado licensed professional engineer, along with construction plans conforming to the drainage report,shall be submitted with the final plat application for approval prior to recording the final plat. The report shall address all issues indicated in the Weld County Department of Public Works referral response dated January 24, 2004. K. The applicant shall submit a final Landscape Plan which addresses all issues listed on the memorandum dated January 19, 2004, from the Weld County Department of Planning Services. L. The applicant shall provide written documentation to the Department of Planning Services that the bus pullout area satisfies both Public Works and the School District. The right-of-way will be dedicated on the Final Plat. M. Evidence shall be provided to the Weld County Department of Planning Services from the applicable Post Office stating that the proposed mailbox location meets its design standards and delivery requirements. Should a single pedestal mail box not be the preferred standard,written evidence from the applicable Post Office shall be provided stating the contrary. N. Additional information shall be submitted regarding the bus shelter. The information shall include setbacks, road right-of-way encroachment,type of construction, and foundation. O. The applicant shall submit a time frame for construction in accordance to Section 27-2-200 of the Weld County Code. P. Upon approval of an access location,the applicant shall submit a request to a Weld County Building Technician for lot addresses. The subdivision street name and lot addresses shall be submitted to the Mountain View Fire Protection District, the Weld County Sheriffs Office, Ambulance provider, and the Post Office for review. Written evidence of approval shall be submitted to the Weld County Department of Planning Services. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 13 Q. The applicant shall submit development covenants for DalMar Estates PUD. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development covenants. The covenants shall state that activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. R. The applicant shall address the requirements of Weld County School District RE-1J St.Vrain Valley as stated in the referral response dated January 20, 2004. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. S. The applicant shall enter into an Improvements Agreement with the Department of Public Works to discuss the proportionate expense for dust control on Weld County Road 16.5. Evidence shall be provided to the Department of Planning Services. T. The applicant shall submit an itemized Improvements Agreement for all on-site features and elements associated with this development. The proposed improvements will include all transportation and non-transportation elements. A lump sum cost estimate number is unacceptable. U. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 6. Prior to construction: A. Stop signs and street name signs will be required at all intersections. 2004-2504 PL1741 CHANGE OF ZONE #629 FROM A (AGRICULTURAL) TO PUD - DALLAS AND MARJORIE SCHNEIDER PAGE 14 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 15th day of September, A.D., 2004. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO *VETi `►`Me EXCUSED Robert D. Masden, Chair Clerk to the Board 1 1861 If A William H. rke, Pro-Tern fr ®, ik 9 Clerk to the Board 7/177 &Ce, M. J elle AP ED AS • David . Lon ty Attorn y Glenn Vaad Date of signature: 2004-2504 PL1741 Hello